A kind of highway construction environmental monitoring system
Technical field
The present invention relates to highway construction environmental monitoring, specifically a kind of highway construction environmental monitoring
System.
Background technology
With the rapid development of society, the construction efficiency of the fast development of traffic, highway is gradually increased, highway
120 kilometers/hour or higher speed are adapted to, road surface has the width in 4 or more tracks, centre setting dividing strip to use
Bituminous concrete or cement concrete high class pavement, it is particularly important to the monitoring of construction environment during expressway construction.
However traditional highway construction environmental monitoring system is monitored by the weather environment to construction area, is supervised
It is small to survey range, it is inconvenient to be monitored to construction speed, is not easy to remotely coordinate weather condition to make corresponding place according to condition of construction
Reason.In consideration of it, the present invention provides a kind of highway construction environmental monitoring system, have the characteristics that:
(1) a kind of highway construction environmental monitoring system of the present invention, data acquisition module is convenient for acquisition high speed
The information such as construction progress, environment temperature, ambient humidity and the construction picture in construction of the highway place, construction site is detected convenient for the moment
Condition of construction, keep construction monitoring more perfect.
(2) a kind of highway construction environmental monitoring system of the present invention, weather data transfer module cooperation weather
The data information of the information and acquisition that data reception module detects weather forecast compares, to construction time section weather and
Its other environmental factor is predicted, convenient for control construction speed.
(3) a kind of highway construction environmental monitoring system of the present invention, decision input module coordinate CPU to handle mould
Block carries out processing decision to the construction information of acquisition, and when environmental factor is not easy to construction, warning module is alarmed, while passing through number
Information will be handled according to sending module to be sent in specified location, the network data receiving module of specified duration, convenient for by long-range
Control construction progress.
Invention content
For the problems of the prior art, the present invention provides a kind of highway construction environmental monitoring system, data are adopted
Collect module convenient for information such as the construction progress in acquisition highway construction place, environment temperature, ambient humidity and construction pictures, just
In the condition of construction for detecting construction site constantly, keep construction monitoring more perfect, weather data transfers module cooperation weather data
The data information of the information and acquisition that receiving module detects weather forecast compares, to construction time section weather and its its
Its environmental factor is predicted, convenient for control construction speed, decision input module coordinates CPU processing modules to believe the construction of acquisition
Breath carries out processing decision, and when environmental factor is not easy to construction, warning module is alarmed, while will be handled by data transmission blocks
Information is sent in specified location, the network data receiving module of specified duration, convenient for passing through remote control construction progress.
The technical solution adopted by the present invention to solve the technical problems is:A kind of highway construction environmental monitoring system,
Module, weather are transferred including data acquisition module, data memory module, CPU processing modules, decision input module, weather data
Data reception module, warning module, data transmission blocks, data show statistical module and network data receiving module;For adopting
The data acquisition module for collecting the temperature of construction site, humidity, construction speed and picture of constructing is connected to for storing data
The data memory module;The weather data for transferring weather transfers module and is connected to the weather data reception mould
Block, and the weather data receiving module for receiving weather is connected to the data memory module;The data store mould
Block is connected to the CPU processing modules for handling data;The CPU processing modules are connected to the early warning for alarm
Module;The decision input module for controlling condition of construction is connected to the CPU processing modules;The CPU processing modules
It is connected to for for showing that the data of condition of construction show statistical module;The cpu data processing module is connected to use
In the data transmission blocks of transmission;The data transmission blocks are connected to the network data for receiving data and receive
Module;
The highway construction environmental monitoring system data acquisition and data transmission method include the following steps:
Step 1:Monitoring personnel by monitoring device by the data of construction site by the data collecting module collected,
The memory module is sent to by network data transmission equipment to be stored;
Step 2:The data for transferring the weather forecast information cooperation acquisition of construction site are stored in the memory module,
Then analyzing processing is carried out by the CPU processing modules, the weather of construction site is inquired by mobile phone or other communication apparatus
Then forecast is transferred the data of weather forecast of the construction site of module calls inquiry by the weather data and is sent to institute
It states in weather data receiving module, the Weather information of reception is stored in the data and stores mould by the weather data receiving module
In block;
Step 3:The data of CPU processing modules processing are analyzed, construction ring is inputted by decision input module
The handling suggestion that border is directed to;
Step 4:By data disaply moudle display environment monitoring and its treatment situation, sent by the data
Module is sent to the network data receiving module of corresponding location by data are handled, and construction personnel receives the network data
The information that module receives carries out analyzing processing, and the task and its progress of construction are determined according to instructions from the higher level, realizes that remote control is applied
Work progress.
Specifically, the data acquisition module in the step 1 includes camera shooting acquisition module, humidity collection module, temperature
Spend acquisition module and construction data acquisition module, and the camera shooting acquisition module, the humidity collection module, the temperature acquisition
Module and the construction data acquisition module are all connected to the data memory module;In order to keep data acquisition more accurate, just
Construction site condition of construction is monitored in implementation.
Specifically, in the step 1, the condition of construction of construction site is acquired by the camera shooting acquisition module, coordinates institute
State the weather data of temperature collecting module and humidity collection module acquisition construction site, the storage acquired in matching step two
Data in the data store organisation are compared, the weather data of the construction site in the comparison prediction short time, simultaneously
Pass through the specification of construction data acquisition module acquisition construction, process, progress, the arrangement of construction personnel, construction personnel's body
The data such as situation;Data acquisition module convenient for the construction progress in acquisition highway construction place, environment temperature, ambient humidity and
The information such as picture of constructing keep construction monitoring more perfect convenient for the condition of construction of moment detection construction site.
Specifically, the data for the inside for being stored in the data memory module are referred to by the CPU processing modules
Number analysis, according to construction classification, construction speed, construction weather, the physical condition of construction personnel, the data such as distribution of construction personnel
The exponent data being stored in inside the CPU processing modules with long-term construction statistics compares and analyzes, and comparison generates construction field
The factors such as the construction speed arrangement on ground, the distribution of construction personnel and construction safety performance, administrative staff handle mould according to the CPU
The prediction data that block provides inputs rational control data by the decision input module;Weather data transfers module cooperation day
The data information for the information and acquisition that gas data reception module detects weather forecast compares, to the weather to construction time section
And its other environmental factors are predicted, convenient for control construction speed, decision input module coordinates CPU processing modules to acquisition
Construction information carries out processing decision.
Specifically, the network data receiving module in the step 4 is equipped with multiple, it is set to different construction sections
Control module in, described in the decision information that is handled by the CPU processing modules is sent to by the data transmission blocks
In network data receiving module, pass through the construction speed of the network data receiving module remote control construction site;In order to make
It constructs more convenient, is convenient for remote control Construction Decision.
Specifically, described in being determined according to working security after CPU processing modules processing information in the step 3
The start and stop of warning module, when construction is there are when security risk, decision-maker shows that statistical module shows hidden danger by the data
Problem and its construction environment monitoring situation determine final arrangement and method for construction by discussing;In order to keep construction more safe and efficient.
Beneficial effects of the present invention:
(1) a kind of highway construction environmental monitoring system of the present invention, data acquisition module is convenient for acquisition high speed
The information such as construction progress, environment temperature, ambient humidity and the construction picture in construction of the highway place, construction site is detected convenient for the moment
Condition of construction, keep construction monitoring more perfect.
(2) a kind of highway construction environmental monitoring system of the present invention, weather data transfer module cooperation weather
The data information of the information and acquisition that data reception module detects weather forecast compares, to construction time section weather and
Its other environmental factor is predicted, convenient for control construction speed.
(3) a kind of highway construction environmental monitoring system of the present invention, decision input module coordinate CPU to handle mould
Block carries out processing decision to the construction information of acquisition, and when environmental factor is not easy to construction, warning module is alarmed, while passing through number
Information will be handled according to sending module to be sent in specified location, the network data receiving module of specified duration, convenient for by long-range
Control construction progress.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of structural representation of preferred embodiment of highway construction environmental monitoring system provided by the invention
Figure;
Fig. 2 is the structural schematic diagram of decision input module shown in FIG. 1;
Fig. 3 is the work flow diagram of highway construction environmental monitoring system provided by the invention.
Specific implementation mode
In order to make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, tie below
Specific implementation mode is closed, the present invention is further explained.
As shown in Figure 1, Figure 2 and Figure 3, a kind of highway construction environmental monitoring system of the present invention, including data
Acquisition module, data memory module, CPU processing modules, decision input module, weather data transfer module, weather data receives
Module, warning module, data transmission blocks, data show statistical module and network data receiving module;For acquiring field of constructing
The temperature on ground, humidity, construction speed and picture of constructing the data acquisition module be connected to the number for storing data
According to memory module;The weather data for transferring weather transfers module and is connected to the weather data receiving module, and uses
It is connected to the data memory module in the weather data receiving module for receiving weather;The data memory module is connected to
The CPU processing modules for handling data;The CPU processing modules are connected to the warning module for alarm;With
It is connected to the CPU processing modules in the decision input module of control condition of construction;The CPU processing modules are connected to use
In for showing that the data of condition of construction show statistical module;The cpu data processing module is connected to for transmission
The data transmission blocks;The data transmission blocks are connected to the network data receiving module for receiving data;
The highway construction environmental monitoring system data acquisition and data transmission method include the following steps:
Step 1:Monitoring personnel by monitoring device by the data of construction site by the data collecting module collected,
The memory module is sent to by network data transmission equipment to be stored;
Step 2:The data for transferring the weather forecast information cooperation acquisition of construction site are stored in the memory module,
Then analyzing processing is carried out by the CPU processing modules, the weather of construction site is inquired by mobile phone or other communication apparatus
Then forecast is transferred the data of weather forecast of the construction site of module calls inquiry by the weather data and is sent to institute
It states in weather data receiving module, the Weather information of reception is stored in the data and stores mould by the weather data receiving module
In block;
Step 3:The data of CPU processing modules processing are analyzed, construction ring is inputted by decision input module
The handling suggestion that border is directed to;
Step 4:By data disaply moudle display environment monitoring and its treatment situation, sent by the data
Module is sent to the network data receiving module of corresponding location by data are handled, and construction personnel receives the network data
The information that module receives carries out analyzing processing, and the task and its progress of construction are determined according to instructions from the higher level, realizes that remote control is applied
Work progress.
Specifically, as shown in Figure 1, Figure 2 and Figure 3, a kind of highway construction environmental monitoring system of the present invention, institute
It includes camera shooting acquisition module, humidity collection module, temperature collecting module and construction to state the data acquisition module in step 1
Data acquisition module, and the camera shooting acquisition module, the humidity collection module, the temperature collecting module and the construction number
It is all connected to the data memory module according to acquisition module;In order to keep data acquisition more accurate, monitoring construction convenient to carry out field
Ground condition of construction.
Specifically, as shown in Figure 1, Figure 2 and Figure 3, a kind of highway construction environmental monitoring system of the present invention, institute
State in step 1, by it is described camera shooting acquisition module acquire construction site condition of construction, coordinate the temperature collecting module and
The humidity collection module acquires the weather data of construction site, and what is acquired in matching step two is stored in the data storage knot
Data in structure are compared, the weather data of the construction site in the comparison prediction short time, while passing through the construction data
The data such as specification, process, progress, the arrangement of construction personnel, the construction personnel's physical condition of acquisition module acquisition construction;Data are adopted
Collect module convenient for information such as the construction progress in acquisition highway construction place, environment temperature, ambient humidity and construction pictures, just
In the condition of construction for detecting construction site constantly, keep construction monitoring more perfect.
Specifically, as shown in figures 1 and 3, a kind of highway construction environmental monitoring system of the present invention passes through institute
The data for stating the inside that CPU processing modules will be stored in the data memory module carry out index analysis, according to construction classification, apply
Work progress, construction weather, the physical condition of construction personnel, construction personnel the data such as distribution and long-term construction statistics be stored in institute
It states the exponent data inside CPU processing modules to compare and analyze, comparison generates the construction speed arrangement of construction site, constructor
Factors, the administrative staff such as the distribution of member and construction safety performance pass through institute according to the prediction data that the CPU processing modules provide
State the rational control data of decision input module input;It is pre- to weather that weather data transfers module cooperation weather data receiving module
The data information of information and acquisition that inspection declaration is surveyed compares, so that the weather and its progress of other environmental factors to construction time section are pre-
It surveys, convenient for control construction speed, decision input module cooperation CPU processing modules carry out processing decision to the construction information of acquisition.
Specifically, as shown in Figure 1, Figure 2 and Figure 3, a kind of highway construction environmental monitoring system of the present invention, institute
It states the network data receiving module in step 4 and is equipped with multiple, be set in the control module of different construction sections, pass through
The decision information of the CPU processing modules processing is sent to the network data receiving module by the data transmission blocks
In, pass through the construction speed of the network data receiving module remote control construction site;In order to keep construction more convenient, it is convenient for
Remote control Construction Decision.
Specifically, as shown in Figure 1, Figure 2 and Figure 3, a kind of highway construction environmental monitoring system of the present invention, institute
The start and stop of the warning module are determined according to working security after stating the processing information of the CPU processing modules in step 3, when
There are when security risk, decision-maker shows that statistical module shows that potential problem and its construction environment are supervised by the data for construction
Survey situation determines final arrangement and method for construction by discussing;In order to keep construction more safe and efficient.
The data of construction site are taken through network data transmission equipment transmission by monitoring personnel by monitoring device first
It is stored to the memory module, the data for transferring the weather forecast information cooperation acquisition of construction site are stored in the storage
In module, analyzing processing then is carried out by the CPU processing modules, the data of CPU processing modules processing are divided
Analysis inputs the handling suggestion that construction environment is directed to by decision input module, is supervised by the data disaply moudle display environment
It surveys and its treatment situation, the network data that processing data are sent to corresponding location by the data transmission blocks receives
Module;Specifically have:
(1) monitoring personnel by monitoring device by the data of construction site by the data collecting module collected, pass through
The condition of construction of the camera shooting acquisition module acquisition construction site, coordinates the temperature collecting module and the humidity collection module
The weather data for acquiring construction site, the data being stored in the data store organisation acquired in matching step two carry out pair
Than, the weather data of the construction site in the comparison prediction short time, while being acquired and being constructed by the construction data acquisition module
The data such as specification, process, progress, the arrangement of construction personnel, construction personnel's physical condition;Data acquisition module is high convenient for acquisition
The information such as construction progress, environment temperature, ambient humidity and the construction picture in fast construction of the highway place, convenient for moment detection construction field
The condition of construction on ground keeps construction monitoring more perfect, and being sent to the memory module by network data transmission equipment is deposited
Storage;
(2) data for transferring the weather forecast information cooperation acquisition of construction site are stored in the memory module, then
Analyzing processing is carried out by the CPU processing modules, the weather forecast of construction site is inquired by mobile phone or other communication apparatus,
Then the data of weather forecast of the construction site of module calls inquiry is transferred by the weather data and is sent to the day
In gas data reception module, the Weather information of reception is stored in the data memory module by the weather data receiving module
In;
(3) data that the inside of the data memory module will be stored in by the CPU processing modules are divided into row index
Analysis, according to construction classification, construction speed, construction weather, the physical condition of construction personnel, data and the length such as distribution of construction personnel
The exponent data that phase construction statistics are stored in inside the CPU processing modules compares and analyzes, and comparison generates construction site
The factors such as construction speed arrangement, the distribution of construction personnel and construction safety performance, administrative staff give according to the CPU processing modules
The prediction data gone out inputs rational control data by the decision input module;Weather data transfers module cooperation day destiny
The data information of the information and acquisition that are detected to weather forecast according to receiving module compares, to construction time section weather and its
Other environmental factors are predicted, convenient for control construction speed, decision input module coordinates construction of the CPU processing modules to acquisition
Information carries out processing decision, and opening for the warning module is determined according to working security after the CPU processing modules processing information
Stop, when construction is there are when security risk, decision-maker shows that statistical module shows potential problem and its construction by the data
Environmental monitoring situation determines final arrangement and method for construction by discussing;
(4) by data disaply moudle display environment monitoring and its treatment situation, pass through the data transmission blocks
Data will be handled and be sent to the network data receiving module of corresponding location, construction personnel is by the network data receiving module
The information of reception carries out analyzing processing, and the task and its progress of construction are determined according to instructions from the higher level, realize remote control construct into
Degree.
The data acquisition module of the present invention is convenient for construction progress, environment temperature, the environment in acquisition highway construction place
The information such as humidity and construction picture keep construction monitoring more perfect, day destiny convenient for the condition of construction of moment detection construction site
According to the data information comparison for transferring information and acquisition that module cooperation weather data receiving module detects weather forecast, to right
The weather of construction time section and its other environmental factors are predicted that, convenient for control construction speed, decision input module coordinates CPU
Processing module carries out processing decision to the construction information of acquisition, and when environmental factor is not easy to construction, warning module is alarmed, simultaneously
Information will be handled by data transmission blocks to be sent in specified location, the network data receiving module of specified duration, convenient for logical
Cross remote control construction progress.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the description in the above embodiment and specification only illustrates the present invention
Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these variation and
Improvement is both fallen in the scope of protection of present invention.The claimed scope of the invention is by appended claims and its equivalent
Object defines.