Prior art keywords
screw
mounting hole
steering engine
thread
thread bush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810670689.7A
Other languages
Chinese (zh)
Inventor
苏顺德
刘冬儿
朱建文
邓学忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Aerospace Control Technology Co Ltd
Original Assignee
Guizhou Aerospace Control Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Aerospace Control Technology Co Ltd filed Critical Guizhou Aerospace Control Technology Co Ltd
Priority to CN201810670689.7A priority Critical patent/CN108724101A/en
Publication of CN108724101A publication Critical patent/CN108724101A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B29/00Accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • B25B27/14Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same
    • B25B27/143Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same for installing wire thread inserts or tubular threaded inserts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Vibration Dampers (AREA)

Abstract

The invention discloses a kind of means of defences of energy steering engine mounting hole adjustment process to post safeguard structure; the present invention is to be threaded bushing in the mounting hole of energy steering engine; installation hole surface by screw-thread bush in energy steering engine forms protective layer, prevents screw from damaging mounting hole when fastening energy steering engine.The present invention protects mounting hole screw thread well by the method for the increase screw-thread bush in mounting hole in the product testing stage, and screw-thread bush is removed after product testing, and mounting hole is excellent, does not occur damaging caused by adjustment, delivery process.The internal and external threads of screw-thread bush solve the problems, such as screw-thread bush intensity well using parallel thread.

Description

A kind of means of defence and safeguard structure of energy steering engine mounting hole adjustment process
Technical field
The present invention relates to a kind of means of defences and safeguard structure of energy steering engine mounting hole adjustment process, belong to mechanical debugging Technical field.
Background technology
Certain model energy steering engine is wrought aluminium part, and material cannot be changed.Energy steering engine is equipped with the screw thread of one group of M10 × 1-6H Hole is as mounting hole.Energy steering engine is needed in process of production through load testing, dynamic test and vibration screening ability referable Client uses.But it in load testing, dynamic test and vibration screening, needs repeatedly to be fixed energy steering engine with stainless steel screw It tests in different test equipments test, causes the mounting hole of energy steering engine by stainless steel screw repeatedly fastening and dismounting Mounting hole screw thread is caused to damage unqualified and can not deliver.
The method one that the prior art solves above-mentioned technical problem is use as few as possible before energy steering engine is delivered for use Mounting hole is fixed;Second is that changing the material at energy steering engine mounting hole;Third, the intensity of screw is reduced, to prevent screw damage peace Fill hole.
But energy steering engine material be it is unalterable, product before delivery by every detection also necessarily, cannot It omits.Since the operating torque of energy actuator load test is in 600N m or so, vibration screening magnitude is 6.06g, and example is shaken when trying Momentum grade is 12g, more demanding to mounting screw Material Strength.Therefore it can not also use and change mounting screw material or heat treatment The method of hardness come reduce to install threaded hole abrasion.
The above problem is at the technical barrier in the production of energy steering engine.
Invention content
The purpose of the present invention is to provide a kind of means of defences and safeguard structure of energy steering engine mounting hole adjustment process, make Energy steering engine detection-phase protects its mounting hole, and makes to remove protection after the completion of the detection of energy steering engine, to improve product Quality, it is ensured that product qualification rate, to overcome the deficiencies in the prior art.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of means of defence of energy steering engine mounting hole adjustment process of the present invention, this method is in the mounting hole of energy steering engine It is threaded bushing, the installation hole surface by screw-thread bush in energy steering engine forms protective layer, prevents screw in the fastening energy Mounting hole is damaged when steering engine.
In preceding method, the screw-thread bush is the closed circular tube shaped in one end, and the blind end of pipe is equipped with hexagonal hole, pipe Outer circle be equipped with external screw thread, the inner circle of pipe is equipped with internal thread;It will by allen wrench when testing energy steering engine Screw-thread bush blind end is screwed inwardly into mounting hole, and then energy steering engine is fixed in test equipment with screw again.
In preceding method, the hardness of the screw-thread bush is no more than the hardness at energy steering engine mounting hole.
In preceding method, the external screw thread of the screw-thread bush and the screw thread of mounting hole correspond to M10 × 1-6h;Screw-thread bush Internal thread be M8 × 1-6H.
In preceding method, the internal thread of the screw-thread bush is parallel with the external screw thread of screw-thread bush.
In preceding method, the screw is M8 × 1-6h screws.
In preceding method, the length of the screw-thread bush is corresponding with mounting hole internal thread length.
According to a kind of safeguard structure for energy steering engine mounting hole adjustment process of the invention that the above method is constituted, including energy Source steering engine is equipped with mounting hole on energy steering engine, and screw-thread bush, screw-thread bush and peace are provided in the mounting hole of energy steering engine It fills hole to be threadedly coupled, the screw-thread bush is the closed circular tube shaped in one end, and the blind end of pipe is equipped with hexagonal hole, the outer circle of pipe Equipped with the external screw thread being threadedly coupled with mounting hole, the inner circle of pipe is equipped with internal thread.
By adopting the above-described technical solution, compared with prior art, the present invention the present invention in mounting hole by increasing The method of screw-thread bush protects mounting hole screw thread in the product testing stage, screw thread lining is removed after product testing well Set, mounting hole is excellent, does not occur damaging caused by adjustment, delivery process.The internal and external threads of screw-thread bush are using parallel Screw thread solves the problems, such as screw-thread bush intensity well.
Description of the drawings
Fig. 1 is the method schematic diagram of the present invention;
Fig. 2 is that the screw-thread bush of the present invention is packed into the structural schematic diagram of mounting hole;
Fig. 3 is the structural schematic diagram of the screw-thread bush of the present invention.
In figure label for:1- mounting holes, 2- screw-thread bushes, 3- hexagonal holes, 4- internal threads, 5- external screw threads, 6- energy steering engine, 7- is parallel.
Specific implementation mode
The present invention is described in further detail with reference to the accompanying drawings and examples.
The means of defence of a kind of energy steering engine mounting hole adjustment process of the present invention, as shown in Figure 1, this method is in the energy It is threaded bushing 2 in the mounting hole 1 of steering engine 6, is formed and is protected in 1 thread surface of mounting hole of energy steering engine 6 by screw-thread bush 2 Sheath prevents screw from damaging mounting hole 1 when fastening energy steering engine 6.The length of screw-thread bush 2 and 1 internal thread length of mounting hole It is corresponding.Screw-thread bush 2 is the closed circular tube shaped in one end, and the blind end of pipe is equipped with hexagonal hole 3, and the outer circle of pipe is equipped with external screw thread 5, the inner circle of pipe is equipped with internal thread 4;Screw-thread bush 2 is closed by allen wrench when testing energy steering engine 6 End is screwed inwardly into mounting hole 1, and then energy steering engine 6 is fixed in test equipment with screw again.The hardness of screw-thread bush 2 is little Hardness at 6 upper installing hole 1 of energy steering engine.The external screw thread 5 of screw-thread bush 2 corresponds to M10 × 1- with the screw thread of mounting hole 1 6h;The internal thread 4 of screw-thread bush 2 is M8 × 1-6H.The internal thread 4 of screw-thread bush 2 is put down each other with the external screw thread 5 of screw-thread bush 2 Row 7.M8 × 1-6h screws are used with the screw of test.
According to a kind of safeguard structure for energy steering engine mounting hole adjustment process of the invention that the above method is constituted, such as Fig. 2 Shown in Fig. 3, which includes energy steering engine 6, mounting hole 1 is equipped on energy steering engine 6, in the mounting hole 1 of energy steering engine 6 It is provided with screw-thread bush 2, screw-thread bush 2 is threadedly coupled with mounting hole 1, and the screw-thread bush 2 is the closed circular tube shaped in one end, circle The blind end of pipe is equipped with hexagonal hole 3, and the outer circle of pipe is equipped with the external screw thread 5 being threadedly coupled with mounting hole 1, and the inner circle of pipe is equipped with Internal thread 4.
Embodiment
This example is as depicted in figs. 1 and 2.In order to be protected to the screw thread in mounting hole 1, spiral shell is increased in mounting hole 1 Line bushing 2, screw-thread bush 2 is packed into energy steering engine 6 before debugging, takes out screw-thread bush 2 after the completion of delivery, in energy steering engine 6 Adjustment, the screw thread in mounting hole is protected in delivery process.
The mounting hole 1 of energy steering engine 6 is the threaded hole of M10 × 1-6H, thus determines the external screw thread 5 of screw-thread bush 2 It is only M10 × 1-6h.Energy steering engine 6 all needs to install rudder using mounting hole 1 in load testing, dynamic test, vibration screening Machine, in 600N m or so, vibration screening magnitude is 6.06g will influence the operating torque of load testing if mounting screw is too thin Mounting screw intensity, causes security risk, by calculating, experiment, analysis and summary, determines that the outer diameter of mounting screw can only adjust It just can guarantee that mounting screw can bear the intensity of load, vibration to φ 8, thus determine that the internal thread 4 of screw-thread bush 2 is M8 ×1-6H。
When conventional design, when external screw thread is M10 × 1-6h, externally threaded smallest base diameter is φ 9, and internal thread 4 is M8 × 1- When 6H, the maximum inner diameter of internal thread 4 is φ 9.Therefore, according to conventional design, calculated with dimension limit, screw-thread bush 2 it is inside and outside Screw thread can run through.2 intensity of screw-thread bush can not ensure, in order to solve this problem, ensure the intensity of screw-thread bush 2, screw thread is served as a contrast The internal and external screw thread of set 2 is designed as parallel 7 screw thread, so that the wall thickness of screw-thread bush is reached 0.5mm, which is addressed.Screw thread serves as a contrast Set 2 is shown in Fig. 2.

Claims (8)

1. a kind of means of defence of energy steering engine mounting hole adjustment process, it is characterised in that:This method is the peace in energy steering engine Dress is threaded bushing in hole, and the installation hole surface by screw-thread bush in energy steering engine forms protective layer, prevents screw tight Gu damaging mounting hole when energy steering engine.
2. means of defence according to claim 1, it is characterised in that:The screw-thread bush is the closed circular tube shaped in one end, circle The blind end of pipe is equipped with hexagonal hole, and the outer circle of pipe is equipped with external screw thread, and the inner circle of pipe is equipped with internal thread;To energy steering engine into Screw-thread bush blind end is screwed inwardly by mounting hole by allen wrench when row test, is then again consolidated energy steering engine with screw It is scheduled in test equipment.
3. means of defence according to claim 2, it is characterised in that:The hardness of the screw-thread bush is pacified no more than energy steering engine Fill the hardness at hole.
4. means of defence according to claim 3, it is characterised in that:The external screw thread of the screw-thread bush and the screw thread of mounting hole Correspond to M10 × 1-6h;The internal thread of screw-thread bush is M8 × 1-6H.
5. means of defence according to claim 4, it is characterised in that:The internal thread of the screw-thread bush and screw-thread bush it is outer Screw thread is parallel.
6. means of defence according to claim 5, it is characterised in that:The screw is M8 × 1-6h screws.
7. means of defence according to claim 6, it is characterised in that:The length of the screw-thread bush and mounting hole internal thread are long Degree corresponds to.
8. a kind of safeguard structure of energy steering engine mounting hole adjustment process, including energy steering engine(6), in energy steering engine(6)On set There is mounting hole(1), it is characterised in that:In energy steering engine(6)Mounting hole(1)Inside it is provided with screw-thread bush(2), screw-thread bush (2)With mounting hole(1)It is threadedly coupled, the screw-thread bush(2)Blind end for the closed circular tube shaped in one end, pipe is equipped with six sides Hole(3), the outer circle of pipe is equipped with and mounting hole(1)The external screw thread of threaded connection(5), the inner circle of pipe is equipped with internal thread(4).
CN201810670689.7A 2018-06-26 2018-06-26 A kind of means of defence and safeguard structure of energy steering engine mounting hole adjustment process Pending CN108724101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810670689.7A CN108724101A (en) 2018-06-26 2018-06-26 A kind of means of defence and safeguard structure of energy steering engine mounting hole adjustment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810670689.7A CN108724101A (en) 2018-06-26 2018-06-26 A kind of means of defence and safeguard structure of energy steering engine mounting hole adjustment process

Publications (1)

Publication Number Publication Date
CN108724101A true CN108724101A (en) 2018-11-02

Family

ID=63930758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810670689.7A Pending CN108724101A (en) 2018-06-26 2018-06-26 A kind of means of defence and safeguard structure of energy steering engine mounting hole adjustment process

Country Status (1)

Country Link
CN (1) CN108724101A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT9020142A0 (en) * 1990-04-26 1990-04-26 Salvagnini Transferica Spa SET OF ACTIVE COMPONENTS FOR LOCKING A RAW PIECE TO BE WORKED ON A PALLET WHICH INCORPORATE THE CAPABILITY OF ADJUSTMENT IN HEIGHT AND ANGULAR ORIENTATION
KR20060094328A (en) * 2005-02-24 2006-08-29 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 Bushing of enable fixing
CN201193637Y (en) * 2008-05-08 2009-02-11 苏州试验仪器总厂 Screwed connection structure with sleeve nut
US20090293248A1 (en) * 2008-06-03 2009-12-03 Advanex Inc. Tanged insert insertion tool
US20110008125A1 (en) * 2009-07-13 2011-01-13 United Technologies Corporation Threaded flanged bushing for fastening applications
CN204402614U (en) * 2015-01-29 2015-06-17 中国重汽集团济南动力有限公司 A kind of oil sump jettison gear
JP2018039138A (en) * 2016-09-06 2018-03-15 住友ゴム工業株式会社 Screw bush and tire vulcanization apparatus
CN208468276U (en) * 2018-06-26 2019-02-05 贵州航天控制技术有限公司 A kind of safeguard structure of energy steering engine mounting hole adjustment process

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT9020142A0 (en) * 1990-04-26 1990-04-26 Salvagnini Transferica Spa SET OF ACTIVE COMPONENTS FOR LOCKING A RAW PIECE TO BE WORKED ON A PALLET WHICH INCORPORATE THE CAPABILITY OF ADJUSTMENT IN HEIGHT AND ANGULAR ORIENTATION
KR20060094328A (en) * 2005-02-24 2006-08-29 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 Bushing of enable fixing
CN201193637Y (en) * 2008-05-08 2009-02-11 苏州试验仪器总厂 Screwed connection structure with sleeve nut
US20090293248A1 (en) * 2008-06-03 2009-12-03 Advanex Inc. Tanged insert insertion tool
US20110008125A1 (en) * 2009-07-13 2011-01-13 United Technologies Corporation Threaded flanged bushing for fastening applications
CN204402614U (en) * 2015-01-29 2015-06-17 中国重汽集团济南动力有限公司 A kind of oil sump jettison gear
JP2018039138A (en) * 2016-09-06 2018-03-15 住友ゴム工業株式会社 Screw bush and tire vulcanization apparatus
CN208468276U (en) * 2018-06-26 2019-02-05 贵州航天控制技术有限公司 A kind of safeguard structure of energy steering engine mounting hole adjustment process

Similar Documents

Publication Publication Date Title
CN110001976A (en) Component and its manufacturing method and aircraft or aircraft wing with clamped nut
AU2010258497A1 (en) Family of fixation devices with variable taper
CN102619781A (en) Device and method for connecting impeller with shaft of compressor
CN206770366U (en) A kind of swivel nut of locking key
WO2015000318A9 (en) Anti-loosening threaded part
CN208468276U (en) A kind of safeguard structure of energy steering engine mounting hole adjustment process
CN108724101A (en) A kind of means of defence and safeguard structure of energy steering engine mounting hole adjustment process
CN203650435U (en) Integrated special device for horizontally disassembling and assembling valve decks of large-caliber pressure seal valves
CN202937596U (en) Novel device for locking nut clockwise and counter-clockwise
CN2898053Y (en) Aluminum-alloy forge ring unit against quenching formation
CN203702814U (en) Locknut
CN104149545A (en) Universal wheel
CN103868033B (en) Switching device, lighting device and switching device for adjusting lamp installing angle
CN203972573U (en) The formed spinning device that a kind of on-line control Mick is heavy
CN207621156U (en) Bolt with prestressing force conducting wire platen
GB2477550A (en) Threaded insert
CN108412837A (en) Part retaining mechanism in a kind of extruder
CN107477464A (en) A kind of underground lamp of Fast Installation
CN211775426U (en) Height adjusting device for rotary floor
CN103291725B (en) A kind of connecting means of soft composite material
CN207906262U (en) A kind of nut assembly for locking fastening
CN208594969U (en) A kind of novel wheel disk of turbine variable cross-section bolt fastening structure
CN103868034B (en) Switching device, lighting device and switching device for adjusting lamp installing angle
CN216241889U (en) Inner spacer ring of back-to-back angular contact ball bearing
CN207848176U (en) Locking Anti-off bolt nut assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination