CN108715398A - 一种管道爬行器吊舱 - Google Patents
一种管道爬行器吊舱 Download PDFInfo
- Publication number
- CN108715398A CN108715398A CN201810846126.9A CN201810846126A CN108715398A CN 108715398 A CN108715398 A CN 108715398A CN 201810846126 A CN201810846126 A CN 201810846126A CN 108715398 A CN108715398 A CN 108715398A
- Authority
- CN
- China
- Prior art keywords
- frame
- pipe crawling
- cable
- crawling device
- protection ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
- B66C1/16—Slings with load-engaging platforms or frameworks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/12—Arrangements of means for transmitting pneumatic, hydraulic, or electric power to movable parts of devices
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
本发明公开一种管道爬行器吊舱,包括框架、吊耳和电缆保护环,所述吊耳设置于所述框架上、用于与绳索连接,所述电缆保护环设置于所述框架的开口处、用于固定管道爬行器的电缆。本发明提供的管道爬行器吊舱,设计有电缆保护环,在对管道爬行器进行下放和上吊过程中,保护爬行器的工作线缆不受外界影响而损坏,保证爬行器可以正常进行检测维护工作,进一步保证了对地下管道的检测维护工作。
Description
技术领域
本发明涉及管道检测设备技术领域,特别涉及一种管道爬行器吊舱。
背景技术
地下管道和地下管廊是城市功能主体的重要组成部分。地下管道包括多种不同的功能管道,例如:雨水管、污水管、自来水管、热力管道等。地下综合管廊,是一种地下城市管道综合走廊,在城市的地下建造一个隧道空间,将给排水、电力、通信、燃气、供热等多种工程管线集中于一体。地下管道和地下综合管廊,是保障城市运行的重要技术设施。因此,对于地下管道的检测维护工作就显得尤为重要,而一般情况下,对地下管道的检测维护工作都是通过爬行器进行的,现行的操作是用吊链将管道爬行器放入检测井底,吊链的挂钩在管道爬行器沉入井底时不易取下,更困难的是,爬行器工作完成后,需要重新将管道爬行器拉上来的时候,挂钩很难挂在爬行器的正确位置上,造成工作上的困难,降低工作效率;且现有的吊链挂钩方式在井道对爬行器进行上下运吊过程中会对爬行器的线缆造成损伤,严重是使爬行器无法正常工作,影响检测维护工作。
因此,如何提供一种保障吊放过程不会造成爬行器及线缆损伤的吊放装置,是本领域技术人员亟待解决的技术问题。
发明内容
本发明的目的是提供一种管道爬行器吊舱,能够正常顺利吊放管道爬行器,还可以保证在吊放爬行器过程中保护爬行器的工作线缆不受外界损伤,可以保证检测维护工作顺利进行,保证工作效率。
为解决上述技术问题,本发明提供一种管道爬行器吊舱,包括框架、吊耳和电缆保护环,所述吊耳设置于所述框架上、用于与绳索连接,所述电缆保护环设置于所述框架的开口处、用于固定管道爬行器的电缆。
优选地,所述框架的侧壁上设置有用于加强支撑强度的连接杆。
优选地,所述连接杆在同一侧壁上呈交叉分布。
优选地,所述框架顶部设置有横梁,且所述电缆保护环设置于所述横梁上。
优选地,所述吊耳的数量至少为2个。
优选地,所述吊耳设置于所述框架顶部边缘上。
本发明所提供的管道爬行器吊舱,主要包括框架、吊耳和电缆保护环,吊耳设置于框架上、用于与绳索连接,电缆保护环设置于框架的开口处、用于保护管道爬行器的电缆。本发明提供的管道爬行器吊舱,设计有电缆保护环,在对管道爬行器进行下放和上吊过程中,保护爬行器的工作线缆不受外界影响而损坏,保证爬行器可以正常进行检测维护工作,进一步保证了对地下管道的检测维护工作。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。
图1为本发明所提供的一种具体实施方式的整体结构示意图。
其中,图1中:
框架—1,吊耳—2,电缆保护环—3,连接杆—4,横梁—5。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参考图1,图1为本发明所提供的一种具体实施方式的整体结构示意图。
在本发明所提供的一种具体实施方式中,管道爬行器吊舱主要包括框架1、吊耳2和电缆保护环3,吊耳2设置于框架1上、用于与绳索连接,电缆保护环3设置于框架1的开口处、用于保护管道爬行器的电缆。
其中,框架1
具体的,在实际的吊放管道爬行器过程当中,通过四根不一样长的钢索,将吊舱连接在主索上,需要将管道爬行器放入井中时,先将管道爬行器放入吊舱中,并将管道爬行器的电缆穿过吊舱的电缆保护环3,然后将吊舱放入井底,当管道爬行器从吊舱中出来时,电缆保护环3可以保护电缆,避免电缆从井壁划过损伤电缆。本发明提供的管道爬行器吊舱,设计有电缆保护环,在对管道爬行器进行下放和上吊过程中,保护爬行器的工作线缆不受外界影响而损坏,保证爬行器可以正常进行检测维护工作,进一步保证了对地下管道的检测维护工作。
为了优化上述实施例中管道爬行器吊舱可以更加稳定地吊放爬行器的优点,框架1的侧壁上设置有用于加强支撑强度的连接杆4;连接杆4在同一侧壁上呈交叉分布。连接杆4的设计,可以增加框架1整体的稳定性,保证吊放爬行器的过程更加稳定,保护爬行器线缆不受到井壁的划伤;同时,连接杆4在同一侧壁上呈交叉分布,进一步增加了框架1的稳定性,进一步保护爬行器吊放过程中,避免受到井壁的划伤,保护爬行器线缆。
进一步地,框架1顶部设置有横梁5,且电缆保护环3设置于横梁5上。横梁5的设计,进一步增强了框架1的稳定性,保证爬行器吊放过程的稳定性,提高对爬行器的吊放效率。
进一步地,吊耳2的数量至少为2个,本实施例中吊耳2的数量为4个。通过四根不一样长的钢索,连接在吊舱的吊耳2上,保持在下行的过程中,吊舱处于倾斜角度,一是可以避免管道爬行器滑出吊舱,另外可以进入较小的检测井,避免碰撞井壁对爬行器造成损伤,当然吊耳的数量可根据实际需要进行设计选择。
进一步地,吊耳2设置于框架1顶部边缘上。吊耳2设置于框架1顶部边缘,可以使吊挂动作更加方便,进一步提高对爬行器的放吊过程,提高工作效率。
综上所述,本实施例所提供的管道爬行器吊舱主要包括框架、吊耳和电缆保护环,吊耳设置于框架上、用于与绳索连接,电缆保护环设置于框架的开口处、用于保护管道爬行器的电缆。本发明提供的管道爬行器吊舱,设计有电缆保护环,在对管道爬行器进行下放和上吊过程中,保护爬行器的工作线缆不受外界影响而损坏,保证爬行器可以正常进行检测维护工作,进一步保证了对地下管道的检测维护工作。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。
Claims (6)
1.一种管道爬行器吊舱,其特征在于,包括框架(1)、吊耳(2)和电缆保护环(3),所述吊耳(2)设置于所述框架(1)上、用于与绳索连接,所述电缆保护环(3)设置于所述框架(1)的开口处、用于固定管道爬行器的电缆。
2.根据权利要求1所述的管道爬行器吊舱,其特征在于,所述框架(1)的侧壁上设置有用于加强支撑强度的连接杆(4)。
3.根据权利要求2所述的管道爬行器吊舱,其特征在于,所述连接杆(4)在同一侧壁上呈交叉分布。
4.根据权利要求1所述的管道爬行器吊舱,其特征在于,所述框架(1)顶部设置有横梁(5),且所述电缆保护环(3)设置于所述横梁(5)上。
5.根据权利要求1所述的管道爬行器吊舱,其特征在于,所述吊耳(2)的数量至少为2个。
6.根据权利要求5所述的管道爬行器吊舱,其特征在于,所述吊耳(2)设置于所述框架(1)顶部边缘上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810846126.9A CN108715398A (zh) | 2018-07-27 | 2018-07-27 | 一种管道爬行器吊舱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810846126.9A CN108715398A (zh) | 2018-07-27 | 2018-07-27 | 一种管道爬行器吊舱 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108715398A true CN108715398A (zh) | 2018-10-30 |
Family
ID=63913831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810846126.9A Pending CN108715398A (zh) | 2018-07-27 | 2018-07-27 | 一种管道爬行器吊舱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108715398A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110526101A (zh) * | 2019-09-27 | 2019-12-03 | 深圳市施罗德工业集团有限公司 | 一种吊舱 |
CN110526164A (zh) * | 2019-09-27 | 2019-12-03 | 深圳市施罗德工业集团有限公司 | 上下井装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4609307A (en) * | 1984-11-05 | 1986-09-02 | Exxon Production Research Co. | Anode pod system for offshore structures and method of installation |
US20030019133A1 (en) * | 2001-07-24 | 2003-01-30 | Kazutoshi Hori | Elastic-bodied crawler |
CN203428160U (zh) * | 2013-08-19 | 2014-02-12 | 中国海洋石油总公司 | 一种测井电缆滚筒支架 |
CN203526818U (zh) * | 2013-10-18 | 2014-04-09 | 中国建筑装饰集团有限公司 | 实用型多功能电焊机保护篮 |
JP2016142033A (ja) * | 2015-02-02 | 2016-08-08 | 新明和工業株式会社 | 車両搬送装置 |
CN205463463U (zh) * | 2016-01-16 | 2016-08-17 | 漳州市锦成电力设备有限公司 | 一种清理城市管道垃圾的机器人*** |
CN207283058U (zh) * | 2017-07-27 | 2018-04-27 | 国家电网公司 | 电缆走线吊环 |
CN209038861U (zh) * | 2018-07-27 | 2019-06-28 | 深圳市施罗德工业测控设备有限公司 | 一种管道爬行器吊舱 |
-
2018
- 2018-07-27 CN CN201810846126.9A patent/CN108715398A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4609307A (en) * | 1984-11-05 | 1986-09-02 | Exxon Production Research Co. | Anode pod system for offshore structures and method of installation |
US20030019133A1 (en) * | 2001-07-24 | 2003-01-30 | Kazutoshi Hori | Elastic-bodied crawler |
CN203428160U (zh) * | 2013-08-19 | 2014-02-12 | 中国海洋石油总公司 | 一种测井电缆滚筒支架 |
CN203526818U (zh) * | 2013-10-18 | 2014-04-09 | 中国建筑装饰集团有限公司 | 实用型多功能电焊机保护篮 |
JP2016142033A (ja) * | 2015-02-02 | 2016-08-08 | 新明和工業株式会社 | 車両搬送装置 |
CN205463463U (zh) * | 2016-01-16 | 2016-08-17 | 漳州市锦成电力设备有限公司 | 一种清理城市管道垃圾的机器人*** |
CN207283058U (zh) * | 2017-07-27 | 2018-04-27 | 国家电网公司 | 电缆走线吊环 |
CN209038861U (zh) * | 2018-07-27 | 2019-06-28 | 深圳市施罗德工业测控设备有限公司 | 一种管道爬行器吊舱 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110526101A (zh) * | 2019-09-27 | 2019-12-03 | 深圳市施罗德工业集团有限公司 | 一种吊舱 |
CN110526164A (zh) * | 2019-09-27 | 2019-12-03 | 深圳市施罗德工业集团有限公司 | 上下井装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106838465B (zh) | 地下综合管廊既有管道开挖保护施工方法 | |
CN108715398A (zh) | 一种管道爬行器吊舱 | |
CN204230769U (zh) | 攀爬式钢丝绳梯 | |
CN105546278A (zh) | 一种开挖管沟时地下管道的防护方法 | |
CN209038861U (zh) | 一种管道爬行器吊舱 | |
CN110943396B (zh) | 一种河网地区输电线路带电进出等电位的操作方法 | |
JP2008133596A (ja) | 立坑用足場及び立坑用足場の組立・撤去方法 | |
CN206495234U (zh) | 地下综合管廊既有管道开挖保护施工装置 | |
CN102182181B (zh) | 一种锚索下索装置 | |
CN104234636B (zh) | 自升式平台井架安装方法 | |
CN105790130B (zh) | 一种可升降式岸电接线箱 | |
CN105888529B (zh) | 一种窨井口爬梯 | |
CN205442567U (zh) | 钢管杆作业平台 | |
CN208747451U (zh) | 一种适用于管道爬行器的辅助提升缆 | |
CN104030176B (zh) | 吊装平台桁架的平衡梁及其吊装方法 | |
CN102611057A (zh) | 跨越网 | |
CN213869888U (zh) | 变电站出线电缆隧道 | |
CN108715397B (zh) | 一种适用于管道爬行器的辅助提升缆 | |
CN202474756U (zh) | 跨越网 | |
CN205381883U (zh) | 一种新型的塔式起重机大臂分段拆除辅助装置 | |
CN213205164U (zh) | 一种带有埋深标识和刻度的水泥杆 | |
CN205558818U (zh) | 一种整体起升式钻机 | |
CN110130669A (zh) | 一种人工挖孔作业安全防护罩 | |
CN216699401U (zh) | 一种工程施工用的组装式管道 | |
CN205776885U (zh) | 一种多功能可重复使用的预制安全防护墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 11/F, Silver Star Zhijie Building 2, 1301 Guanlan Street, Longhua New District, Shenzhen City, Guangdong Province Applicant after: Shenzhen Schroder Industry Group Co., Ltd. Address before: 518111 2nd and 3rd floors of No. 9 workshop of Xilitang Lang Tongfu Industrial City, Taoyuan Street, Nanshan District, Shenzhen City, Guangdong Province Applicant before: SHENZHEN CITY SCHROEDER MEASUREMENT AND CONTROL EQUIPMENT CO., LTD. |
|
CB02 | Change of applicant information |