CN108775894A CN201810554761.XA CN201810554761A CN108775894A CN 108775894 A CN108775894 A CN 108775894A CN 201810554761 A CN201810554761 A CN 201810554761A CN 108775894 A CN108775894 A CN 108775894A
Authority
CN
China
Prior art keywords
construction
target structures
dimensional panoramic
panoramic model
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810554761.XA
Other languages
Chinese (zh)
Inventor
李少伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiankun Information Technology Co Ltd
Original Assignee
Shanghai Jiankun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiankun Information Technology Co Ltd filed Critical Shanghai Jiankun Information Technology Co Ltd
Priority to CN201810554761.XA priority Critical patent/CN108775894A/en
Publication of CN108775894A publication Critical patent/CN108775894A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of construction monitoring method based on BIM, is related to technical field of building construction, the solution is to improve construction efficiency.This method first builds construction drawing, and sets a central axis for target structures, and builds the BIM models of target structures in a computer;Then the construction of target structures is carried out according to construction drawing, and the building data for acquiring part of having constructed in the construction process build the three-dimensional panoramic model of target structures and the update of interval in a computer;And the three-dimensional panoramic model of target structures is compared with BIM models in a computer, the difference between three-dimensional panoramic model and BIM models is calculated according to the central axis of target structures;And Construction Condition is judged according to results of measuring.Method provided by the invention is suitable for the construction supervision of building.

Description

Construction monitoring method based on BIM
Technical field
The present invention relates to building construction technologies, more particularly to a kind of technology of the construction monitoring method based on BIM.
Background technology
Existing construction monitoring is all the building data of part of having been constructed by engineers and technicians' acquisition, further according to adopting The building data of collection judge that construction quality, this artificial judgment result often deposit larger deviation, finally with construction experience The counter-measure made also tends to not be best, and implementation result is limited, to affect construction efficiency, also increases construction Cost.
Invention content
Defect present in for the above-mentioned prior art can be improved technical problem to be solved by the invention is to provide a kind of Construction efficiency reduces the construction monitoring method based on BIM of construction cost.
In order to solve the above-mentioned technical problem, a kind of construction monitoring method based on BIM provided by the present invention, it is special Sign is, is as follows:
1)The construction drawing of construction is built, and according to constructed construction drawing, a vertical center is set for target structures Axis, and the BIM models of target structures are built in a computer;
2)The construction of target structures is carried out according to the construction drawing of construction, and in the construction process, between construction site The acquisition having a rest has been constructed the building data of part;
According to the building data of the part of having constructed acquired for the first time, the three-dimensional panoramic model of target structures is built in a computer, And the building data of the part of having constructed according to subsequent acquisition, the three-dimensional panoramic model of target structures is updated;
When building the three-dimensional panoramic model of target structures, and when being updated every time to the three-dimensional panoramic model of target structures, The three-dimensional panoramic model of target structures is compared with the BIM models of target structures in a computer, according to target structures Central axis calculates the building data of each comparison point in three-dimensional panoramic model and building for each corresponding points in BIM models Build the difference between data;
Point is compared for any one in three-dimensional panoramic model, if the building data of the comparison point and pair in BIM models Difference between the building data that should be put exceeds preset tolerance, then judges that the construction of the comparison point is below standard.
Construction monitoring method provided by the invention based on BIM, passes through the three-dimensional of target structures in construction progress Panorama model and the comparison of BIM models built in advance, carry out auxiliary construction management, can find in time construction there are the problem of Or hidden danger, best counter-measure is made so as to auxiliary construction management, raising production efficiency in building construction process, It is cost-effective and shorten the construction period aspect play a significant role.
Specific implementation mode
Below in conjunction with specific embodiment, present invention is further described in detail, but the present embodiment is not limited to this hair Bright, every similar structure using the present invention and its similar variation should all be included in protection scope of the present invention, in the present invention Number indicate the relationship of sum.
A kind of construction monitoring method based on BIM that the embodiment of the present invention is provided, which is characterized in that specific steps It is as follows:
1)The construction drawing of construction is built, and according to constructed construction drawing, a vertical center is set for target structures Axis, and the BIM models of target structures are built in a computer(Architecture information model), the method for structure BIM models is existing There is technology;
2)The construction of target structures is carried out according to the construction drawing of construction, and in the construction process, between construction site The acquisition having a rest has been constructed the building data of part(Building data includes:It the length of each construction part and each has applied Spacing etc. between Ministry of worker position);
According to the building data of the part of having constructed acquired for the first time, the three-dimensional panoramic model of target structures is built in a computer, And the building data of the part of having constructed according to subsequent acquisition, the three-dimensional panoramic model of target structures is updated, structure three The method for tieing up panorama model is the prior art;
When building the three-dimensional panoramic model of target structures, and when being updated every time to the three-dimensional panoramic model of target structures, The three-dimensional panoramic model of target structures is compared with the BIM models of target structures in a computer, according to target structures Central axis calculates the building data of each comparison point in three-dimensional panoramic model and building for each corresponding points in BIM models Build the difference between data;
Point is compared for any one in three-dimensional panoramic model, if the building data of the comparison point and pair in BIM models Difference between the building data that should be put exceeds preset tolerance, then judges that the construction of the comparison point is below standard.

Claims (1)

1. a kind of construction monitoring method based on BIM, which is characterized in that be as follows:
1)The construction drawing of construction is built, and according to constructed construction drawing, a vertical center is set for target structures Axis, and the BIM models of target structures are built in a computer;
2)The construction of target structures is carried out according to the construction drawing of construction, and in the construction process, between construction site The acquisition having a rest has been constructed the building data of part;
According to the building data of the part of having constructed acquired for the first time, the three-dimensional panoramic model of target structures is built in a computer, And the building data of the part of having constructed according to subsequent acquisition, the three-dimensional panoramic model of target structures is updated;
When building the three-dimensional panoramic model of target structures, and when being updated every time to the three-dimensional panoramic model of target structures, The three-dimensional panoramic model of target structures is compared with the BIM models of target structures in a computer, according to target structures Central axis calculates the building data of each comparison point in three-dimensional panoramic model and building for each corresponding points in BIM models Build the difference between data;
Point is compared for any one in three-dimensional panoramic model, if the building data of the comparison point and pair in BIM models Difference between the building data that should be put exceeds preset tolerance, then judges that the construction of the comparison point is below standard.
CN201810554761.XA 2018-06-01 2018-06-01 Construction monitoring method based on BIM Pending CN108775894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810554761.XA CN108775894A (en) 2018-06-01 2018-06-01 Construction monitoring method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810554761.XA CN108775894A (en) 2018-06-01 2018-06-01 Construction monitoring method based on BIM

Publications (1)

Publication Number Publication Date
CN108775894A true CN108775894A (en) 2018-11-09

Family

ID=64028379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810554761.XA Pending CN108775894A (en) 2018-06-01 2018-06-01 Construction monitoring method based on BIM

Country Status (1)

Country Link
CN (1) CN108775894A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113869684A (en) * 2021-09-17 2021-12-31 湖南方圆工程咨询监理有限公司 BIM-based project progress management method, device and system
WO2022183650A1 (en) * 2021-03-05 2022-09-09 中国铁建国际集团有限公司 Three-dimensional scanning technology-based method and system for monitoring construction of steel structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105719200A (en) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
CN106055839A (en) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 Application method of three-dimensional scanning technology in building engineering based on BIM
CN106251249A (en) * 2016-07-28 2016-12-21 内蒙古科技大学 A kind of construction informationization dynamic monitoring system
CN106647585A (en) * 2017-01-20 2017-05-10 深圳广田集团股份有限公司 Monitoring method and system based on BIM (building information module) three-dimensional model and intelligent safety helmet
CN107943844A (en) * 2016-10-25 2018-04-20 福建省建筑设计研究院有限公司 Project data based on BIM gathers in real time, processing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105719200A (en) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
CN106055839A (en) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 Application method of three-dimensional scanning technology in building engineering based on BIM
CN106251249A (en) * 2016-07-28 2016-12-21 内蒙古科技大学 A kind of construction informationization dynamic monitoring system
CN107943844A (en) * 2016-10-25 2018-04-20 福建省建筑设计研究院有限公司 Project data based on BIM gathers in real time, processing system
CN106647585A (en) * 2017-01-20 2017-05-10 深圳广田集团股份有限公司 Monitoring method and system based on BIM (building information module) three-dimensional model and intelligent safety helmet

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022183650A1 (en) * 2021-03-05 2022-09-09 中国铁建国际集团有限公司 Three-dimensional scanning technology-based method and system for monitoring construction of steel structure
CN113869684A (en) * 2021-09-17 2021-12-31 湖南方圆工程咨询监理有限公司 BIM-based project progress management method, device and system

Similar Documents

Publication Publication Date Title
CN107974945B (en) BIM modeling method based on variable cross-section rigid frame bridge continuous beam cantilever pouring construction
WO2019072289A3 (en) Blockchain smart contract updates using decentralized decision
CN111627099B (en) Steel structure non-contact actual measurement real quantity method and system based on three-dimensional scanning technology
WO2019070644A3 (en) Systems and methods for utilizing multicriteria optimization in additive manufacture
CN108775894A (en) Construction monitoring method based on BIM
WO2023159810A1 (en) Digital twinning-based construction monitoring method and system for concrete-filled steel tube arch bridges
CN105178922B (en) A kind of perforation completion method for hydraulic fracturing physical simulation experiment
WO2015101461A3 (en) Method and apparatus for design of a metrology target
CN108898085A (en) Intelligent road disease detection method based on mobile phone video
WO2014052246A3 (en) Method for electronic temperature controlled curing of concrete and accelerating concrete maturity or equivalent age of precast concrete structures and objects and apparatus for same
WO2015165739A3 (en) Artificial turf production using a nucleating agent
WO2006115725A3 (en) Method and apparatus for determining the location of a node in a wireless system
WO2017083852A8 (en) Methods for the treatment of corneal dystrophies
WO2010049564A3 (en) Optimized-cost method for computer-assisted calculation of the aerodynamic forces in an aircraft
CN109269486B (en) Vibration-corrected total station displacement monitoring method
EP2608123A1 (en) System for distributing electrical energy over a cluster of electrical devices, method for distributing electrical energy over a cluster of electrical devices of such a system and controller for use in such a system
CN109299825A (en) A kind of prediction technique and forecasting system based on the real-time passenger flow of rail traffic
CN110411363B (en) Tunnel convergence deformation detection method and system
CN112185476A (en) Method and device for improving utilization rate of artemisinin by-product
SA115360319B1 (en) Method for analyzing the wall thickness distribution of a pipe
CN103967247A (en) Special-shaped GRG block partition limiting installation structure and splicing method thereof
CN108427792A (en) A kind of manufacturing cost estimation method and system
WO2008021943A3 (en) Geospatial modeling system for performing filtering operations based upon a sum of differences of a given and neighboring location points and related methods
CN112153151B (en) Intelligent manufacturing workshop safety management method and system based on blockchain
CN104266625A (en) Method for monitoring thickness of concrete base layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181109