CN108777482A - A kind of optimal power transmission path decision method of the power grid of rule-based formula - Google Patents
A kind of optimal power transmission path decision method of the power grid of rule-based formula Download PDFInfo
- Publication number
- CN108777482A CN108777482A CN201810521482.3A CN201810521482A CN108777482A CN 108777482 A CN108777482 A CN 108777482A CN 201810521482 A CN201810521482 A CN 201810521482A CN 108777482 A CN108777482 A CN 108777482A
- Authority
- CN
- China
- Prior art keywords
- power transmission
- rule
- transmission path
- optimal
- power grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 69
- 238000000034 method Methods 0.000 title claims abstract description 15
- 230000005611 electricity Effects 0.000 claims description 2
- 230000002596 correlated effect Effects 0.000 abstract 1
- 238000011084 recovery Methods 0.000 description 4
- 150000001875 compounds Chemical class 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Classifications
-
- H02J3/005—
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The present invention relates to a kind of optimal power transmission path decision methods of the power grid of rule-based formula, it is characterised in that carries out according to the following steps:Step 1, breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission;Step 2, power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults;Step 3 determines busbar or transformer fault power transmission rule;Step 4 plans optimal power transmission path:Optimal power transmission path planning is carried out to complex fault according to above-mentioned rule.The present invention considers network load demand and correlated condition constraint using isolated fault electrical equipment as principle, based on series of optimum power transmission rule, one optimal power transmission path is provided, so that the influence suffered by power grid is minimum, power off time is effectively reduced, maximizes and ensures power grid operation.
Description
Technical field
The invention belongs to the technical fields of electric system, and in particular to a kind of optimal power transmission path of the power grid of rule-based formula
Decision-making technique.
Background technology
With the continuous development of extra-high voltage grid construction, interregional interconnection is more and more closer, and substation is as power grid core
Website, to the quick processing of its multiple compound contingency, fast quick-recovery normal device power transmission, more stringent requirements are proposed.Power grid event
The quick disposition of barrier there is an urgent need to using compared to former more abundant fault message, progress rapidly and accurately faulty equipment every
From, and the power transmission path of optimization is provided.
Currently, after identifying faulty equipment by accident analysis, selection restores power transmission path and relies primarily on dispatcher's
Operating experience, such way can be applicable in the case where minor scale power net simple fault.But for power grid multiple compound contingency
Speech, non-faulting equipment to be restored may more than one, and the recovery of each non-faulting equipment power grid can be generated compared with
Big influence, in addition lead to the problem of it is new, such as power flow transfer cause branch overload.Therefore, restore in power transmission path process, such as
The recovery sequence of what reasonable arrangement non-faulting equipment, on the one hand ensures the safe and stable operation of power grid, avoids insecurity
Occur again, on the other hand takes recovery power transmission path most short, the operating experience for relying solely on dispatcher judges, past
It is past to be difficult to obtain satisfactory result.
Invention content
It is an object of the invention to provide a kind of optimal power transmission path decision methods of the power grid of rule-based formula, and the present invention is in failure
When processing, the optimal path that restores electricity is formulated to dispatcher.
A kind of optimal power transmission path decision method of the power grid of rule-based formula, it is characterised in that carry out according to the following steps:
Step 1, breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission;
Step 2, power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults;
Step 3 determines busbar or transformer fault power transmission rule;
Step 4 plans optimal power transmission path:Optimal power transmission path planning is carried out to complex fault according to above-mentioned rule.
A kind of optimal power transmission path decision method of the power grid of rule-based formula, it is characterised in that following steps:
Breaker closing Cahn-Ingold-Prelog sequence rule is when step 1 determines circuit power transmission:It first closes a floodgate far from fault point side;Or, if line
Road side is equipped with high-voltage shunt reactor, then closes a floodgate since offside;Or, if circuit side is power plant, opened from offside
Begin to close a floodgate.
Power transmission Cahn-Ingold-Prelog sequence rule is when step 2 determines multi-line simultaneous faults:The preferential power transmission of important interconnection or failure between province
The preferential power transmission of the preceding circuit in heavy condition.
Step 3 determines that busbar or transformer fault power transmission rule are:Busbar or transformer on site fault clearing and must be examined
Look into errorless rear power transmission.
Step 4 plans that optimal power transmission path is:According to above-mentioned steps one, Step 2: the rule progress described in step 3 is whole
Body power transmission path planning, to maximize guarantee power grid operation.
Description of the drawings
Fig. 1 is that the power transmission rule of the present invention forms flow chart.
Fig. 2 is the optimal power transmission path decision flow chart of the present invention.
Specific implementation mode
The technical solution of the present invention is further elaborated with specific implementation case below in conjunction with the accompanying drawings.
A kind of optimal power transmission path decision method of the power grid of rule-based formula, as shown in Figure 1, it is characterised in that press following step
It is rapid to carry out:
Step 1:Breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission, as in the table below:
Step 2:Power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults, as in the table below:
Serial number | Rule |
1 | The important preferential power transmission of interconnection between province |
2 | The preferential power transmission of circuit of heavy condition is in before failure |
Step 3:Busbar or transformer fault power transmission rule are determined, for busbar or transformer fault, it is necessary to which scene excludes
Failure simultaneously checks errorless rear power transmission.
Step 4:Plan that optimal power transmission path is:According to above-mentioned steps one, Step 2: the rule progress described in step 3 is whole
Body power transmission path planning, to maximize guarantee power grid operation, detailed process is as shown in Figure 2:
(1) first determine whether that faulty equipment is that circuit or busbar or transformer are intended to busbar or transformer fault
On site fault clearing simultaneously checks errorless rear power transmission;
(2) for line fault, determine whether single-phase fault, if not single-phase fault, to arrive on site fault clearing
And check errorless rear power transmission;
(3) if line fault is single-phase fault, failure judgement equipment is a plurality of circuit or single line;
(4) a plurality of circuit is decomposed into multiple single lines power transmission in order, and power transmission path order planning strategy is:It is important between province
It is the first power transmission of heavy-haul line before interconnection or failure;Power transmission after common line.
(5) single line needs to plan optimal power transmission path (i.e. breaker closing sequence), planning strategy
For:A. it first closes a floodgate far from fault point side breaker;
B. if circuit side is mounted with that high-voltage shunt reactor, offside breaker first close a floodgate;
C. if circuit side is power plant, offside breaker first closes a floodgate.
The present invention can generate optimal power transmission path on the basis of electric network fault equipment has determined, ensure that power grid exists
It resumes operation in shortest time, while ensureing stability of the power grid in restoring transmission process.
Claims (5)
1. a kind of optimal power transmission path decision method of the power grid of rule-based formula, it is characterised in that carry out according to the following steps:
Step 1, breaker closing Cahn-Ingold-Prelog sequence rule when determining circuit power transmission;
Step 2, power transmission Cahn-Ingold-Prelog sequence rule when determining multi-line simultaneous faults;
Step 3 determines busbar or transformer fault power transmission rule;
Step 4 plans optimal power transmission path:Optimal power transmission path planning is carried out to complex fault according to above-mentioned rule.
2. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step
Breaker closing Cahn-Ingold-Prelog sequence rule is when one determination circuit power transmission:It first closes a floodgate far from fault point side;Or, if circuit side is equipped with
High-voltage shunt reactor then closes a floodgate since offside;Or, if circuit side is power plant, close a floodgate since offside.
3. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step
Power transmission Cahn-Ingold-Prelog sequence rule is when two determination multi-line simultaneous faults:In heavily loaded shape before the preferential power transmission of important interconnection or failure between province
The preferential power transmission of circuit of state.
4. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step
Three determination busbares or transformer fault power transmission rule are:Busbar or transformer must on site fault clearing and check it is errorless after give
Electricity.
5. the optimal power transmission path decision method of the power grid of rule-based formula according to claim 1, it is characterised in that:Step
The four optimal power transmission paths of planning are:According to above-mentioned steps one, Step 2: the rule described in step 3 carries out whole power transmission path rule
It draws, to maximize guarantee power grid operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810521482.3A CN108777482A (en) | 2018-05-28 | 2018-05-28 | A kind of optimal power transmission path decision method of the power grid of rule-based formula |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810521482.3A CN108777482A (en) | 2018-05-28 | 2018-05-28 | A kind of optimal power transmission path decision method of the power grid of rule-based formula |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108777482A true CN108777482A (en) | 2018-11-09 |
Family
ID=64027820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810521482.3A Withdrawn CN108777482A (en) | 2018-05-28 | 2018-05-28 | A kind of optimal power transmission path decision method of the power grid of rule-based formula |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108777482A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109754334A (en) * | 2019-01-14 | 2019-05-14 | 华北电力大学(保定) | The packet recovery method and device in power transmission path |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102545138A (en) * | 2012-02-07 | 2012-07-04 | 中国电力科学研究院 | Modeling power supply recovering method |
CN103138227A (en) * | 2013-02-06 | 2013-06-05 | 上海交通大学 | Power distribution network fast power restoration method containing distributed power connected grid |
CN103199512A (en) * | 2013-04-10 | 2013-07-10 | 华北电力大学 | Power distribution network single-phase earth fault network reconstruction method |
CN103236683A (en) * | 2013-04-25 | 2013-08-07 | 国家电网公司 | Grid fault accident management method |
CN103593708A (en) * | 2013-11-28 | 2014-02-19 | 国家电网公司 | Method for multi-failure power restoration of power distribution network |
CN104158178A (en) * | 2014-08-05 | 2014-11-19 | 国家电网公司 | Smart distribution grid power supply zone recovery and whole optimization method based on reliability |
CN105048460A (en) * | 2015-08-26 | 2015-11-11 | 云南电网有限责任公司电力科学研究院 | Power supply recovery method adopting heuristic search algorithm and fuzzy comprehensive judgment for power distribution grid |
CN106026088A (en) * | 2016-07-12 | 2016-10-12 | 国网天津市电力公司 | Distribution network automation policy based on load section dividing transferring |
CN106779171A (en) * | 2016-11-25 | 2017-05-31 | 国网山东省电力公司济南供电公司 | A kind of strong power transmission Intelligent Decision-making Method of transmission line malfunction |
CN107317335A (en) * | 2017-09-04 | 2017-11-03 | 云南电网有限责任公司电力科学研究院 | A kind of method and device of failure distribution network restoration |
CN107846011A (en) * | 2017-07-17 | 2018-03-27 | 中国南方电网有限责任公司 | A kind of distribution network failure restoration methods based on main distribution Collaborative Control |
-
2018
- 2018-05-28 CN CN201810521482.3A patent/CN108777482A/en not_active Withdrawn
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102545138A (en) * | 2012-02-07 | 2012-07-04 | 中国电力科学研究院 | Modeling power supply recovering method |
CN103138227A (en) * | 2013-02-06 | 2013-06-05 | 上海交通大学 | Power distribution network fast power restoration method containing distributed power connected grid |
CN103199512A (en) * | 2013-04-10 | 2013-07-10 | 华北电力大学 | Power distribution network single-phase earth fault network reconstruction method |
CN103236683A (en) * | 2013-04-25 | 2013-08-07 | 国家电网公司 | Grid fault accident management method |
CN103593708A (en) * | 2013-11-28 | 2014-02-19 | 国家电网公司 | Method for multi-failure power restoration of power distribution network |
CN104158178A (en) * | 2014-08-05 | 2014-11-19 | 国家电网公司 | Smart distribution grid power supply zone recovery and whole optimization method based on reliability |
CN105048460A (en) * | 2015-08-26 | 2015-11-11 | 云南电网有限责任公司电力科学研究院 | Power supply recovery method adopting heuristic search algorithm and fuzzy comprehensive judgment for power distribution grid |
CN106026088A (en) * | 2016-07-12 | 2016-10-12 | 国网天津市电力公司 | Distribution network automation policy based on load section dividing transferring |
CN106779171A (en) * | 2016-11-25 | 2017-05-31 | 国网山东省电力公司济南供电公司 | A kind of strong power transmission Intelligent Decision-making Method of transmission line malfunction |
CN107846011A (en) * | 2017-07-17 | 2018-03-27 | 中国南方电网有限责任公司 | A kind of distribution network failure restoration methods based on main distribution Collaborative Control |
CN107317335A (en) * | 2017-09-04 | 2017-11-03 | 云南电网有限责任公司电力科学研究院 | A kind of method and device of failure distribution network restoration |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109754334A (en) * | 2019-01-14 | 2019-05-14 | 华北电力大学(保定) | The packet recovery method and device in power transmission path |
CN109754334B (en) * | 2019-01-14 | 2020-12-04 | 华北电力大学(保定) | Grouping recovery method and device for power transmission path |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zadkhast et al. | Reliability evaluation of an HVDC transmission system tapped by a VSC station | |
CN104836214B (en) | A kind of based on distributed power generation grid-connected transition operational mode coordination comprehensive method of protection | |
CN107506849A (en) | A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system | |
CN104269809B (en) | Method for on-line verification of relay protection setting value of regional power grid | |
CN109787224B (en) | Method for generating regional power grid load transfer strategy for preventing cascading overload | |
Azeroual et al. | Fault location and detection techniques in power distribution systems with distributed generation: Kenitra City (Morocco) as a case study | |
CN109787196A (en) | Low-voltage direct distribution network protection control method and system | |
CN107844891A (en) | A kind of method for judging Power grid structure and changing and calculating schedule risk value | |
CN111948490B (en) | Fault positioning and processing method for active power distribution network | |
CN111639841B (en) | Lightning trip-out risk comprehensive evaluation method for high-voltage transmission line | |
Monadi et al. | A communication-assisted protection scheme for direct-current distribution networks | |
CN108365600A (en) | The faulty line detection method of hybrid dc circuit breaker system and breaker closing | |
Anudeep et al. | Transient energy‐based combined fault detector and faulted phase selector for distribution networks with distributed generators | |
CN105337314A (en) | Multisource coordination control fault treatment method based on distributed power supply black start technology | |
CN105391030B (en) | The plan isolated island division methods of polymerization are gradually loaded based on network topology structure load | |
CN114971168A (en) | Cable line synchronous line loss rate abnormity analysis method based on multi-system interaction | |
CN107067126A (en) | It is a kind of based on power flow transfer than thermally-stabilised key transmission channel recognition method | |
CN108777482A (en) | A kind of optimal power transmission path decision method of the power grid of rule-based formula | |
Rahman et al. | Multi-agent approach for overcurrent protection coordination in low voltage microgrids | |
CN102611085B (en) | Intertripping simulation analysis method | |
CN108847656B (en) | Distribution network grounding line selection protection system based on self-adaptive dynamic contribution rate | |
CN114221326B (en) | Segmented transfer method under condition of insufficient transfer capability of centralized self-healing function | |
Kim et al. | Active TCC based protection coordination scheme for networked distribution system | |
CN115733140A (en) | Method and system for searching power transmission section and calculating section limit based on search cut set | |
CN112595932B (en) | Monopole fault line selection method suitable for medium-voltage direct-current power distribution network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181109 |