CN108824485A - The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation - Google Patents

The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation Download PDF

Info

Publication number
CN108824485A
CN108824485A CN201810626735.3A CN201810626735A CN108824485A CN 108824485 A CN108824485 A CN 108824485A CN 201810626735 A CN201810626735 A CN 201810626735A CN 108824485 A CN108824485 A CN 108824485A
Authority
CN
China
Prior art keywords
main structure
construction
steel
pipe pile
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810626735.3A
Other languages
Chinese (zh)
Inventor
印长俊
龚航里
龙勇齐
胡凯
李卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangtan University
Original Assignee
Xiangtan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangtan University filed Critical Xiangtan University
Priority to CN201810626735.3A priority Critical patent/CN108824485A/en
Publication of CN108824485A publication Critical patent/CN108824485A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • E02D29/055Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses the construction methods of rock-soil layer supporting outside side wall in a kind of sheltered reverse excavation, including following construction procedure:(1)The Construction Arrangement solid matter steel-pipe pile outside the design boundary of main structure side wall, steel-pipe pile insertion depth be by ground surface to the bottom surface of main structure bottom plate below;(2)Dig one layer of earthwork from up to down by ground, and excavate the groove of certain depth downwards along the steel-pipe pile inner wall of main structure side, in the trench and excavate layer pour one layer of hypogee contignation formed main structure top plate, after main structure top plate reaches some strength, foundation pit is backfilled on main structure top plate and forms coating;(3)The construction of underground main body structural excavation is carried out, the construction of main structure exterior wall is carried out after excavation, finally pours to form main structure bottom plate in main structure bottom.Construction technology of the present invention is simple, accelerates main structure side wall construction speed, strong operability, safety is higher, and construction cost is low.

Description

The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation
Technical field
The present invention relates to a kind of outer rock-soil layer branch of side wall in underground engineering construction construction field more particularly to sheltered reverse excavation The construction method of shield.
Background technique
With urban construction and the continuous development of other infrastructures, the development and utilization of the underground space is to become China The development trend of building trade, the underground construction engineering of complex environment is more and more therewith, and the difficulty of design and construction is also more next Bigger, the construction of underground engineering at present mostly uses greatly along two methods of the practice or contrary sequence method.In the construction process due to the suitable practice The limitation that will receive environmental condition etc. causes construction cost the drawbacks such as increase, be unfavorable for excavating again, therefore, multiple for environment Miscellaneous underground engineering is constructed more appropriate using sheltered reverse excavation.Sheltered reverse excavation refers to is excavated to certain depth by ground downwards Afterwards, will be top closed, remaining lower part engineering is constructed under closed top plate, i.e., successively excavates from top to bottom and build master Body structure is until bottom.In current sheltered reverse excavation work progress, usually using export-oriented along main structure side wall design boundary It is lower fluting to main structure bottom, casting concrete and form diaphragm wall, in this, as hypogee structure side wall and side wall outside The building enclosure of rock-soil layer, while having off position construction intermediate studdle in building interior, to form the vertical load-bearing of contrary sequence method System.This method relatively expends reinforcing bar and concrete, and the construction period that the solidification of concrete need to consume, complicated construction technique are applied Work is expensive.
Summary of the invention
In order to solve the above technical problems, the present invention provides the constructions of rock-soil layer supporting outside side wall in a kind of sheltered reverse excavation Method, this method can effectively solve going along with sb. to guard him for the outer rock-soil layer of hypogee structure side wall and side wall, and have efficiently construction, The advantages that structure safety and reduction construction cost.
In order to achieve the above object, the invention adopts the following technical scheme:
The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation, including following construction procedure:
(1)The Construction Arrangement solid matter steel-pipe pile outside the design boundary of main structure side wall, steel-pipe pile insertion depth are by ground surface To the bottom surface of main structure bottom plate;
(2)Dig one layer of earthwork from up to down by ground, and the steel-pipe pile inner wall along main structure side excavates downwards certain depth Groove, in the trench and excavate layer pour one layer of hypogee contignation formed main structure top plate, work as main structure After top plate reaches some strength, foundation pit is backfilled on main structure top plate and forms coating;
(3)The construction of underground main body structural excavation is carried out, the construction of main structure exterior wall is carried out after excavation, finally at main structure bottom Portion pours to form main structure bottom plate.
Preferably, the insertion depth of the steel-pipe pile be by least 2m below ground surface to the bottom surface of main structure bottom plate, So that steel-pipe pile is simultaneously by horizontally-supported in coating, main structure top plate, main structure bottom plate and its underpart rock-soil layer Effect, to improve the stability and bearing capacity of steel-pipe pile.
Preferably, the spacing of adjacent two steel-pipe pile of the solid matter steel-pipe pile is 350~450mm, avoids being spaced excessive, is led Cause work progress in because between adjacent steel-pipe pile rock-soil layer it is unstable due to cause rock-soil layer partial collapse.
Preferably, stage excavation mode is used when the underground main body structural excavation is constructed, after completing one layer of excavation, is carried out The construction of this layer of structure outer.
Preferably, the steel-pipe pile is equipped with multiple apertures, can be into steel-pipe pile when regional level of ground water of constructing is higher Slip casting, so that slurry passes through soil layer around the aperture and stake being arranged on steel-pipe pile and forms soil cement, to improve the anti-of soil layer Penetrating power and stability.
Compared with prior art, beneficial effects of the present invention are as follows:
1. the present invention substitutes RC Continuous wall by using arrangement solid matter steel-pipe pile, saves and disappear needed for concrete setting The duration of consumption, and steel-pipe pile is cheap, saves the duration to reach, reduces the purpose of construction cost;
2. the present invention passes through the insertion depth of strict control steel-pipe pile, so that the interior water that steel-pipe pile is applied by various structures simultaneously Flat supporting role improves the stability and bearing capacity of steel-pipe pile, the unstable of steel-pipe pile is effectively avoided to lead to main structure And partial collapse accident occurs for surrounding rock-soil layer, substantially increases construction safety;
3. the present invention passes through the spacing to steel pipe setting aperture and the adjacent steel-pipe pile of strict control, effectively solution work progress The adverse effect occurred by soil layer unstability, improve construction safety.
Detailed description of the invention
Fig. 1 is general structure schematic diagram of the invention.
Fig. 2 is steel-pipe pile schematic diagram in Fig. 1.
It is marked in figure:1- rock-soil layer, 2- coating, 3- main structure top plate, 4- main structure, 5- main structure bottom plate, 6- main structure side wall, 7- steel-pipe pile, 8- aperture.
Specific embodiment
To facilitate the understanding of the present invention, the present invention is made below in conjunction with Figure of description and preferred embodiment more complete Face meticulously describes, but the protection scope of the present invention is not limited to the following specific embodiments.
As Figure 1-Figure 2, in a kind of sheltered reverse excavation the outer rock-soil layer supporting of side wall construction method, using covered back-digging When method is constructed, before main structure 4 is constructed, Construction Arrangement outside boundary is first designed along main structure side wall 6 by screw pile driver Solid matter steel-pipe pile, the insertion depth of the steel-pipe pile 7 are to be made by least 2m below ground surface to the bottom surface of main structure bottom plate 5 For the building enclosure of rock-soil layer 1 outside underground main body structure side wall 6 and side wall.The spacing of adjacent two steel-pipe pile 7 is 350~450mm, Avoid being spaced it is excessive, cause in work progress because between adjacent two steel-pipe pile rock-soil layer it is unstable due to cause rock-soil layer locally to collapse It collapses.
Then, one layer of earthwork is dug from up to down by ground, and 7 inner wall of steel-pipe pile along 4 side of main structure excavates downwards The groove of 400~500mm depth, casting concrete contignation is as main structure top plate 3, after it reaches some strength, Then the interior horizontal support structure that can be used as building enclosure backfills foundation pit, the as covering in diagram on main structure top plate 3 Layer 2, to reach the safety requirements that can continue to construct downwards.
When carrying out 4 excavation construction of underground main structure, stage excavation mode is generally used, legend of the present invention, which uses, divides three Layer, which excavates, carries out Technical Analysis, after completing first layer excavation, carries out the construction of this layer of structure outer.Then the second layer is carried out It excavates, at the end of the second layer excavates, the structure side wall that first layer construction is built is in vacant state, in main structure top plate 3 Also there is construction joint between the side wall for thering is construction joint to be formed between main structure side wall 6, and constructing after each layer excavates, is covering Under the collective effect of layer 2, main structure top plate 3 and soil pressure, main structure side wall 6 is also easy to produce deformation or cracking phenomena, at this point, By the setting of solid matter steel-pipe pile, solid matter steel-pipe pile directly bears the soil pressure effect of the outer rock-soil layer 1 of main structure side wall 6, The stress for effectively slowing down main structure side wall 6 avoids main structure side wall from directly being acted on and had an adverse effect by soil pressure, To improve working security, it is successively excavated to main structure bottom downwards, finally pours to form main structure bottom plate 5.
Solid matter steel-pipe pile is ultimately formed simultaneously by coating 2, main structure top plate 3, main structure bottom plate 5 and its underpart The interior horizontal support effect of rock-soil layer, substantially increases the stability and bearing capacity of steel-pipe pile 7, restricts steel-pipe pile 7 weeks with this Influence of the country rock soil layer 1 to underground structure major project.
Particularly, when regional level of ground water of constructing is higher, multiple apertures 8 can be set on steel-pipe pile 7, it can be toward steel-pipe pile Slip casting in 7, so that slurry forms soil cement by soil layer around the aperture 8 and stake on steel-pipe pile 7, to improve the anti-of soil layer Penetrating power and stability.
With the help of the introduction present in aforementioned specification and relevant drawings, those skilled in the art in the invention will It will recognize that many modifications and other embodiments of the invention.It will consequently be understood that the present invention is not limited to disclosed specific realities Scheme is applied, modification and other embodiments are to be considered as included in scope of the appended claims.Although spy is used herein Determine term, they are only used with generic and descriptive sense, rather than limitation.

Claims (5)

1. the construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation, it is characterised in that:Including following construction procedure:
(1)The Construction Arrangement solid matter steel-pipe pile outside the design boundary of main structure side wall, steel-pipe pile insertion depth are by ground surface To the bottom surface of main structure bottom plate;
(2)Dig one layer of earthwork from up to down by ground, and the steel-pipe pile inner wall along main structure side excavate 400 downwards~ The groove of 500mm depth, casting concrete contignation is as main structure top plate, after it reaches some strength, in main body Foundation pit is backfilled in structure roof forms coating;
(3)The construction of underground main body structural excavation is carried out, the construction of main structure exterior wall is carried out after excavation, finally at main structure bottom Portion pours to form main structure bottom plate.
2. the construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation as described in claim 1, it is characterised in that: The insertion depth of the steel-pipe pile is by least 2m below ground surface to the bottom surface of main structure bottom plate.
3. the construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation as described in claim 1, it is characterised in that: The spacing of adjacent two steel-pipe pile of the solid matter steel-pipe pile is 350~450mm.
4. the construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation as described in claim 1, it is characterised in that: Stage excavation mode is used when the underground main body structural excavation is constructed, and after completing one layer of excavation, carries out this layer of structure outer Construction.
5. the construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation as described in claim 1-4 any one, It is characterized in that:The steel-pipe pile is equipped with multiple apertures, when regional level of ground water of constructing is higher, can infuse into steel-pipe pile Slurry, so that slurry passes through soil layer around the aperture and stake being arranged on steel-pipe pile and forms soil cement.
CN201810626735.3A 2018-06-19 2018-06-19 The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation Pending CN108824485A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810626735.3A CN108824485A (en) 2018-06-19 2018-06-19 The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810626735.3A CN108824485A (en) 2018-06-19 2018-06-19 The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation

Publications (1)

Publication Number Publication Date
CN108824485A true CN108824485A (en) 2018-11-16

Family

ID=64141422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810626735.3A Pending CN108824485A (en) 2018-06-19 2018-06-19 The construction method of the outer rock-soil layer supporting of side wall in a kind of sheltered reverse excavation

Country Status (1)

Country Link
CN (1) CN108824485A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232686A (en) * 2021-12-03 2022-03-25 中铁四院集团西南勘察设计有限公司 Construction method for underground structure cover excavation and top-down construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202969371U (en) * 2012-11-14 2013-06-05 福建工程学院 Novel pipe pile
CN103741714A (en) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 Full-cover excavation top-down construction method for underground engineering
CN105464134A (en) * 2015-12-31 2016-04-06 上海建工集团股份有限公司 Top-down and bottom-up combined construction method and supporting structure of multi-layer underground space below existing facility
CN205776406U (en) * 2016-05-31 2016-12-07 中铁第四勘察设计院集团有限公司 A kind of encircling type underground structure covered back-digging waterproof construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202969371U (en) * 2012-11-14 2013-06-05 福建工程学院 Novel pipe pile
CN103741714A (en) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 Full-cover excavation top-down construction method for underground engineering
CN105464134A (en) * 2015-12-31 2016-04-06 上海建工集团股份有限公司 Top-down and bottom-up combined construction method and supporting structure of multi-layer underground space below existing facility
CN205776406U (en) * 2016-05-31 2016-12-07 中铁第四勘察设计院集团有限公司 A kind of encircling type underground structure covered back-digging waterproof construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232686A (en) * 2021-12-03 2022-03-25 中铁四院集团西南勘察设计有限公司 Construction method for underground structure cover excavation and top-down construction

Similar Documents

Publication Publication Date Title
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN108204240A (en) Newly built tunnels closely on across existing tunnel anti-floating reinforcement system and its reinforcement means
CN110700841B (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN102828520A (en) Ring-shaped inner supporting structure used in deep peat soil deep foundation pit
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN103981898A (en) Integral open-excavation node top-down underground engineering construction method
CN102966108A (en) Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN104074529A (en) A continuous double-shell reinforcement method for deep roadways and chambers
CN111502696A (en) Dense-mesh type advanced support system of underground excavation tunnel and construction method
CN106437798A (en) Pretreatment method for anchor cable group penetrating through shield driving fracture surface
CN101509261A (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN104329095A (en) Construction method for widening existing tunnel
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN207934910U (en) A kind of newly built tunnels closely on across existing tunnel anti-floating reinforcement system
CN106545019A (en) For the support-replacing system and construction method of stage differential style Underground Construction
CN104131571B (en) A kind of deep foundation pit supporting construction method
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN109403339A (en) The deep basal pit composite supporting construction and its method for protecting support of double-row pile combination method of center island

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116