CN108777482A - A kind of optimal power transmission path decision method of the power grid of rule-based formula - Google Patents

A kind of optimal power transmission path decision method of the power grid of rule-based formula Download PDF

Info

Publication number
CN108777482A
CN108777482A CN201810521482.3A CN201810521482A CN108777482A CN 108777482 A CN108777482 A CN 108777482A CN 201810521482 A CN201810521482 A CN 201810521482A CN 108777482 A CN108777482 A CN 108777482A
Authority
CN
China
Prior art keywords
power transmission
rule
transmission path
optimal
power grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810521482.3A
Other languages
Chinese (zh)
Inventor
金明亮
李敏
李勇
郭明宇
王英英
李会新
陈祥文
谢俊
杨增力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Zhongyuan Huadian Science & Technology Co Ltd
STATE GRID CENTER CHINA GRID Co Ltd
Central China Grid Co Ltd
Original Assignee
Wuhan Zhongyuan Huadian Science & Technology Co Ltd
STATE GRID CENTER CHINA GRID Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Zhongyuan Huadian Science & Technology Co Ltd, STATE GRID CENTER CHINA GRID Co Ltd filed Critical Wuhan Zhongyuan Huadian Science & Technology Co Ltd
Priority to CN201810521482.3A priority Critical patent/CN108777482A/en
Publication of CN108777482A publication Critical patent/CN108777482A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • H02J3/005

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of optimal power transmission path decision methods of the power grid of rule-based formula, it is characterised in that carries out according to the following steps:Step 1, breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission;Step 2, power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults;Step 3 determines busbar or transformer fault power transmission rule;Step 4 plans optimal power transmission path:Optimal power transmission path planning is carried out to complex fault according to above-mentioned rule.The present invention considers network load demand and correlated condition constraint using isolated fault electrical equipment as principle, based on series of optimum power transmission rule, one optimal power transmission path is provided, so that the influence suffered by power grid is minimum, power off time is effectively reduced, maximizes and ensures power grid operation.

Description

A kind of optimal power transmission path decision method of the power grid of rule-based formula
Technical field
The invention belongs to the technical fields of electric system, and in particular to a kind of optimal power transmission path of the power grid of rule-based formula Decision-making technique.
Background technology
With the continuous development of extra-high voltage grid construction, interregional interconnection is more and more closer, and substation is as power grid core Website, to the quick processing of its multiple compound contingency, fast quick-recovery normal device power transmission, more stringent requirements are proposed.Power grid event The quick disposition of barrier there is an urgent need to using compared to former more abundant fault message, progress rapidly and accurately faulty equipment every From, and the power transmission path of optimization is provided.
Currently, after identifying faulty equipment by accident analysis, selection restores power transmission path and relies primarily on dispatcher's Operating experience, such way can be applicable in the case where minor scale power net simple fault.But for power grid multiple compound contingency Speech, non-faulting equipment to be restored may more than one, and the recovery of each non-faulting equipment power grid can be generated compared with Big influence, in addition lead to the problem of it is new, such as power flow transfer cause branch overload.Therefore, restore in power transmission path process, such as The recovery sequence of what reasonable arrangement non-faulting equipment, on the one hand ensures the safe and stable operation of power grid, avoids insecurity Occur again, on the other hand takes recovery power transmission path most short, the operating experience for relying solely on dispatcher judges, past It is past to be difficult to obtain satisfactory result.
Invention content
It is an object of the invention to provide a kind of optimal power transmission path decision methods of the power grid of rule-based formula, and the present invention is in failure When processing, the optimal path that restores electricity is formulated to dispatcher.
A kind of optimal power transmission path decision method of the power grid of rule-based formula, it is characterised in that carry out according to the following steps:
Step 1, breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission;
Step 2, power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults;
Step 3 determines busbar or transformer fault power transmission rule;
Step 4 plans optimal power transmission path:Optimal power transmission path planning is carried out to complex fault according to above-mentioned rule.
A kind of optimal power transmission path decision method of the power grid of rule-based formula, it is characterised in that following steps:
Breaker closing Cahn-Ingold-Prelog sequence rule is when step 1 determines circuit power transmission:It first closes a floodgate far from fault point side;Or, if line Road side is equipped with high-voltage shunt reactor, then closes a floodgate since offside;Or, if circuit side is power plant, opened from offside Begin to close a floodgate.
Power transmission Cahn-Ingold-Prelog sequence rule is when step 2 determines multi-line simultaneous faults:The preferential power transmission of important interconnection or failure between province The preferential power transmission of the preceding circuit in heavy condition.
Step 3 determines that busbar or transformer fault power transmission rule are:Busbar or transformer on site fault clearing and must be examined Look into errorless rear power transmission.
Step 4 plans that optimal power transmission path is:According to above-mentioned steps one, Step 2: the rule progress described in step 3 is whole Body power transmission path planning, to maximize guarantee power grid operation.
Description of the drawings
Fig. 1 is that the power transmission rule of the present invention forms flow chart.
Fig. 2 is the optimal power transmission path decision flow chart of the present invention.
Specific implementation mode
The technical solution of the present invention is further elaborated with specific implementation case below in conjunction with the accompanying drawings.
A kind of optimal power transmission path decision method of the power grid of rule-based formula, as shown in Figure 1, it is characterised in that press following step It is rapid to carry out:
Step 1:Breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission, as in the table below:
Step 2:Power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults, as in the table below:
Serial number Rule
1 The important preferential power transmission of interconnection between province
2 The preferential power transmission of circuit of heavy condition is in before failure
Step 3:Busbar or transformer fault power transmission rule are determined, for busbar or transformer fault, it is necessary to which scene excludes Failure simultaneously checks errorless rear power transmission.
Step 4:Plan that optimal power transmission path is:According to above-mentioned steps one, Step 2: the rule progress described in step 3 is whole Body power transmission path planning, to maximize guarantee power grid operation, detailed process is as shown in Figure 2:
(1) first determine whether that faulty equipment is that circuit or busbar or transformer are intended to busbar or transformer fault On site fault clearing simultaneously checks errorless rear power transmission;
(2) for line fault, determine whether single-phase fault, if not single-phase fault, to arrive on site fault clearing And check errorless rear power transmission;
(3) if line fault is single-phase fault, failure judgement equipment is a plurality of circuit or single line;
(4) a plurality of circuit is decomposed into multiple single lines power transmission in order, and power transmission path order planning strategy is:It is important between province It is the first power transmission of heavy-haul line before interconnection or failure;Power transmission after common line.
(5) single line needs to plan optimal power transmission path (i.e. breaker closing sequence), planning strategy
For:A. it first closes a floodgate far from fault point side breaker;
B. if circuit side is mounted with that high-voltage shunt reactor, offside breaker first close a floodgate;
C. if circuit side is power plant, offside breaker first closes a floodgate.
The present invention can generate optimal power transmission path on the basis of electric network fault equipment has determined, ensure that power grid exists It resumes operation in shortest time, while ensureing stability of the power grid in restoring transmission process.

Claims (5)

1. a kind of optimal power transmission path decision method of the power grid of rule-based formula, it is characterised in that carry out according to the following steps:
Step 1, breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission;
Step 2, power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults;
Step 3 determines busbar or transformer fault power transmission rule;
Step 4 plans optimal power transmission path:Optimal power transmission path planning is carried out to complex fault according to above-mentioned rule.
2. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step Breaker closing Cahn-Ingold-Prelog sequence rule is when one determination circuit power transmission:It first closes a floodgate far from fault point side;Or, if circuit side is equipped with High-voltage shunt reactor then closes a floodgate since offside;Or, if circuit side is power plant, close a floodgate since offside.
3. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step Power transmission Cahn-Ingold-Prelog sequence rule is when two determination multi-line simultaneous faults:In heavily loaded shape before the preferential power transmission of important interconnection or failure between province The preferential power transmission of circuit of state.
4. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step Three determination busbares or transformer fault power transmission rule are:Busbar or transformer must on site fault clearing and check it is errorless after give Electricity.
5. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step The four optimal power transmission paths of planning are:According to above-mentioned steps one, Step 2: the rule described in step 3 carries out whole power transmission path rule It draws, to maximize guarantee power grid operation.
CN201810521482.3A 2018-05-28 2018-05-28 A kind of optimal power transmission path decision method of the power grid of rule-based formula Withdrawn CN108777482A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810521482.3A CN108777482A (en) 2018-05-28 2018-05-28 A kind of optimal power transmission path decision method of the power grid of rule-based formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810521482.3A CN108777482A (en) 2018-05-28 2018-05-28 A kind of optimal power transmission path decision method of the power grid of rule-based formula

Publications (1)

Publication Number Publication Date
CN108777482A true CN108777482A (en) 2018-11-09

Family

ID=64027820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810521482.3A Withdrawn CN108777482A (en) 2018-05-28 2018-05-28 A kind of optimal power transmission path decision method of the power grid of rule-based formula

Country Status (1)

Country Link
CN (1) CN108777482A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109754334A (en) * 2019-01-14 2019-05-14 华北电力大学(保定) The packet recovery method and device in power transmission path

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102545138A (en) * 2012-02-07 2012-07-04 中国电力科学研究院 Modeling power supply recovering method
CN103138227A (en) * 2013-02-06 2013-06-05 上海交通大学 Power distribution network fast power restoration method containing distributed power connected grid
CN103199512A (en) * 2013-04-10 2013-07-10 华北电力大学 Power distribution network single-phase earth fault network reconstruction method
CN103236683A (en) * 2013-04-25 2013-08-07 国家电网公司 Grid fault accident management method
CN103593708A (en) * 2013-11-28 2014-02-19 国家电网公司 Method for multi-failure power restoration of power distribution network
CN104158178A (en) * 2014-08-05 2014-11-19 国家电网公司 Smart distribution grid power supply zone recovery and whole optimization method based on reliability
CN105048460A (en) * 2015-08-26 2015-11-11 云南电网有限责任公司电力科学研究院 Power supply recovery method adopting heuristic search algorithm and fuzzy comprehensive judgment for power distribution grid
CN106026088A (en) * 2016-07-12 2016-10-12 国网天津市电力公司 Distribution network automation policy based on load section dividing transferring
CN106779171A (en) * 2016-11-25 2017-05-31 国网山东省电力公司济南供电公司 A kind of strong power transmission Intelligent Decision-making Method of transmission line malfunction
CN107317335A (en) * 2017-09-04 2017-11-03 云南电网有限责任公司电力科学研究院 A kind of method and device of failure distribution network restoration
CN107846011A (en) * 2017-07-17 2018-03-27 中国南方电网有限责任公司 A kind of distribution network failure restoration methods based on main distribution Collaborative Control

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102545138A (en) * 2012-02-07 2012-07-04 中国电力科学研究院 Modeling power supply recovering method
CN103138227A (en) * 2013-02-06 2013-06-05 上海交通大学 Power distribution network fast power restoration method containing distributed power connected grid
CN103199512A (en) * 2013-04-10 2013-07-10 华北电力大学 Power distribution network single-phase earth fault network reconstruction method
CN103236683A (en) * 2013-04-25 2013-08-07 国家电网公司 Grid fault accident management method
CN103593708A (en) * 2013-11-28 2014-02-19 国家电网公司 Method for multi-failure power restoration of power distribution network
CN104158178A (en) * 2014-08-05 2014-11-19 国家电网公司 Smart distribution grid power supply zone recovery and whole optimization method based on reliability
CN105048460A (en) * 2015-08-26 2015-11-11 云南电网有限责任公司电力科学研究院 Power supply recovery method adopting heuristic search algorithm and fuzzy comprehensive judgment for power distribution grid
CN106026088A (en) * 2016-07-12 2016-10-12 国网天津市电力公司 Distribution network automation policy based on load section dividing transferring
CN106779171A (en) * 2016-11-25 2017-05-31 国网山东省电力公司济南供电公司 A kind of strong power transmission Intelligent Decision-making Method of transmission line malfunction
CN107846011A (en) * 2017-07-17 2018-03-27 中国南方电网有限责任公司 A kind of distribution network failure restoration methods based on main distribution Collaborative Control
CN107317335A (en) * 2017-09-04 2017-11-03 云南电网有限责任公司电力科学研究院 A kind of method and device of failure distribution network restoration

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109754334A (en) * 2019-01-14 2019-05-14 华北电力大学(保定) The packet recovery method and device in power transmission path
CN109754334B (en) * 2019-01-14 2020-12-04 华北电力大学(保定) Grouping recovery method and device for power transmission path

Similar Documents

Publication Publication Date Title
Zadkhast et al. Reliability evaluation of an HVDC transmission system tapped by a VSC station
CN104836214B (en) A kind of based on distributed power generation grid-connected transition operational mode coordination comprehensive method of protection
CN107506849A (en) A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system
CN104269809B (en) Method for on-line verification of relay protection setting value of regional power grid
CN109787224B (en) Method for generating regional power grid load transfer strategy for preventing cascading overload
Azeroual et al. Fault location and detection techniques in power distribution systems with distributed generation: Kenitra City (Morocco) as a case study
CN109787196A (en) Low-voltage direct distribution network protection control method and system
CN107844891A (en) A kind of method for judging Power grid structure and changing and calculating schedule risk value
CN111948490B (en) Fault positioning and processing method for active power distribution network
CN111639841B (en) Lightning trip-out risk comprehensive evaluation method for high-voltage transmission line
Monadi et al. A communication-assisted protection scheme for direct-current distribution networks
CN108365600A (en) The faulty line detection method of hybrid dc circuit breaker system and breaker closing
Anudeep et al. Transient energy‐based combined fault detector and faulted phase selector for distribution networks with distributed generators
CN105337314A (en) Multisource coordination control fault treatment method based on distributed power supply black start technology
CN105391030B (en) The plan isolated island division methods of polymerization are gradually loaded based on network topology structure load
CN114971168A (en) Cable line synchronous line loss rate abnormity analysis method based on multi-system interaction
CN107067126A (en) It is a kind of based on power flow transfer than thermally-stabilised key transmission channel recognition method
CN108777482A (en) A kind of optimal power transmission path decision method of the power grid of rule-based formula
Rahman et al. Multi-agent approach for overcurrent protection coordination in low voltage microgrids
CN102611085B (en) Intertripping simulation analysis method
CN108847656B (en) Distribution network grounding line selection protection system based on self-adaptive dynamic contribution rate
CN114221326B (en) Segmented transfer method under condition of insufficient transfer capability of centralized self-healing function
Kim et al. Active TCC based protection coordination scheme for networked distribution system
CN115733140A (en) Method and system for searching power transmission section and calculating section limit based on search cut set
CN112595932B (en) Monopole fault line selection method suitable for medium-voltage direct-current power distribution network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181109