CN108729626A - A kind of construction preliminary installation apparatus of room floors cement - Google Patents

A kind of construction preliminary installation apparatus of room floors cement Download PDF

Info

Publication number
CN108729626A
CN108729626A CN201810414597.2A CN201810414597A CN108729626A CN 108729626 A CN108729626 A CN 108729626A CN 201810414597 A CN201810414597 A CN 201810414597A CN 108729626 A CN108729626 A CN 108729626A
Authority
CN
China
Prior art keywords
framework
cement
guide sleeve
fixed pulley
bracing wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810414597.2A
Other languages
Chinese (zh)
Inventor
胡敦豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810414597.2A priority Critical patent/CN108729626A/en
Publication of CN108729626A publication Critical patent/CN108729626A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/24Implements for finishing work on buildings for laying flooring of masses made in situ, e.g. smoothing tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of preliminary installation apparatus of room floors cement more particularly to a kind of construction preliminary installation apparatus of room floors cement.The technical problem of the present invention:A kind of construction preliminary installation apparatus of room floors cement for being automatically poured on cement and being paved on ground is provided.Technical solution is as follows:A kind of construction preliminary installation apparatus of room floors cement, includes framework, wheel, knob, the first sliding rail, the first sliding block, baffle, the first link block, the first spring, first guide sleeve etc.;The bottom of framework is equipped with wheel, and the right upper portion of framework is connected with knob, and the bottom left of framework is provided with discharge hole.The present invention is moved by direct pull equipment; cement can be layered on the ground in room; mobile push plate can quickly pave cement simultaneously; second inserted link can be when discharge hole be blocked by cement; discharge hole is dredged; rattle balls constantly tap baffle and shake off cement thereon, so while protecting equipment, also save cement.

Description

A kind of construction preliminary installation apparatus of room floors cement
Technical field
The present invention relates to a kind of preliminary installation apparatus of room floors cement more particularly to a kind of construction room floors The preliminary installation apparatus of cement.
Background technology
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also It says it is various lines on design drawing, in specified place, becomes process in kind.It includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries " construction site ", is also named building site.
All it is to have the work for being laid with cement on construction site, when being laid with cement, staff is usually that will mix Cement in heaps on ground on the ground, then with push plate is bulldozed by dump cement, not only wastes staff's pouring mud in this way Time will also waste staff and pave the time of cement, and it is again extremely laborious to pave cement, so occurring currently on the market Many installation apparatus for facilitating staff to be laid with cement.
In staff using installation apparatus come when paving cement, cement is constantly flowed out from discharge hole, when having in cement When compared with big lumps, it is more likely that discharge hole can be blocked, can not thus continue to be laid with cement, so staff can generally use Waddy discloses out discharge hole, and then cement is allowed normally to fall on the ground;When needing to increase new cement, staff generally can Cover board is turned on hand, then by new cement injection framework, leans on human hand turn cover board in this way, it is more inconvenient;When cement not When flowing out framework disconnectedly, a large amount of cement can be stained on baffle, staff can generally be scraped the cement on baffle with scraper plate.
Therefore there is an urgent need for research and develop a kind of cement to be poured on to the construction paved on ground room floors cement automatically Preliminary installation apparatus.
Invention content
It when being laid with cement now to overcome, needs cement on the ground, is then lacked again to what cement was paved Point, technical problem of the invention:A kind of construction room floors for being automatically poured on cement and being paved on ground are provided The preliminary installation apparatus of cement.
Technical solution is as follows:A kind of construction preliminary installation apparatus of room floors cement, include framework, wheel, Knob, the first sliding rail, the first sliding block, baffle, the first link block, the first spring, the first guide sleeve, the first inserted link, electronic reel, The bottom of first bracing wire, the second sliding rail, the second sliding block, push plate, the first nut, bearing block, screw rod and handwheel, framework is equipped with wheel The right upper portion of son, framework is connected with knob, and the bottom left of framework is provided with discharge hole, and right side central is provided with groove in framework, The framework of bottom portion of groove is equipped with the first sliding rail, and slidingtype is connected with the first sliding block on the first sliding rail, connects on the left of the first sliding block It is connected to baffle, the left upper portion of right contact in the right side of baffle and framework, the first sliding rail is connected with the first link block, and first connects It connects and is connected with the first spring between the bottom of block and the top of the first sliding block, the first guide sleeve is connected at the top of baffle, first leads Set inner sliding type is connected with the first inserted link, and right upper portion is uniformly opened there are three card slot in framework, and the top right side of framework is connected with Electronic reel is wound with the first bracing wire on electronic reel, and the first bracing wire bottom end is connected on the first guide sleeve, under the left side of framework Portion is equipped with the second sliding rail, and slidingtype is connected with the second sliding block on the second sliding rail, and push plate is connected on the left of the second sliding block, push plate Left upper portion is connected with the first nut, bearing block is equipped on the left of framework, bearing seat is in the top of the second sliding rail, bearing block Interior interference is connected with screw rod, and screw rod passes through the first nut, handwheel is connected at the top of screw rod.
Further, further include having cover board, the second guide sleeve, the second inserted link, the second link block, the first bolt, wing nut And second spring, the top right side of framework are hingedly connected with cover board, the right part of cover board is provided with the second through-hole, and electronic reel is located at In second through-hole, the left part of cover board is embedded with the second guide sleeve, and the second guide sleeve inner sliding type is connected with the second inserted link, the second inserted link lower part In framework, the second link block is connected at the top of the second inserted link, the left part of cover board is provided with first through hole, framework left wall top It is connected with the first bolt, the first bolt passes through first through hole, wing nut, the bottom, right of the second link block are rotary on the first bolt It is connected with second spring between side and the top left side of cover board.
Further, further include having the first fixed pulley, the second bracing wire and the first lifting the ball, the top left side of cover board is connected with One fixed pulley, the first fixed pulley are located at the right of second spring, and the bottom right of the second link block is connected with the second bracing wire, and second Bracing wire bypasses the first fixed pulley and electronic reel, and the second bracing wire right end is connected with the first lifting the ball.
Further, further include having connecting plate, third guide sleeve, guide rod, rattle balls, third spring, the second fixed pulley, third Fixed pulley, the 4th guide sleeve, third bracing wire and the second lifting the ball, framework right wall lower part are provided with third through-hole, the upper and lower both sides of third through-hole Framework between be equipped with connecting plate, be connected with third guide sleeve on front side of connecting plate, third guide sleeve inner sliding type is connected with guide rod, leads Rattle balls, the right contact of rattle balls and baffle, the top right side of guide rod and the frame on the upside of third through-hole are connected on the left of bar It is connected with third spring between body, the second fixed pulley is connected on the right side of framework, third fixed pulley is connected on the right side of framework, the Three fixed pulleys are located at the top of third through-hole, and third fixed pulley is located at the lower section of the second fixed pulley, and is connected on the right side of framework Four guide sleeves, the 4th guide sleeve are located at the top of the second fixed pulley, and third bracing wire is connected on the right side of guide rod, and third bracing wire bypasses second Fixed pulley and third fixed pulley, third are drawstring through the 4th guide sleeve, and third bracing wire top is connected with the second lifting the ball.
Further, further include having the second bolt, the second nut and fixture block, the bottom left of cover board is connected with the second spiral shell Bolt, the second bolt are located at the right of the second inserted link, are rotary with the second nut on the second bolt, card is connected on the right side of the second nut Block.
When staff needs using this equipment, this equipment is shifted to the region for needing to be laid with cement first onto, then by water Mud pours into framework, and subsequent staff holds handwheel and rotates counterclockwise, and handwheel drives screw rod to rotate counterclockwise, and then makes first Nut moves downward, and the first nut drives push plate to move downward, and push plate is moved downward by the second sliding block on the second sliding rail, when When push plate is moved downwardly to ground to appropriately distance, staff stops operating handwheel, and controls electronic reel up time Needle rotates, and electronic reel tenses the first bracing wire, and then the first guide sleeve is driven to move upwards, and the first guide sleeve can drive baffle upward Movement, baffle moved upwards by the first sliding block on the first sliding rail, and the first spring is compressed, with moving upwards for baffle, Discharge hole is gradually opened, and the cement in framework is fallen to by discharge hole on ground, when the size of discharge hole reaches work people When the demand of member, staff closes electronic reel, and the first inserted link is inserted on corresponding card slot, and then fixed baffle Position, at the same time, staff hold knob move right, knob drive framework move right, framework by wheel to Right movement, framework drive push plate to move right, and the cement fallen from discharge hole is bulldozed by push plate, can mitigate staff in this way It is bulldozed the workload of cement, the time of staff can also be saved, when staff need not be laid with cement, first is inserted Bar extracts card slot, then controls electronic reel and rotate counterclockwise, and the first bracing wire is relaxed, and the first spring sets back, and pushes First sliding block moves downward on the first sliding rail, and the first sliding block drives baffle to move downward, and baffle blocks discharge hole, in framework Cement no longer fall, staff rotates clockwise handwheel later, and handwheel drives screw rod to rotate clockwise, and then makes the first spiral shell Mother moves upwards, and the first nut drives push plate to move upwards, and push plate is moved up to by the second sliding block on the second sliding rail extensive Restore position.
Because further including having cover board, the second guide sleeve, the second inserted link, the second link block, the first bolt, wing nut and second The top right side of spring, framework is hingedly connected with cover board, and the right part of cover board is provided with the second through-hole, and it is logical that electronic reel is located at second The left part of Kong Zhong, cover board are embedded with the second guide sleeve, and the second guide sleeve inner sliding type is connected with the second inserted link, and the second inserted link lower part is located at frame In vivo, the second link block is connected at the top of the second inserted link, the left part of cover board is provided with first through hole, is connected at the top of framework left wall First bolt, the first bolt pass through first through hole, wing nut, the bottom right and lid of the second link block are rotary on the first bolt It is connected with second spring between the top left side of plate, so after discharge hole is blocked by cement, staff can pin downwards Second link block, the second link block drive the second inserted link to move downward, and second spring is compressed, and the second inserted link will be in discharge hole Cement is disclosed out, and after discharge hole is disclosed out, staff unclamps the second link block, and second spring sets back, and drives second Link block moves upwards, and the second link block drives the second inserted link to move up to and sets back, when staff needs to increase water When mud, wing nut is turned counterclockwise, and wing nut moves upwards, and then loosens cover board, and staff holds the second connection again Block moves upwards, and the second link block drives the second inserted link to move upwards, and second spring is stretched, when the second link block moves upwards When to certain distance, staff holds the second link block and rotates backward again, and the second link block is led by the second inserted link and second Set drives cover board to rotate backward, and cement can be added in framework by staff, after staff adds cement, can will be covered Plate goes back to forward original position, and decontrols the second link block, and second spring sets back, and the second link block is driven to set back, with Staff rotates clockwise wing nut again afterwards, and wing nut moves downward, and then cover board is compressed.
Because further including having the first fixed pulley, the second bracing wire and the first lifting the ball, the top left side of cover board is connected with first and determines Pulley, the first fixed pulley are located at the right of second spring, and the bottom right of the second link block is connected with the second bracing wire, the second bracing wire Around the first fixed pulley and electronic reel, the second bracing wire right end is connected with the first lifting the ball, so staff can hold One lifting the ball moves right, the first lifting the ball drive the second link block move downward, second spring is compressed, so make the second inserted link to Discharge hole is disclosed out in lower movement, and such staff can shake hands there is no need to free hand to press the second link block pulling While, discharge hole is disclosed out, the time of staff is saved, after the cement of discharge hole is disclosed out, staff unclamps again One lifting the ball, second spring set back, and the second link block can be pulled to move up to and set back.
Because further including thering is connecting plate, third guide sleeve, guide rod, rattle balls, third spring, the second fixed pulley, third to slide surely Wheel, the 4th guide sleeve, third bracing wire and the second lifting the ball, framework right wall lower part are provided with third through-hole, the frame of the upper and lower both sides of third through-hole It is equipped with connecting plate between body, is connected with third guide sleeve on front side of connecting plate, third guide sleeve inner sliding type is connected with guide rod, guide rod Left side is connected with rattle balls, the right contact of rattle balls and baffle, the top right side of guide rod and the framework on the upside of third through-hole it Between be connected with third spring, the second fixed pulley is connected on the right side of framework, third fixed pulley is connected on the right side of framework, third is fixed Pulley is located at the top of third through-hole, and third fixed pulley is located at the lower section of the second fixed pulley, and being connected with the 4th on the right side of framework leads Set, the 4th guide sleeve are located at the top of the second fixed pulley, and third bracing wire is connected on the right side of guide rod, and third bracing wire is fixed sliding around second Wheel and third fixed pulley, third are drawstring through the 4th guide sleeve, and third bracing wire top is connected with the second lifting the ball, so being stayed when on baffle When having cement, staff can hold the second lifting the ball and move upwards, and the second lifting the ball drives guide rod to transport to the right by third bracing wire Dynamic, third spring is stretched, and guide rod drives rattle balls to move right, and subsequent staff decontrols the second lifting the ball, third spring again It sets back, and guide rod is driven to move downward, guide rod drives rattle balls to move downward, and rattle balls are hit with baffle, pass through work Personnel constantly hold and unclamp the second lifting the ball upwards, can shoot down the cement on baffle.
Because further including having the second bolt, the second nut and fixture block, the bottom left of cover board is connected with the second bolt, second Bolt is located at the right of the second inserted link, is rotary with the second nut on the second bolt, fixture block is connected on the right side of the second nut, so working as When second inserted link moves upward to the top of the second nut, staff rotates clockwise 90 degree of the second nut, and then makes fixture block 90 degree are rotated clockwise, such fixture block can fix the position of the second inserted link, after avoiding the second inserted link from interfering staff The work in face, when that need not fix the position of the second inserted link, staff rotates counterclockwise 90 degree of the second nut again, and then blocks Block rotates clockwise 90 degree, and under the action of second spring, the second inserted link, which moves downwardly to, to set back.
The present invention is moved by direct pull equipment, you can cement is layered on the ground in room, while mobile push plate Quickly cement can be paved, the second inserted link can be dredged discharge hole when discharge hole is blocked by cement, tap Ball constantly taps baffle and shakes off cement thereon, so while protecting equipment, also saves cement.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
The label of each parts is as follows in attached drawing:1 framework, 2 wheels, 3 knobs, 4 discharge holes, 5 grooves, 6 first Sliding rail, 7 first sliding blocks, 8 baffles, 9 first link blocks, 10 first springs, 11 first guide sleeves, 12 first inserted links, 13 cards Slot, 14 electronic reels, 15 first bracing wires, 16 second sliding rails, 17 second sliding blocks, 18 push plates, 19 first nuts, 20 Bearing block, 21 screw rods, 22 handwheels, 23 cover boards, 24 second guide sleeves, 25 second inserted links, 26 second link blocks, 27 first Through-hole, 28 first bolts, 29 wing nuts, 30 second through-holes, 31 second springs, 32 first fixed pulleys, 33 second draw Line, 34 first lifting the balls, 35 third through-holes, 36 connecting plates, 37 third guide sleeves, 38 guide rods, 39 rattle balls, 40 third bullets Spring, 41 second fixed pulleys, 42 third fixed pulleys, 43 the 4th guide sleeves, 44 third bracing wires, 45 second lifting the balls, 46 second spiral shells Bolt, 47 second nuts, 48 fixture blocks.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
A kind of construction preliminary installation apparatus of room floors cement includes as shown in Figs. 1-5 framework 1, wheel 2, knob 3, the first sliding rail 6, the first sliding block 7, baffle 8, the first link block 9, the first spring 10, the first guide sleeve 11, the first inserted link 12, electronic Reel 14, the first bracing wire 15, the second sliding rail 16, the second sliding block 17, push plate 18, the first nut 19, bearing block 20,21 and of screw rod The bottom of handwheel 22, framework 1 is equipped with wheel 2, and the right upper portion of framework 1 is connected with knob 3, and the bottom left of framework 1 is provided with Discharge hole 4, right side central is provided with groove 5 in framework 1, and the framework 1 of 5 bottom of groove is equipped with the first sliding rail 6, on the first sliding rail 6 Slidingtype is connected with the first sliding block 7, and the left side of the first sliding block 7 is connected with baffle 8, and the right side of baffle 8 connects with right side in framework 1 Touch, the left upper portion of the first sliding rail 6 is connected with the first link block 9, the top of the bottom of the first link block 9 and the first sliding block 7 it Between be connected with the first spring 10, the top of baffle 8 is connected with the first guide sleeve 11, and 11 inner sliding type of the first guide sleeve is connected with first and inserts Bar 12, right upper portion uniformly opens that there are three card slots 13 in framework 1, and the top right side of framework 1 is connected with electronic reel 14, electronic The first bracing wire 15 is wound on reel 14,15 bottom end of the first bracing wire is connected on the first guide sleeve 11, and the left lower of framework 1 is equipped with Second sliding rail 16, slidingtype is connected with the second sliding block 17 on the second sliding rail 16, and the left side of the second sliding block 17 is connected with push plate 18, pushes away The left upper portion of plate 18 is connected with the first nut 19, and the left side of framework 1 is equipped with bearing block 20, and bearing block 20 is located at the second sliding rail 16 top, in bearing block 20 interference be connected with screw rod 21, screw rod 21 passes through the first nut 19, and the top of screw rod 21 is connected with hand Wheel 22.
Embodiment 2
A kind of construction preliminary installation apparatus of room floors cement includes as shown in Figs. 1-5 framework 1, wheel 2, knob 3, the first sliding rail 6, the first sliding block 7, baffle 8, the first link block 9, the first spring 10, the first guide sleeve 11, the first inserted link 12, electronic Reel 14, the first bracing wire 15, the second sliding rail 16, the second sliding block 17, push plate 18, the first nut 19, bearing block 20,21 and of screw rod The bottom of handwheel 22, framework 1 is equipped with wheel 2, and the right upper portion of framework 1 is connected with knob 3, and the bottom left of framework 1 is provided with Discharge hole 4, right side central is provided with groove 5 in framework 1, and the framework 1 of 5 bottom of groove is equipped with the first sliding rail 6, on the first sliding rail 6 Slidingtype is connected with the first sliding block 7, and the left side of the first sliding block 7 is connected with baffle 8, and the right side of baffle 8 connects with right side in framework 1 Touch, the left upper portion of the first sliding rail 6 is connected with the first link block 9, the top of the bottom of the first link block 9 and the first sliding block 7 it Between be connected with the first spring 10, the top of baffle 8 is connected with the first guide sleeve 11, and 11 inner sliding type of the first guide sleeve is connected with first and inserts Bar 12, right upper portion uniformly opens that there are three card slots 13 in framework 1, and the top right side of framework 1 is connected with electronic reel 14, electronic The first bracing wire 15 is wound on reel 14,15 bottom end of the first bracing wire is connected on the first guide sleeve 11, and the left lower of framework 1 is equipped with Second sliding rail 16, slidingtype is connected with the second sliding block 17 on the second sliding rail 16, and the left side of the second sliding block 17 is connected with push plate 18, pushes away The left upper portion of plate 18 is connected with the first nut 19, and the left side of framework 1 is equipped with bearing block 20, and bearing block 20 is located at the second sliding rail 16 top, in bearing block 20 interference be connected with screw rod 21, screw rod 21 passes through the first nut 19, and the top of screw rod 21 is connected with hand Wheel 22.
Further include having cover board 23, the second guide sleeve 24, the second inserted link 25, the second link block 26, the first bolt 28, wing nut 29 and second spring 31, the top right side of framework 1 be hingedly connected with cover board 23, the right part of cover board 23 is provided with the second through-hole 30, electricity Dynamic reel 14 is located in the second through-hole 30, and the left part of cover board 23 is embedded with the second guide sleeve 24, the connection of 24 inner sliding type of the second guide sleeve There are the second inserted link 25,25 lower part of the second inserted link to be located in framework 1, the top of the second inserted link 25 is connected with the second link block 26, lid The left part of plate 23 is provided with first through hole 27, and the first bolt 28 is connected at the top of 1 left wall of framework, and the first bolt 28 passes through first through hole 27, wing nut 29 is rotary on the first bolt 28, is connected between the bottom right and the top left side of cover board 23 of the second link block 26 It is connected to second spring 31.
Embodiment 3
A kind of construction preliminary installation apparatus of room floors cement includes as shown in Figs. 1-5 framework 1, wheel 2, knob 3, the first sliding rail 6, the first sliding block 7, baffle 8, the first link block 9, the first spring 10, the first guide sleeve 11, the first inserted link 12, electronic Reel 14, the first bracing wire 15, the second sliding rail 16, the second sliding block 17, push plate 18, the first nut 19, bearing block 20,21 and of screw rod The bottom of handwheel 22, framework 1 is equipped with wheel 2, and the right upper portion of framework 1 is connected with knob 3, and the bottom left of framework 1 is provided with Discharge hole 4, right side central is provided with groove 5 in framework 1, and the framework 1 of 5 bottom of groove is equipped with the first sliding rail 6, on the first sliding rail 6 Slidingtype is connected with the first sliding block 7, and the left side of the first sliding block 7 is connected with baffle 8, and the right side of baffle 8 connects with right side in framework 1 Touch, the left upper portion of the first sliding rail 6 is connected with the first link block 9, the top of the bottom of the first link block 9 and the first sliding block 7 it Between be connected with the first spring 10, the top of baffle 8 is connected with the first guide sleeve 11, and 11 inner sliding type of the first guide sleeve is connected with first and inserts Bar 12, right upper portion uniformly opens that there are three card slots 13 in framework 1, and the top right side of framework 1 is connected with electronic reel 14, electronic The first bracing wire 15 is wound on reel 14,15 bottom end of the first bracing wire is connected on the first guide sleeve 11, and the left lower of framework 1 is equipped with Second sliding rail 16, slidingtype is connected with the second sliding block 17 on the second sliding rail 16, and the left side of the second sliding block 17 is connected with push plate 18, pushes away The left upper portion of plate 18 is connected with the first nut 19, and the left side of framework 1 is equipped with bearing block 20, and bearing block 20 is located at the second sliding rail 16 top, in bearing block 20 interference be connected with screw rod 21, screw rod 21 passes through the first nut 19, and the top of screw rod 21 is connected with hand Wheel 22.
Further include having cover board 23, the second guide sleeve 24, the second inserted link 25, the second link block 26, the first bolt 28, wing nut 29 and second spring 31, the top right side of framework 1 be hingedly connected with cover board 23, the right part of cover board 23 is provided with the second through-hole 30, electricity Dynamic reel 14 is located in the second through-hole 30, and the left part of cover board 23 is embedded with the second guide sleeve 24, the connection of 24 inner sliding type of the second guide sleeve There are the second inserted link 25,25 lower part of the second inserted link to be located in framework 1, the top of the second inserted link 25 is connected with the second link block 26, lid The left part of plate 23 is provided with first through hole 27, and the first bolt 28 is connected at the top of 1 left wall of framework, and the first bolt 28 passes through first through hole 27, wing nut 29 is rotary on the first bolt 28, is connected between the bottom right and the top left side of cover board 23 of the second link block 26 It is connected to second spring 31.
Further include having the first fixed pulley 32, the second bracing wire 33 and the first lifting the ball 34, the top left side of cover board 23 is connected with One fixed pulley 32, the first fixed pulley 32 are located at the right of second spring 31, and the bottom right of the second link block 26 is connected with second Bracing wire 33, the second bracing wire 33 bypass the first fixed pulley 32 and electronic reel 14, and 33 right end of the second bracing wire is connected with the first lifting the ball 34。
Embodiment 4
A kind of construction preliminary installation apparatus of room floors cement includes as shown in Figs. 1-5 framework 1, wheel 2, knob 3, the first sliding rail 6, the first sliding block 7, baffle 8, the first link block 9, the first spring 10, the first guide sleeve 11, the first inserted link 12, electronic Reel 14, the first bracing wire 15, the second sliding rail 16, the second sliding block 17, push plate 18, the first nut 19, bearing block 20,21 and of screw rod The bottom of handwheel 22, framework 1 is equipped with wheel 2, and the right upper portion of framework 1 is connected with knob 3, and the bottom left of framework 1 is provided with Discharge hole 4, right side central is provided with groove 5 in framework 1, and the framework 1 of 5 bottom of groove is equipped with the first sliding rail 6, on the first sliding rail 6 Slidingtype is connected with the first sliding block 7, and the left side of the first sliding block 7 is connected with baffle 8, and the right side of baffle 8 connects with right side in framework 1 Touch, the left upper portion of the first sliding rail 6 is connected with the first link block 9, the top of the bottom of the first link block 9 and the first sliding block 7 it Between be connected with the first spring 10, the top of baffle 8 is connected with the first guide sleeve 11, and 11 inner sliding type of the first guide sleeve is connected with first and inserts Bar 12, right upper portion uniformly opens that there are three card slots 13 in framework 1, and the top right side of framework 1 is connected with electronic reel 14, electronic The first bracing wire 15 is wound on reel 14,15 bottom end of the first bracing wire is connected on the first guide sleeve 11, and the left lower of framework 1 is equipped with Second sliding rail 16, slidingtype is connected with the second sliding block 17 on the second sliding rail 16, and the left side of the second sliding block 17 is connected with push plate 18, pushes away The left upper portion of plate 18 is connected with the first nut 19, and the left side of framework 1 is equipped with bearing block 20, and bearing block 20 is located at the second sliding rail 16 top, in bearing block 20 interference be connected with screw rod 21, screw rod 21 passes through the first nut 19, and the top of screw rod 21 is connected with hand Wheel 22.
Further include having cover board 23, the second guide sleeve 24, the second inserted link 25, the second link block 26, the first bolt 28, wing nut 29 and second spring 31, the top right side of framework 1 be hingedly connected with cover board 23, the right part of cover board 23 is provided with the second through-hole 30, electricity Dynamic reel 14 is located in the second through-hole 30, and the left part of cover board 23 is embedded with the second guide sleeve 24, the connection of 24 inner sliding type of the second guide sleeve There are the second inserted link 25,25 lower part of the second inserted link to be located in framework 1, the top of the second inserted link 25 is connected with the second link block 26, lid The left part of plate 23 is provided with first through hole 27, and the first bolt 28 is connected at the top of 1 left wall of framework, and the first bolt 28 passes through first through hole 27, wing nut 29 is rotary on the first bolt 28, is connected between the bottom right and the top left side of cover board 23 of the second link block 26 It is connected to second spring 31.
Further include having the first fixed pulley 32, the second bracing wire 33 and the first lifting the ball 34, the top left side of cover board 23 is connected with One fixed pulley 32, the first fixed pulley 32 are located at the right of second spring 31, and the bottom right of the second link block 26 is connected with second Bracing wire 33, the second bracing wire 33 bypass the first fixed pulley 32 and electronic reel 14, and 33 right end of the second bracing wire is connected with the first lifting the ball 34。
Further include have connecting plate 36, third guide sleeve 37, guide rod 38, rattle balls 39, third spring 40, the second fixed pulley 41, Third fixed pulley 42, the 4th guide sleeve 43, third bracing wire 44 and the second lifting the ball 45,1 right wall lower part of framework are provided with third through-hole 35, the Connecting plate 36 is equipped between the framework 1 of three through-holes, about 35 both sides, the front side of connecting plate 36 is connected with third guide sleeve 37, and third is led It covers 37 inner sliding types and is connected with guide rod 38, the left side of guide rod 38 is connected with rattle balls 39, and rattle balls 39 and the right side of baffle 8 connect It touches, is connected with third spring 40 between the framework 1 of 35 upside of top right side and third through-hole of guide rod 38, the right side of framework 1 connects It is connected to the second fixed pulley 41, the right side of framework 1 is connected with third fixed pulley 42, and third fixed pulley 42 is located at the upper of third through-hole 35 Side, third fixed pulley 42 are located at the lower section of the second fixed pulley 41, and the right side of framework 1 is connected with the 4th guide sleeve 43, the 4th guide sleeve 43 Positioned at the top of the second fixed pulley 41, the right side of guide rod 38 is connected with third bracing wire 44, and third bracing wire 44 bypasses the second fixed pulley 41 and third fixed pulley 42, third bracing wire 44 passes through the 4th guide sleeve 43, and 44 top of third bracing wire is connected with the second lifting the ball 45.
Further include thering is the second bolt 46, the second nut 47 and fixture block 48, the bottom left of cover board 23 to be connected with the second bolt 46, the second bolt 46 is located at the right of the second inserted link 25, and the second nut 47, the right side of the second nut 47 are rotary on the second bolt 46 It is connected with fixture block 48.
When staff needs using this equipment, this equipment is shifted to the region for needing to be laid with cement first onto, then by water Mud pours into framework 1, and subsequent staff holds handwheel 22 and rotates counterclockwise, and handwheel 22 drives screw rod 21 to rotate counterclockwise, into And the first nut 19 is made to move downward, the first nut 19 drives push plate 18 to move downward, and push plate 18 is by the second sliding block 17 the It is moved downward on two sliding rails 16, when push plate 18 is moved downwardly to ground to appropriately distance, staff stops operating hand Wheel 22, and control electronic reel 14 and rotate clockwise, electronic reel 14 tenses the first bracing wire 15, and then drives the first guide sleeve 11 move upwards, and the first guide sleeve 11 can drive baffle 8 to move upwards, and baffle 8 is upward on the first sliding rail 6 by the first sliding block 7 Movement, the first spring 10 is compressed, and with moving upwards for baffle 8, discharge hole 4 is gradually opened, and the cement in framework 1 passes through Discharge hole 4 is fallen on ground, and when the size of discharge hole 4 reaches the demand of staff, staff closes electronic coiling Wheel 14, and the first inserted link 12 is inserted on corresponding card slot 13, and then the position of fixed baffle 8, at the same time, staff It holds knob 3 to move right, 3 drive framework 1 of knob moves right, and framework 1 is moved right by wheel 2, and framework 1 drives push plate 18 move right, and the cement fallen from discharge hole 4 is bulldozed by push plate 18, can mitigate the work that staff is bulldozed cement in this way Amount, can also save the time of staff, and when staff need not be laid with cement, the first inserted link 12 is extracted card slot 13, then control electronic reel 14 and rotate counterclockwise, the first bracing wire 15 is relaxed, and the first spring 10 sets back, and pushes the One sliding block 7 moves downward on the first sliding rail 6, and the first sliding block 7 drives baffle 8 to move downward, and baffle 8 blocks discharge hole 4, frame Cement in body 1 is no longer fallen, and staff rotates clockwise handwheel 22 later, and handwheel 22 drives screw rod 21 to rotate clockwise, And then the first nut 19 is made to move upwards, the first nut 19 drives push plate 18 to move upwards, and push plate 18 is existed by the second sliding block 17 It moves up to and sets back on second sliding rail 16.
Because further including having cover board 23, the second guide sleeve 24, the second inserted link 25, the second link block 26, the first bolt 28, butterfly The top right side of nut 29 and second spring 31, framework 1 is hingedly connected with cover board 23, and the right part of cover board 23 is provided with the second through-hole 30, electronic reel 14 is located in the second through-hole 30, and the left part of cover board 23 is embedded with the second guide sleeve 24,24 inner sliding type of the second guide sleeve It is connected with the second inserted link 25,25 lower part of the second inserted link is located in framework 1, and the top of the second inserted link 25 is connected with the second link block 26, the left part of cover board 23 is provided with first through hole 27, is connected with the first bolt 28 at the top of 1 left wall of framework, and the first bolt 28 passes through the One through-hole 27 is rotary with wing nut 29, the top left side of the bottom right and cover board 23 of the second link block 26 on first bolt 28 Between be connected with second spring 31, so after discharge hole 4 is blocked by cement, staff can pin downwards the second link block 26, the second link block 26 drives the second inserted link 25 to move downward, and second spring 31 is compressed, and the second inserted link 25 will be in discharge hole 4 Cement disclose out, after discharge hole 4 is disclosed out, staff unclamp the second link block 26, second spring 31 sets back, and band Dynamic second link block 26 moves upwards, and the second link block 26 drives the second inserted link 25 to move up to and sets back, as work people When member needs to increase cement, wing nut 29 is turned counterclockwise, and wing nut 29 moves upwards, and then loosens cover board 23, work Personnel hold the second link block 26 and move upwards again, and the second link block 26 drives the second inserted link 25 to move upwards, second spring 31 It is stretched, when the second link block 26 moves up to certain distance, staff holds the second link block 26 and rotates backward again, Second link block 26 drives cover board 23 to rotate backward by the second inserted link 25 and the second guide sleeve 24, and staff can add cement Into framework 1, after staff adds cement, cover board 23 can be gone back to original position, and decontrol the second link block 26 forward, the Two springs 31 set back, and the second link block 26 is driven to set back, and subsequent staff rotates clockwise wing nut again 29, wing nut 29 moves downward, and then cover board 23 is compressed.
Because further including having the first fixed pulley 32, the second bracing wire 33 and the first lifting the ball 34, the top left side of cover board 23 connects There are the first fixed pulley 32, the first fixed pulley 32 to be located at the right of second spring 31, the bottom right of the second link block 26 is connected with Second bracing wire 33, the second bracing wire 33 bypass the first fixed pulley 32 and electronic reel 14, and 33 right end of the second bracing wire is connected with first Lifting the ball 34, so staff can hold the first lifting the ball 34 and move right, the first lifting the ball 34 drives the second link block 26 downwards Movement, second spring 31 is compressed, and then so that the second inserted link 25 is moved downward and disclosed out discharge hole 4, and such staff is just not It needs to free hand to press the second link block 26, can disclose open discharge hole 4 while pulling knob 3, save staff's Time, after the cement of discharge hole 4 is disclosed out, staff unclamps again the first lifting the ball 34, and second spring 31 sets back, and can draw Dynamic second link block 26, which moves up to, to set back.
Because further including having connecting plate 36, third guide sleeve 37, guide rod 38, rattle balls 39, third spring 40, the second fixed pulley 41, third fixed pulley 42, the 4th guide sleeve 43, third bracing wire 44 and the second lifting the ball 45,1 right wall lower part of framework are provided with third through-hole 35, connecting plate 36 is equipped between the framework 1 of about 35 both sides of third through-hole, the front side of connecting plate 36 is connected with third guide sleeve 37, 37 inner sliding type of third guide sleeve is connected with guide rod 38, and the left side of guide rod 38 is connected with rattle balls 39, the right side of rattle balls 39 and baffle 8 Side contacts are connected with third spring 40, the right side of framework 1 between the top right side of guide rod 38 and the framework 1 on the upside of third through-hole 35 Side is connected with the second fixed pulley 41, and the right side of framework 1 is connected with third fixed pulley 42, and third fixed pulley 42 is located at third through-hole 35 Top, third fixed pulley 42 is located at the lower section of the second fixed pulley 41, and the right side of framework 1 is connected with the 4th guide sleeve 43, and the 4th leads Set 43 is located at the top of the second fixed pulley 41, and the right side of guide rod 38 is connected with third bracing wire 44, and third bracing wire 44 is fixed around second Pulley 41 and third fixed pulley 42, third bracing wire 44 pass through the 4th guide sleeve 43,44 top of third bracing wire to be connected with the second lifting the ball 45, So when, there are when cement, staff can hold the second lifting the ball 45 and move upwards, and the second lifting the ball 45 passes through third on baffle 8 Bracing wire 44 drives guide rod 38 to move right, and third spring 40 is stretched, and guide rod 38 drives rattle balls 39 to move right, and then works Personnel decontrol the second lifting the ball 45 again, and third spring 40 sets back, and guide rod 38 is driven to move downward, and guide rod 38 drives rattle balls 39 move downward, and rattle balls 39 are hit with baffle 8, constantly hold and unclamp the second lifting the ball 45 upwards by staff, can The cement on baffle 8 to be shot down.
Because further including thering is the second bolt 46, the second nut 47 and fixture block 48, the bottom left of cover board 23 to be connected with second Bolt 46, the second bolt 46 are located at the right of the second inserted link 25, the second nut 47 are rotary on the second bolt 46, the second nut 47 Right side is connected with fixture block 48, so when the second inserted link 25 moves upward to the top of the second nut 47, staff is clockwise 4790 degree of the second nut is rotated, and then fixture block 48 is made to rotate clockwise 90 degree, such fixture block 48 can be by the position of the second inserted link 25 It sets and fixes, the second inserted link 25 is avoided to interfere the subsequent work of staff, when the position of the second inserted link 25 need not be fixed, Staff rotates counterclockwise 4790 degree of the second nut again, and then fixture block 48 rotates clockwise 90 degree, in the work of second spring 31 Under, the second inserted link 25, which moves downwardly to, to set back.
Above-described embodiment, which is available to, to be familiar with person in the art to realize or use the present invention, and is familiar with this field Personnel can make various modifications or variation, thus this to above-described embodiment without departing from the present invention in the case of the inventive idea The protection domain of invention is not limited by above-described embodiment, and should meet inventive features that claims are mentioned most On a large scale.

Claims (5)

1. a kind of construction preliminary installation apparatus of room floors cement, which is characterized in that include framework(1), wheel (2), knob(3), the first sliding rail(6), the first sliding block(7), baffle(8), the first link block(9), the first spring(10), first lead Set(11), the first inserted link(12), electronic reel(14), the first bracing wire(15), the second sliding rail(16), the second sliding block(17), push away Plate(18), the first nut(19), bearing block(20), screw rod(21)And handwheel(22), framework(1)Bottom wheel is installed(2), Framework(1)Right upper portion be connected with knob(3), framework(1)Bottom left be provided with discharge hole(4), framework(1)In interior right side Portion is provided with groove(5), groove(5)The framework of bottom(1)It is equipped with the first sliding rail(6), the first sliding rail(6)Upper slidingtype is connected with First sliding block(7), the first sliding block(7)Left side be connected with baffle(8), baffle(8)Right side and framework(1)Interior right contact, First sliding rail(6)Left upper portion be connected with the first link block(9), the first link block(9)Bottom and the first sliding block(7)Top The first spring is connected between portion(10), baffle(8)Top be connected with the first guide sleeve(11), the first guide sleeve(11)Inner sliding type It is connected with the first inserted link(12), framework(1)Interior right upper portion is uniformly opened there are three card slot(13), framework(1)Top right side connect It is connected to electronic reel(14), electronic reel(14)On be wound with the first bracing wire(15), the first bracing wire(15)Bottom end is connected to One guide sleeve(11)On, framework(1)Left lower be equipped with the second sliding rail(16), the second sliding rail(16)Upper slidingtype is connected with second Sliding block(17), the second sliding block(17)Left side be connected with push plate(18), push plate(18)Left upper portion be connected with the first nut (19), framework(1)Left side bearing block is installed(20), bearing block(20)Positioned at the second sliding rail(16)Top, bearing block (20)Interior interference is connected with screw rod(21), screw rod(21)Across the first nut(19), screw rod(21)Top be connected with handwheel (22).
2. a kind of construction according to claim 1 preliminary installation apparatus of room floors cement, which is characterized in that also It include cover board(23), the second guide sleeve(24), the second inserted link(25), the second link block(26), the first bolt(28), wing nut (29)And second spring(31), framework(1)Top right side be hingedly connected with cover board(23), cover board(23)Right part be provided with second Through-hole(30), electronic reel(14)Positioned at the second through-hole(30)In, cover board(23)Left part be embedded with the second guide sleeve(24), second Guide sleeve(24)Inner sliding type is connected with the second inserted link(25), the second inserted link(25)Lower part is located at framework(1)It is interior, the second inserted link(25) Top be connected with the second link block(26), cover board(23)Left part be provided with first through hole(27), framework(1)Connection at the top of left wall There is the first bolt(28), the first bolt(28)Across first through hole(27), the first bolt(28)On be rotary with wing nut(29), the Two link blocks(26)Bottom right and cover board(23)Top left side between be connected with second spring(31).
3. a kind of construction according to claim 2 preliminary installation apparatus of room floors cement, which is characterized in that also It include the first fixed pulley(32), the second bracing wire(33)With the first lifting the ball(34), cover board(23)Top left side be connected with first Fixed pulley(32), the first fixed pulley(32)Positioned at second spring(31)Right, the second link block(26)Bottom right connection There is the second bracing wire(33), the second bracing wire(33)Around the first fixed pulley(32)With electronic reel(14), the second bracing wire(33)It is right End is connected with the first lifting the ball(34).
4. a kind of construction according to claim 3 preliminary installation apparatus of room floors cement, which is characterized in that also It include connecting plate(36), third guide sleeve(37), guide rod(38), rattle balls(39), third spring(40), the second fixed pulley (41), third fixed pulley(42), the 4th guide sleeve(43), third bracing wire(44)With the second lifting the ball(45), framework(1)It opens right wall lower part There is third through-hole(35), third through-hole(35)The framework of upper and lower both sides(1)Between be equipped with connecting plate(36), connecting plate(36)Before Side is connected with third guide sleeve(37), third guide sleeve(37)Inner sliding type is connected with guide rod(38), guide rod(38)Left side be connected with Rattle balls(39), rattle balls(39)With baffle(8)Right contact, guide rod(38)Top right side and third through-hole(35)Upside Framework(1)Between be connected with third spring(40), framework(1)Right side be connected with the second fixed pulley(41), framework(1)The right side Side is connected with third fixed pulley(42), third fixed pulley(42)Positioned at third through-hole(35)Top, third fixed pulley(42)Position In the second fixed pulley(41)Lower section, framework(1)Right side be connected with the 4th guide sleeve(43), the 4th guide sleeve(43)It is fixed positioned at second Pulley(41)Top, guide rod(38)Right side be connected with third bracing wire(44), third bracing wire(44)Around the second fixed pulley (41)With third fixed pulley(42), third bracing wire(44)Across the 4th guide sleeve(43), third bracing wire(44)Top is connected with second Lifting the ball(45).
5. a kind of construction according to claim 4 preliminary installation apparatus of room floors cement, which is characterized in that also It include the second bolt(46), the second nut(47)And fixture block(48), cover board(23)Bottom left be connected with the second bolt (46), the second bolt(46)Positioned at the second inserted link(25)Right, the second bolt(46)On be rotary with the second nut(47), the second spiral shell It is female(47)Right side be connected with fixture block(48).
CN201810414597.2A 2018-05-03 2018-05-03 A kind of construction preliminary installation apparatus of room floors cement Withdrawn CN108729626A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810414597.2A CN108729626A (en) 2018-05-03 2018-05-03 A kind of construction preliminary installation apparatus of room floors cement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810414597.2A CN108729626A (en) 2018-05-03 2018-05-03 A kind of construction preliminary installation apparatus of room floors cement

Publications (1)

Publication Number Publication Date
CN108729626A true CN108729626A (en) 2018-11-02

Family

ID=63937931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810414597.2A Withdrawn CN108729626A (en) 2018-05-03 2018-05-03 A kind of construction preliminary installation apparatus of room floors cement

Country Status (1)

Country Link
CN (1) CN108729626A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797633A (en) * 2018-12-27 2019-05-24 张敏 A kind of artificial swamp construction clinker laydown machine
CN110056199A (en) * 2019-03-19 2019-07-26 肖辉 One kind is built a wall brick cement adder
CN110593540A (en) * 2019-09-04 2019-12-20 曾剑威 Building ground cement preliminary laying equipment

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2244893A1 (en) * 1973-09-21 1975-04-18 Wessely Alfred Trolley for dispensing a mortar screed - for using a low viscosity resin modified mortar delivered by a pump
US5387051A (en) * 1992-04-15 1995-02-07 Antonietta Investments Ltd. Levelled cement spreader for laying tiles
WO2002100555A1 (en) * 2001-06-13 2002-12-19 Dana Lim A/S Apparatus for the spreading of adhesive material
CN202517579U (en) * 2012-03-15 2012-11-07 绍兴益生砂浆有限公司 Dredging structure for movable dry-mixed mortar bulk tank
CN104002380A (en) * 2013-02-22 2014-08-27 苏州欧霸机电工程有限公司 Material-accumulation-prevention concrete stirring machine discharging hopper
CN204920165U (en) * 2015-08-21 2015-12-30 临海市路通市政工程有限公司 Cement floor file machine
CN105484481A (en) * 2015-12-15 2016-04-13 安徽紫来建设集团有限公司 Mortar flattening cart
CN206840437U (en) * 2017-05-31 2018-01-05 新昌县羽林街道东商机械厂 A kind of building field charging device
CN207058900U (en) * 2017-06-22 2018-03-02 朱鸿锐 A kind of high efficiency concrete central mix plant for building
CN207177239U (en) * 2017-08-31 2018-04-03 杨振 A kind of construction ground mortar applicating machine

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2244893A1 (en) * 1973-09-21 1975-04-18 Wessely Alfred Trolley for dispensing a mortar screed - for using a low viscosity resin modified mortar delivered by a pump
US5387051A (en) * 1992-04-15 1995-02-07 Antonietta Investments Ltd. Levelled cement spreader for laying tiles
WO2002100555A1 (en) * 2001-06-13 2002-12-19 Dana Lim A/S Apparatus for the spreading of adhesive material
CN202517579U (en) * 2012-03-15 2012-11-07 绍兴益生砂浆有限公司 Dredging structure for movable dry-mixed mortar bulk tank
CN104002380A (en) * 2013-02-22 2014-08-27 苏州欧霸机电工程有限公司 Material-accumulation-prevention concrete stirring machine discharging hopper
CN204920165U (en) * 2015-08-21 2015-12-30 临海市路通市政工程有限公司 Cement floor file machine
CN105484481A (en) * 2015-12-15 2016-04-13 安徽紫来建设集团有限公司 Mortar flattening cart
CN206840437U (en) * 2017-05-31 2018-01-05 新昌县羽林街道东商机械厂 A kind of building field charging device
CN207058900U (en) * 2017-06-22 2018-03-02 朱鸿锐 A kind of high efficiency concrete central mix plant for building
CN207177239U (en) * 2017-08-31 2018-04-03 杨振 A kind of construction ground mortar applicating machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797633A (en) * 2018-12-27 2019-05-24 张敏 A kind of artificial swamp construction clinker laydown machine
CN110056199A (en) * 2019-03-19 2019-07-26 肖辉 One kind is built a wall brick cement adder
CN110593540A (en) * 2019-09-04 2019-12-20 曾剑威 Building ground cement preliminary laying equipment
CN110593540B (en) * 2019-09-04 2020-12-08 金华美诺机电有限公司 Building ground cement preliminary laying equipment

Similar Documents

Publication Publication Date Title
CN108729626A (en) A kind of construction preliminary installation apparatus of room floors cement
CN106677504B (en) A kind of construction site ground cement installation apparatus
CN205700679U (en) A kind of cement for building recycles breaker
CN205701411U (en) A kind of construction sand sand fast screening devices
CN108756274B (en) Building construction is with shoveling equipment before room lays cement
CN108609707A (en) A kind of sanitary sewage disposal sedimentation basin movable type applicating equipment
CN107138445A (en) A kind of special cleaning plant of building implement
CN207017383U (en) A kind of dual-purpose toilet
CN107090864A (en) A kind of construction site irrigation canals and ditches cement highly efficient pad device
CN107119894B (en) Mattess trowel ray machine floating device
DE102006027193A1 (en) Adjustable toilet bowl for public usage, has screws installed in lower element so as to adapt structure which is in form of elongated sleeve with internal threads, and input opening connected to reservoir by accordion type conduit
CN105386508A (en) Novel hydraulic automatic control initial rainwater discarding well
CN106049658B (en) A kind of Recycled Asphalt Pavement highway sewer intelligently decontaminates all-in-one machine
CN206184508U (en) Fitment is with high -efficient breaker of condensate water clod
CN208056271U (en) A kind of anti-blocking cistern for hydraulic engineering
CN109499135A (en) Treatment tank is used in a kind of production of semicircular tile
CN109761299A (en) A kind of flocculate removal structure, aerator and sewage-treatment plant
CN213572148U (en) Rainwater collection device is used in gardens
CN210421679U (en) Building water supply and drainage pipeline
CN107185791A (en) A kind of sand screening installation for building
CN106489009B (en) Environmentally friendly unpowered flow regulator
CN210875500U (en) Broken screening plant of building stones
CN208105181U (en) A kind of vegetation slope pavement of hydraulic engineering
CN207606961U (en) A kind of concrete removes slag device
CN215026590U (en) Detachable filter equipment that sewage treatment used

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181102