CN108756899A - A kind of control of large deformation tunnel becomes excavation method - Google Patents
A kind of control of large deformation tunnel becomes excavation method Download PDFInfo
- Publication number
- CN108756899A CN108756899A CN201810595766.7A CN201810595766A CN108756899A CN 108756899 A CN108756899 A CN 108756899A CN 201810595766 A CN201810595766 A CN 201810595766A CN 108756899 A CN108756899 A CN 108756899A
- Authority
- CN
- China
- Prior art keywords
- steelframe
- steel
- arch
- shelf
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009412 basement excavation Methods 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000010276 construction Methods 0.000 claims abstract description 32
- 235000007164 Oryza sativa Nutrition 0.000 claims abstract description 11
- 235000009566 rice Nutrition 0.000 claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 88
- 239000010959 steel Substances 0.000 claims description 88
- 230000003014 reinforcing effect Effects 0.000 claims description 21
- 210000003771 C cell Anatomy 0.000 claims description 15
- 238000005520 cutting process Methods 0.000 claims description 13
- 241000209094 Oryza Species 0.000 claims description 10
- 238000009826 distribution Methods 0.000 claims description 7
- 238000003032 molecular docking Methods 0.000 claims description 7
- 238000005457 optimization Methods 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 5
- 238000007363 ring formation reaction Methods 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 3
- 230000005641 tunneling Effects 0.000 claims description 3
- 240000007594 Oryza sativa Species 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 101100510615 Caenorhabditis elegans lag-2 gene Proteins 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 238000003325 tomography Methods 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/003—Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/28—Longitudinal struts, i.e. longitudinal connections between adjoining arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810595766.7A CN108756899B (en) | 2018-06-11 | 2018-06-11 | Variable control excavation method for large-deformation tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810595766.7A CN108756899B (en) | 2018-06-11 | 2018-06-11 | Variable control excavation method for large-deformation tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108756899A true CN108756899A (en) | 2018-11-06 |
CN108756899B CN108756899B (en) | 2020-02-14 |
Family
ID=64021986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810595766.7A Active CN108756899B (en) | 2018-06-11 | 2018-06-11 | Variable control excavation method for large-deformation tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108756899B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112780287A (en) * | 2021-02-03 | 2021-05-11 | 中铁二局第一工程有限公司 | Violent-desertification dolomite small-section tunnel excavation system and method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3743202A1 (en) * | 1987-12-19 | 1989-06-29 | Kordes & Partner Beratende Ing | Control of pipe advances by means of asymmetrical longitudinal prestressing |
US20010025583A1 (en) * | 1999-12-31 | 2001-10-04 | Shim Dong Soo | Center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split |
CN103244146A (en) * | 2013-05-14 | 2013-08-14 | 中铁二十一局集团第四工程有限公司 | Construction method for steel frame connection in tunnel anchor-plate retaining |
CN104405399A (en) * | 2014-09-18 | 2015-03-11 | 中铁建大桥工程局集团第二工程有限公司 | Construction method for excavating support body in tunnel by crossing quicksand stratum |
CN106761769A (en) * | 2016-11-23 | 2017-05-31 | 长安大学 | A kind of construction technology of big cross section large-deformation tunnel in soft rock |
CN107725071A (en) * | 2017-09-05 | 2018-02-23 | 长安大学 | The large deformation control method of chlorite quartz-schist stratum longspan tunnel |
CN107725058A (en) * | 2017-09-05 | 2018-02-23 | 长安大学 | The large deformation control method of chlorite schist stratum list hole Three-Lane Highway Tunnel |
CN207377571U (en) * | 2017-11-10 | 2018-05-18 | 中铁二十四局集团安徽工程有限公司 | Extension type cross preliminary bracing structure |
-
2018
- 2018-06-11 CN CN201810595766.7A patent/CN108756899B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3743202A1 (en) * | 1987-12-19 | 1989-06-29 | Kordes & Partner Beratende Ing | Control of pipe advances by means of asymmetrical longitudinal prestressing |
US20010025583A1 (en) * | 1999-12-31 | 2001-10-04 | Shim Dong Soo | Center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split |
CN103244146A (en) * | 2013-05-14 | 2013-08-14 | 中铁二十一局集团第四工程有限公司 | Construction method for steel frame connection in tunnel anchor-plate retaining |
CN104405399A (en) * | 2014-09-18 | 2015-03-11 | 中铁建大桥工程局集团第二工程有限公司 | Construction method for excavating support body in tunnel by crossing quicksand stratum |
CN106761769A (en) * | 2016-11-23 | 2017-05-31 | 长安大学 | A kind of construction technology of big cross section large-deformation tunnel in soft rock |
CN107725071A (en) * | 2017-09-05 | 2018-02-23 | 长安大学 | The large deformation control method of chlorite quartz-schist stratum longspan tunnel |
CN107725058A (en) * | 2017-09-05 | 2018-02-23 | 长安大学 | The large deformation control method of chlorite schist stratum list hole Three-Lane Highway Tunnel |
CN207377571U (en) * | 2017-11-10 | 2018-05-18 | 中铁二十四局集团安徽工程有限公司 | Extension type cross preliminary bracing structure |
Non-Patent Citations (2)
Title |
---|
代长礼 等: "软岩大变形隧道施工技术探讨", 《科学研究》 * |
杨仕彬: "隧道软弱围岩段大变形分析及处理措施", 《科技论坛(下半月)》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112780287A (en) * | 2021-02-03 | 2021-05-11 | 中铁二局第一工程有限公司 | Violent-desertification dolomite small-section tunnel excavation system and method |
Also Published As
Publication number | Publication date |
---|---|
CN108756899B (en) | 2020-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102562099B (en) | Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits | |
CN104612698B (en) | A kind of shallow-depth-excavation tunnel top bar interval wall construction method | |
CN110630283B (en) | Three-layer supporting structure suitable for double-arch tunnel and construction method | |
CN110439571A (en) | Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel | |
CN110017144B (en) | Loess tunnel three-step construction method considering substrate reinforcement treatment | |
CN104653187B (en) | Method for excavating geological large-section tunnel with water-rich sand layer | |
CN102268993B (en) | Method for excavating tunnel in high liquid limit soil | |
CN104329095B (en) | A kind of existing tunnel Widening Construction method | |
CN107905814B (en) | Large span loess tunnel top bar CD construction method | |
CN111594185B (en) | Construction method for mechanically excavating CRD (cross section) of tunnel under loess stratum condition | |
CN103277106A (en) | Highway tunnel three-step five-procedure excavation construction method | |
CN110486021B (en) | Construction method for converting large-section tunnel into two small-section tunnels | |
CN106837357A (en) | A kind of no-dig technique pipe-roof method of use curve pipe canopy | |
CN110043290A (en) | A kind of large section tri-arch tunnel construction method | |
CN107939415A (en) | Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span | |
CN109184704B (en) | Small clear distance tunnel excavation and middle rock clamping reinforcement technology | |
CN106246191B (en) | A kind of hole body is dredged, fills plentiful large-scale karst cave treatment and tunnel excavation method deeply | |
CN104533428A (en) | Steep cliff tunnel hole excavation construction method | |
CN108915714A (en) | The double TBM installation methods in one hole | |
CN108756899A (en) | A kind of control of large deformation tunnel becomes excavation method | |
CN107387129A (en) | A kind of rapid constructing method for controlling the deformation of tunnel extrusion pressing type | |
CN111828012A (en) | Construction method for subway tunnel mine with upper soft and lower hard rock stratum in high karst area | |
CN208578574U (en) | A kind of nine supporting construction of double -side approach | |
CN109594995A (en) | A kind of Support System in Soft Rock Tunnels micro-disturbance machinery branch driving engineering method | |
CN110410110A (en) | A kind of large cross-section tunnel composite lining and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wan Fei Inventor after: Xue Yunke Inventor after: Qin Kai Inventor after: Gu Qi Hui Inventor after: Shen Ke Inventor after: Tian Libing Inventor after: Li Changsong Inventor after: Chen Lin Inventor after: Li Li Inventor after: Liang Enhua Inventor after: Cai Chenglin Inventor after: Tang Zhongquan Inventor after: Pu Tongti Inventor after: He Fusheng Inventor after: Wang Guowei Inventor after: Zeng Jun Inventor before: Wan Fei Inventor before: Qin Kai Inventor before: Gu Qi Hui Inventor before: Shen Ke Inventor before: Tian Libing Inventor before: Li Changsong Inventor before: Chen Lin Inventor before: Li Li Inventor before: Liang Enhua Inventor before: Tang Zhongquan Inventor before: Pu Tongti Inventor before: He Fusheng Inventor before: Wang Guowei Inventor before: Zeng Jun Inventor before: Xue Yunke |