CN108678755A - Weak stratum upper pipe working well rapid constructing method - Google Patents

Weak stratum upper pipe working well rapid constructing method Download PDF

Info

Publication number
CN108678755A
CN108678755A CN201810474405.7A CN201810474405A CN108678755A CN 108678755 A CN108678755 A CN 108678755A CN 201810474405 A CN201810474405 A CN 201810474405A CN 108678755 A CN108678755 A CN 108678755A
Authority
CN
China
Prior art keywords
push pipe
jacking
construction
pipe jacking
stake holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810474405.7A
Other languages
Chinese (zh)
Other versions
CN108678755B (en
Inventor
隆小华
李明亮
冉顶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201810474405.7A priority Critical patent/CN108678755B/en
Publication of CN108678755A publication Critical patent/CN108678755A/en
Application granted granted Critical
Publication of CN108678755B publication Critical patent/CN108678755B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of weak stratum upper pipe working well rapid constructing method, smooth location, surveying and locating positions stake holes position;Using Spiral digging machine drilling operation, a distance is often crept into, Spiral digging machine drill bit exits stake holes, casing is put into stake holes;The above method is repeated until drilling arrives specified absolute altitude;Push pipe jacking construction mouth is opened up on the casing of bottom, and push pipe jacking gathering hole is opened up on the casing of push pipe jacking construction mouth opposite side;Its corresponding rock stratum excavate by push pipe jacking gathering hole and forms push pipe jacking operating space;Cure process is carried out to ground in ground in push pipe jacking operating space and stake holes;Jacking mechanism of the installation for carrying out jacking operation to push pipe in push pipe jacking operating space;Its corresponding rock stratum is excavated by push pipe jacking construction mouth, and jacking construction is carried out to push pipe by jacking mechanism.The present invention reduces construction workloads, reduce difficulty of construction, shorten the construction period, reduce effect on environment.

Description

Weak stratum upper pipe working well rapid constructing method
Technical field
The present invention relates to construction fields, and in particular to a kind of weak stratum upper pipe working well rapid constructing method.
Background technology
Jacking construction is exactly non-excavating construction method, is a kind of piping laying construction technology do not excavated or excavated less. This technology thoroughly solves the problems such as the destruction in piping laying construction to City Building and the blocking of road traffic, Its advantage is highlighted in terms of steady soil and environmental protection.This to heavy traffic, densely populated, above ground structure is numerous, buried pipe The city of line complexity is very important, it will create a cleaning, comfortable and fine environment for city.In weak stratum Construction environment in, it is necessary first to a foundation pit is excavated, in order to avoid rock stratum caves in the lifting with push pipe, it will usually setting compared with The big gradient, but can thus increase the workload of construction, in addition, the construction period accordingly can also extend, while can also be to week Collarette border impacts.
Invention content
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to:A kind of reduce how is provided to apply Work workload reduces difficulty of construction, shortens the construction period, reduces project cost, reduces the weak stratum push pipe of effect on environment Active well rapid constructing method.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
A kind of weak stratum upper pipe working well rapid constructing method, includes the following steps:
(1) smooth location, surveying and locating position stake holes position;
(2) it uses Spiral digging machine to carry out drilling operation, often creeps into a distance, Spiral digging machine drill bit exits stake holes, into stake holes Being put into casing makes its whereabouts;
(3) step (2) is repeated until drilling is to specified absolute altitude, the two neighboring casing head and the tail splicing in stake holes is one It rises, and multiple casings extend to bottom hole by stake holes aperture;
(4) on the lowermost casing and the position in corresponding jacking construction direction opens up push pipe jacking construction mouth, in push pipe Push pipe jacking gathering hole, push pipe jacking construction mouth and push pipe jacking gathering hole are opened up on the casing of jacking construction mouth opposite side Width be all higher than the diameter of push pipe to be onstructed, push pipe jacking construction mouth and push pipe jacking gathering hole be from push pipe bottom end to The height of the opening of upper extension, wherein push pipe jacking gathering hole isWherein c be every section of push pipe to be onstructed most Long length, b are casing internal diameter;
(5) its corresponding rock stratum laterally excavate widening forming push pipe jacking operation sky by push pipe jacking gathering hole Between for being horizontally arranged to push pipe, and to push pipe jacking operating space carry out strengthening construction;
(6) cure process is carried out to ground in ground in push pipe jacking operating space and stake holes;
(7) jacking mechanism of the installation for carrying out jacking operation to push pipe in push pipe jacking operating space;
(8) its corresponding rock stratum is excavated by push pipe jacking construction mouth, and push pipe is carried out by jacking mechanism Jacking construction.
In the present invention, use Spiral digging machine drilling mode, segmentation drilling, every section be drilled after casing is installed, casing exists Sink under gravity, in this way after Spiral digging machine is crept into specified absolute altitude, the lowermost casing also sinks down into stake holes bottom hole, and And multiple casings head and the tail are stitched together to stake mouth position, are protected in this way with regard to stake holes by casing, avoid weak stratum to It caves in stake holes.After the completion of pile hole construction, construct on the casing of bottom hole push pipe jacking construction mouth and push pipe jacking gathering hole, Then push pipe jacking operating space is excavated by push pipe jacking gathering hole, cure process is carried out to ground after the completion, be convenient for the later stage It constructs.For push pipe to be onstructed from the downward handling in stake holes aperture, entire casing internal diameter is little, thus push pipe hung under when It waits, can only be declined by the way of the vertical or a small amount of angle of inclination, after push pipe drops to bottom hole, need to put down push pipe It puts, is convenient for jacking construction operation, push pipe will enter push pipe jacking operating space by push pipe jacking gathering hole, then root According to the push pipe maximum angle tilted in casing, carry out push pipe jacking gathering hole is calculated upwardly extending by Pythagorean theorem Height, such push pipe bottom end is placed in bottom hole and close to push pipe jacking construction mouth side, and push pipe is kept flat as basic point, pushes up Pipe can be entered in push pipe jacking operating space by push pipe jacking gathering hole, finally by push pipe jacking construction mouth Rock stratum is excavated, the operation of push pipe jacking construction is completed.There is no need to excavate to form larger foundation pit in this way before construction, Stake holes only is crept into Spiral digging machine, eliminates a large amount of manpower and materials, reduces the workload of construction, difficulty of construction also obtains To reduction, while speed of application is accelerated, and shortens the duration, the larger foundation pit of the corresponding construction area of stake holes, reduces pair Influence caused by environment.
As an optimization, push pipe jacking operating space has the arch roof of outwardly convex, and anchor is used on arch roof The mode of bar slip casting is reinforced.It push pipe jacking operating space can be as the hedging space of construction personnel, in lower furred ceiling pipe When, construction personnel can avoid falling object from high altitude from injuring by a crashing object in push pipe jacking operating space.Arch roof is not only constructed phase To convenient, in addition its structure cannot be easily caused caving in for weak stratum, while be also convenient for being reinforced using bolt grouting.
As an optimization, the two neighboring casing is attached using tongue and groove connection type.Two neighboring casing is set to splice When it is more firm, avoid the dislocation of two casings that external sandstone leakage is caused to come in cause safety accident.
In conclusion the beneficial effects of the present invention are:The present invention uses stake holes mode, reduces boundary of works area, in this way Construction workload and difficulty are reduced accordingly, improves construction efficiency, the construction period is also shortened, and is reduced pair The influence of ambient enviroment.
Specific implementation mode
The present invention is described in further detail below.
A kind of weak stratum upper pipe working well rapid constructing method in present embodiment, includes the following steps:
(1) smooth location, surveying and locating position stake holes position;
(2) it uses Spiral digging machine to carry out drilling operation, often creeps into a distance, Spiral digging machine drill bit exits stake holes, into stake holes Being put into casing makes its whereabouts;
(3) step (2) is repeated until drilling is to specified absolute altitude, the two neighboring casing head and the tail splicing in stake holes is one It rises, and multiple casings extend to bottom hole by stake holes aperture;
(4) on the lowermost casing and the position in corresponding jacking construction direction opens up push pipe jacking construction mouth, in push pipe Push pipe jacking gathering hole, push pipe jacking construction mouth and push pipe jacking gathering hole are opened up on the casing of jacking construction mouth opposite side Width be all higher than the diameter of push pipe to be onstructed, push pipe jacking construction mouth and push pipe jacking gathering hole be from push pipe bottom end to The height of the opening of upper extension, wherein push pipe jacking gathering hole isWherein c be every section of push pipe to be onstructed most Long length, b are casing internal diameter;
(5) its corresponding rock stratum laterally excavate widening forming push pipe jacking operation sky by push pipe jacking gathering hole Between for being horizontally arranged to push pipe, and to push pipe jacking operating space carry out strengthening construction;
(6) cure process is carried out to ground in ground in push pipe jacking operating space and stake holes;
(7) jacking mechanism of the installation for carrying out jacking operation to push pipe in push pipe jacking operating space;
(8) its corresponding rock stratum is excavated by push pipe jacking construction mouth, and push pipe is carried out by jacking mechanism Jacking construction.
In present embodiment, push pipe jacking operating space has the arch roof of outwardly convex, arch roof On reinforced by the way of bolt grouting.
In present embodiment, the two neighboring casing is attached using tongue and groove connection type.
During specific implementation, after the completion of push pipe jacking operating space is constructed in step (5), pass through push pipe jacking Construction mouth to its corresponding rock stratum laterally excavate and widens to form push pipe jacking construction space, and push pipe jacking construction space is same Sample has the arch roof of outwardly convex, is reinforced by the way of bolt grouting on arch roof, construction personnel is facilitated to exist Corresponding construction instrument is placed in this space, there are enough spaces to construct.
Finally illustrate, the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although passing through ginseng According to the preferred embodiment of the present invention, invention has been described, it should be appreciated by those of ordinary skill in the art that can To make various changes to it in the form and details, without departing from this hair defined by the appended claims Bright spirit and scope.

Claims (3)

1. a kind of weak stratum upper pipe working well rapid constructing method, it is characterised in that:Include the following steps:
(1) smooth location, surveying and locating position stake holes position;
(2) it uses Spiral digging machine to carry out drilling operation, often creeps into a distance, Spiral digging machine drill bit exits stake holes, is put into stake holes Casing makes its whereabouts;
(3) step (2) is repeated until drilling is to specified absolute altitude, the two neighboring casing head and the tail in stake holes are stitched together, and And multiple casings extend to bottom hole by stake holes aperture;
(4) on the lowermost casing and the position in corresponding jacking construction direction opens up push pipe jacking construction mouth, in push pipe jacking Push pipe jacking gathering hole, the width of push pipe jacking construction mouth and push pipe jacking gathering hole are opened up on the casing of construction mouth opposite side It is all higher than the diameter of push pipe to be onstructed, push pipe jacking construction mouth and push pipe jacking gathering hole are upwardly extended by push pipe bottom end Opening, the height of wherein push pipe jacking gathering hole areWherein c is the maximum length of every section of push pipe to be onstructed, and b is Casing internal diameter;
(5) its corresponding rock stratum laterally excavate by push pipe jacking gathering hole widen to be formed push pipe jacking operating space with Strengthening construction is carried out for being horizontally arranged to push pipe, and to push pipe jacking operating space;
(6) cure process is carried out to ground in ground in push pipe jacking operating space and stake holes;
(7) jacking mechanism of the installation for carrying out jacking operation to push pipe in push pipe jacking operating space;
(8) its corresponding rock stratum is excavated by push pipe jacking construction mouth, and jacking is carried out to push pipe by jacking mechanism Construction.
2. weak stratum upper pipe working well rapid constructing method according to claim 1, it is characterised in that:The push pipe top There is the arch roof of outwardly convex into operating space, reinforced by the way of bolt grouting on arch roof.
3. weak stratum upper pipe working well rapid constructing method according to claim 1, it is characterised in that:Two neighboring institute Casing is stated to be attached using tongue and groove connection type.
CN201810474405.7A 2018-05-17 2018-05-17 Quick construction method for soft rock stratum pipe jacking working well Active CN108678755B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810474405.7A CN108678755B (en) 2018-05-17 2018-05-17 Quick construction method for soft rock stratum pipe jacking working well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810474405.7A CN108678755B (en) 2018-05-17 2018-05-17 Quick construction method for soft rock stratum pipe jacking working well

Publications (2)

Publication Number Publication Date
CN108678755A true CN108678755A (en) 2018-10-19
CN108678755B CN108678755B (en) 2020-09-01

Family

ID=63805629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810474405.7A Active CN108678755B (en) 2018-05-17 2018-05-17 Quick construction method for soft rock stratum pipe jacking working well

Country Status (1)

Country Link
CN (1) CN108678755B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07224590A (en) * 1994-02-10 1995-08-22 Tokyo Gas Co Ltd Pipe jacking method of double-tube
CN201459756U (en) * 2009-08-19 2010-05-12 郑州市市政工程总公司 Hanging-type construction ceiling coil vertical shaft
KR100984883B1 (en) * 2009-05-22 2010-10-01 위성배 The construction method of shield tunneling
CN202731927U (en) * 2012-07-24 2013-02-13 岑益南 Tunnel construction device
CN103061777A (en) * 2013-01-18 2013-04-24 中铁隧道集团有限公司 Method for building urban underground tunnel shield cutter repairing space with preset reinforcing pile groups
CN203925507U (en) * 2014-03-21 2014-11-05 中铁二十二局集团第一工程有限公司 A kind of metro shield assembling and the system of going into the well
CN105240019A (en) * 2015-09-24 2016-01-13 中国石油天然气集团公司 Pipe jacking construction method
CN105626088A (en) * 2016-02-02 2016-06-01 中铁十九局集团轨道交通工程有限公司 Well-descending translation method of T-shaped bored tunnel shield tunneling machine
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN107060795A (en) * 2017-05-26 2017-08-18 安徽理工大学 A kind of underground mine TBM assembly construction methods
CN206738711U (en) * 2017-05-23 2017-12-12 罗永强 jacking construction structure

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07224590A (en) * 1994-02-10 1995-08-22 Tokyo Gas Co Ltd Pipe jacking method of double-tube
KR100984883B1 (en) * 2009-05-22 2010-10-01 위성배 The construction method of shield tunneling
CN201459756U (en) * 2009-08-19 2010-05-12 郑州市市政工程总公司 Hanging-type construction ceiling coil vertical shaft
CN202731927U (en) * 2012-07-24 2013-02-13 岑益南 Tunnel construction device
CN103061777A (en) * 2013-01-18 2013-04-24 中铁隧道集团有限公司 Method for building urban underground tunnel shield cutter repairing space with preset reinforcing pile groups
CN203925507U (en) * 2014-03-21 2014-11-05 中铁二十二局集团第一工程有限公司 A kind of metro shield assembling and the system of going into the well
CN105240019A (en) * 2015-09-24 2016-01-13 中国石油天然气集团公司 Pipe jacking construction method
CN105649012A (en) * 2015-12-30 2016-06-08 中铁局集团有限公司 Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN105626088A (en) * 2016-02-02 2016-06-01 中铁十九局集团轨道交通工程有限公司 Well-descending translation method of T-shaped bored tunnel shield tunneling machine
CN206738711U (en) * 2017-05-23 2017-12-12 罗永强 jacking construction structure
CN107060795A (en) * 2017-05-26 2017-08-18 安徽理工大学 A kind of underground mine TBM assembly construction methods

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴骏涛: "基于顶管工作坑钢筋混凝土护壁支护的施工工艺研究", 《中国科技信息》 *
欧阳璋等: "盾构机及后续设备下井组装技术", 《西部探矿工程》 *

Also Published As

Publication number Publication date
CN108678755B (en) 2020-09-01

Similar Documents

Publication Publication Date Title
CN104847355B (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
CN103835661B (en) A kind of local excavation pre support mine shaft rising boring technique
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN106014419B (en) Multiple-limb hole pre grouting from the surface water-blocking construction method
CN105178368A (en) Method for correcting deviation of building in miniature pile hole earth taking manner
CN104989272A (en) Upward inverse well drilling process
CN109183787A (en) A kind of forming method of man-made digging pile mould-pipe
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN108547628A (en) Upper-soft lower-hard ground upper pipe working well rapid constructing method
CN110374091A (en) A kind of rectangle friction pile mechanical hole building construction method
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN106930768B (en) Tunnel Construction and application
CN204299468U (en) A kind of positioning and guiding system and device of hidden hole drilling boring
CN105155547A (en) Construction method for deep foundation pit excavation on steep slope terrain
CN107675703B (en) Rectangular anti-slide pile construction method
CN204283438U (en) Portal supporting and protection structure
CN110331989A (en) Deep well construction exploitation layout method
CN112528362A (en) Waste pit backfilling method and device and storage medium
CN108678755A (en) Weak stratum upper pipe working well rapid constructing method
CN106285677A (en) Side back production subregion filling studding recovery method is expanded to route on Chao Qian
CN107339114B (en) Mountain highway tunnel portal critical slope pre-balancing stable control structure and method
CN109869163A (en) A kind of construction method and structure of tunnel
CN105401572A (en) Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube
CN108798625A (en) Mine and mining construction method
CN212405120U (en) Bored concrete pile of construction is executed to underground reinforced concrete structure department

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant