CN108723718A - The processing method for the hot coiling spring that wire diameter is 90 millimeters - Google Patents

The processing method for the hot coiling spring that wire diameter is 90 millimeters Download PDF

Info

Publication number
CN108723718A
CN108723718A CN201810559772.7A CN201810559772A CN108723718A CN 108723718 A CN108723718 A CN 108723718A CN 201810559772 A CN201810559772 A CN 201810559772A CN 108723718 A CN108723718 A CN 108723718A
Authority
CN
China
Prior art keywords
spring
millimeters
minutes
processing method
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810559772.7A
Other languages
Chinese (zh)
Inventor
姚惠彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xiangying Hardware Spring Co Ltd
Original Assignee
Jiangsu Xiangying Hardware Spring Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xiangying Hardware Spring Co Ltd filed Critical Jiangsu Xiangying Hardware Spring Co Ltd
Priority to CN201810559772.7A priority Critical patent/CN108723718A/en
Publication of CN108723718A publication Critical patent/CN108723718A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F3/00Coiling wire into particular forms
    • B21F3/02Coiling wire into particular forms helically
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Steel (AREA)
  • Wire Processing (AREA)
  • Springs (AREA)

Abstract

A kind of processing method for the hot coiling spring that wire diameter is 90 millimeters, steps are as follows:Sorting, blanking, tagging, hot briquetting, quenching treatment, temper makees the swirling flows for examining thermal treatment quality and stabilizing spring size, makees the mill spring processing for ensureing free height and verticality, spring-load is tested by design requirement, flaw detection is handled, and is examined, bead, surface treatment.This processing method is simple for process, easy to operate, and production cost is low, and the helical spring bearing capacity of processing is strong, in use, solves the problems, such as that spring number can not be increased when small product size is restricted.

Description

The processing method for the hot coiling spring that wire diameter is 90 millimeters
Technical field
The present invention relates to a kind of processing method of helical spring, especially a kind of wire diameter is 90 millimeters of hot rolling bullet The processing method of spring.
Background technology
Currently, the spring steel material of well known manufacture spring is 60Si2CrVA, material diameter through blanking, is quenched within 60 millimeters The techniques such as fiery processing, temper can reach various performance indicators and can guarantee that metallographic structure is secondary troostite.Work as material diameter Be difficult to meet its performance indicator by existing Conventional processing methods when more than 60 millimeters of φ, using oil be hardening media material without Method through hardening, center portion have a small amount of bainite and sorbite.The use of water is such as that hardening media easy tos produce hardening crack phenomenon again, can cause Extreme loss.Especially the material diameter of spring wire is 90 millimeters of φ, can not also be processed into helical spring at present.It was using Cheng Zhong will such as increase load, can only be by the way of two or more spring serial or parallel connections, in the range of finite volume very It is difficult to resolve certainly.The previous practice is exactly to increase small product size, increases number of springs, and when given volume, increase number of springs just at To be difficult to solve the problems, such as.
Invention content
The object of the present invention is to provide a kind of processing methods for the hot coiling spring that wire diameter is 90 millimeters, to increase list The bearing load of a spring, overcome the deficiencies in the prior art.
The processing method for the hot coiling spring that the wire diameter of the present invention is 90 millimeters, includes the following steps:
A, a diameter of 90 millimeters of materials for 60Si2CrVA hot rolling and air cooling spring steel is selected in sorting;
B, blanking determines length, and reconditioning cut surface using autogenous cutting;
The two ends of spring wire are transitioned into square type section, the heating forged by c, tagging in the way of forging from circular section Temperature is 980~1000 DEG C, and heating time is 95~105 minutes, and the heated length of two ends is 900~950 millimeters, after forging Point is 900~1000 millimeters long, and point is 72~82 millimeters wide, and point is 22~27 millimeters thick, and the final temperature forged is 900~920 DEG C.
D, hot briquetting, heating temperature are 980~1000 DEG C, and soaking time is 115~130 minutes, and mandrel is straight when hot rolling Diameter be 315 millimeters, pitch be 142~144 millimeters, the number of effective coils 3.8, number of total coils 5.3, once completed using spring coiling machine into Feed collet is tight, and rolls building ring and end moulding;
The spring that upper step rolls is heated and is monitored by e, quenching treatment, when the own temperature of spring reaches 825~ At 835 DEG C, spring is placed in hardening media, the sodium-chloride water solution that hardening media is 10%~15%, spring workpiece is being quenched Run duration is 32~40 seconds in fiery medium;
F, temper, heating temperature are 460~480 DEG C, and tempering time 280~320 minutes is then air-cooled;
G, make the swirling flows of inspection thermal treatment quality and stabilizing spring size;
H, make to ensure that the mill spring of free height and verticality is handled;
I, it presses design requirement and tests spring-load;
J, flaw detection is handled;
K, it examines;
L, bead;
M, it is surface-treated.
The processing method for the hot coiling spring that the wire diameter of the present invention is 90 millimeters, wherein hard after the temper Degree is HRC45-50, and the metallographic structure after tempering is secondary troostite, 0.5 millimeter of decarburized layer deepness <;The swirling flows It is that swirling flows are carried out to spring piece by piece on horizontal power press, suppresses 48 tons of load, suppress number 3 times;Described in above-mentioned k steps Inspection be to make the inspection of following items to every spring:Wire diameter, spring outer diameter, free height, the number of effective coils are total to enclose Number, verticality, the depth of parallelism, load test P1=270088N ± 5%, P2=382200N ± 5%, processing of halting, hardness decarburization It examines, metal lographic examination;The bead is to carry out shot peening strengthening, pellet to spring on suspension type throwing pill strengthening cleaning machine A diameter of 1.2~1.4 millimeters, the shot-peening time is 20 minutes, and 1 every time, surface coverage is 98%~100%, shot peening strength 0.4~0.45A;The surface treatment is to carry out an iron oxide red primer processing and secondary middle grey finishing coat application to the surface of spring Processing.
The processing method for the hot coiling spring that the wire diameter of the present invention is 90 millimeters, simple for process, easy to operate, production At low cost, the helical spring bearing capacity of processing is strong, and in use, solving can not increase when small product size is restricted The problem of spring number.
Specific implementation mode
The processing method for the hot coiling spring that the wire diameter of the present invention is 90 millimeters, includes the following steps:
A, sorting, it is the hot rolling and air cooling spring steel of 60Si2CrVA to select a diameter of 90 millimeters of materials, the chemistry of material at Part and mechanical performance need to meet the requirement of GB/T1222 standards, and dimensional discrepancy executes the standard of degree of precision in GB/T702 standards.
B, the cutting length of blanking, spring wire is 6235 ± 60 millimeters, i.e. length is determined as 6175 millimeters or 6195 millimeters Or 6215 millimeters or 6235 millimeters or 6255 millimeters or 6275 millimeters or 6295 millimeters.It is carried out down in the way of autogenous cutting Material, cut surface hand handle grinding wheel reconditioning, to ensure that end point fine fisssure does not occur after grinding point, forging.
The two ends of spring wire are transitioned into square type section from circular section in the way of forging, forge heating and set by c, tagging Standby to use fuel oil type heating furnace, the heating temperature forged is 980 DEG C or 985 DEG C or 990 DEG C or 995 DEG C or 1000 DEG C, i.e., 980 Between~1000 DEG C;Heating time is 95 minutes or 100 minutes or 105 minutes, i.e., between 95~105 minutes; The heated length of two ends is 900 millimeters or 910 millimeters or 920 millimeters or 930 millimeters or 940 millimeters or 950 millimeters, that is, is existed Between 900~950 millimeters;A length of 900 millimeters or 950 millimeters or 1000 millimeters of metacone is forged, i.e., at 900~1000 millimeters Between;Sharp width is 72 millimeters or 77 millimeters or 82 millimeters, i.e., between 72~82 millimeters;Sharp thickness is 22 millimeters or 23 Millimeter or 25 millimeters or 27 millimeters, i.e., between 22~27 millimeters;The final temperature forged is 900 DEG C or 910 DEG C or 920 DEG C, i.e., between 900~920 DEG C.
D, hot briquetting, heating are carried out in microcomputer controls rolling bottom formula electric furnace, and heating temperature is 980 DEG C or 985 DEG C or 990 DEG C or 995 DEG C or 1000 DEG C, i.e., between 980~1000 DEG C;Soaking time be 115 minutes or 120 minutes or 125 minutes or 130 minutes, i.e., between 115~130 minutes;When hot rolling axle diameter be 315 millimeters, pitch be 142~ 144 millimeters, the number of effective coils 3.8, number of total coils 5.3 is once completed pan feeding clamping using spring coiling machine, and rolls building ring and end Head is molded, and spring coiling machine stops rotating after a roll-forming, unclamps clamp system, takes out claw, and spring coiling machine is reversely rotated, removed The spring of forming, completes the hot briquetting of a spring at this time, and the AF80/ of Germany's manufacture can be selected in wind spring former 140CNC type spring coiling machines.
E, quenching treatment, the spring rolled to upper step under the continuous monitoring of far infrared intelligent temperature measurement instrument are heated simultaneously Monitoring, when the own temperature of spring reaches 825 DEG C or 830 DEG C or 835 DEG C, i.e., when between 825~835 DEG C, the instrument of setting Spring is placed in hardening media by device alarm equipment alarm, the sodium-chloride water solution that hardening media is 10% or 15%, i.e. sodium chloride The concentration of aqueous solution is between 10%~15%;It is carried out at quenching using the quenching unit of heat-treatment quenching sink front Reason, quenching unit are to rotate to make quenching unit move up and down with movable sprocket, chain by motor, and the distance of up and down motion passes through row Cheng Kaiguan and adjustable buting iron, the time of up and down motion is adjustable by the time relay.90 millimeters of spring workpiece are in hardening media It ceaselessly moves up and down, run duration is 32 seconds or 34 seconds or 36 seconds or 38 seconds or 40 seconds, i.e., between 32~40 seconds.It reaches To after the run duration of setting, propose that spring workpiece completes quenching process from medium.
F, temper after spring quenches in the medium, will carry out quenching hardness measurement, hardness range HRC > 58, then It is transferred to this process and carries out temper, tempering equipment selects cabinet-type electric furnace.Heating temperature be 460 DEG C or 470 DEG C or 480 DEG C, i.e., Between 460~480 DEG C;Tempering time is 280 minutes or 290 minutes or 300 minutes or 310 minutes or 320 minutes, i.e., Between 280~320 minutes;Timing after being tripped to temperature with stove, it is air-cooled after tempering, and hardness and metallographic structure are examined, it returns Hardness is HRC45-50 after fire, and the metallographic structure after tempering is secondary troostite, decarburized layer deepness < 0.5mm.
G, the swirling flows for making inspection thermal treatment quality and stabilizing spring size, spring is placed on horizontal power press piece by piece Swirling flows are carried out, 48 tons of load is suppressed, it is 3 times to suppress number.
H, make to ensure that the mill spring of free height and verticality is handled, horizontal reed milling machine is selected to grind the two ends of spring It cuts, to ensure the free height and verticality of setting.
I, design requirement test spring-load is pressed to be born under the premise of the geometric dimension of spring meets design requirement Lotus is tested, and testing equipment selects 100T cylindrical spring force measuring machines, carries out piece by piece.
J, flaw detection is handled, and every spring carries out fluorescent magnetic particle flaw detection, the portable magnetic powder inspections of testing equipment CJW-1000 Machine.
K, it examines, every spring is intended to carry out the inspection of following items:Steel wire diameter, spring outer diameter, free height, work Make the number of turns, number of total coils, verticality, the depth of parallelism, load test P1=270088N ± 5%, P2=382200N ± 5%, place of halting Reason, hardness decarburization are examined, metal lographic examination.
L, bead, shot peening strengthening is carried out on suspension type throwing pill strengthening cleaning machine to spring, and pellet diameters determine Between 1.2~1.4, the shot-peening time be 20 minutes, 1 every time, surface coverage 98%~100%, shot peening strength be 0.4~ 0.45A。
M, it is surface-treated, an iron oxide red primer processing and secondary middle grey finishing coat application processing is carried out to the surface of spring.

Claims (2)

1. a kind of processing method for the hot coiling spring that wire diameter is 90 millimeters, it is characterised in that:Include the following steps:
A, sorting, it is the hot rolling and air cooling spring steel of 60Si2CrVA to select a diameter of 90 millimeters of materials;
B, blanking determines length, and reconditioning cut surface using autogenous cutting;
The two ends of spring wire are transitioned into square type section, the heating temperature forged by c, tagging in the way of forging from circular section It it is 980~1000 DEG C, heating time is 95~105 minutes, and the heated length of two ends is 900~950 millimeters, and it is long to forge metacone 900~1000 millimeters, point is 72~82 millimeters wide, and point is 22~27 millimeters thick, and the final temperature forged is 900~920 DEG C.
D, hot briquetting, heating temperature are 980~1000 DEG C, and soaking time is 115~130 minutes, and axle diameter is when hot rolling 315 millimeters, pitch is 142~144 millimeters, and the number of effective coils 3.8, number of total coils 5.3 is once completed using spring coiling machine into feed collet Tightly, and building ring and end moulding are rolled;
The spring that upper step rolls is heated and is monitored by e, quenching treatment, when the own temperature of spring reaches 825~835 DEG C When, spring is placed in hardening media, the sodium-chloride water solution that hardening media is 10%~15%, spring workpiece is in hardening media Middle run duration is 32~40 seconds;
F, temper, heating temperature are 460~480 DEG C, and tempering time 280~320 minutes is then air-cooled;
G, make the swirling flows of inspection thermal treatment quality and stabilizing spring size;
H, make to ensure that the mill spring of free height and verticality is handled;
I, it presses design requirement and tests spring-load;
J, flaw detection is handled;
K, it examines;
L, bead;
M, it is surface-treated.
2. the processing method for the hot coiling spring that wire diameter according to claim 1 is 90 millimeters, it is characterised in that:Institute Hardness is HRC45-50 after the temper stated, and the metallographic structure after tempering is secondary troostite, 0.5 millis of decarburized layer deepness < Rice;The swirling flows are to carry out swirling flows to spring piece by piece on horizontal power press, suppress 48 tons of load, suppress number 3 times;Inspection described in above-mentioned k steps is to make the inspection of following items to every spring:Wire diameter, spring outer diameter, freely Highly, the number of effective coils, number of total coils, verticality, the depth of parallelism, load test P1=270088N ± 5%, P2=382200N ± 5%, It halts processing, hardness decarburization is examined, metal lographic examination;The bead is on suspension type throwing pill strengthening cleaning machine to spring Carry out shot peening strengthening, pellet diameters be 1.2~1.4 millimeters, the shot-peening time be 20 minutes, 1 every time, surface coverage 98% ~100%, 0.4~0.45A of shot peening strength;The surface treatment be to the surface of spring carry out an iron oxide red primer processing and Secondary middle grey finishing coat application processing.
CN201810559772.7A 2018-06-02 2018-06-02 The processing method for the hot coiling spring that wire diameter is 90 millimeters Withdrawn CN108723718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810559772.7A CN108723718A (en) 2018-06-02 2018-06-02 The processing method for the hot coiling spring that wire diameter is 90 millimeters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810559772.7A CN108723718A (en) 2018-06-02 2018-06-02 The processing method for the hot coiling spring that wire diameter is 90 millimeters

Publications (1)

Publication Number Publication Date
CN108723718A true CN108723718A (en) 2018-11-02

Family

ID=63931926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810559772.7A Withdrawn CN108723718A (en) 2018-06-02 2018-06-02 The processing method for the hot coiling spring that wire diameter is 90 millimeters

Country Status (1)

Country Link
CN (1) CN108723718A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111349773A (en) * 2020-02-24 2020-06-30 无锡市东亭新强弹簧厂 Spring heat treatment process
CN111926165A (en) * 2020-08-13 2020-11-13 无锡金峰园弹簧制造有限公司 Heat treatment process of 60Si2CrA spring steel
CN113414655A (en) * 2021-07-26 2021-09-21 浙江富淳弹簧有限公司 Spring end face grinding machine and spring manufacturing process applying grinding machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111349773A (en) * 2020-02-24 2020-06-30 无锡市东亭新强弹簧厂 Spring heat treatment process
CN111926165A (en) * 2020-08-13 2020-11-13 无锡金峰园弹簧制造有限公司 Heat treatment process of 60Si2CrA spring steel
CN111926165B (en) * 2020-08-13 2022-04-05 无锡金峰园弹簧制造有限公司 Heat treatment process of 60Si2CrA spring steel
CN113414655A (en) * 2021-07-26 2021-09-21 浙江富淳弹簧有限公司 Spring end face grinding machine and spring manufacturing process applying grinding machine

Similar Documents

Publication Publication Date Title
CN101125402A (en) Method for processing heat coiling spring whose spring wire diameter is 90 millimeter
CN108723718A (en) The processing method for the hot coiling spring that wire diameter is 90 millimeters
CN103894792B (en) Method for machining forge piece of large-scale single-flange anti-explosion motor main shaft of all-fiber texture
CN110052792B (en) Manufacturing method of cylinder barrel for hydraulic cylinder
CN103276297B (en) A kind of self-joining type high strength cord is cored the manufacture method of drilling rod weldless steel tube
CN101642868B (en) Technique for processing suspension spring
CN105583588A (en) Machining method for inner ring and outer ring of conical roller bearing
CN103710715A (en) Cold-drawing and cold-rolling mixed molding method of stainless steel seamless pipe
CN105798539A (en) Method for manufacturing high-temperature alloy bolt
CN101176963A (en) Method for feeding material and group soldering macrotype torpedo tank
CN109675927B (en) Preparation method of 410 stainless steel strip for nuclear power
CN112251664A (en) Ultra-fine grain alloy steel forging and manufacturing method thereof
CN111299495A (en) Green forging process method for transition section
CN104988351A (en) Brass strip for button and manufacturing method thereof
CN112718910A (en) Manufacturing method of large-caliber TC4 titanium alloy thick-wall pipe
CN104593696B (en) A kind of station boiler heat-resisting steel sheet and plate and manufacture method thereof
CN106475503B (en) A kind of manufacturing method of titanium forged flange threeway
CN109971937B (en) Integral quenching process and equipment for high-carbon chromium steel passenger car engine cam plate
CN115555806A (en) Wire rod preparation method capable of improving stainless steel rivet yield
Rocha et al. Changes in the axial residual stresses in AISI 1045 steel bars resulting from a combined drawing process chain
CN103103920A (en) Manufacturing method for tempering cable clip applied to suspension bridge
CN101591726B (en) Cold drawing method for medium-carbon steel bar
CN105506481B (en) A kind of preparation method of impact resistance Alloy Balls In Milling
CN113953426A (en) Manufacturing method of high-toughness mining wear-resistant steel ball
CN112122521A (en) Method and system for manufacturing conical head transition section of coke tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181102