CN108708485A CN201810505984.7A CN201810505984A CN108708485A CN 108708485 A CN108708485 A CN 108708485A CN 201810505984 A CN201810505984 A CN 201810505984A CN 108708485 A CN108708485 A CN 108708485A
Authority
CN
China
Prior art keywords
support
pedestal
bolt
connecting rod
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810505984.7A
Other languages
Chinese (zh)
Other versions
CN108708485B (en
Inventor
高建芳
高林博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810505984.7A priority Critical patent/CN108708485B/en
Publication of CN108708485A publication Critical patent/CN108708485A/en
Application granted granted Critical
Publication of CN108708485B publication Critical patent/CN108708485B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a kind of mounting structures of precast concrete assembled wallboard, including pedestal, Side fascia and lining are fixedly connected on pedestal, keel shoe is installed between Side fascia and lining, the keel shoe includes several vertically disposed first supports and second support, first support is staggered with second support, it is fixed on pedestal and the one-to-one bolt of first support, the bottom activity of first support is plugged on bolt, bolt outer wall is fixed with the first rubber sleeve, first rubber sleeve is interference fitted with first support, the bottom of first rubber sleeve is provided with collet, the first spring body being connect with first support is fixed on collet, second support bottom is connect by second spring body with pedestal, it is hinged with third holder between adjacent first support and second support.The present invention can improve the deficiencies in the prior art, the installation that improves precast concrete assembled wallboard, the security and stability using process.

Description

A kind of mounting structure of precast concrete assembled wallboard
Technical field
The present invention relates to technical field of building construction, especially a kind of mounting structure of precast concrete assembled wallboard.
Background technology
Precast concrete assembled wallboard be one kind in manufacturer's centralized production, directly assembled in construction site New Building Materials.With a variety of advantages that pollute that small, construction efficiency is high, heat insulation effect is good etc..Existing precast concrete assembly Formula wallboard is attached and is installed using keel shoe, is produced during the twisting stress for being generated in wallboard installation process and use Raw vibration adequately can not be buffered and be absorbed.
Invention content
The technical problem to be solved in the present invention is to provide a kind of mounting structures of precast concrete assembled wallboard, can solve Certainly the deficiencies in the prior art, the installation for improving precast concrete assembled wallboard, the security and stability using process.
In order to solve the above technical problems, the technical solution used in the present invention is as follows.
A kind of mounting structure of precast concrete assembled wallboard, including pedestal, be fixedly connected on pedestal Side fascia and Lining, is equipped with keel shoe between Side fascia and lining, the keel shoe includes several vertically disposed first supports And second support, first support are staggered with second support, be fixed on pedestal with the one-to-one bolt of first support, The bottom activity of one holder is plugged on bolt, and bolt outer wall is fixed with the first rubber sleeve, the first rubber sleeve and first support mistake It is full of cooperation, the bottom of the first rubber sleeve is provided with collet, the first spring body being connect with first support, bolt are fixed on collet Top is provided with tapped blind hole, is connect with tapped blind hole after bolt-through first support, the top of bolt and the top of first support Portion's sliding contact, second support bottom are connect by second spring body with pedestal, between adjacent first support and second support It is hinged with third holder, the hinge joint of third holder and first support is higher than the hinge joint of third holder and second support.
Preferably, being socketed with the second rubber sleeve on the outside of first spring body, it is fixedly connected on the outside of the second rubber sleeve There are first connecting rod, the outboard end of first connecting rod to be provided with the sliding slot tilted down, the side walls hinged of first support has second connecting rod, The bottom end of second connecting rod is fixed with the first sliding block, and the first sliding block is in sliding fit with the sliding chute.
Preferably, being hinged with hydraulic bjuffer between the first support and second connecting rod.
Preferably, the pedestal is fixedly connected with banking stop, it is provided with curved portion at the top of banking stop, is opened up in curved portion There are straight slot, second support to run through straight slot, the both sides of second support have been respectively fixedly connected with third connecting rod, have been hinged at the top of third connecting rod There are the second sliding block, the second sliding block to be clamped with straight slot sliding.
Preferably, being provided with rubber damping piece in the straight slot.
Preferably, being fixed with reinforcing rib in the pedestal.
It is using advantageous effect caused by above-mentioned technical proposal:The present invention is utilized by the structure of improvement keel shoe Change to the horizontal and vertical support force of the entire keel shoe of longitudinally adjusted realization of first support, to eliminate the office inside wallboard Portion's stress.The buffer structure of first support and second support bottom can effectively to the vibration that is subject on keel shoe and twisting resistance into Row buffering absorbs, to improve the impact resistance of entire wallboard and use installation.
Description of the drawings
Fig. 1 is the structure chart of a specific implementation mode of the invention.
Fig. 2 is the structure chart of first support in a specific implementation mode of the invention.
Fig. 3 is the structure chart of second support in a specific implementation mode of the invention.
In figure:1, Side fascia;2, lining;3, pedestal;4, keel shoe;5, first support;6, second support;7, bolt; 8, the first rubber sleeve;9, collet;10, the first spring body;11, tapped blind hole;12, bolt;13, second spring body;14, third branch Frame;15, the second rubber sleeve;16, first connecting rod;17, sliding slot;18, second connecting rod;19, the first sliding block;20, hydraulic bjuffer; 21, banking stop;22, curved portion;23, straight slot;24, third connecting rod;25, the second sliding block;26, rubber damping piece;27, reinforcing rib.
Specific implementation mode
The standardized element used in the present invention can commercially, and shaped piece is according to specification and attached drawing Record can carry out customized, and the specific connection type of each part is all made of bolt ripe in the prior art, rivet, weldering The conventional means such as connect, paste, this will not be detailed here.
Referring to Fig.1-3, a specific implementation mode of the invention includes pedestal 3, and 1 He of Side fascia is fixedly connected on pedestal 3 Lining 2, is equipped with keel shoe 4 between Side fascia 1 and lining 2, the keel shoe 4 include several vertically disposed first Holder 5 and second support 6, first support 5 are staggered with second support 6, are fixed on pedestal 3 a pair of with first support 5 one The bottom activity of the bolt 7 answered, first support 5 is plugged on bolt 7, and 7 outer wall of bolt is fixed with the first rubber sleeve 8, the first rubber Gum cover 8 and first support 5 are interference fitted, and the bottom of the first rubber sleeve 8 is provided with collet 9, are fixed on collet 9 and first support First spring bodies 10 of 5 connections, the top of bolt 7 are provided with tapped blind hole 11, bolt 12 run through after first support 5 with tapped blind hole 11 connections, the top of bolt 12 contacts with the top slide of first support 5,6 bottom of second support by second spring body 13 and Pedestal 3 connects, and third holder 14, third holder 14 and first support are hinged between adjacent first support 5 and second support 6 5 hinge joint is higher than the hinge joint of third holder 14 and second support 5.The outside of first spring body 10 is socketed with the second rubber sleeve 15,15 outside of the second rubber sleeve is fixedly connected with first connecting rod 16, and the outboard end of first connecting rod 16 is provided with the cunning tilted down Slot 17, the side walls hinged of first support 5 have second connecting rod 18, the bottom end of second connecting rod 18 to be fixed with the first sliding block 19, and first slides Block 19 is slidably matched with sliding slot 17.Hydraulic bjuffer 20 is hinged between first support 5 and second connecting rod 18.Pedestal 3, which is fixed, to be connected It is connected to banking stop 21,21 top of banking stop is provided with curved portion 22, straight slot 23 is offered in curved portion 22, second support 6 runs through The both sides of straight slot 23, second support 6 have been respectively fixedly connected with third connecting rod 24, and 24 top of third connecting rod is hinged with the second sliding block 25, the second sliding block 25 is clamped with the sliding of straight slot 23.Rubber damping piece 26 is provided in straight slot 23.It is fixed with reinforcing rib in pedestal 3 27。
At the both ends of pedestal, the horizontal adjustment for wallboard can be realized using iron contract by installing spirit level additional.In base Electronics load-bearing inductor is installed in seat bottom, and the alarm bell of lead to submounts will touch alarm bell, guarantee pedestal after overweight Destruction off guard.Receive prefabricated panel on structure cast-in-place plate, it is full in work surface to ensure the structure safety of Bars In Poured Concrete Slab in constructing It is laid with I-steel, both ends need to be shelved on load bearing wall.
The present invention improves the installation of precast concrete assembled wallboard, the security and stability using process.
In the description of the present invention, it is to be understood that, term " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown is merely for convenience of the description present invention, does not indicate or imply the indicated device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (6)

1. a kind of mounting structure of precast concrete assembled wallboard, including pedestal (3), pedestal are fixedly connected with exterior wall on (3) Plate (1) and lining (2), are equipped with keel shoe (4) between Side fascia (1) and lining (2), it is characterised in that:The keel Frame (4) includes several vertically disposed first supports (5) and second support (6), and first support (5) is handed over second support (6) Mistake is arranged, and is fixed on pedestal (3) and is inserted with the one-to-one bolt (7) of first support (5), the bottom activity of first support (5) It is connected on bolt (7), bolt (7) outer wall is fixed with the first rubber sleeve (8), and the first rubber sleeve (8) is matched with first support (5) interference It closes, the bottom of the first rubber sleeve (8) is provided with collet (9), the first bullet being connect with first support (5) is fixed on collet (9) Spring body (10), is provided with tapped blind hole (11) at the top of bolt (7), bolt (12) through first support (5) afterwards and tapped blind hole (11) it connects, the top of bolt (12) is contacted with the top slide of first support (5), and second support (6) bottom passes through the second bullet Spring body (13) is connect with pedestal (3), and third holder (14) is hinged between adjacent first support (5) and second support (6), the Three holders (14) are higher than the hinge joint of third holder (14) and second support (5) with the hinge joint of first support (5).
2. the mounting structure of precast concrete assembled wallboard according to claim 1, it is characterised in that:First bullet It is socketed with the second rubber sleeve (15) on the outside of spring body (10), first connecting rod (16) is fixedly connected on the outside of the second rubber sleeve (15), The outboard end of first connecting rod (16) is provided with the sliding slot (17) tilted down, and the side walls hinged of first support (5) has second connecting rod (18), the bottom end of second connecting rod (18) is fixed with the first sliding block (19), and the first sliding block (19) is slidably matched with sliding slot (17).
3. the mounting structure of precast concrete assembled wallboard according to claim 2, it is characterised in that:Described first Hydraulic bjuffer (20) is hinged between frame (5) and second connecting rod (18).
4. the mounting structure of precast concrete assembled wallboard according to claim 1, it is characterised in that:The pedestal (3) it is fixedly connected with banking stop (21), is provided with curved portion (22) at the top of banking stop (21), curved portion offers straight slot on (22) (23), second support (6) runs through straight slot (23), and the both sides of second support (6) have been respectively fixedly connected with third connecting rod (24), third The second sliding block (25) is hinged at the top of connecting rod (24), the second sliding block (25) is clamped with straight slot (23) sliding.
5. the mounting structure of precast concrete assembled wallboard according to claim 4, it is characterised in that:The straight slot (23) rubber damping piece (26) is provided in.
6. the mounting structure of precast concrete assembled wallboard according to claim 1, it is characterised in that:The pedestal (3) reinforcing rib (27) is fixed in.
CN201810505984.7A 2018-05-19 2018-05-19 Mounting structure of precast concrete assembled wallboard Active CN108708485B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810505984.7A CN108708485B (en) 2018-05-19 2018-05-19 Mounting structure of precast concrete assembled wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810505984.7A CN108708485B (en) 2018-05-19 2018-05-19 Mounting structure of precast concrete assembled wallboard

Publications (2)

Publication Number Publication Date
CN108708485A true CN108708485A (en) 2018-10-26
CN108708485B CN108708485B (en) 2019-12-31

Family

ID=63870514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810505984.7A Active CN108708485B (en) 2018-05-19 2018-05-19 Mounting structure of precast concrete assembled wallboard

Country Status (1)

Country Link
CN (1) CN108708485B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN109914649A (en) * 2019-04-03 2019-06-21 董朝旭 A kind of precast shear wall component based in building structure
CN116575696A (en) * 2023-07-12 2023-08-11 中国建筑第六工程局有限公司 Reverse construction method post-pouring belt prefabricated horizontal supporting structure and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1214098A (en) * 1996-02-26 1999-04-14 泰克诺帕克有限公司 Concrete wall formwork
CN202099999U (en) * 2011-05-26 2012-01-04 广州市景龙金属制品有限公司 System with angle aluminum on bottom of inner wallboard of aluminum alloy template
US20130247508A1 (en) * 2011-11-15 2013-09-26 New Standards Manufacturing Co. Mechanical edge setting system and method for setting tiles and tuning lippage
CN103669655A (en) * 2013-12-24 2014-03-26 山东万鑫建设有限公司 Construction technology for pouring concrete of walls on two sides of deformation joint
CN104153590A (en) * 2014-07-17 2014-11-19 中国十七冶集团有限公司 Quick positioning and adjusting device for prefabricated residence superimposed wallboard

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1214098A (en) * 1996-02-26 1999-04-14 泰克诺帕克有限公司 Concrete wall formwork
CN202099999U (en) * 2011-05-26 2012-01-04 广州市景龙金属制品有限公司 System with angle aluminum on bottom of inner wallboard of aluminum alloy template
US20130247508A1 (en) * 2011-11-15 2013-09-26 New Standards Manufacturing Co. Mechanical edge setting system and method for setting tiles and tuning lippage
CN103669655A (en) * 2013-12-24 2014-03-26 山东万鑫建设有限公司 Construction technology for pouring concrete of walls on two sides of deformation joint
CN104153590A (en) * 2014-07-17 2014-11-19 中国十七冶集团有限公司 Quick positioning and adjusting device for prefabricated residence superimposed wallboard

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914649A (en) * 2019-04-03 2019-06-21 董朝旭 A kind of precast shear wall component based in building structure
CN109914649B (en) * 2019-04-03 2020-09-04 董朝旭 Prefabricated shear wall assembly based on building structure
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN116575696A (en) * 2023-07-12 2023-08-11 中国建筑第六工程局有限公司 Reverse construction method post-pouring belt prefabricated horizontal supporting structure and construction method
CN116575696B (en) * 2023-07-12 2023-10-10 中国建筑第六工程局有限公司 Reverse construction method post-pouring belt prefabricated horizontal supporting structure and construction method

Also Published As

Publication number Publication date
CN108708485B (en) 2019-12-31

Similar Documents

Publication Publication Date Title
CN108708485A (en) A kind of mounting structure of precast concrete assembled wallboard
CN103758257B (en) The connected mode of a kind of precast concrete panel and agent structure
KR101030320B1 (en) Constructing apparatus for structure reinforced exterior and interior panels
CN106869368A (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN214574887U (en) Novel assembled shear wall structure power consumption device
KR100899787B1 (en) Fixing bracket
CN111827106B (en) Anti-resonance device for steel-concrete composite bridge
CN106869379A (en) A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure
CN216276281U (en) Novel precast concrete wallboard and major structure's is connected device
CN216405920U (en) Steel structure beam for building
CN110983966A (en) Pre-buried formula bridge shock attenuation piece
AU2012354320A1 (en) Frame for a car of a passenger/freight elevator, and such a car and passenger/freight elevator
CN207863301U (en) A kind of reinforcement structure for C-type steel
CN212127443U (en) Protection device for high-rise building construction
CN211447872U (en) Building structure for floor reinforcement
CN205741916U (en) A kind of movable plate steel corbel
CN210147918U (en) Fixed clamping device is used in Oldham's coupling installation
CN210067508U (en) Protection frame is used in building engineering construction
CN213330547U (en) Upper track damping structure of hollow door
CN210286411U (en) Reinforced car door lintel
CN214531159U (en) High safe type alc wallboard installation accessory of adaptation degree
CN214884967U (en) Prefabricated stair installation construction equipment of prefabricated building concrete
CN220080275U (en) Assembled concrete precast beam easy to construct
CN220301852U (en) ALC slat door head transverse plate reinforcing device for construction wall
CN217676219U (en) Rail support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant