CN108829634A - 一种隧道暗挖施工造成地表沉降的计算方法 - Google Patents
一种隧道暗挖施工造成地表沉降的计算方法 Download PDFInfo
- Publication number
- CN108829634A CN108829634A CN201810662846.XA CN201810662846A CN108829634A CN 108829634 A CN108829634 A CN 108829634A CN 201810662846 A CN201810662846 A CN 201810662846A CN 108829634 A CN108829634 A CN 108829634A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- ground settlement
- unit
- tunnel excavation
- excavation construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Mathematical Physics (AREA)
- Data Mining & Analysis (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Computational Mathematics (AREA)
- Pure & Applied Mathematics (AREA)
- Databases & Information Systems (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Algebra (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种隧道暗挖施工造成地表沉降的计算方法,包括以下步骤:设隧道超挖部分以隧道圆心为中心,且沿隧道外径外呈圆环分布。将隧道超挖部分划分为n个面积相等的单元,分别计算各单元完全塌陷对地表造成的沉降,然后再进行叠加求和,求出隧道暗挖施工造成的地表沉降量S(x),该方法能够精确计算得到隧道暗挖施工造成的地表沉降,并且计算过程较为简便。
Description
技术领域
本发明属于地下工程技术领域,涉及一种隧道暗挖施工造成地表沉降的计算方法。
背景技术
随着我国经济快速发展,城市化进程不断加快,原有的交通设施难以满足日益增长的交通需要,许多大城市面临交通堵塞等问题。
地铁由于在地下,具有不与地面交通相互干扰,安全舒适、方便快捷、运送量大等优点,已成为城市缓解交通压力的主要措施之一。
地铁隧道施工不可避免的引起地层位移和地表沉降塌陷,在土质地层城市中,地层变形问题是地铁建设普遍关注的问题。
地铁隧道施工引发地表沉降,进而带来的问题主要包括:影响道路平整性,造成路面开裂,对行车安全造成影响;引起地表建筑物基础的不均匀沉降,造成开裂、破坏,甚至倒塌引发人员伤亡;造成地下各种预埋市政管线的变形,引发煤气泄露、自来水管爆裂等问题。
Peck法是工程界最常用的地表沉降的计算方法,该方法计算地表沉降具有简单方便、通俗易懂等优点,但大量的实测数据表明,Peck公式对浅埋隧道的适用性较差,其计算结果误差较大。
发明内容
本发明的目的在于克服上述现有技术的缺点,提供了一种隧道暗挖施工造成地表沉降的计算方法,该方法能够精确计算隧道暗挖施工造成的地表沉降,并且计算过程较为简便。
为达到上述目的,本发明所述的隧道暗挖施工造成地表沉降的计算方法包括以下步骤:
设隧道超挖部分以隧道圆心为中心,且沿隧道外径外呈圆环分布,将隧道超挖部分划分为n个面积相等的单元,分别计算各单元完全塌陷对地表造成的沉降,然后再进行叠加求和,求出隧道暗挖施工造成的地表沉降量S(x),其中,隧道暗挖施工造成的地表沉降量S(x)为:
其中,R为隧道的外径,θ为单元与隧道竖向轴线的夹角,x为地面距隧道中轴线的距离,ii为单元引起地表沉降的沉降槽宽度。
各单元引起地表的沉降Si(x)为:
各单元引起地表沉降的沉降槽宽度ii为:
为土体的内摩擦角。
n=20。
本发明具有以下有益效果:
本发明所述的隧道暗挖施工造成地表沉降的计算方法在具体操作时,将隧道超挖部分划分为n个面积相等的单元,分别计算各单元完全塌陷对地表造成的沉降,然后再进行求和,得到隧道暗挖施工造成的地表沉降量。该计算方法简单易行,容易理解,计算精度高,无需复杂的数学运算,更不需要编程,使用门槛较低,易于在工程界推广应用。
附图说明
图1为本发明中隧道超挖部分划分结果示意图。
具体实施方式
下面结合附图对本发明做进一步详细描述:
Peck公式假设隧道超挖部分完全塌陷造成的地表沉降符合正态分布规律,但大量的实测数据表明,该公式对浅埋隧道的适用性较差,其计算结果误差较大。
参考图1,本发明假设隧道超挖部由若干个面积相等的小单元组成,且认为各个单元完全塌陷造成的地表沉降符合正态分布规律,在此基础上提出了一种新的地表沉降计算方法。首先,分别计算各个单元塌陷造成的地表沉降,再对各个单元造成的地表沉降进行叠加求出总沉降量。该方法只需进行数次重复性计算即可得出较为精确的地表沉降量,且简便易行,可实施性强。
本发明所述的隧道暗挖施工造成地表沉降的计算方法包括以下步骤:
设隧道超挖部分以隧道圆心为中心,且沿隧道外径外呈圆环分布。将隧道超挖部分划分为n个面积相等的单元,分别计算各单元完全塌陷对地表造成的沉降,然后再进行叠加求和,求出隧道暗挖施工造成的地表沉降量S(x),其中,隧道暗挖施工造成的地表沉降量S(x)为:
其中,R为隧道的外径,θ为单元与隧道竖向轴线的夹角,x为地面距隧道中轴线的距离,ii为单元引起地表沉降的沉降槽宽度。
各单元引起地表的沉降Si(x)为:
各单元引起地表沉降的沉降槽宽度ii为:
为土体的内摩擦角。
实施例一
为探究一般工程允许误差范围内,对于划分数量n的具体数值进行分析。建立尺寸为30m×20m的二维数值模型进行分析,隧道半径为3m、埋深为6m,位于模型中心。隧道施工地层损失率取为3%、土体内摩擦角取为12.5°。分别计算超挖部分的划分数量为24、20、16、12、8、4的情况下地表沉降曲线的表达式,将本发明提出的计算方法的计算结果和Peck公式的计算结果与数值模拟的结果对比,相对误差如表1所示。
表1
根据表1可知,当n值取20,即将隧道超挖部分均匀划分成20个时,计算结果已经与数值模拟结果无异。因此对于城市地铁隧道施工常遇到的工况,地表沉降的表达式为:
Claims (4)
1.一种隧道暗挖施工造成地表沉降的计算方法,其特征在于,包括以下步骤:
设隧道超挖部分以隧道圆心为中心,且沿隧道外径外呈圆环分布,将隧道超挖部分划分为n个面积相等的单元,分别计算各单元完全塌陷对地表造成的沉降,然后再进行叠加求和,求出隧道暗挖施工造成的地表沉降量S(x),其中,隧道暗挖施工造成的地表沉降量S(x)为:
其中,R为隧道的外径,θ为单元与隧道竖向轴线的夹角,x为地面距隧道中轴线的距离,ii为单元引起地表沉降的沉降槽宽度。
2.根据权利要求1所述的隧道暗挖施工造成地表沉降的计算方法,其特征在于,各单元引起地表的沉降Si(x)为:
3.根据权利要求2所述的隧道暗挖施工造成地表沉降的计算方法,其特征在于,各单元引起地表沉降的沉降槽宽度ii为:
为土体的内摩擦角。
4.根据权利要求1所述的隧道暗挖施工造成地表沉降的计算方法,其特征在于,n=20。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810662846.XA CN108829634A (zh) | 2018-06-25 | 2018-06-25 | 一种隧道暗挖施工造成地表沉降的计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810662846.XA CN108829634A (zh) | 2018-06-25 | 2018-06-25 | 一种隧道暗挖施工造成地表沉降的计算方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108829634A true CN108829634A (zh) | 2018-11-16 |
Family
ID=64137668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810662846.XA Pending CN108829634A (zh) | 2018-06-25 | 2018-06-25 | 一种隧道暗挖施工造成地表沉降的计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108829634A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111980716A (zh) * | 2020-08-27 | 2020-11-24 | 中铁十五局集团有限公司 | 一种预测并行隧道非同步掘进引起土体沉降的计算方法 |
-
2018
- 2018-06-25 CN CN201810662846.XA patent/CN108829634A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111980716A (zh) * | 2020-08-27 | 2020-11-24 | 中铁十五局集团有限公司 | 一种预测并行隧道非同步掘进引起土体沉降的计算方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104632079B (zh) | 一种三维水平井井眼轨道靶前位移的确定方法 | |
CN103410502B (zh) | 一种网络状缝洞型油藏的三维渗透率场的获取方法 | |
CN104933266B (zh) | 一种覆岩导水裂缝带高度的确定方法 | |
CN102254349B (zh) | 一种使用钻孔数据构建沉积地层***三维实体模型的方法 | |
CN103195435B (zh) | 一种控制盾构穿越建筑密集区诱发地面沉降的方法 | |
CN104612700B (zh) | 一种纵向沉降变形引起盾构隧道附加内力的确定方法 | |
CN105387274A (zh) | 一种地下管线修复辅助方法、装置及*** | |
CN103150421A (zh) | 利用位移监测同时确定抗滑桩桩位和临界深度的方法 | |
Wang et al. | Hydraulic barrier function of the underground continuous concrete wall in the pit of subway station and its optimization | |
CN104653172A (zh) | 一种三维水平井井眼轨道初始井斜方位角的确定方法 | |
CN106593526B (zh) | 一种基于模糊判断的隧道地质岩溶风险评估方法 | |
CN106649931B (zh) | 一种矩形顶管隧道施工工后地表沉降计算方法 | |
CN108060661A (zh) | 一种拱坝中心线的拟定方法 | |
CN103425054A (zh) | 一种基于数字化的电力隧道施工控制方法 | |
CN112131748A (zh) | 一种城市隧道施工中复合成层地层的变形预测方法及*** | |
CN114841532A (zh) | 一种盾构开挖过程中地表沉降的安全性评价方法和*** | |
CN111101941A (zh) | 一种基于边界优化的高潜水位采煤沉陷区挖深垫浅超前治理方法 | |
CN104564069B (zh) | 一种基于方格网法的地面动态沉陷预测与复垦方法 | |
Ning et al. | Deformation characteristics observed during multi-step excavation of underground oil storage caverns based on field monitoring and numerical simulation | |
CN105626056A (zh) | 一种确定目标区三维地层孔隙压力的方法和装置 | |
CN106680454A (zh) | 一种具拦沙坝已治理崩岗土壤侵蚀模数测算方法 | |
Ying et al. | An efficient method for evaluating the ground surface settlement of Hangzhou metro deep basement considering the excavation process | |
CN112380757B (zh) | 曲线型隧道施工时地表沉降槽峰值点偏移距离的分析方法 | |
CN108829634A (zh) | 一种隧道暗挖施工造成地表沉降的计算方法 | |
CN104123454A (zh) | 单节理硬岩地下开挖地表沉降预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181116 |