CN108729940A - The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel - Google Patents

The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel Download PDF

Info

Publication number
CN108729940A
CN108729940A CN201810289928.4A CN201810289928A CN108729940A CN 108729940 A CN108729940 A CN 108729940A CN 201810289928 A CN201810289928 A CN 201810289928A CN 108729940 A CN108729940 A CN 108729940A
Authority
CN
China
Prior art keywords
tunnel
ultra
air duct
main air
long deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810289928.4A
Other languages
Chinese (zh)
Inventor
张文新
卓越
张伟
邹翀
李治国
刘石磊
李晓生
吴元金
赵军喜
张良冰
王志洁
宋金贵
尹龙
杨立新
赵希望
唐泽林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201810289928.4A priority Critical patent/CN108729940A/en
Publication of CN108729940A publication Critical patent/CN108729940A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Ventilation (AREA)
  • Duct Arrangements (AREA)

Abstract

A kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel, design liaison main air duct, parallel main air duct and vertical shaft type get in touch with flue on the basis of original service gallery, in the case of can not being constructed in ultra-long deep-buried tunnel to the vertical shaft on ground, the smog assembled in air-flow discharge main tunnel can be smoothly organized, condition is provided for subsequent rescue work.

Description

The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel
Technical field:
The present invention relates to tunneling and underground engineering technical field of construction, taking precautions against natural calamities for especially a kind of ultra-long deep-buried separate tunnel is logical Wind discharge flue setting method.
Background technology:
In recent years, with the quickening of development of the West Regions construction, the Transportation Infrastructure Construction in China is developed rapidly, iron Road tunnel is also carried out towards speciality, buried direction, after tunnel is built up, substantially increases conevying efficiency.It is single since length of tunnel is big From both ends, speed of application is too slow, the requirement that cannot meet construction speed and be open to traffic.Therefore, service gallery in varying numbers is set Realize long tunnel hand-to-hand fight in tights, after the completion of constructing tunnel, service gallery usually all carries out permanent closure.Extra Long Tunnel Construction due to away from From too long, unidirectional slope, which is arranged, cannot meet construction requirement, and open roof is usually arranged so that tunnel centre position elevation is higher than two End, cause to generate pernicious gas substance is built up herein, harmful gas such as flue dust that especially burst fire generates in later stage operation Body is built up herein, is used for daily permanent ventilation of tunnel although longitudinal longitudinal ventilation with jetblower is arranged in tunnel, once tunnel somewhere Fire occurs, the toxic and harmful gas of generation will diffuse into entire tunnel, be unfavorable for personnel escape and rescue work, efficiency compared with It is low, it cannot exclude in time, influence the follow-up works such as the rescue in tunnel.
Invention content:
Above-mentioned in order to overcome the shortcomings of, the present invention provides a kind of ventilation smoke exhaust channels of taking precautions against natural calamities of ultra-long deep-buried separate tunnel to set Set method, can happen suddenly in tunnel fire in the case of effectively organize distinguished and admirable rapid exclusion fire flue dust, be personnel escape And subsequent rescue work provides condition.
The technical solution adopted by the present invention to solve the technical problems:
A kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel, includes the following steps:
A, after the completion of the left and right line construction of ultra-long deep-buried separate tunnel, it is located at the auxiliary hole near tunnel main tunnel knick point position Road is reserved as alternate channel and is not closed, and is joined not less than opening is arranged at 50m distances away from tunnel main tunnel in service gallery The preparation of construction of network main air duct;
B, the lateral part of contact main air duct is excavated according to not less than the plane where 3% gradient to ultra-long deep-buried separate tunnel, Get in touch with main air duct longitudinal component towards ultra-long deep-buried separate tunnel main tunnel two-wire top-direction excavate, until with ultra-long deep-buried It is not less than the height and position of 15m between at the top of separate tunnel main tunnel two-wire, gets in touch with lateral part and the longitudinal component of main air duct It is attached with the curved channel that radius is 50 meters;
C, after the longitudinal component construction in place of contact main air duct, to both sides along be parallel to the direction of ultra-long deep-buried separate tunnel into Row construction, the channel constructed out is parallel main air duct;
D, after the completion of the construction of parallel main air duct, inside the parallel main air duct at the top of ultra-long deep-buried separate tunnel or so line by not Spacing construction shaft formula less than 50m gets in touch with flue, until lining cutting position at the top of ultra-long deep-buried separate tunnel or so line;
E, after the completion of the construction of vertical shaft type contact flue, the vault lining cutting of ultra-long deep-buried separate tunnel is got in touch with cigarette according to vertical shaft type The sectional dimension in road is cut, with tunnel holing through;
F, after the completion of construction, in tunnel, axis stream is arranged in service gallery, contact main air duct, parallel main air duct and vertical shaft type discharge flue Wind turbine, then while encountering emergency case, start wind turbine vapour discharge, and fresh wind is under the action of pressure difference from the positive hole in tunnel both ends Into realizing quick ventilation smoke exhaust.
The vertical shaft type contact flue is divided into lateral part and longitudinal component, and two parts are connected with curved channel.
The lateral part of vertical shaft type contact flue is vertical with parallel main air duct, and with the longitudinal component of getting in touch with main air duct Vertically.
The longitudinal component of vertical shaft type contact flue is parallel with the longitudinal component of main air duct is got in touch with, but with parallel main air duct Vertically.
The section of the contact main air duct is to open face area not less than 4.5m × 4.5m, and arch is arranged in top.
The section of the parallel main air duct is to open face area not less than 4.5m × 4.5m, and arch is arranged in top.
The section of the vertical shaft type contact flue is the excavation area not less than diameter 5m.
Due to using technical solution as described above, the present invention that there is following superiority:
A kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel, can not construct in ultra-long deep-buried tunnel To ground vertical shaft in the case of, can smoothly organize air-flow discharge main tunnel in assemble smog, provide item for subsequent work Part.
Description of the drawings:
Fig. 1 is the floor map of the present invention;
Fig. 2 is the diagrammatic cross-section of the present invention;
Fig. 3 is the parallel main air duct and ultra-long deep-buried separate tunnel position relationship diagrammatic cross-section of the present invention;
Fig. 4 is the parallel main air duct and ultra-long deep-buried separate tunnel position relationship floor map of the present invention;
In figure:1, ultra-long deep-buried separate tunnel;2, service gallery;3, main air duct is got in touch with;4, parallel main air duct;5, vertical shaft type joins Network flue;6, station passage.
Specific implementation mode:
The present invention can be explained in more detail by following example, the open purpose of the present invention is intended in the protection scope of the invention All changes and improvements, the invention is not limited in the following examples;
A kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel in conjunction with described in attached drawing, including walk as follows Suddenly:
A, after the completion of the left and right line construction of ultra-long deep-buried separate tunnel 1, the auxiliary near tunnel main tunnel knick point position Tunnel 2 is reserved as alternate channel and is not closed, and away from opening is arranged at tunnel main tunnel 70m distances in service gallery 2, is got in touch with The preparation of construction of main air duct 3;
B, the lateral part of contact main air duct 3 is excavated according to the plane where 4.95% gradient to ultra-long deep-buried separate tunnel 1, The longitudinal component for getting in touch with main air duct 3 is excavated towards 1 main tunnel two-wire top-direction of ultra-long deep-buried separate tunnel, until deep with speciality The height and position of 25m between burying at the top of 1 main tunnel two-wire of separate tunnel, get in touch with the lateral part of main air duct 3 and longitudinal component with Radius is that 50 meters of curved channel is attached;
C, after the longitudinal component construction in place of contact main air duct 3, to both sides along the direction for being parallel to ultra-long deep-buried separate tunnel 1 It constructs, the channel constructed out is parallel main air duct 4;
D, after the completion of parallel main air duct 4 is constructed, at the top of 1 or so line of ultra-long deep-buried separate tunnel inside the parallel main air duct 4 Flue 5 is got in touch with by the spacing construction shaft formula of 70m, until lining cutting position at the top of 1 or so line of ultra-long deep-buried separate tunnel;
E, after the completion of vertical shaft type contact flue 5 is constructed, the vault lining cutting of ultra-long deep-buried separate tunnel 1 is got in touch with according to vertical shaft type The sectional dimension of flue 5 is cut, with tunnel holing through;
F, after the completion of construction, in tunnel, service gallery 2, contact main air duct 3, parallel main air duct 4 and vertical shaft type discharge flue 5 are arranged Axial flow blower, then while encountering emergency case, start wind turbine vapour discharge, and fresh wind is rectified under the action of pressure difference from tunnel two Hole enters, and realizes that quick ventilation smoke exhaust, passenger can outward be withdrawn by station passage 6.
Vertical shaft type contact flue 5 divides for lateral part and longitudinal component, and two parts are connected with curved channel.
The lateral part of vertical shaft type contact flue 5 is vertical with parallel main air duct 4, and with the longitudinal direction of getting in touch with main air duct 3 Part is vertical.
The longitudinal component of vertical shaft type contact flue 5 is parallel with the longitudinal component of main air duct 3 is got in touch with, but with parallel main wind Road 4 is vertical.
The section of the contact main air duct 3 is to open face area not less than 4.5m × 4.5m, and arch is arranged in top.
The section of the parallel main air duct 4 is to open face area not less than 4.5m × 4.5m, and arch is arranged in top.
The excavation area that the section of the vertical shaft type contact flue 5 is diameter 6m.
It is the prior art not state part in the above content carefully, therefore does not run business into particular one and state.

Claims (7)

1. a kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel, it is characterised in that:Including walking as follows Suddenly:
A, ultra-long deep-buried separate tunnel(1)The construction of left and right line after the completion of, be located at auxiliary near tunnel main tunnel knick point position Help tunnel(2)It reserves and does not close as alternate channel, in service gallery(2)It is interior to be arranged not less than at 50m distances away from tunnel main tunnel Opening, carries out contact main air duct(3)Preparation of construction;
B, main air duct is got in touch with(3)Lateral part according to not less than 3% gradient to ultra-long deep-buried separate tunnel(1)It puts down at place Face is excavated, and main air duct is got in touch with(3)Longitudinal component towards ultra-long deep-buried separate tunnel(1)Main tunnel two-wire top-direction is excavated, Until with ultra-long deep-buried separate tunnel(1)It is not less than the height and position of 15m between at the top of main tunnel two-wire, gets in touch with main air duct(3) Lateral part and longitudinal component be attached with the curved channel that radius is 50 meters;
C, main air duct is got in touch with(3)Longitudinal component construction in place after, to both sides along being parallel to ultra-long deep-buried separate tunnel(1)'s Direction is constructed, and the channel constructed out is parallel main air duct(4);
D, parallel main air duct(4)After the completion of construction, in parallel main air duct(4)Inside is to ultra-long deep-buried separate tunnel(1)Left and right At the top of line flue is got in touch with by the spacing construction shaft formula not less than 50m(5), until ultra-long deep-buried separate tunnel(1)Left and right line Top lining cutting position;
E, vertical shaft type gets in touch with flue(5)After the completion of construction, ultra-long deep-buried separate tunnel(1)Vault lining cutting according to vertical shaft type Get in touch with flue(5)Sectional dimension cut, with tunnel holing through;
F, after the completion of construction, in tunnel service gallery(2), contact main air duct(3), parallel main air duct(4)It is logical with vertical shaft type smoke evacuation Road(5)Start wind turbine vapour discharge when axial flow blower being set, then encountering emergency case, fresh wind is under the action of pressure difference from tunnel The positive hole in road both ends enters, and realizes quick ventilation smoke exhaust.
2. a kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel according to claim 1, It is characterized in that:The vertical shaft type gets in touch with flue(5)It is divided into lateral part and longitudinal component, two parts are connected with curved channel.
3. a kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel according to claim 2, It is characterized in that:The vertical shaft type gets in touch with flue(5)Lateral part and parallel main air duct(4)Vertically, and with contact main air duct(3) Longitudinal component it is vertical.
4. a kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel according to claim 2, It is characterized in that:The vertical shaft type gets in touch with flue(5)Longitudinal component with contact main air duct(3)Longitudinal component it is parallel, but with it is flat Row main air duct(4)Vertically.
5. a kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel according to claim 1, It is characterized in that:The contact main air duct(3)Section be to open face area not less than 4.5m × 4.5m, arch is arranged in top.
6. a kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel according to claim 1, It is characterized in that:The parallel main air duct(4)Section be to open face area not less than 4.5m × 4.5m, arch is arranged in top.
7. a kind of ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel according to claim 1, It is characterized in that:The vertical shaft type gets in touch with flue(5)Section be excavation area not less than diameter 5m.
CN201810289928.4A 2018-04-03 2018-04-03 The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel Withdrawn CN108729940A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810289928.4A CN108729940A (en) 2018-04-03 2018-04-03 The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810289928.4A CN108729940A (en) 2018-04-03 2018-04-03 The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel

Publications (1)

Publication Number Publication Date
CN108729940A true CN108729940A (en) 2018-11-02

Family

ID=63940649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810289928.4A Withdrawn CN108729940A (en) 2018-04-03 2018-04-03 The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel

Country Status (1)

Country Link
CN (1) CN108729940A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287783A (en) * 2020-04-03 2020-06-16 中铁二院工程集团有限责任公司 Vault turning-folding-shaped discharge flue of single-hole double-track tunnel and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050048793A (en) * 2003-11-20 2005-05-25 에스케이건설 주식회사 New longitudinal tunnel ventilation and fire-proof system using the horizontal service tunnel
CN2846757Y (en) * 2005-12-02 2006-12-13 辽宁工程技术大学 Double pipeline emergency self saving system
KR100886350B1 (en) * 2008-07-15 2009-03-03 (주)비엔텍아이엔씨 Intelligent selective supply and exhaust system for tunnel ventilation
CN203685276U (en) * 2013-12-14 2014-07-02 中铁二院工程集团有限责任公司 Emergent rescue station for double single-track railway tunnels
CN105888722A (en) * 2016-04-11 2016-08-24 中铁六局集团有限公司 Construction method for slag discharging and carrying of L-shaped slag discharging table of rail transportation inclined shaft of long and large tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050048793A (en) * 2003-11-20 2005-05-25 에스케이건설 주식회사 New longitudinal tunnel ventilation and fire-proof system using the horizontal service tunnel
CN2846757Y (en) * 2005-12-02 2006-12-13 辽宁工程技术大学 Double pipeline emergency self saving system
KR100886350B1 (en) * 2008-07-15 2009-03-03 (주)비엔텍아이엔씨 Intelligent selective supply and exhaust system for tunnel ventilation
CN203685276U (en) * 2013-12-14 2014-07-02 中铁二院工程集团有限责任公司 Emergent rescue station for double single-track railway tunnels
CN105888722A (en) * 2016-04-11 2016-08-24 中铁六局集团有限公司 Construction method for slag discharging and carrying of L-shaped slag discharging table of rail transportation inclined shaft of long and large tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287783A (en) * 2020-04-03 2020-06-16 中铁二院工程集团有限责任公司 Vault turning-folding-shaped discharge flue of single-hole double-track tunnel and construction method

Similar Documents

Publication Publication Date Title
CN104405430A (en) Ventilation system and ventilation method for single-cavern large-section extra-long tunnel construction
CN202017511U (en) Natural ventilation and smoke discharge system of urban rail transit interval tunnel
CN209430241U (en) One-tunnel two-tracks railway tunnel Rescue Station
CN112780330A (en) Construction ventilation method for parallel three-hole tunnel press-in type ventilation
CN106593508A (en) Plateau high-gas extra long separating type tunnel construction ventilation method
CN108729940A (en) The ventilation smoke exhaust channel setting method of taking precautions against natural calamities of ultra-long deep-buried separate tunnel
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN109707395B (en) Double-layer shield tunnel with upper and lower layer discharge flues and discharge flue setting method
CN209042677U (en) A kind of fire-fighting evacuation stair pressurization ventilating shaft and new ventilating shaft Striping
CN107388466A (en) Underground traffic ventilation smoke extraction system
CN102251802A (en) Bottom independent evacuation safety passage structure for single-hole double-track magnetic levitation tunnel
CN204126663U (en) A kind of single hole big cross section Extra Long Tunnel Construction ventilation system
CN104727841A (en) Exhaust type air purifying tunnel structure
CN102661163A (en) Mine gas, blasting fume and dust separation ventilation system
CN211008711U (en) Novel water sump capable of achieving independent ventilation in underground coal mine
CN104564130A (en) Anti-deformation fast escape tube
CN214787496U (en) Construction ventilation structure of supplementary parallel three hole method tunnels of shaft
CN204941603U (en) A kind of mine safety system
CN107355249A (en) The natural ventilation system and method for traffic tunnel, subway or underground construction tunnel
CN208439250U (en) A kind of three layer of three vertical group hole underground station
CN112780329A (en) Construction ventilation method for vertical shaft assisted parallel three-hole method tunnel
CN104533500B (en) Underground coal mine natural ventilation system and method
CN208816176U (en) A kind of super long tunnel group hole service gallery type emergency relief station structure
CN104847395B (en) Natural ventilation method for tunnel sound barrier
CN206785422U (en) The aeration structure of ventilated drill field in a kind of tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Wenxin

Inventor after: Zhang Wei

Inventor after: Zhang Liangbing

Inventor after: Wang Zhijie

Inventor after: Zhao Junxi

Inventor after: Yin Long

Inventor after: Yang Lixin

Inventor after: Jia Hailong

Inventor after: Zhao Xiwang

Inventor after: Song Jingui

Inventor after: Tan Xiansong

Inventor after: Zhuo Yue

Inventor after: Tang Zelin

Inventor after: Pu Xiaoping

Inventor after: Zhang Xun

Inventor after: Zou Li

Inventor after: Li Zhiguo

Inventor after: Li Xiaosheng

Inventor after: Liu Shilei

Inventor after: Wu Yuanjin

Inventor before: Zhang Wenxin

Inventor before: Zhang Liangbing

Inventor before: Wang Zhijie

Inventor before: Song Jingui

Inventor before: Yin Long

Inventor before: Yang Lixin

Inventor before: Zhao Xiwang

Inventor before: Tang Zelin

Inventor before: Zhuo Yue

Inventor before: Zhang Wei

Inventor before: Zou Li

Inventor before: Li Zhiguo

Inventor before: Liu Shilei

Inventor before: Li Xiaosheng

Inventor before: Wu Yuanjin

Inventor before: Zhao Junxi

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181102