CN108756420A - A kind of cable termination with cross over crane span structure integral type tower - Google Patents

A kind of cable termination with cross over crane span structure integral type tower Download PDF

Info

Publication number
CN108756420A
CN108756420A CN201810616978.9A CN201810616978A CN108756420A CN 108756420 A CN108756420 A CN 108756420A CN 201810616978 A CN201810616978 A CN 201810616978A CN 108756420 A CN108756420 A CN 108756420A
Authority
CN
China
Prior art keywords
arm
cross
crane span
span structure
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810616978.9A
Other languages
Chinese (zh)
Inventor
盛金马
李涛
谢涛
吴晓鸣
常江
韩承永
蔡冰冰
王力
罗正帮
王向阳
罗松
夏祺
汪诚
夏新运
许士娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201810616978.9A priority Critical patent/CN108756420A/en
Publication of CN108756420A publication Critical patent/CN108756420A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A kind of cable termination with cross over crane span structure integral type tower.It is made of two terminal units and a crane span structure unit, terminal unit member is located at crane span structure unit both sides, and the terminal unit includes tower body, ground wire cross-arm, topping wire cross-arm, middle layer conductor cross-arm, lower layer conductor cross-arm, auxiliary cross-arm, foretells font cable termination, cable;Overhead transmission line is connected to side terminal unit, it is converted into cable using font cable termination is foretold, cable is from side terminal unit foretells font cable termination, it is arranged downwards towards crane span structure cell side tower body along terminal unit, into crane span structure unit, the cable bearer in crane span structure unit enters the terminal unit of the other side.The present invention is set up using the force-bearing characteristics of tower body structure and crosses over crane span structure, and highway alignment leap is worn under realization, effectively avoids barrier, is reduced construction cost, is built difficulty and building time, does not influence overall beautiful.

Description

A kind of cable termination with cross over crane span structure integral type tower
【Technical field】
The present invention relates to ultra-high-tension power transmission line technical field, especially a kind of terminal and crane span structure integrated cable crossover tower.
【Background technology】
With national economy fast development, overhead transmission line is with cable run using increasingly popular in engineering.Overhead transmission line It is set up in ground or more, is influenced by site environment, exists and builds the deficiencies of difficulty is big, civil problem is more, influence landscaping;Electricity Cable line arrangement is frequently located in below ground, is influenced by landform, pipeline etc., and huge, pipeline evacuation difficulty etc. that there are construction costs is no Foot.
It in urban area, the case where intersection for same Xia Chuan highways, is influenced, is created by overhead transmission line and cable run limitation Overhead transmission line influences beauty, and the newly-built embedded deep difficulty of construction of cable run is big, it is therefore proposed that a kind of terminal is electric with crane span structure integral type Cable crossover tower completes line crossing cabling using portal structure.
【Invention content】
The main purpose of the present invention is to provide a kind of cable terminations with across crane span structure integral type tower, utilizes tower body structure Force-bearing characteristics, which are set up, crosses over crane span structure, and highway alignment leap is worn under realization, effectively avoids barrier, and reduction construction cost, construction are difficult Degree and building time, do not influence overall beautiful.
To achieve the above object, the technical solution that the present invention takes is:
A kind of cable termination with cross over crane span structure integral type tower, it is made of two terminal units and a crane span structure unit, end End identical element is located at crane span structure unit both sides, and the terminal unit includes tower body, ground wire cross-arm, topping wire cross-arm, middle layer conductor Cross-arm, auxiliary cross-arm, foretells font cable termination, cable at lower layer conductor cross-arm;
The ground wire cross-arm, topping wire cross-arm, middle layer conductor cross-arm, lower layer conductor cross-arm, auxiliary cross-arm are located at tower body On be arranged from top to bottom, both sides cross-arm is arranged in every layer of cross-arm horizontal path direction;
The ground wire cross-arm taper fixes ground wire, and topping wire cross-arm, middle layer conductor cross-arm, lower layer conductor cross-arm taper are solid Determine conducting wire, taper, which is fixed, between topping wire cross-arm, middle layer conductor cross-arm, lower layer conductor cross-arm and auxiliary cross-arm foretells font cable Terminal;
The crane span structure unit is made of laying platform, crane span structure support, cable;
Overhead transmission line is connected to side terminal unit, and cable is converted into using font cable termination is foretold, and cable is from a lateral terminal list Member is foretold font cable termination and is risen, and is arranged downwards towards crane span structure cell side tower body along terminal unit, into crane span structure unit, along crane span structure list Cable bearer in member enters the terminal unit of the other side.
Further, the fore-telling font cable termination is made of end, arrester and insulator string.
Compared with prior art, beneficial effects of the present invention:Suitable for numerous across Xia Chuan highways, brill more overhead railway etc. Occasion, compared with traditional cable version, construction cost caused by avoiding cable burial too deep increases with building time, transmits electricity simultaneously Circuit is integrally located at ground or more, is convenient for operation and maintenance.
【Description of the drawings】
Fig. 1 is the structural schematic diagram of invention.
【Specific implementation mode】
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to Specific implementation mode, the present invention is further explained.
As shown in Figure 1, a kind of cable termination is with across crane span structure integral type tower, it is by two terminal units and a crane span structure list Member composition, terminal unit member are located at crane span structure unit both sides, and the terminal unit includes tower body 1, ground wire cross-arm 2, topping wire cross Load 3, lower layer conductor cross-arm 5, auxiliary cross-arm 6, foretells font cable termination 7, cable 10 at middle layer conductor cross-arm 4.
The ground wire cross-arm 2, topping wire cross-arm 3, middle layer conductor cross-arm 4, lower layer conductor cross-arm 5, auxiliary cross-arm 6 are located at It is arranged from top to bottom on tower body, both sides cross-arm is arranged in every layer of cross-arm horizontal path direction.
The ground wire cross 2 carries on a shoulder pole taper and fixes ground wire, topping wire cross-arm 3, middle layer conductor cross-arm 4, lower 5 tip of layer conductor cross-arm Conducting wire is fixed in portion, and taper, which is fixed, between topping wire cross-arm 3, middle layer conductor cross-arm 4, lower layer conductor cross-arm 5 and auxiliary cross-arm 6 foretells Font cable termination 7.
The fore-telling font cable termination 7, is made of end, arrester and insulator string.
The crane span structure unit is made of laying platform 8, crane span structure support 9, cable 10.
The laying platform 8 is highly determined by lower section across facility between the terminal unit of both sides.The crane span structure support 9 need, according to apart from length, to bear the setting of the elements such as gravity.
A kind of cable termination as shown in the figure and leap crane span structure integrated tower schematic diagram:The present invention usually parallel built highway is built If considering adjust the distance with road safety distance, conducting wire, is overall beautiful etc. factor, wear roadside under creates respectively Terminal unit at one creates above Xia Chuan highways and crosses over unit at one, and overhead transmission line is connected to terminal unit, electric using font is foretold Cable terminal is converted into cable 10, and cable 10 is from side terminal unit foretells font cable termination 7, along terminal unit towards crane span structure list First side tower body one arranges that downwards, into crane span structure unit, the cable bearer in crane span structure unit enters the terminal unit of the other side.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should be included within the scope of the present invention.

Claims (2)

1. a kind of cable termination and leap crane span structure integral type tower, it is characterised in that:It is by two terminal units and a crane span structure list Member composition, terminal unit member are located at crane span structure unit both sides, the terminal unit include tower body, ground wire cross-arm, topping wire cross-arm, Middle layer conductor cross-arm, auxiliary cross-arm, foretells font cable termination, cable at lower layer conductor cross-arm;
The ground wire cross-arm, topping wire cross-arm, middle layer conductor cross-arm, lower layer conductor cross-arm, auxiliary cross-arm are located on tower body certainly Both sides cross-arm is arranged in upper and lower setting, every layer of cross-arm horizontal path direction;
The ground wire cross-arm taper fixes ground wire, and topping wire cross-arm, middle layer conductor cross-arm, the fixation of lower layer conductor cross-arm taper are led Line, taper, which is fixed, between topping wire cross-arm, middle layer conductor cross-arm, lower layer conductor cross-arm and auxiliary cross-arm foretells font cable termination;
The crane span structure unit is made of laying platform, crane span structure support, cable;
Overhead transmission line is connected to side terminal unit, is converted into cable using font cable termination is foretold, cable is foretold from side terminal unit Font cable termination rises, and is arranged downwards towards crane span structure cell side tower body along terminal unit, into crane span structure unit, along crane span structure unit Cable bearer enter the terminal unit of the other side.
2. integral type tower according to claim 1, it is characterised in that:The fore-telling font cable termination is by end, arrester And insulator string composition.
CN201810616978.9A 2018-06-14 2018-06-14 A kind of cable termination with cross over crane span structure integral type tower Pending CN108756420A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810616978.9A CN108756420A (en) 2018-06-14 2018-06-14 A kind of cable termination with cross over crane span structure integral type tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810616978.9A CN108756420A (en) 2018-06-14 2018-06-14 A kind of cable termination with cross over crane span structure integral type tower

Publications (1)

Publication Number Publication Date
CN108756420A true CN108756420A (en) 2018-11-06

Family

ID=64021264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810616978.9A Pending CN108756420A (en) 2018-06-14 2018-06-14 A kind of cable termination with cross over crane span structure integral type tower

Country Status (1)

Country Link
CN (1) CN108756420A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259247A (en) * 2019-07-05 2019-09-20 荆州市荆力工程设计咨询有限责任公司 A kind of single loop staggered floor electric power line pole tower

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204691371U (en) * 2015-05-19 2015-10-07 国家电网公司 A kind of 110kV cable double-circuit line terminal tower
CN205243135U (en) * 2015-12-16 2016-05-18 龙源(北京)风电工程设计咨询有限公司 Two times overhead transmission line alternately bores tower more
CN106164395A (en) * 2014-02-12 2016-11-23 Rwe可再生能源有限公司 There is the lattice tower of open frame structure, particularly pylon or antenna tower and for the method improving its stability of tower
CN205985947U (en) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 Tower of london bridge type transmission line leap system that does not have a power failure
CN106451271A (en) * 2016-12-28 2017-02-22 国网冀北电力有限公司迁西县供电分公司 Cable aisle bridge structure and installment method thereof
CN106555496A (en) * 2016-09-26 2017-04-05 安徽华电工程咨询设计有限公司 A kind of double back overhead transmission line cable cut-offs and draws lower angle tower
CN208473420U (en) * 2018-06-14 2019-02-05 国网安徽省电力有限公司经济技术研究院 A kind of cable termination and cross over gantry integral type tower

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106164395A (en) * 2014-02-12 2016-11-23 Rwe可再生能源有限公司 There is the lattice tower of open frame structure, particularly pylon or antenna tower and for the method improving its stability of tower
CN204691371U (en) * 2015-05-19 2015-10-07 国家电网公司 A kind of 110kV cable double-circuit line terminal tower
CN205243135U (en) * 2015-12-16 2016-05-18 龙源(北京)风电工程设计咨询有限公司 Two times overhead transmission line alternately bores tower more
CN205985947U (en) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 Tower of london bridge type transmission line leap system that does not have a power failure
CN106555496A (en) * 2016-09-26 2017-04-05 安徽华电工程咨询设计有限公司 A kind of double back overhead transmission line cable cut-offs and draws lower angle tower
CN106451271A (en) * 2016-12-28 2017-02-22 国网冀北电力有限公司迁西县供电分公司 Cable aisle bridge structure and installment method thereof
CN208473420U (en) * 2018-06-14 2019-02-05 国网安徽省电力有限公司经济技术研究院 A kind of cable termination and cross over gantry integral type tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259247A (en) * 2019-07-05 2019-09-20 荆州市荆力工程设计咨询有限责任公司 A kind of single loop staggered floor electric power line pole tower

Similar Documents

Publication Publication Date Title
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN103362343B (en) A kind of with tower six circuit pole tower
CN103603536B (en) Multiloop cross is handed over across steel pipe pole
CN203951136U (en) The switching Wiring device of overhead power transmission conducting wire and cable
CN104201634A (en) Crossover connecting and disconnecting method of single-loop line
CN203352105U (en) A wire arrangement mode converting rod
CN106099757A (en) A kind of transmission line insulator crosses over crane span structure and construction technology thereof
CN208473420U (en) A kind of cable termination and cross over gantry integral type tower
CN108756420A (en) A kind of cable termination with cross over crane span structure integral type tower
CN203603572U (en) Multi-loop cross striding steel pipe pole
CN201406865Y (en) 66KV overhead transmission line double-circuit horizontal crossing tower
CN101850729B (en) Traction network of electrical expressway
CN206189980U (en) Communication and sending end integral type shaft tower
CN208473419U (en) A kind of double back cable suitable for built span line draws lower facility
CN206071191U (en) Bore and get over tower in 110kV common-tower double-returns road
CN105172620B (en) City rail vehicle ground power supply system track switch section transition structure
CN108756419A (en) A kind of double back cable suitable for built span line draws lower facility
CN204633282U (en) Steel tower changes double hanging point equipment
CN210622425U (en) Single-loop staggered-layer power transmission line tower
CN201703272U (en) Electrified highway traction network
CN107294034A (en) cable terminal pole
CN207568300U (en) A kind of three circuit corner steel towers
CN208473424U (en) A kind of bearing platform type narrow base tower for making somebody a mere figurehead under double-circuit line cable T joint draws
CN202678841U (en) Fast rush repair tower of high-voltage transmission lines
CN206267615U (en) A kind of 110kV overhead transmission lines double back gate steel pipe tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181121

Address after: 230071 Hongyuan Building, Hefei Municipal Administration District, Anhui Province, 9th Floor

Applicant after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID ANHUI ELECTRIC POWER CO.,LTD.

Applicant after: State Grid Anhui Electric Power Company

Address before: 230071 Hongyuan Building, Hefei Municipal Administration District, Anhui Province, 9th Floor

Applicant before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID ANHUI ELECTRIC POWER CO.,LTD.

Applicant before: State Grid Anhui Electric Power Company

Applicant before: ANHUI HUADIAN ENGINEERING CONSULTATING & DESIGN Co.,Ltd.

WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181106