CN108797600A - Miniature steel pipe pile prestressed anchor rope combination supporting construction method - Google Patents

Miniature steel pipe pile prestressed anchor rope combination supporting construction method Download PDF

Info

Publication number
CN108797600A
CN108797600A CN201810489524.XA CN201810489524A CN108797600A CN 108797600 A CN108797600 A CN 108797600A CN 201810489524 A CN201810489524 A CN 201810489524A CN 108797600 A CN108797600 A CN 108797600A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
length
construction method
prestressed anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810489524.XA
Other languages
Chinese (zh)
Inventor
吴海泉
高国锋
郭诚
王军良
袁传亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN201810489524.XA priority Critical patent/CN108797600A/en
Publication of CN108797600A publication Critical patent/CN108797600A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to construction site Base hole supporting technology fields,Especially miniature steel pipe pile prestressed anchor rope combination supporting construction method,Including Guan Liang is arranged,Steel pipe,Earth excavation,Anchor pole rope and waist rail are set,After earth excavation,Paving hangs steel grid,The jetting cement on waist rail and steel grid,Drain hole and tapping pipe are installed after the completion of spray plane,After anchor pole grouting,Carry out anchorage cable stretching anchoring,With the development of urban construction,A large amount of high levels are emerged around existing building,Often construction site is narrow and proximate building,When excavating, Slope Stability is affected,Proposed place surrounding enviroment are complicated,It is closer away from existing structure,Pipeline is more,When stringent to deformation requirements deep foundation pit support,There are many deficiencies for traditional slope excavation,The present invention is easy for construction,Foundation pit sideline is easy to control,Conducive to shoveling and bursting work,Globality is firm,Effective control slope deforming,Ensure the excavation of deep basal pit and the safety of Adjacent Buildings.

Description

Miniature steel pipe pile prestressed anchor rope combination supporting construction method
Technical field
The present invention relates to construction site Base hole supporting technology fields, especially miniature steel pipe pile prestressed anchor rope combination branch Protect construction method.
Background technology
With the development of urban construction, a large amount of high level is emerged around existing building, often construction site is narrow And proximate building, Slope Stability is affected and proposed place surrounding enviroment are complicated excavating, away from existing structure compared with Closely, pipeline is more, and when the deep foundation pit support stringent to deformation requirements, traditional slope excavation cannot be satisfied deep foundation pit support It is required that there are many deficiencies, such as vertical cut local instability, backbreak, explosion, the formation such as catalase and unfavorable structural plane The danger of adverse slope, supporting and excavation construction difficulty are big, and foundation pit sideline is not easy to control, are unfavorable for shoveling and bursting work, globality It is poor, and cannot effectively control slope deforming, how under the execution conditions in no slope space, it is ensured that the excavation of deep basal pit and And the safety of Adjacent Buildings, it has also become the technical barrier in foundation pit support construction.
Invention content
The purpose of the present invention is being directed to many deficiencies existing for traditional pattern foundation pit supporting structure at present, provides miniature steel pipe pile and answer in advance Power anchor pole rope combination supporting construction method, can effectively solve at no slope space, the support issues of deep basal pit, ensure deep basal pit And the safety of surrounding building.
In view of the deficienciess of the prior art, miniature steel pipe pile prestressed anchor rope combination supporting construction method of the present invention is wanted The technical issues of solution, is adopted the technical scheme that:Miniature steel pipe pile prestressed anchor rope combination supporting construction method, including Following steps:
(One), miniature steel pipe pile drilling use mesohigh bore process, steel pipe is put into after drilling, after steel pipe is put into, in steel pipe Portion is inserted into Grouting Pipe, and Grouting Pipe is inserted into bottom hole, then retreats, and starts slip casting, is returned out by steel pipe bottom extravasating hole, slurries from lower and Upper continuous pouring, until being filled in entire steel pipe and stake holes, Grouting Pipe is at the uniform velocity extracted with the injection of cement mortar, if aperture Without the slurry that overflows, mend slurry in time, in addition to the infiltration of the also oriented rock-soil layer of the solidification shrinkage of itself, causes aperture to be starched after cement mortar injection Liquid retraction should use back-grouting technique, and benefit slurry one arrives secondary in time, ensure that aperture slip casting is full;
(Two), top armored concrete Guan Liang is set, the main reinforcement of miniature steel pipe pile and Guan Liang using being welded to connect, reinforcing bar binding, After the completion of formwork erection, concrete is poured;
(Three), after first layer earth excavation, carry out first of anchor pole rope and waist rail construction, it is true according to design requirement before armature boring Determine hole position, armature boring is taken casing follow-up mode, anchor pole rope should be put into hole immediately after pore-forming, with prestressed anchor Rope is node, and concrete breast beam is arranged in length and breadth, and waist rail is made of more reinforcing bars, after carrying out reinforcing bar binding, supporting module, with slope surface Gunite concrete together;
(Four), a secondary grouting pipe is set among anchor cable bar, prestressed anchor rope free segment uses high pressure polyethylene casing, will The standoff body of rod of band performed is placed into hole together together with once grouting pipe, and Grouting Pipe is first inserted into bottom hole, then retreats, and opens Beginning slip casting, slurries from bottom to top with the injection of cement mortar at the uniform velocity extract by continuous pouring, Grouting Pipe, if aperture is mended in time without excessive slurry Slurry;
(Six), after the earth excavation of stake face, paving hangs steel grid, between being fixed on anchor pole rope with waist rail, in waist rail and bar-mat reinforcement Jetting cement on lattice, top of the slope are arranged a casting and follow closely, and bar-mat reinforcement top is arranged reinforcing rib and is connected with soil nailing binding;
(Seven), drain hole is installed after the completion of spray plane, tapping pipe is set in drain hole;
(Eight), anchor pole grouting after, carry out anchorage cable stretching anchoring;
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, steel-pipe pile top enter Guan Liang 0.3m, miniature steel The deviation proportion of pile pile drilling axis is not more than the 1% of steel pipe pile length, and hole depth is not less than Design of Steel-tube Piles length, but also unsuitable big In the 200mm of design length, 1 ~ 2min should be stagnated, miniature steel pipe pile drills to projected depth, and blows into hole, will be in hole Rock powder is blown clean, and after miniature slip casting, before slurry solidifies completely, forbids to collide, rock steel pipe, bolthole finish in drilling and Aperture is blocked using cement package bags before slip casting, is prevented in sundries and soil bits access aperture.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, grouting cement are mixed by 0.50 ratio of mud System, cement mortar should stir evenly, with mixing with the cement mortar once mixed and stirred should be finished before initial set, and prevent that stone, sundries are mixed Enter.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, waist rail length 300mm.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method starts suitably reduce injection when injection Distance makes concrete squeeze into bar-mat reinforcement behind, ensures that bar-mat reinforcement is fully wrapped around by concrete, when spray skin layer concrete, then suitably widens injection Distance detects surface thickness with bar dowel immediately to 0.6 ~ 1.2 meter after injection, as thickness is unsatisfactory for requiring to spray again again One time.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, hole position vertical direction tolerance be ± 50mm, horizontal direction tolerance are ± 30mm, and drill hole inclination tolerance is 3%, bore diameter 130mm, and drilling should be more than Soil Anchor Design length 0.5m.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, anchor cable body of rod centering holder use finished product Plastic stent, every 2.0 meters set one, and free section can uniformly smear one layer of butter or housing plastic bellows hose, and fasten, Prestressed anchor bar material uses underrelaxation high strength steel strand, and the tensioning of normal intensity 1860MPa, anchor pole should be strong in anchoring body It can carry out after spending reach design strength with girt strip concrete strength 80%, and by design prestressing force lock value locking, should take 0.1 ~ 0.2 times of axial tension design value Nt keeps the body of rod totally straight the pre- tensioning of anchor cable 1 ~ 2 time, and each location contacts are close;Anchor pole Tensioning requires timing stage loading to carry out, and manipulates machinery, record and observation data by special messenger when tensioning, and draw anchor pole lotus at any time A deflection curve figure is carried, for judging that anchor pole quality is used, when prestressed tension rod is not obviously decayed, is pulled to 1.05 ~ 1.1Nt When, 10min is kept to rock stratum, then off-load to locking load is locked;Prestressed anchor rope strictly presses design length blanking, Its allowable error is 50mm, and exposed tensioning length is determined according to tensioning equipment, and before body of rod processing, strength test is carried out to material Sampling observation.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, soil nailing use the screw-thread steel of diameter 25, Length and level interval are 1.5 meters, are positioned manually and are driven into.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, steel grid φ 6.5, single-layer bidirectional, Length at least 300mm, the intensity C20 of jetting cement, thickness 80mm on waist rail and steel grid spray concrete ratio, cement:In Sand:Graded broken stone(Grain size is not more than 15mm)=1:2:2.
Above-mentioned miniature steel pipe pile prestressed anchor rope combination supporting construction method, sluicing tube material are the pvc of caliber 50 Pipe, total length 400mm, protruded length 100mm, slope 5% are evenly arranged by the spacing in length and breadth of 2m × 2m in slope surface, in drain hole Cobble heap capsule drainage layer is arranged in inlet side, is close to not make drainage layer when rock stratum, is wrapped up using strainer on the inside of tapping pipe, and iron wire is tied up Tightly, it is placed in after tapping pipe and concrete on the outside of pipe is uniformly smeared into reality, leave no gaps.
The advantageous effect of miniature steel pipe pile prestressed anchor rope combination supporting construction method of the present invention be by be arranged Guan Liang, Steel pipe, earth excavation, before excavation, miniature steel pipe pile of first constructing carries out advance support, it is possible to prevente effectively from backbreak, explosion, rock Broken and unfavorable structural plane etc. forms the danger of adverse slope, and Slope Stability is advantageous, and anchor pole rope is arranged and waist rail, waist rail pass through reinforcing bar Tie up, and and concrete layer combination, it is simple in structure, it is easy for construction, after earth excavation, paving hang steel grid, Jetting cement on waist rail and steel grid, spray plane install drain hole and tapping pipe after the completion, are conducive to water guide and are carried out after anchor pole grouting Anchorage cable stretching anchors, and anchor pole rope is firm with breast beam structure, effectively controls slope deforming, the present invention is easy for construction, and foundation pit sideline is easy Control is conducive to cut the earth and bursting work, globality consolidates, effectively controls slope deforming, it is ensured that the excavation and surrounding of deep basal pit The safety of building.
Specific implementation mode
It elaborates to the present invention with reference to specific embodiment.
Miniature steel pipe pile drilling uses mesohigh bore process, stake diameter to be not less than 150 mm.108mm wall thickness is put into after drilling 5mm seamless steel pipes, spacing 1.0m;After steel pipe is put into, it is inserted into Grouting Pipe in steel duct, Grouting Pipe is inserted into bottom hole, then retreats 300 ~ 500mm starts slip casting, and 0.5 neat slurry of the ratio of mud is perfused, is returned out by steel pipe bottom extravasating hole, slurries connect from bottom to top Continuous perfusion, until being filled in entire steel pipe and stake holes.Grouting Pipe is at the uniform velocity extracted with the injection of cement mortar, if aperture is without excessive Slurry mends slurry in time.After cement mortar injection, in addition to the infiltration of the also oriented rock-soil layer of the solidification shrinkage of itself, aperture slurries is caused to return It contracts, back-grouting technique should be used, benefit slurry one arrives secondary in time, ensures that aperture slip casting is full.
Armored concrete Guan Liang is arranged in top, enters Guan Liang 0.3m at the top of steel-pipe pile.The main reinforcement of miniature steel pipe pile and Guan Liang is adopted With being welded to connect, after the completion of reinforcing bar binding, formwork erection, C20 concretes are poured.
After first layer earth excavation, first of anchor pole rope and waist rail construction are carried out.It is true according to design requirement before armature boring Determine hole position, hole position vertical direction tolerance is ± 50mm, and horizontal direction tolerance is ± 30mm, and drill hole inclination allows inclined Difference is 3%, bore diameter 130mm.Armature boring takes casing follow-up mode, and should anchor pole rope hole be put into immediately after pore-forming Interior, drilling should be more than Soil Anchor Design length 0.5m.
Prestressed anchor bar material uses 15.2 underrelaxation high strength steel strands of Φ, normal intensity 1860MPa, the anchor cable body of rod pair Middle holder uses finished plastic holder, and every 2.0 meters set one, and a secondary grouting pipe is arranged among anchor cable bar.Prestressed anchor Rope free segment uses high pressure polyethylene casing, so that the body of rod is isolated with cement mortar, it is ensured that this section of Free Transform of the body of rod.The band that will be performed The standoff body of rod is placed into hole together together with once grouting pipe, and Grouting Pipe is first inserted into bottom hole, then retreats 300 ~ 500mm, Start slip casting, slurries continuous pouring from bottom to top, and ensures out of hole smoothly draining, gas.Grouting Pipe is even with the injection of cement mortar Speed is extracted, if slurry without excessive slurry, is mended in aperture in time, prestressed anchor rope strictly presses design length blanking, allowable error 50mm, Its exposed tensioning length is determined according to tensioning equipment.
Using prestressed anchor rope as node, 300mm waist rails are set in length and breadth, breast beam structure is made of more reinforcing bars, carries out steel After muscle binding, supporting module, C20 concrete is sprayed together with slope surface.
Top of the slope is arranged a casting and follows closely, and bar-mat reinforcement top is arranged reinforcing rib and is connected with soil nailing binding.Soil nailing uses HRB400 diameters 25 screw-thread steel, length and level interval are 1.5 meters.It is positioned manually and is driven into, ensure its length before constructing and be driven into angle Meet design requirement.
Paving hangs 6.5@200mm single-layer bidirectionals of steel grid φ, between being fixed on anchor pole rope with waist rail, the lap of splice between mesh sheet At least 300mm.Jetting cement, concrete strength C20, thickness 80mm.Spray concrete ratio, cement:Middle sand:Graded broken stone(Grain size is little In 15mm)=1:2:2, after the earth excavation of stake face, linked network simultaneously carries out concrete spray concrete, and spray concrete thickness is not less than 80mm.
Drain hole is installed, material is that the pvc of caliber 50 is managed, total length 400mm, protruded length 100mm, tiltedly after the completion of spray plane Rate 5% is evenly arranged by the spacing in length and breadth of 2m × 2m in slope surface.In drain hole inlet side, cobble heap capsule drainage layer is set,(Tightly Do not make drainage layer when pasting rock stratum), use dank material.It is wrapped up using strainer on the inside of water pipe, iron wire tightens, after being placed in tapping pipe Concrete on the outside of pipe is uniformly smeared into reality, is left no gaps.
After soil bolt grouting, when anchoring body and waist rail concrete strength reach the 80% of design strength, you can carry out prestressing force Tensioning;0.1 ~ 0.2 times of axial tension design value Nt should be taken to the pre- tensioning of anchor cable 1 ~ 2 time, keep the body of rod totally straight, each location contacts Closely;Anchor pole tensioning requires timing stage loading to carry out, and manipulates machinery, record and observation data by special messenger when tensioning, and at any time One deflection curve figure of anchor pole load is drawn, for judging that anchor pole quality is used.When prestressed tension rod is not obviously decayed, it is pulled to When 1.05 ~ 1.1Nt, 10min is kept to rock stratum, then off-load to locking load is locked.
The materials such as cement, sand, stone, steel and concrete ratio are taken out according to the rules by specific supervision engineer witness sampling Sample presentation is examined, laboratory there must be corresponding qualification.
This bracing engineering cutting depth, area are larger, therefore remove and carry out safe and reliable retaining design design, strictly press Code requirement construction is outer, should still carry out field monitoring, accomplish information-aided construction.Monitoring content:Horizontal displacement monitoring, prestressed anchor The monitoring of bar axle power, underground water are observation, close on ground, the observation of building, pipe settlement.
In the construction process, it is noted that the deviation proportion of miniature steel pipe pile drilling axis is no more than steel pipe pile length 1%.Hole depth is not less than Design of Steel-tube Piles length, but is not also preferably greater than the 200mm of design length.
Miniature steel pipe pile drills to projected depth, should stagnate 1 ~ 2min, and blow into hole, and rock powder in hole is dried up Only.Drilling blocks aperture before finishing slip casting, prevents in sundries and soil bits access aperture, bottom hole sediment is not more than 200mm.
After miniature slip casting, before slurry solidifies completely, forbids to collide, rocks steel pipe.
Bolthole finishes in drilling and blocks aperture using cement package bags before slip casting, prevents sundries and soil bits access aperture It is interior.
Grouting P.O42.5 cement, by 0.50 ratio of mud mixing.Cement mortar should stir evenly, with mixing with once mixing The cement mortar of sum should be finished before initial set, and prevent that stone, sundries are mixed into.
Slope surface is cleared up:Earthwork evacuation finishes and behind thick pingbian slope, should use manual amendment slope surface, exclude surface dust or danger Stone reduces the rebound degree of concrete, the purpose of the smooth beauty of face layer to reach the bond strength of enhancing concrete face layer and side slope.
Start suitably reduce jet length when injection, concrete is made to squeeze into bar-mat reinforcement behind, ensures that bar-mat reinforcement is wrapped completely by concrete It wraps up in, when spray skin layer concrete, then suitably widens jet length to 0.6 ~ 1.2 meter, keep concrete jetting thickness uniform, surfacing.
Surface thickness is detected with bar dowel immediately after injection, as thickness is unsatisfactory for requiring spraying one time again again.
Free section can uniformly smear one layer of butter or housing plastic bellows hose, and fasten.
The tensioning of anchor pole should anchoring body intensity and waist rail concrete strength reach design strength 80% after can be into Row, and by design prestressing force lock value locking.Before body of rod processing, strength test sampling observation is carried out to material, ensures the tension of the body of rod Power.
Bolt cement uses P.O42.5 cement, the ratio of mud 0.40~0.5, bolt grouting to use secondary grouting technique.
In construction, process record is performed per procedure, it is stringent to check and accept, not by inspection, next process must not be entered.Anchor Bar construction size and tolerance see the table below
All construction personnel are before being on duty, it is necessary to carry out post education, learn act of technique for security and rules and regulations, safety is anti- Protect performance and the application of facility, personal protective equipment use and keeping etc., can be on duty operation after examination is qualified.
Twice flak jacket railing is set with Ф 48mm steel pipes around away from foundation pit side 0.6m, upright bar spacing 2m is higher by naturally Level ground 1.2m, buried depth 0.8m.
Forbid mound, windrow within the scope of foundation pit upper brim 1m and parks equipment.It mustn't within the scope of bolt-spary supports 5m suitable for reading Loaded vehicle stops.
In Excavation Process, bucket is forbidden to collide supporting construction(Waist rail, anchor pole rope, concrete mask etc.), excavate tight in place Taboo is backbreak.
Warning sign is set during foundation pit construction, night adds red colored lamp mark.
Adopt an effective measure control construction in airborne dust, bagged cement must cover, must not random air storage, Yi Mianyu Leaching.
Personnel into site operation must put on work clothes, safe wearing cap, gloves, goggles, etc. labour protections use Product.
When opening work position, it is necessary to which closing electrical switching is simultaneously cut off the power.When using electric tool, unsuitable band gloves.
Certainly, above description is not limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the those of ordinary skill in domain is made in the essential scope of the present invention, should also belong to this hair Bright protection domain.

Claims (10)

1. miniature steel pipe pile prestressed anchor rope combination supporting construction method, which is characterized in that include the following steps:
(One), miniature steel pipe pile drilling use mesohigh bore process, steel pipe is put into after drilling, after steel pipe is put into, in steel pipe Portion is inserted into Grouting Pipe, and Grouting Pipe is inserted into bottom hole, then retreats, and starts slip casting, is returned out by steel pipe bottom extravasating hole, slurries from lower and Upper continuous pouring, until being filled in entire steel pipe and stake holes, Grouting Pipe is at the uniform velocity extracted with the injection of cement mortar, if aperture Without the slurry that overflows, mend slurry in time, in addition to the infiltration of the also oriented rock-soil layer of the solidification shrinkage of itself, causes aperture to be starched after cement mortar injection Liquid retraction should use back-grouting technique, and benefit slurry one arrives secondary in time, ensure that aperture slip casting is full;
(Two), top armored concrete Guan Liang is set, the main reinforcement of miniature steel pipe pile and Guan Liang using being welded to connect, reinforcing bar binding, After the completion of formwork erection, concrete is poured;
(Three), after first layer earth excavation, carry out first of anchor pole rope and waist rail construction, it is true according to design requirement before armature boring Determine hole position, armature boring is taken casing follow-up mode, anchor pole rope should be put into hole immediately after pore-forming, with prestressed anchor Rope is node, and concrete breast beam is arranged in length and breadth, and waist rail is made of more reinforcing bars, after carrying out reinforcing bar binding, supporting module, with slope surface Gunite concrete together;
(Four), a secondary grouting pipe is set among anchor cable bar, prestressed anchor rope free segment uses high pressure polyethylene casing, will The standoff body of rod of band performed is placed into hole together together with once grouting pipe, and Grouting Pipe is first inserted into bottom hole, then retreats, and opens Beginning slip casting, slurries from bottom to top with the injection of cement mortar at the uniform velocity extract by continuous pouring, Grouting Pipe, if aperture is mended in time without excessive slurry Slurry;
(Six), after the earth excavation of stake face, paving hangs steel grid, between being fixed on anchor pole rope with waist rail, in waist rail and bar-mat reinforcement Jetting cement on lattice, top of the slope are arranged a casting and follow closely, and bar-mat reinforcement top is arranged reinforcing rib and is connected with soil nailing binding;
(Seven), drain hole is installed after the completion of spray plane, tapping pipe is set in drain hole;
(Eight), anchor pole grouting after, carry out anchorage cable stretching anchoring.
2. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that steel pipe Stake top portion enters Guan Liang 0.3m, and the deviation proportion of miniature steel pipe pile drilling axis is not more than the 1% of steel pipe pile length, and hole depth is not less than steel Pipe pile design length, but it is not also preferably greater than the 200mm of design length, 1 ~ 2min should be stagnated, miniature steel pipe pile drills deep to design It after degree, and blows into hole, rock powder in hole is blown clean, after miniature slip casting, before slurry solidifies completely, forbid to collide, shake Steel pipe is shaken, bolthole finishes in drilling and blocks aperture using cement package bags before slip casting, prevents in sundries and soil bits access aperture.
3. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that slip casting With cement, by 0.50 ratio of mud mixing, cement mortar should stir evenly, with mixing with the cement mortar once mixed and stirred should be in initial set Before be finished, and prevent that stone, sundries are mixed into.
4. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that waist rail Length 300mm.
5. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that start Jet length should be suitably reduced when injection, concrete is made to squeeze into bar-mat reinforcement behind, ensured that bar-mat reinforcement is fully wrapped around by concrete, worked as spray skin layer When concrete, then jet length is suitably widened to 0.6 ~ 1.2 meter, surface thickness, such as thickness are detected with bar dowel immediately after injection It is unsatisfactory for requiring spraying one time again again.
6. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that Kong Wei Vertical direction tolerance is ± 50mm, and horizontal direction tolerance is ± 30mm, and drill hole inclination tolerance is 3%, drilling Diameter 130mm, drilling should be more than Soil Anchor Design length 0.5m.
7. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that anchor cable Body of rod centering holder uses finished plastic holder, and every 2.0 meters set one, and free section can uniformly smear one layer of butter or housing Plastic bellows hose, and fasten, prestressed anchor bar material uses underrelaxation high strength steel strand, normal intensity 1860MPa, anchor pole Tensioning should anchoring body intensity reach with girt strip concrete strength design strength 80% after can carry out, and by design Prestressing force lock value locks, and 0.1 ~ 0.2 times of axial tension design value Nt should be taken to the pre- tensioning of anchor cable 1 ~ 2 time, keep the body of rod completely flat Directly, each location contacts are close;Anchor pole tensioning requires timing stage loading to carry out, and manipulates machinery, record by special messenger when tensioning and sees Measured data, and one deflection curve figure of anchor pole load is drawn at any time, for judging that anchor pole quality is used, when prestressed tension rod is not bright When aobvious decaying, when being pulled to 1.05 ~ 1.1Nt, 10min is kept to rock stratum, then off-load to locking load is locked, prestressed anchor Bar rope strictly presses design length blanking, allowable error 50mm, and exposed tensioning length determines that the body of rod adds according to tensioning equipment Before work, strength test sampling observation is carried out to material.
8. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that soil nailing Using the screw-thread steel of diameter 25, length and level interval are 1.5 meters, are positioned manually and are driven into.
9. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that reinforcing bar Grid φ 6.5, single-layer bidirectional, length at least 300mm, the intensity C20 of jetting cement, thickness 80mm on waist rail and steel grid, Spray concrete ratio, cement:Middle sand:Graded broken stone(Grain size is not more than 15mm)=1:2:2.
10. miniature steel pipe pile prestressed anchor rope combination supporting construction method according to claim 1, characterized in that let out Supplying pipe is that the pvc of caliber 50 is managed, and total length 400mm, protruded length 100mm, slope 5% exist by the spacing in length and breadth of 2m × 2m Slope surface is evenly arranged, and cobble heap capsule drainage layer is arranged in drain hole inlet side, is close to not make drainage layer when rock stratum, in tapping pipe Side is wrapped up using strainer, and iron wire tightens, and is placed in after tapping pipe concrete on the outside of pipe uniformly smearing reality, leave no gaps.
CN201810489524.XA 2018-05-21 2018-05-21 Miniature steel pipe pile prestressed anchor rope combination supporting construction method Pending CN108797600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810489524.XA CN108797600A (en) 2018-05-21 2018-05-21 Miniature steel pipe pile prestressed anchor rope combination supporting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810489524.XA CN108797600A (en) 2018-05-21 2018-05-21 Miniature steel pipe pile prestressed anchor rope combination supporting construction method

Publications (1)

Publication Number Publication Date
CN108797600A true CN108797600A (en) 2018-11-13

Family

ID=64092717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810489524.XA Pending CN108797600A (en) 2018-05-21 2018-05-21 Miniature steel pipe pile prestressed anchor rope combination supporting construction method

Country Status (1)

Country Link
CN (1) CN108797600A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208614A (en) * 2018-11-14 2019-01-15 中国建筑第二工程局有限公司 Steel strand wires isolation mount and the construction method that the secondary pore-forming of anchor cable is carried out with the bracket
CN109518699A (en) * 2019-01-23 2019-03-26 广州地铁集团有限公司 Miniature steel pipe pile adds grid spray anchor deep foundation ditch combination supporting scheme system and its construction method
CN109811771A (en) * 2019-01-16 2019-05-28 北京建材地质工程有限公司 Make the simple and easy method not bent when anchor bar steel waist rail tensioning
CN110004927A (en) * 2019-03-27 2019-07-12 招商局重庆交通科研设计院有限公司 Prestressing force miniature pile construction method
CN110761292A (en) * 2019-09-27 2020-02-07 中国二十冶集团有限公司 Prestressed anchor cable structure and prestressed anchor cable construction method
CN110984171A (en) * 2019-11-25 2020-04-10 中铁十四局集团第四工程有限公司 Steel pipe pile grouting combined waist beam anchor rod supporting method
CN113216202A (en) * 2021-04-20 2021-08-06 中铁第一勘察设计院集团有限公司 Small-sized steel pipe concrete pile supporting system and construction method thereof
CN114934518A (en) * 2022-05-23 2022-08-23 甘肃建投建设有限公司 Deep foundation pit reinforcing method combining reverse pile, pressure reduction and grouting
CN115012426A (en) * 2022-06-13 2022-09-06 山东建材勘察测绘研究院有限公司 Steel pipe pile support and construction method for existing telegraph pole during four-cycle full excavation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4123058B2 (en) * 2003-02-05 2008-07-23 株式会社大林組 Construction method of wall structure with permanent anchor construction, Wall structure with permanent anchor construction
CN101285309A (en) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 Compound support method for deep foundation pit of tall buildings
CN102031784A (en) * 2011-01-12 2011-04-27 陕西建工集团第六建筑工程有限公司 Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN103306289A (en) * 2013-06-28 2013-09-18 中国三冶集团有限公司第一建筑工程公司 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN105155550A (en) * 2015-07-23 2015-12-16 甘肃第六建设集团股份有限公司 Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN105970970A (en) * 2016-05-25 2016-09-28 中国能源建设集团安徽电力建设第工程有限公司 Pre-stressed anchor cable supporting construction method for near-railway deep foundation pit
CN106320346A (en) * 2016-08-24 2017-01-11 陕西建工第六建设集团有限公司 Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4123058B2 (en) * 2003-02-05 2008-07-23 株式会社大林組 Construction method of wall structure with permanent anchor construction, Wall structure with permanent anchor construction
CN101285309A (en) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 Compound support method for deep foundation pit of tall buildings
CN102031784A (en) * 2011-01-12 2011-04-27 陕西建工集团第六建筑工程有限公司 Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN103306289A (en) * 2013-06-28 2013-09-18 中国三冶集团有限公司第一建筑工程公司 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN105155550A (en) * 2015-07-23 2015-12-16 甘肃第六建设集团股份有限公司 Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN105970970A (en) * 2016-05-25 2016-09-28 中国能源建设集团安徽电力建设第工程有限公司 Pre-stressed anchor cable supporting construction method for near-railway deep foundation pit
CN106320346A (en) * 2016-08-24 2017-01-11 陕西建工第六建设集团有限公司 Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208614A (en) * 2018-11-14 2019-01-15 中国建筑第二工程局有限公司 Steel strand wires isolation mount and the construction method that the secondary pore-forming of anchor cable is carried out with the bracket
CN109811771A (en) * 2019-01-16 2019-05-28 北京建材地质工程有限公司 Make the simple and easy method not bent when anchor bar steel waist rail tensioning
CN109811771B (en) * 2019-01-16 2020-09-01 北京建材地质工程有限公司 Simple method for preventing anchor rod steel waist beam from bending during tensioning
CN109518699A (en) * 2019-01-23 2019-03-26 广州地铁集团有限公司 Miniature steel pipe pile adds grid spray anchor deep foundation ditch combination supporting scheme system and its construction method
CN110004927A (en) * 2019-03-27 2019-07-12 招商局重庆交通科研设计院有限公司 Prestressing force miniature pile construction method
CN110761292A (en) * 2019-09-27 2020-02-07 中国二十冶集团有限公司 Prestressed anchor cable structure and prestressed anchor cable construction method
CN110984171A (en) * 2019-11-25 2020-04-10 中铁十四局集团第四工程有限公司 Steel pipe pile grouting combined waist beam anchor rod supporting method
CN113216202A (en) * 2021-04-20 2021-08-06 中铁第一勘察设计院集团有限公司 Small-sized steel pipe concrete pile supporting system and construction method thereof
CN114934518A (en) * 2022-05-23 2022-08-23 甘肃建投建设有限公司 Deep foundation pit reinforcing method combining reverse pile, pressure reduction and grouting
CN114934518B (en) * 2022-05-23 2024-04-26 甘肃建投建设有限公司 Deep foundation pit reinforcement method combining reverse pile, decompression and grouting
CN115012426A (en) * 2022-06-13 2022-09-06 山东建材勘察测绘研究院有限公司 Steel pipe pile support and construction method for existing telegraph pole during four-cycle full excavation
CN115012426B (en) * 2022-06-13 2024-02-13 山东建材勘察测绘研究院有限公司 Steel pipe pile support and construction method for existing telegraph pole during four-week full excavation

Similar Documents

Publication Publication Date Title
CN108797600A (en) Miniature steel pipe pile prestressed anchor rope combination supporting construction method
CN208415267U (en) Miniature steel pipe pile prestressed anchor rope combination supporting system
CN102031784B (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN106958256B (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN105804089B (en) Locally increase deep support system and its construction method after a kind of former deep foundation pit construction
CN106049505B (en) A kind of construction method of deep pit support supporting system
CN111733828A (en) Large-section deep foundation pit fender pile and prestressed anchor cable supporting construction technology
CN106284314A (en) Karst landform spiral-digging pore cast-in-place pile construction method
CN104746517B (en) A kind of suspension roof support system of total length below artesian head
CN110821503A (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN106968139A (en) The construction method of railway bed supporting in undercrossing tunnel jacking framed bridge jack-in process
CN112095633A (en) Construction process of die-free concrete beam
CN104847365B (en) A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel construction method
CN111287759A (en) Shallow-buried close-connection underground excavation tunnel construction method
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN110106889A (en) A kind of deep basal pit perfusion slope protection pile adds cable bolting construction
CN210766754U (en) Recoverable prestressed anchorage cable stock supporting construction
CN111827260A (en) Defect repairing and leaking stoppage construction method for underground diaphragm wall
CN115012426A (en) Steel pipe pile support and construction method for existing telegraph pole during four-cycle full excavation
CN108797599A (en) Miniature steel pipe pile prestressed anchor rope combination supporting system
CN113802582A (en) Mountain supporting method for near special-shaped buildings in hilly areas
CN205576934U (en) Part increases ramus profundus watch box system behind former deep foundation pit construction
CN209586373U (en) The support system of the lower rock compound cross-section stratum jacking construction inlet and outlet cave of upper soil
CN114352319B (en) Construction method for large-section hydraulic tunnel composite type bias hole section
CN207828980U (en) A kind of foundation pit supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113

RJ01 Rejection of invention patent application after publication