CN108756892A - Job platform and its work continuously system and operational method for constructing tunnel - Google Patents

Job platform and its work continuously system and operational method for constructing tunnel Download PDF

Info

Publication number
CN108756892A
CN108756892A CN201810289134.8A CN201810289134A CN108756892A CN 108756892 A CN108756892 A CN 108756892A CN 201810289134 A CN201810289134 A CN 201810289134A CN 108756892 A CN108756892 A CN 108756892A
Authority
CN
China
Prior art keywords
tunnel
arch support
arch
construction
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810289134.8A
Other languages
Chinese (zh)
Other versions
CN108756892B (en
Inventor
伍毅敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201810289134.8A priority Critical patent/CN108756892B/en
Publication of CN108756892A publication Critical patent/CN108756892A/en
Application granted granted Critical
Publication of CN108756892B publication Critical patent/CN108756892B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Work continuously system and operational method the invention discloses a kind of job platform and its for constructing tunnel, job platform include arch support similar with tunnel arcuate inner walls transverse shapes and the running gear that is moved along tunnel longitudinal direction for arch support;The running gear includes main walking mechanism and auxiliary propelling machine;Arch support suspension is connected on suspended rail by main walking mechanism, while arch support support being connected on supporting track by auxiliary propelling machine again, and the circumferential walking mechanism for carrying construction equipment head is set in its circular arch direction of arch support upper edge.The system of working continuously for constructing tunnel proposed using the job platform proposes a kind of completely new method of tunnel drilling and blasting form of construction work, the drill bursting construction existing technical barrier that construction site is irregular, excavation method is various, equipment interoperability is not strong in the process is effectively overcome, to realize the comprehensive mechanization of drill+blast tunnel and unmanned condition of laying a good foundation of constructing.

Description

Job platform and its work continuously system and operational method for constructing tunnel
Technical field
The invention belongs to tunnel construction technologies, and in particular to a kind of job platform and its working continuously for constructing tunnel System and operational method.
Background technology
It is built the epoch in wisdom, comprehensive mechanization and unmanned construct are the inexorable trends of Tunnel Engineering technology development.It bores quick-fried Method and shield method are two kinds of main methods of constructing tunnel.Shield method builds tunnel by using comprehensive large-scale shield at present Structure machine may be implemented to tunnel, slag tap, the full process mechanized construction such as pipe sheet assembling, back-grouting, theoretically can reach nobody and apply Work.And drilling and blasting method build tunnel include excavations, supporting, waterproof layer paving extension, lining cutting pour, the working procedures such as lining cutting health, each Process all configures special mechanical equipment or Working gantry, realizes that the unmanned construction of comprehensive mechanization faces great difficulty.But it bores The advantage and adaptation that quick-fried method has shield method irreplaceable in tunnel scale, sidewalk condition, construction site, prefabricated condition etc. Property, it is still the main method of constructing tunnel within the following considerable time.
When using drill bursting construction, (rock drilling, explosion, is slagged tap at powder charge), supporting (anchoring, stand, spray concrete), construction are excavated Each construction procedures such as monitoring, waterproof layer paving extension, lining cutting (including assembling reinforcement), maintenance have different types of trolley and machine Tool, these trolleys and equipment are all that ground running construction in tunnel is arranged in support, and in geometry and size, vehicle with walking machine There are greatest differences for the everyways such as structure, Operation control.Meanwhile explosive blasting broken rock is used using the tunnel of drill bursting construction, The tunnel bottom bumps actually excavated rise and fall, and underground water impregnates in addition and vehicle rolls, and construction site is extremely irregular.In addition, adopting When with drill bursting construction, according to formation condition difference, it is also possible to more using tunneling boring, up/down steps, three steps and pilot tunnel method etc. Kind excavation method is excavated, and section piecemeal quantity, the shapes and sizes of different excavation methods are different from, each excavation stage Tunnel bottom edge cannot meet the requirement of comprehensive mechanization, corresponding special condition of construction also needs to design special construction machine Tool.Above-mentioned factor causes drill+blast tunnel to realize that the difficulty of the unmanned construction of mechanical systemization comprehensively is very big.
Such as application No. is 201520901763.3 Chinese patents to disclose a kind of constructing tunnel Multifunctional arch frame, In job platform be arranged on the chassis of setting movable pulley by braced frame, then mobile be arranged in tunnel is supported by movable pulley In the construction ground in road.The job platform of this arched frame is generally only applicable to the track laying installation in tunnel later stage, at this time tunnel Road ground completed it is smooth, can wheel easy to remove rolling.But this arched frame can not but be applied to the brill in tunnel Quick-fried method construction.
Invention content
Present invention solves the technical problem that being:It is irregular for during existing tunnel drill bursting construction because construction site Caused construction difficult problem provides a kind of novel job platform and its work continuously system and operator for constructing tunnel Method can realize that the standardization of method of tunnel drilling and blasting and systematization are constructed by such job platform and the system of working continuously.
The present invention adopts the following technical scheme that realization:
Job platform, including arch support 1 similar with tunnel arcuate inner walls transverse shapes and be used for arch support edge The running gear of tunnel longitudinal direction movement;
The running gear includes main walking mechanism 2 and auxiliary propelling machine 3;
The main walking mechanism 2 includes suspended rail 21 and main traveling wheel 22, and the suspended rail 21 is along tunnel arch Longitudinal at the top of wall to be laid with, and track is face-up, the main traveling wheel 22 is assemblied in the center top of arch support 1, and with it is outstanding It hangs track 21 and rolls cooperation, the suspension of arch support 1 is connected on suspended rail 21;
The auxiliary propelling machine 3 includes supporting track 31 and secondary row travelling wheels 32, and the supporting track 31 is vertical along tunnel To being laid in the both sides tunnel arcuate inner walls of suspended rail 21, and track is face-up, and the secondary row travelling wheels 32 are assemblied in The both sides of arch support 1, and roll and coordinate with supporting track 31, the support of arch support 1 is connected on supporting track;
The main walking mechanism 2 or/and auxiliary propelling machine 3 are provided with the driving equipment of driving traveling wheel.
Further, its circular arch direction of 1 upper edge of the arch support is provided with circumferential walking mechanism 4.
Further, the circumferential walking mechanism 4 includes the driving cog 41 being continuously arranged along the circular arch direction of arch support 1 And it is oriented to the mobile operation holder 42 being mounted on arch support, circular arch of the mobile operation holder 42 along arch support 1 Direction is oriented to setting, is moved along the circular arch direction of arch support by being driven with the driving gear 43 of transmission tooth engagement.
Further, further include auxiliary shoring system 5, the auxiliary shoring system 5 include be located at arch support both sides with The vertical supporting structure between lateral support structure 51 and arch support both ends and tunnel ground between tunnel arcuate inner walls 52。
Further, the lateral support structure 51 is the flexible lateral support boots being horizontally installed on arch support.
Further, the vertical supporting structure 52 is vertically arranged the telescopic outrigger in arch support end.
Further, the arch support 1 is the arch truss structure of splicing.
The invention also discloses a kind of systems of working continuously for constructing tunnel, including the operation horizontal that several groups are above-mentioned Platform;
The job platform is respectively distributed to each construction section of constructing tunnel, and on the arch support of different construction sections Construction equipment head used in the corresponding construction section of installation.
Specifically, the construction equipment head includes scanning head, concrete-spraying machine head, water spray head, rock drilling head and waterproof At least one of plate roller bearing.
The invention also discloses a kind of continuous operation methods for constructing tunnel, are by using above-mentioned working continuously System carry out drill+blast tunnel construction, drilled successively to each construction section using multigroup workbench, explosion, supporting, waterproof, The construction of lining cutting.
The present invention utilize constructing tunnel during tunnel arcuate inner walls compared with the more unified regular feature in ground, by tunnel Two groups of walking mechanisms are arranged in road vault, and are set arch support suspension similar with tunnel arcuate inner walls by main walking mechanism It sets, in mobile work progress, departing from the limitation of tunnel ground, overcomes the extremely irregular problem in construction site.
The procedures equipment of constructing tunnel can be mounted on standardized arch support simultaneously, all longitudinal directions in tunnel All job platforms of construction section can walk on same rail system, and each flow chart is made to realize systematization and standard Change.
Arch support also uses modular truss assembled simultaneously, realizes the flexible of job platform or folds adjustment, favorably Assembly is built in different construction sizes, meets the needs of different excavation method operations, overcomes that excavation method is various asks Topic.
From the above mentioned, Pass through above-mentioned technical proposal of the present invention proposes a kind of completely new method of tunnel drilling and blasting form of construction work, has Effect overcomes the existing skill that construction site is irregular, excavation method is various, equipment interoperability is not strong during drill bursting construction Art problem, to realize the comprehensive mechanization of drill+blast tunnel and unmanned condition of laying a good foundation of constructing.
Below in conjunction with the drawings and specific embodiments, the invention will be further described.
Description of the drawings
Fig. 1 is the structural schematic diagram of workbench in embodiment one.
Fig. 2 is that workbench is located at the cross-sectional distribution schematic diagram during tunnel bench excavation in embodiment one.
Fig. 3 is the structural schematic diagram that workbench is located at step high position arrangement in embodiment one.
Fig. 4 is the structural schematic diagram that workbench is located at step low position in embodiment one.
Fig. 5 is the structural schematic diagram for the workbench that circumferential walking mechanism is arranged in embodiment one.
Fig. 6 is the structural schematic diagram of workbench in embodiment two.
Fig. 7 is cross-sectional distribution schematic diagram of system during drill bursting construction of working continuously in embodiment three.
Fig. 8 is the one of which work platform structure schematic diagram in the system of working continuously in embodiment three, and the work is flat Platform is mainly used for Tunnel and support lining maintenance.
Fig. 9 is another group of work platform structure schematic diagram in the system of working continuously in embodiment three, the workbench It is mainly used for the volume paving construction of splash guard.
Reference numeral:
1- arch supports,
The main walking mechanisms of 2-, 21- suspended rails, the main traveling wheels of 22-, 23- wheel carriers, 24- rail brackets,
3- auxiliary propelling machines, 31- supporting tracks, 32- secondary row travelling wheels,
4- circumferential directions walking mechanism, 41- driving cogs, 42- move operation holder, and 43- drives gear
5- auxiliary shoring systems, 51- lateral support structures, 52- vertical supportings structure,
101- rock drilling head, 102- concrete-spraying machines head, 103- water sprays head, 104- splash guard roller bearings
The tunnels 61- arcuate inner walls, 62- tunnel grounds
Specific implementation mode
Embodiment one
In order to solve the implements such as the irregular caused trolley in method of tunnel drilling and blasting work progress because construction site not It easily sets up, mobile problem, a kind of novel job platform scheme is provided, as shown in Fig. 1, which includes mainly arch Shape holder 1, main walking mechanism 2 and auxiliary propelling machine 3.
Specifically, arch support 1 is a belfast truss component, outer arcuate shape and 61 shape of tunnel arcuate inner walls It is similar, you can to ensure arch support 1 when being close to close to tunnel arcuate inner walls, the top of entire arch support 1 and tunnel Arcuate inner walls cross section is parallel, and job platform entire so when moving, can avoid the arcuate inner walls with tunnel from colliding.
In conjunction with shown in Fig. 2, construction ground height is different between the different construction sections of tunnel internal, different sections, leads to tunnel The length of road arcuate inner walls is also all not quite similar, therefore the arch support 1 of the present embodiment uses the truss of splicing construction, can basis The arch support of the assembled corresponding length of actual conditions assembling of different construction sections, and aluminum alloy material is used, proof strength Meanwhile the dead weight of workbench itself is reduced as possible.
Arch support 1 is connected to by main walking mechanism 2 and auxiliary propelling machine 3 in tunnel arcuate inner walls 61, is encircleed in this way Shape holder 1 is whole to be vacantly arranged in moving process relative to tunnel ground, is not contacted with tunnel ground, is avoided constructing tunnel The influence for facing workbench irregularly, main walking mechanism 2 and auxiliary propelling machine 3 in the present embodiment are not only realized The guiding of arch support 1 is walked, while the suspension support of arcuate inner walls is also hung on as arch support 1.
In conjunction with shown in Fig. 1, Fig. 3 and Fig. 4, main walking mechanism 2 includes suspended rail 21, main traveling wheel 22, wheel carrier 23 and leads Rail holder 24, wherein suspended rail 21 are longitudinal at the top of the tunnel arcuate inner walls to be laid with, by along the track of suspended rail 21 to tunnel The fixed several L-shaped rail brackets 24 of road inner wall anchoring, the fixation of suspended rail 21 are laid on rail brackets 24, keep hanging rail The track in road 21 is face-up.Main traveling wheel 22 is assemblied in the center top of arch support 1 by wheel carrier 23, and main traveling wheel 22 rolls It is assemblied on suspended rail 21, guiding movement of the arch support 1 along suspended rail 21 is realized by this structure, while also utilizing Arch support 1 is vacantly articulated in tunnel arcuate inner walls 61 by main traveling wheel 22.
In order to ensure the stationarity and intensity of main walking mechanism 2, suspended rail 21 is using two groups and is arranged in parallel, corresponding logical It crosses two groups of symmetrical winner's traveling wheels 22 to coordinate, arch support is reliably suspended on suspended rail 21.
Auxiliary propelling machine 3 includes supporting track 31 and secondary row travelling wheels 32, and wherein supporting track 31 is longitudinally spread along tunnel It is located in the both sides tunnel arcuate inner walls of suspended rail 21, if fixed by being anchored to tunnel inner wall along the track of supporting track 31 Dry horizontal stand supports track 31 to be directly laid on horizontal stand, keeps the track of supporting track 31 face-up, and both sides hang It can be arranged symmetrically between extension track 21.Secondary row travelling wheels 32 are assemblied in the both sides of arch support 1, while secondary row travelling wheels 32 are rolled It is dynamic to be assemblied on supporting track 31, Auxiliary support is played the role of to arch support 1 by Auxiliary support track, avoids arch All stress of holder 1 all concentrate in main walking mechanism.
The setting quantity of auxiliary propelling machine 3 can be designed according to the entire length of arch support 1, as longer in Fig. 3 Arch support 1 is respectively set two groups of auxiliary propelling machines between both sides and tunnel arcuate inner walls 61, shorter arch branch in Fig. 4 One group of auxiliary propelling machine is respectively set in frame 1 between both sides and tunnel arcuate inner walls 61.
At least one mechanism has driving traveling wheel along track travel in main walking mechanism 2 and auxiliary propelling machine 3 Driving equipment, such as driving motor.
As shown in Figure 5, in order to enable workbench to realize automated construction control, the present embodiment is in arch support 1 Its circular arch direction of upper edge is provided with circumferential walking mechanism 4, and construction equipment head can be by circumferential walking mechanism 4 along arch support 1 is close to tunnel inner wall movement construction, realizes workbench to tunnel inner wall in conjunction with active walking mechanism 2 and auxiliary propelling machine 3 Comprehensive covering construction.
Specifically, circumferential walking mechanism 4 includes the driving cog 41 being continuously arranged along the circular arch direction of arch support 1 and leads To the mobile operation holder 42 on arch support, mobile operation holder 42 is oriented to along the circular arch direction of arch support 1 to be set It sets, it can be by the guiding mounting means of guide wheel and guide rail, by being nibbled with driving cog between mobile operation holder 42 and arch support 1 Driving gear 43 drive of conjunction is moved along the circular arch direction of arch support.The setting of circumferential walking mechanism 4 should will be avoided simultaneously The main walking mechanism and auxiliary propelling machine of arch support avoid interfering between the walking mechanism on different directions.
Driving gear 43 by be capable of self-locking motor drive, using driving gear 43 and driving cog 41 type of drive, Driving construction equipment head along arch support 1 climb while move, and can utilize the characteristic of engaged transmission, head is determined Position is in any position of arch support.
Job platform in the present embodiment can be used for the scanning construction of tunnel surrounding and constructional aspect.
Embodiment two
Embodiment one belongs to light job platform, and can be used for scanning of tunnel inner wall etc. need not bear applying for very big load Work process.In order to further increase the working procedure for needing to bear relatively large load for other, the present embodiment is in embodiment one On the basis of a kind of another job platform scheme is provided.
Specifically as shown in fig. 6, arch support 1 is connected to tunnel arch by main walking mechanism 2 and the suspension of auxiliary propelling machine 3 While shape inner wall 61, in order to realize that arch support 1 can bear the work progress of more heavy load, also set on arch support 1 It sets and auxiliary shoring system 5, after navigating to fixed position by the walking of arch support 1, by arch support 1 and tunnel arcuate inner walls Support is formed between 61 and tunnel ground 62 to fix, and the Auxiliary support of workbench in the construction process is provided.
Specifically, support system 5 includes lateral support structure 51 and vertical supporting structure 52, lateral support structure 51 is fixed It is arranged on 1 both sides of arch support, using the flexible lateral support boots towards both sides expansion setting, by flexible lateral support boots to overhanging Go out, it can be with cross-brace in tunnel arcuate inner walls 61;Vertical supporting structure 52 is fixed at the both ends of arch support 1, adopts With vertical telescopic outrigger directed downwardly, is contacted with tunnel ground 62 downwards by telescopic outrigger, the vertical branch of arch support 1 is provided Support, and vertical supporting structure only needs the two side positions progress to tunnel ground smooth, with not needing the occupancy tunnel of large area Space of planes.
Arch support 1 stretches out flexible lateral support boots and telescopic outrigger after being moved to specified construction location, respectively will arch Secure support is formed between shape holder 1 and tunnel arcuate inner walls 61 and tunnel ground 62, avoids whole load in work progress It all concentrates in walking mechanism, improves the construction reliability of workbench.
In practical applications, arch support 1 can carry out the assembled adjustment of length according to practical excavation method.With up/down steps For method construction, as shown in Fig. 3 and Fig. 4 of embodiment one, in tunnel excavation top bar, the height of arch support 1 is relatively low, whole Body length is shorter, and both sides only need one group of auxiliary propelling machine 3 of setting and one group of lateral support structure 51.It gets out of a predicament or an embarrassing situation in tunnel excavation Afterwards, the height of arch support 1 increases, and entire length is longer, while the weight of holder and increasing therewith, both sides can be arranged two groups or More multigroup auxiliary propelling machine 3 and one group of lateral support structure 51 more may be used with ensureing that workbench has in the construction process The stability and intensity leaned on.
The present embodiment is equally provided with circumferential walking mechanism 4 on arch support 1, and concrete structure is identical as embodiment one, It is also noted that when setting circumferential direction walking structure and avoids auxiliary shoring system.The workbench of the present embodiment is medium-sized or heavy work Make platform, rock drilling drilling, supporting, lining cutting or waterproof can be carried and the constructions such as mated formation.
Embodiment three
The present embodiment a kind of is worked continuously for constructing tunnel according to providing based on embodiment one and embodiment two System, it is specific as shown in Figure 7, Figure 8 and Figure 9, include multigroup workbench on tunnel internal up/down steps, different construction sections Workbench on carry corresponding construction equipment head, the tunnel inner wall for carrying out corresponding construction section is constructed, and is applied at one After the completion of workshop section, the workbench of construction section below can be moved forward by walking mechanism, realize the continuous construction in tunnel Operation.
It is described in detail below in conjunction with Fig. 8 and Fig. 9.
As shown in Figure 8, it is illustrated that three groups of circumferential direction walking mechanisms 4 are provided on the arch support 1 of middle workbench, every group circumferential Walking mechanism 4 shares driving cog, carried respectively on the mobile job platform of three groups of circumferential direction walking mechanisms setting rock drilling head 101, Concrete-spraying machine head 102 and water spray head 103, rock drilling head 101 is under the motor driving of circumferential walking mechanism 4 along 1 ring of arch support To movement, radial rock drilling installation anchor pole can be carried out, also rock drilling borehole can be laid forward, explosion is carried out to tunnel front end;Spray concrete Head 102 moves under the motor driving of circumferential walking mechanism 4 along 1 circumferential direction of arch support, carries out 61 initial stage of tunnel arcuate inner walls The spray concrete operation of supporting;Water spray head 103 moves under the motor driving of circumferential walking mechanism 4 along 1 circumferential direction of arch support, can be with Carry out the concrete curing of preliminary bracing.
Multiple construction equipment heads can be mounted on the same workbench, carry out continuous synchronization construction, can also be incited somebody to action Multiple construction equipment heads are mounted in respectively on multiple workbenches, carry out front and back continuous construction.
As shown in figure 9, can be seen that in conjunction with Fig. 7, it is illustrated that in for splash guard volume paving construction, due to be used for splash guard paving If splash guard roller bearing 104 length it is longer, be originally embodiment use front and back three groups close arch supports 1 carry jointly it is anti- Water plate roller bearing 104 drives splash guard roller bearing 104 and the thereon splash guard of coiling, from arch support by circumferential walking mechanism 4 Coiled waterproof coiled sheet is taped against the first of tunnel arcuate inner walls by 1 centre to two side rolls, using the rotation of splash guard roller bearing 104 In phase supporting.
The system of working continuously of the present embodiment can be used in the construction of drill+blast tunnel, realizes the drilling in tunnel, props up The continuous work progress of shield, waterproof and lining cutting, specific drill bursting construction technical process is constant, hanging by opposite tunnel ground The workbench of walking reduces the influence for irregularly facing construction of tunnel excavation, and the arch support 1 of workbench Can be freely assembled, conventional construction equipment head can be carried, need not specially be designed otherwise for construction environment trolley into Row construction, improves the versatility of equipment, reduces construction cost, improve construction efficiency.
Although the embodiments of the present invention have been disclosed as above, but it is not limited in listed fortune in specification and embodiments With.It can be applied to various suitable the field of the invention completely.It for those skilled in the art, can be easy to implement The modification of patent other structures design of the present invention.Therefore without departing substantially from universal defined by claim and equivalency range Under, the present invention is not limited to specific details and legend shown here.

Claims (10)

1. job platform, it is characterised in that:Including arch support (1) similar with tunnel arcuate inner walls transverse shapes and it is used for The running gear that arch support is moved along tunnel longitudinal direction;
The running gear includes main walking mechanism (2) and auxiliary propelling machine (3);
The main walking mechanism (2) includes suspended rail (21) and main traveling wheel (22), and the suspended rail (21) is encircleed along tunnel It is longitudinal at the top of shape inner wall to be laid with, and track is face-up, and the main traveling wheel (22) is assemblied in the central term of arch support (1) Portion, and roll and coordinate with suspended rail (21), arch support (1) suspension is connected on suspended rail (21);
The auxiliary propelling machine (3) includes supporting track (31) and secondary row travelling wheels (32), and the supporting track (31) is along tunnel Road is longitudinally laid in the both sides tunnel arcuate inner walls of suspended rail (21), and track is face-up, the secondary row travelling wheels (32) both sides of arch support (1) are assemblied in, and rolls and coordinates with supporting track (31), arch support (1) support is connected to On supporting track;
The main walking mechanism (2) or/and auxiliary propelling machine (3) are provided with the driving equipment of driving traveling wheel.
2. job platform according to claim 1, its circular arch direction of arch support (1) upper edge is provided with circumferential walking Mechanism (4).
3. job platform according to claim 2, the circumferential direction walking mechanism (4) includes the circular arch along arch support (1) The driving cog (41) and be oriented to the mobile operation holder (42) being mounted on arch support that direction is continuously arranged, the mobile work Industry holder (42) is oriented to setting along the circular arch direction of arch support (1), by being driven with the driving gear (43) of transmission tooth engagement It is moved along the circular arch direction of arch support.
4. job platform according to claim 2 further includes auxiliary shoring system (5), auxiliary shoring system (5) packet Include lateral support structure (51) between arch support both sides and tunnel arcuate inner walls and arch support both ends and tunnel Vertical supporting structure (52) between ground.
5. job platform according to claim 4, the lateral support structure (51) is to be horizontally installed on arch support Flexible lateral support boots.
6. job platform according to claim 4, the vertical supporting structure (52) is vertically arranged at arch support end The telescopic outrigger in portion.
7. according to the job platform described in any one of claim 1-6, the arch support (1) is the arch truss knot of splicing Structure.
8. a kind of system of working continuously for constructing tunnel, it is characterised in that:Including the operation horizontal in several claim 1-7 Platform;
The job platform is respectively distributed to each construction section of constructing tunnel, and is installed on the arch support of different construction sections Construction equipment head used in corresponding construction section.
9. a kind of system of working continuously for constructing tunnel according to claim 8, the construction equipment head include Scan at least one of head, concrete-spraying machine head, water spray head, rock drilling head and splash guard roller bearing.
10. a kind of continuous operation method for constructing tunnel, it is characterised in that:It is using working continuously in claim 9 System carry out drill+blast tunnel construction, drilled successively to each construction section using multigroup workbench, explosion, supporting, waterproof, The construction of lining cutting.
CN201810289134.8A 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction Active CN108756892B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810289134.8A CN108756892B (en) 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810289134.8A CN108756892B (en) 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction

Publications (2)

Publication Number Publication Date
CN108756892A true CN108756892A (en) 2018-11-06
CN108756892B CN108756892B (en) 2023-08-18

Family

ID=63980830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810289134.8A Active CN108756892B (en) 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction

Country Status (1)

Country Link
CN (1) CN108756892B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030012A (en) * 2019-05-08 2019-07-19 长沙泽和智能科技有限公司 A kind of foldable arched type tunnel milling digging machine
CN110365944A (en) * 2019-07-19 2019-10-22 精英数智科技股份有限公司 Monitoring method, device, equipment and the storage medium of sky top operation
CN111271094A (en) * 2020-03-03 2020-06-12 中铁工程服务有限公司 Mountain tunnel secondary lining reinforcing bar mechanized operation complete sets
CN112302674A (en) * 2020-10-30 2021-02-02 国家电网有限公司 Embrace tunnel construction device that rail slided location
CN113123804A (en) * 2020-01-13 2021-07-16 中国建筑第四工程局有限公司 Tunnel inner wall repairing method and device

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB850201A (en) * 1957-03-28 1960-10-05 Saarlandische Gesselschaft Fur Improvements in or relating to platforms for use in mine galleries or tunnels
DE2216643A1 (en) * 1972-04-07 1973-10-11 Bergbaustahl Gmbh & Co METHOD AND DEVICE FOR ASSEMBLING LINE STRUCTURES, IN PARTICULAR FOR MACHINE LINE FORWARD DRIVING WITH SECTION CUTTING MACHINES IN MINING
JPH05106399A (en) * 1991-10-15 1993-04-27 Tone Chika Gijutsu Kk Erecting device for tunnel timbering
JPH05280287A (en) * 1992-04-01 1993-10-26 Okumura Corp Construction device for tunnel wall
JPH06117198A (en) * 1992-10-05 1994-04-26 Mitsubishi Heavy Ind Ltd Additionally tightening apparatus for segment of shield tunnel
JPH09250296A (en) * 1996-03-15 1997-09-22 Konoike Constr Ltd Suspension type form tunnel lining device
JP2005083014A (en) * 2003-09-05 2005-03-31 Ishikawajima Constr Materials Co Ltd Pre-cast tunnel method and member conveyor used therefor
CN101403305A (en) * 2008-09-08 2009-04-08 中铁隧道集团有限公司 Construction method for tunnel continuous mucking, lining and excavation synchronization
KR20110032457A (en) * 2009-09-23 2011-03-30 코오롱건설주식회사 Work platform for tunnel
CN102226402A (en) * 2011-04-08 2011-10-26 中铁三局集团有限公司 Auxiliary device and method used for laying tunnel waterproofing plates
KR20120134441A (en) * 2011-06-02 2012-12-12 김하늘 Construction method of waterproof in tunnel
CN203248171U (en) * 2013-04-28 2013-10-23 湖南五新重型装备有限公司 Full fracture surface needle beam trolley without beam frame
CN204436416U (en) * 2014-11-19 2015-07-01 上海东方雨虹防水工程有限公司 Lay chassis
WO2015154698A1 (en) * 2014-04-09 2015-10-15 邓卫东 Installation platform and installation method for tunnel waterproof sheet having wide width
CN205578009U (en) * 2016-04-27 2016-09-14 中铁四局集团第一工程有限公司 Two lined steel bones RACK in tunnel equipment of being under construction
CN107144490A (en) * 2017-07-03 2017-09-08 中南大学 Tunnel Second Lining pours monitoring system and monitoring method
CN206562935U (en) * 2017-03-16 2017-10-17 中铁工程装备集团有限公司 TBM steel arch-shelfs are kept in and transshipment acitivity
CN208010349U (en) * 2018-04-03 2018-10-26 中南大学 A kind of job platform and its system of working continuously for constructing tunnel

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB850201A (en) * 1957-03-28 1960-10-05 Saarlandische Gesselschaft Fur Improvements in or relating to platforms for use in mine galleries or tunnels
DE2216643A1 (en) * 1972-04-07 1973-10-11 Bergbaustahl Gmbh & Co METHOD AND DEVICE FOR ASSEMBLING LINE STRUCTURES, IN PARTICULAR FOR MACHINE LINE FORWARD DRIVING WITH SECTION CUTTING MACHINES IN MINING
JPH05106399A (en) * 1991-10-15 1993-04-27 Tone Chika Gijutsu Kk Erecting device for tunnel timbering
JPH05280287A (en) * 1992-04-01 1993-10-26 Okumura Corp Construction device for tunnel wall
JPH06117198A (en) * 1992-10-05 1994-04-26 Mitsubishi Heavy Ind Ltd Additionally tightening apparatus for segment of shield tunnel
JPH09250296A (en) * 1996-03-15 1997-09-22 Konoike Constr Ltd Suspension type form tunnel lining device
JP2005083014A (en) * 2003-09-05 2005-03-31 Ishikawajima Constr Materials Co Ltd Pre-cast tunnel method and member conveyor used therefor
CN101403305A (en) * 2008-09-08 2009-04-08 中铁隧道集团有限公司 Construction method for tunnel continuous mucking, lining and excavation synchronization
KR20110032457A (en) * 2009-09-23 2011-03-30 코오롱건설주식회사 Work platform for tunnel
CN102226402A (en) * 2011-04-08 2011-10-26 中铁三局集团有限公司 Auxiliary device and method used for laying tunnel waterproofing plates
KR20120134441A (en) * 2011-06-02 2012-12-12 김하늘 Construction method of waterproof in tunnel
CN203248171U (en) * 2013-04-28 2013-10-23 湖南五新重型装备有限公司 Full fracture surface needle beam trolley without beam frame
WO2015154698A1 (en) * 2014-04-09 2015-10-15 邓卫东 Installation platform and installation method for tunnel waterproof sheet having wide width
CN204436416U (en) * 2014-11-19 2015-07-01 上海东方雨虹防水工程有限公司 Lay chassis
CN205578009U (en) * 2016-04-27 2016-09-14 中铁四局集团第一工程有限公司 Two lined steel bones RACK in tunnel equipment of being under construction
CN206562935U (en) * 2017-03-16 2017-10-17 中铁工程装备集团有限公司 TBM steel arch-shelfs are kept in and transshipment acitivity
CN107144490A (en) * 2017-07-03 2017-09-08 中南大学 Tunnel Second Lining pours monitoring system and monitoring method
CN208010349U (en) * 2018-04-03 2018-10-26 中南大学 A kind of job platform and its system of working continuously for constructing tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘敏捷;伍毅敏;高劲松;: "公路隧道隧底结构水害机理研究", 地下空间与工程学报, no. 1, pages 319 - 326 *
朱灿;: "隧道工程混凝土衬砌施工技术及质量控制要点", 交通世界, no. 34, pages 98 - 99 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030012A (en) * 2019-05-08 2019-07-19 长沙泽和智能科技有限公司 A kind of foldable arched type tunnel milling digging machine
CN110365944A (en) * 2019-07-19 2019-10-22 精英数智科技股份有限公司 Monitoring method, device, equipment and the storage medium of sky top operation
CN113123804A (en) * 2020-01-13 2021-07-16 中国建筑第四工程局有限公司 Tunnel inner wall repairing method and device
CN111271094A (en) * 2020-03-03 2020-06-12 中铁工程服务有限公司 Mountain tunnel secondary lining reinforcing bar mechanized operation complete sets
CN112302674A (en) * 2020-10-30 2021-02-02 国家电网有限公司 Embrace tunnel construction device that rail slided location

Also Published As

Publication number Publication date
CN108756892B (en) 2023-08-18

Similar Documents

Publication Publication Date Title
CN108756892A (en) Job platform and its work continuously system and operational method for constructing tunnel
CN201106451Y (en) Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire
CN104695984A (en) Multifunctional tunnel construction trolley
CN204716251U (en) Circular orbit formula multifunctional rock drilling trolley
CN202690045U (en) Comprehensive mechanized rock drift heading machine
CN104879061A (en) Multifunctional self-propelled portal wagon drill
CN110655015B (en) Trackless self-propelled platform car for subway tunnel maintenance
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN112360340A (en) Automatic anchor rod drill carriage
CN106437741A (en) Tunneling machine by new Austrian tunneling method
CN110318763A (en) Multi-platform car-type excavation expansion of inclined well method
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN113833505A (en) Anchor rod drilling and grouting integrated machine
CN209976479U (en) Be used for full section excavation rock drilling in tunnel and steel bow member installation platform truck
CN208010349U (en) A kind of job platform and its system of working continuously for constructing tunnel
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN109736861A (en) A kind of monorail crane drill carriage and construction method
CN206844193U (en) Bore support integral type pile hole forming device
CN112832804A (en) Mining multi-row double-arm hydraulic drill carriage
CN209941704U (en) Side slope or retaining wall construction trolley
CN113530553B (en) Three-step construction process based on tunnel excavation and support integrated trolley
CN207847625U (en) Rectangular shaped roadways driving moves into covering device certainly without support repeatedly
CN206092012U (en) Operation car is demolishd to subway deep tunnel reinforced concrete pipe piece
CN113530552B (en) Tunnel comprehensive excavation trolley
JP2004068526A (en) Slope reinforcing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant