CN108755711A - A kind of Novel underground pipe gallery method for reinforcing side slope - Google Patents

A kind of Novel underground pipe gallery method for reinforcing side slope Download PDF

Info

Publication number
CN108755711A
CN108755711A CN201810613821.0A CN201810613821A CN108755711A CN 108755711 A CN108755711 A CN 108755711A CN 201810613821 A CN201810613821 A CN 201810613821A CN 108755711 A CN108755711 A CN 108755711A
Authority
CN
China
Prior art keywords
slope
tire
waste tire
short nail
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810613821.0A
Other languages
Chinese (zh)
Inventor
揭恒
吴建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810613821.0A priority Critical patent/CN108755711A/en
Publication of CN108755711A publication Critical patent/CN108755711A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of Novel underground pipe gallery method for reinforcing side slope, carry out consolidation process to piping lane excavation slope in such a way that waste tire, short nail, waterproof geotextiles are combined, construction procedure is followed successively by:Slope Treatment, waterproof geotextile laying, waste tire are laid with, short nail implantation.Novel underground pipe gallery method for reinforcing side slope of the present invention is applied to be reinforced in underground pipe gallery foundation pit stope support, it can be under the premise of meeting construction needs, pattern foundation pit supporting structure cost is greatly lowered, and waste tire, short nail, waterproof geotextiles can repeat to recycle, energy conservation and environmental protection.

Description

A kind of Novel underground pipe gallery method for reinforcing side slope
Technical field
It is comprehensive more particularly, to a kind of Novel underground the invention belongs to the technology in underground pipe gallery foundation pit cut and cover tunneling Close piping lane method for reinforcing side slope.
Background technology
It is cost-effective, major part is applied using cut and cover method currently, in the underground pipe gallery work progress of large size city Work.In cut and cover tunneling, the slope reinforcement after excavation of foundation pit is the key that foundation pit job safety.Normal practice is, using digging Machine brush slope is excavated to after the sloping coefficient of design requirement, is just sprayed a layer concrete first, is then hung reinforced mesh again, installation is let out Water hole is finally reinforced using short nail, and anchor concrete support is sprayed.If such method supporting because drain hole blocks, leads to water excretion not Go out, accumulated time, the pore water pressure in soil can be increased, and then conduct oneself with dignity plus the soil body, when its gravity is more than the anti-of spray anchor face When cutting ability, the danger on slope failure landslide will occur.Piping lane foundation pit needs backfill to handle after the molding of piping lane main body, at this time Anchor face will be sprayed by, which needing, removes, and forming a large amount of concrete residue and reinforced mesh can not reuse, and result in waste of resources and increase Add support cost.
Invention content
To solve the above problems, the present invention proposes a kind of Novel underground pipe gallery method for reinforcing side slope, using waste and old wheel The mode that tire, short nail, waterproof geotextiles are combined carries out consolidation process to piping lane excavation slope, easy for construction and at low cost.
The specific technical solution of the method for the present invention is:
Step 1:Slope Treatment
It answers first side slope effectively to be cleared up before construction, by easy landing, influences the unconsolidated formation of stability of slope, miscellaneous soil Deng removing, keep slope surface smooth as far as possible, in favor of the laying construction of waste tire.
Step 2:Waterproof geotextile laying
After the completion of side slope is cleared up, the laying of waterproof geotextiles is carried out.Paving is manually rolled when laying, cloth cover wants smooth, And suitably there are distortion allowances.Geotextiles, according to the difference of landform, can be divided into nature overlap joint, sew up or weld in overlap joint.
Step 3:Waste tire is laid with
Waste tire is laid with one by one from slope foot to top of the slope, when laying, pre-designed tire tread layout and short nail position, So as to short nail preferably combined with tread layer it is integral;It is continuously soft that composition tire is directly coupled using steel wire between tire and tire Soft face layer, allows tire being entirely spatially unified into an entirety, increases the ability of its globality and antiskid slope.
Step 4:Short nail implantation
After the completion of waste tire is integrally laid with, short nail is implanted into, short nail one end is deeply inserted into the soil body, other end bent anchor Fixed tire.
Compared with prior art, it is the advantages of the method for the present invention:
1) in terms of materials of constructing, when foundation pit backfills, the spray anchor face layer after removing can produce the combined bolting and shotcrete of conventional method Raw a large amount of building waste causes the waste of resource, and waste tire, short nail, waterproof geotextiles can repeat in the present invention It recycles, when piping lane foundation pit backfills, can retain and be continuing with after removing;
2) waterproof geotextiles have good water permeability in the present invention, and have preferable antiskid slope ability, water penetration It so that rainwater is flowed into foundation pit along waste tire, water will not be made to be deposited in the soil body, cause the pore water in the soil body Pressure rise, and then generate the danger on landslide;
3) the waste tire tyre surface in the present invention has larger friction coefficient, and the dead weight of tire itself, which can also increase, to rub Power is wiped, and then ensures that slope soil is not in landslide;
4) waste tire is coupled by the way of link in the present invention, and entire slope surface connects into an entirety, subtracts The danger on small landslide.
Description of the drawings
Fig. 1 is waste tire supporting schematic diagram in the present invention;
In figure:1, waste tire, 2, short nail, 3, waterproof geotextiles, 4, steel wire, 5, side slope.
Specific implementation mode
In conjunction with attached drawing to a kind of novel underground pipe gallery method for reinforcing side slope method proposed by the invention make into The explanation of one step.
The foundation pit stope support that the method for the present invention can be used for cut and cover method is reinforced, and concrete operation step is as follows:
Step 1:The processing of side slope 5
It answers first side slope 5 effectively to be cleared up before construction, by easy landing, influences the unconsolidated formation, miscellaneous of the stabilization of side slope 5 The removings such as soil keep slope surface smooth as far as possible, in favor of the laying construction of waste tire 1.
Step 2:Waterproof geotextiles 3 are laid with
After the completion of side slope 5 is cleared up, the laying of waterproof geotextiles 3 is carried out.Paving is manually rolled when laying, cloth cover will be put down It is whole, and suitably there are distortion allowances.
Waterproof geotextiles 3 in this step, according to the difference of landform, can be divided into nature overlap joint, sew up in overlap joint Or welding.
Step 3:Waste tire 1 is laid with
Waste tire 1 from bottom to top, i.e., is laid with one by one from slope foot to top of the slope, when laying, pre-designed tire tread cloth Office and 2 positions of short nail, so as to it is short follow closely 2 preferably combined with tread layer it is integral.Steel wire 4 is directly used between tire and tire The continuous flexibility face layer of composition tire is connect, allows tire being entirely spatially unified into an entirety, increases its globality and antiskid slope Ability.
Step 4:2 implantation of short nail
After the completion of the whole laying of waste tire 1, short nail is implanted into, short nail one end is deeply inserted into the soil body, and the other end is curved Waste tire 1 is determined in anchoring.
The present invention apply underground pipe gallery foundation pit stope support reinforce, can meet construction need under the premise of, Pattern foundation pit supporting structure cost is greatly lowered.First, in terms of materials of constructing, the combined bolting and shotcrete of conventional method is taken off when foundation pit backfills Spray anchor face layer after removing will produce a large amount of building waste, cause the waste of resource, and waste tire, short nail, waterproof geotextiles It can repeat to recycle, when piping lane foundation pit backfills, can retain and be continuing with after removing.Secondly, waterproof geotextiles tool There is good water permeability, and there is preferable antiskid slope ability.Water permeability preferably can make rainwater along waste tire stream Enter foundation pit, water will not be made to be deposited in the soil body, the pore water pressure in the soil body is caused to increase, and then generates the danger on landslide.So Afterwards, waste tire tyre surface has larger friction coefficient, and the dead weight of tire itself can also increase frictional force, and then ensure side slope The soil body is not in landslide.Finally, waste tire be using link by the way of coupled, entire slope surface connect into one it is whole Body reduces the danger on landslide.

Claims (1)

1. a kind of Novel underground pipe gallery method for reinforcing side slope, characterized in that construction procedure is:
Step 1:Side slope (5) processing
It answers first side slope (5) effectively to be cleared up before construction, by easy landing, influences the unconsolidated formation of stability of slope, miscellaneous soil Deng removing, keep slope surface smooth as far as possible, in favor of the laying construction of waste tire (1);
Step 2:Waterproof geotextiles (3) are laid with
After the completion of side slope (5) are cleared up, the laying of waterproof geotextiles (3) is carried out, when laying will manually roll paving, and cloth cover will be put down It is whole, and suitably there are distortion allowances;
Step 3:Waste tire (1) is laid with
Waste tire (1) is laid with one by one from slope foot to top of the slope, when laying, pre-designed tire tread layout and short nail (2) position Set, so as to short nail (2) preferably combined with tread layer it is integral;Composition is directly coupled using steel wire (4) between tire and tire The continuous flexibility face layer of tire;
Step 4:Short nail (2) implantation
After the completion of waste tire (1) is integrally laid with, short nail (2) is implanted into, short nail one end is deeply inserted into the soil body, and the other end is curved Waste tire (1) is determined in anchoring.
CN201810613821.0A 2018-06-14 2018-06-14 A kind of Novel underground pipe gallery method for reinforcing side slope Pending CN108755711A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810613821.0A CN108755711A (en) 2018-06-14 2018-06-14 A kind of Novel underground pipe gallery method for reinforcing side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810613821.0A CN108755711A (en) 2018-06-14 2018-06-14 A kind of Novel underground pipe gallery method for reinforcing side slope

Publications (1)

Publication Number Publication Date
CN108755711A true CN108755711A (en) 2018-11-06

Family

ID=64021701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810613821.0A Pending CN108755711A (en) 2018-06-14 2018-06-14 A kind of Novel underground pipe gallery method for reinforcing side slope

Country Status (1)

Country Link
CN (1) CN108755711A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306568A (en) * 2019-06-26 2019-10-08 广州穗岩土木科技股份有限公司 A kind of construction method of underground pipe gallery slope retaining

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1358908A (en) * 2001-10-09 2002-07-17 邹胜文 Method for consolidating soil, protecting slope and planting vegetation on rock slope
JP2004353430A (en) * 2003-05-28 2004-12-16 Jogen In Reinforcement/construction method for earth structure using mats made by mat manufacturing method utilizing used tires
CN202148529U (en) * 2011-03-08 2012-02-22 陈丕虎 Novel rubber turf slope-protecting device
CN205617390U (en) * 2016-01-12 2016-10-05 西安科技大学 A softer side of sears layer excavation supporting system for loess area

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1358908A (en) * 2001-10-09 2002-07-17 邹胜文 Method for consolidating soil, protecting slope and planting vegetation on rock slope
JP2004353430A (en) * 2003-05-28 2004-12-16 Jogen In Reinforcement/construction method for earth structure using mats made by mat manufacturing method utilizing used tires
CN202148529U (en) * 2011-03-08 2012-02-22 陈丕虎 Novel rubber turf slope-protecting device
CN205617390U (en) * 2016-01-12 2016-10-05 西安科技大学 A softer side of sears layer excavation supporting system for loess area

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306568A (en) * 2019-06-26 2019-10-08 广州穗岩土木科技股份有限公司 A kind of construction method of underground pipe gallery slope retaining

Similar Documents

Publication Publication Date Title
CN101294390B (en) Support system and construction method for smoothening-digging partial center island foundation pit
CN101725149B (en) Construction method of long open-cut tunnel
CN104763435B (en) Construction method of shallow-buried excavation type large cross section of tunnel in tail slag filling area
CN101864960A (en) Carst region double-arch road tunnel construction method
CN102966114A (en) Tower crane foundation structure and construction method thereof
CN110486053A (en) A kind of urban track traffic shallow tunnel fault of construction treatment construction method
CN106760620A (en) A kind of utilization open caisson increases the construction method for building the underground space under existing building
CN109736334A (en) Collapsible loess slope support construction device and method
CN108677982A (en) Complex geological condition foundation pit substrate excavates Tunnel gushing treatment method
CN110761300B (en) Construction method for supporting impervious soft soil body on side slope of deep foundation pit of high-rise building through micro-expansion
CN109403981B (en) Construction process of main body structure of subway shield well
CN109695457A (en) In-situ expansion super-large section tunnel of hard rock and step construction method
CN108755711A (en) A kind of Novel underground pipe gallery method for reinforcing side slope
CN108277800A (en) A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile and its construction method
CN112854254A (en) Construction method for existing railway field level subgrade support in deep artificial waste slag area
CN207260082U (en) Active service refutes bank revetment and increases structure
CN208455387U (en) Mountain highway, which is filled out, digs intersection road structure
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN107401142B (en) Bank revetment heightening construction method is refuted in active service
CN110306568A (en) A kind of construction method of underground pipe gallery slope retaining
CN115198790A (en) Reinforcing and supporting method for existing embankment upright retaining wall
CN110617077B (en) Construction method for preventing floor heave of tunnel bottom inverted arch
CN204080842U (en) Steel mesh-paved sprayed concrete cushion layer
CN102926403A (en) Roof construction method by cover-excavation method
CN220953473U (en) Tunnel open cut tunnel expansive soil slope landslide and upward slope cracking treatment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181106

WD01 Invention patent application deemed withdrawn after publication