CN108824193B - 桥梁上部结构快速拆除、安装方法及其更换*** - Google Patents
桥梁上部结构快速拆除、安装方法及其更换*** Download PDFInfo
- Publication number
- CN108824193B CN108824193B CN201810588636.0A CN201810588636A CN108824193B CN 108824193 B CN108824193 B CN 108824193B CN 201810588636 A CN201810588636 A CN 201810588636A CN 108824193 B CN108824193 B CN 108824193B
- Authority
- CN
- China
- Prior art keywords
- bridge
- spmt
- support
- groups
- module vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810588636.0A CN108824193B (zh) | 2018-06-08 | 2018-06-08 | 桥梁上部结构快速拆除、安装方法及其更换*** |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810588636.0A CN108824193B (zh) | 2018-06-08 | 2018-06-08 | 桥梁上部结构快速拆除、安装方法及其更换*** |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108824193A CN108824193A (zh) | 2018-11-16 |
CN108824193B true CN108824193B (zh) | 2021-02-26 |
Family
ID=64144463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810588636.0A Active CN108824193B (zh) | 2018-06-08 | 2018-06-08 | 桥梁上部结构快速拆除、安装方法及其更换*** |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108824193B (zh) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372272B (zh) * | 2018-11-30 | 2021-10-01 | 上海宝冶集团有限公司 | 多纵列模块车平移构件时荷载横向分布的控制方法 |
CN109468960A (zh) * | 2018-12-07 | 2019-03-15 | 武汉二航路桥特种工程有限责任公司 | 高速公路跨线天桥的快速更换方法及更换*** |
CN110396944A (zh) * | 2019-07-11 | 2019-11-01 | 武汉二航路桥特种工程有限责任公司 | 桥梁应急支撑卸载与检修一体机及施工方法 |
CN110792044B (zh) * | 2019-08-22 | 2021-09-03 | 中铁十二局集团有限公司 | 一种天桥快速拆除施工方法 |
CN110804958B (zh) * | 2019-11-26 | 2021-06-25 | 中铁第五勘察设计院集团有限公司 | 一种整孔梁换架方法 |
CN111021268B (zh) * | 2019-12-26 | 2021-07-06 | 中交第二公路勘察设计研究院有限公司 | 用于大吨位桥梁快速更换的自适应支撑***及其使用方法 |
CN111733712B (zh) * | 2020-06-16 | 2022-08-30 | 中铁工程设计咨询集团有限公司 | 一种桥梁梁部结构更换施工方法 |
CN111877195A (zh) * | 2020-06-24 | 2020-11-03 | 广东力特工程机械有限公司 | 一种公路桥梁分段拆卸方法 |
CN113668388B (zh) * | 2021-07-14 | 2023-12-19 | 中交特种工程有限公司 | 一种基于车载装备的墩梁协同整体快速安装及拆除的方法 |
CN113818365A (zh) * | 2021-10-14 | 2021-12-21 | 上海公路桥梁(集团)有限公司 | 高架桥梁体的更换方法 |
CN114411555A (zh) * | 2021-12-24 | 2022-04-29 | 中海广瀛工程物流有限公司 | 一种spmt快速架、拆桥可变托运支架 |
CN114411560A (zh) * | 2022-01-27 | 2022-04-29 | 武汉二航路桥特种工程有限责任公司 | 梁体精确定位调控***及其使用方法 |
CN114775465A (zh) * | 2022-05-24 | 2022-07-22 | 中国建筑土木建设有限公司 | 自行式模块车驮梁运输设备及桥梁静力拆除方法 |
CN116122624A (zh) * | 2023-03-20 | 2023-05-16 | 中国十九冶集团有限公司 | 一种大型设备保护性拆除的施工方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101399113B1 (ko) * | 2013-08-26 | 2014-05-30 | (주)지엠지 | 교량 교체시공용 교량이동장치 |
CN105178201A (zh) * | 2015-07-17 | 2015-12-23 | 中海广瀛工程物流江苏有限公司 | Spmt运输车辅助过桥钢梁结构及使用该结构的过桥方法 |
CN207362720U (zh) * | 2017-09-15 | 2018-05-15 | 中铁二局集团有限公司 | 一种spmt模块车用可调式胎架 |
-
2018
- 2018-06-08 CN CN201810588636.0A patent/CN108824193B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN108824193A (zh) | 2018-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108824193B (zh) | 桥梁上部结构快速拆除、安装方法及其更换*** | |
CN105625195A (zh) | 新型波形钢腹板scc工法移动挂篮及其施工方法 | |
CN111139749A (zh) | 一种大跨度上承式连续钢桁梁悬臂架设施工方法 | |
CN109235291B (zh) | 铁路桥梁换梁*** | |
CN109162204B (zh) | 一种桥梁下部结构横向分块快速组拼的施工方法 | |
CN105155431A (zh) | 三立柱结构桥梁侧立柱毁损梁板结构完好的快速抢修方法 | |
CN104609300A (zh) | 万吨级可移动门式起重机的轨道结构 | |
CN110117933B (zh) | 一种节段梁墩顶现浇移动模架 | |
CN112575697A (zh) | 多层立交桥混凝土连续箱梁匝道桥快速拆除***及施工方法 | |
CN104947604A (zh) | 一种高速铁路900t混凝土箱梁的快速换架施工方法 | |
CN112411308A (zh) | 用于装配式道面结构的套筒伸缩式传力装置及施工方法 | |
CN103352425A (zh) | 桥梁整体驮运的精确定位方法及定位装置 | |
CN114508056A (zh) | 一种可拆除旧桥架设新桥的一体化装备及其施工方法 | |
CN102758405B (zh) | 一种钢箱梁、混凝土梁结合顶升的工艺 | |
CN208501505U (zh) | 千吨级桥梁上部结构快速更换*** | |
CN113106877B (zh) | 既有桥梁转体利用方法 | |
CN214737289U (zh) | 一种装配式高架道路、桥梁安装结构 | |
Gao et al. | Integral jacking of concrete continuous box beam bridge | |
CN212335790U (zh) | 一种大悬臂盖梁施工台车 | |
CN204112226U (zh) | 一种两孔连做节段拼装造桥机 | |
CN112695650A (zh) | 一种浅滩变曲线宽幅现浇梁下行式移动模架法施工方法 | |
CN112458912A (zh) | 走行式台车及其安装方法、施工方法 | |
Yu et al. | Yachihe Bridge, China: engineering the world’s longest cable-stayed steel truss | |
CN203411914U (zh) | 节段支撑及定位***结构 | |
Zhou | Research on Bridge Construction Control Technology Based on Mobile Formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Room 2101-2104, 21 / F, unit a, block a, Hubei science and technology venture building, Xiaohongshan East District, Wuchang District, Wuhan City, Hubei Province, 430061 Patentee after: CCCC Road & Bridge Special Engineering Co.,Ltd. Address before: Room 2101-2104, 21 / F, unit a, block a, Hubei science and technology venture building, Xiaohongshan East District, Wuchang District, Wuhan City, Hubei Province, 430061 Patentee before: CCCC ROAD & BRIDGE SPECIAL ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhu Cixiang Inventor after: Zhao Yafeng Inventor after: Chen Ze Inventor after: Zhu Shifeng Inventor after: Hu Xianpeng Inventor after: Song Boshi Inventor after: Qiu Yeliang Inventor after: Sheng Haijun Inventor after: Wang Wei Inventor after: Bing Yuxu Inventor after: Gao Wang Inventor after: Li Shuang Inventor after: Liu Ang Inventor after: Yi Xiaofeng Inventor before: Zhu Cixiang Inventor before: Zhao Yafeng Inventor before: Chen Ze Inventor before: Zhu Shifeng Inventor before: Hu Xianpeng Inventor before: Song Boshi Inventor before: Qiu Yeliang Inventor before: Sheng Haijun Inventor before: Wang Wei Inventor before: Bing Yuxu Inventor before: Gao Wang Inventor before: Li Shuang Inventor before: Liu Ang Inventor before: Yi Xiaofeng |
|
CB03 | Change of inventor or designer information |