CN108678287A - A kind of bar connecting full grout sleeve of slurry pin bank conjunction - Google Patents

A kind of bar connecting full grout sleeve of slurry pin bank conjunction Download PDF

Info

Publication number
CN108678287A
CN108678287A CN201810392426.4A CN201810392426A CN108678287A CN 108678287 A CN108678287 A CN 108678287A CN 201810392426 A CN201810392426 A CN 201810392426A CN 108678287 A CN108678287 A CN 108678287A
Authority
CN
China
Prior art keywords
grout sleeve
pin
sleeve body
hole
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810392426.4A
Other languages
Chinese (zh)
Inventor
王景全
诸钧政
王震
赵国堂
孙树礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201810392426.4A priority Critical patent/CN108678287A/en
Publication of CN108678287A publication Critical patent/CN108678287A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention provides a kind of bar connecting full grout sleeve of slurry pin bank conjunction, including grout sleeve body, pin hole, the pin for being inserted into the pin hole and being fixed on the grout sleeve body, the injected hole for extending through the grout sleeve body and spaced setting and plasma discharge hole, the UHPC grouting materials and two connected reinforcing bars that pour into the grout sleeve body;The injected hole and the plasma discharge hole are arranged side by side along the axis direction of the grout sleeve body, two connected reinforcing bars to insertion and block grout sleeve body both ends by grout sleeve body both ends, by pouring into the UHPC grouting materials by the grouting port until being flowed out by the thick liquid discharge mouth.Compared with the relevant technologies, bar connecting of the invention, which with slurry pin bank closes full grout sleeve and combined pin with UHPC grouting materials, considerably increases the reliability of sleeve connection, contributes to the connectivity problem for solving Large-size rebar in bridge structure.

Description

A kind of bar connecting full grout sleeve of slurry pin bank conjunction
Technical field
The present invention relates to field of civil engineering more particularly to a kind of prefabricated assembled concrete member stress bar connecting to use It starches the bar connecting that pin bank is closed and closes full grout sleeve with slurry pin bank.
Background technology
Development fabricated construction, main member is promoted to be prefabricated in the factory life currently, country advocates building industrialization energetically Postpartum carries out the assembly of prefabricated components to scene, and component is connected as overall structure, and between prefabricated components steel bar stress can It is the key factor for influencing structure general safety and stress performance by connecting then.National sector standard《Prefabricated concrete structure Technical regulation》JGJ1 has carried out relevant regulation to the connection method of prefabricated components, according to the rules, the application of sleeve grouting connection Range is wider, connects reliability higher, can be applied to the connection between vertical member in bridge structure.
Since the weight and volume of prefabricated components is typically much deeper than building structure, bar diameter used in bridge structure Also larger, and the connection of Large-size rebar is conducive to construct, therefore, being proposed to the sleeve grouting connection of Large-size rebar needs It asks.Had in connection using the reinforcing bar of major diameter in prefabricated components convenient construction, can quick-assembling, erection tolerance it is big The advantages that, meanwhile, diameter, which increases after sleeve length wall thickness, all to be needed to increase, this makes existing sleeve processing more difficult, and even The performance of increase grouting material when connecing due to bar diameter is also required to improve, to meet the performance requirement of connection.
Therefore, a kind of full grout sleeve of bar connecting slurry pin bank conjunction must be provided by, which having in fact, solves above-mentioned technical problem.
Invention content
The technical problem to be solved in the invention is to provide a kind of providing the reinforcing bar reliably connected for prefabricated components reinforcing bar Connection closes full grout sleeve with slurry pin bank.
In order to solve the above technical problems, the present invention provides a kind of bar connecting slurry pin banks to close full grout sleeve, including In the grout sleeve body of hollow columnar, through the grout sleeve body setting pin hole, be inserted into the pin hole and fixation In the grout sleeve body pin, extend through the grout sleeve body and spaced setting injected hole and plasma discharge hole, Pour into the UHPC grouting materials and two connected reinforcing bars of the grout sleeve body;Institute's injected hole and the plasma discharge hole are along the filling The axis direction for starching sleeve body is arranged side by side, and two connected reinforcing bars are by grout sleeve body both ends to being inserted into and to institute It states grout sleeve body both ends to be blocked, by pouring into the UHPC grouting materials by the grouting port until by the thick liquid discharge mouth stream Go out.
Preferably, the pin hole includes at least four, and the pin hole is respectively set to the grout sleeve body Both ends form symmetrical structure, and pin actual quantity and pin, which are inserted into after the pin hole, stretches into length in grouting material according to grouting Adhesion strength is adjusted between material and grout sleeve body, and guarantee will not occur grouting material and extract destruction from grout sleeve body.
Preferably, the pin includes the head of a nail and the nail rod that is extended by the head of a nail, and the nail rod includes by the head of a nail The first segment of extension and the second segment extended from the first segment to the direction far from the head of a nail;The outer surface of the first segment Equipped with external screw thread, the inner wall of the pin hole is equipped with the internal thread coordinated with the external screw thread, and the pin passes through the outer spiral shell Line is engaged in the internal thread and is fixed on the grout sleeve body, and the second segment extends in the grout sleeve body.
Preferably, the cross-sectional area of the first segment is more than the cross-sectional area of the second segment, for easy for installation, And the first segment section bearing capacity is more than the second segment, will not be because of processing screw thread and as nail after screw thread for processing Bar stress weakness section ensures that pin and the grout sleeve body form reliable entirety, the pin by the first segment with The grout sleeve body stress fixes to form entirety.
Preferably, the injected hole and the plasma discharge hole are circle, pour into the grouting material in the injected hole as no steel The UHPC grouting materials of fiber, prevent grouting material from directly bearing the pin extruding force and cleaving;The UHPC grouting Material increases the adhesion strength of grouting material and the connected reinforcing bar, reduces the connected reinforcing bar in the grout sleeve body Anchorage length, to reduce the grout sleeve body length.
Preferably, it further includes from the injected hole to far from institute that the bar connecting slurry pin bank, which closes full grout sleeve structure, It states the injected hole wall extension of grout sleeve body direction extension and prolongs from the plasma discharge hole to far from grout sleeve body direction The plasma discharge hole wall extension stretched.
Preferably, the injected hole and the plasma discharge hole are respectively positioned between two pin holes.
Compared to the prior art, the full grout sleeve of bar connecting of the invention slurry pin bank conjunction passes through institute by the pin It states external screw thread to be engaged in the internal thread and be fixed on the grout sleeve body, the second segment extends to the grout sleeve body Interior, the pin and the grout sleeve bodily form are integral, and the grout sleeve body is improved from structure and is filled with internal filling Adhesion strength between slurry.Pin centralized arrangement is made at sleeve both ends in the mechanical snap for effectively improving sleeve and grouting material With, while avoiding the occurrence of sleeve-grouting material sliding rupture, also avoid sleeve stress maximum position punching to sleeve carry Weakening caused by power.From grout sleeve body both ends to two connected reinforcing bars of insertion, then to grout sleeve body both ends It is blocked, then pours into mating ultra-high performance concrete (Ultra High Performance from the injected hole Concrete, UHPC) grouting material, until the plasma discharge hole has the UHPC grouting materials to flow out, grouting works are completed, by supporting Shield, the adhesion strength of reinforcing bar and grouting material can be improved, be avoided out using UHPC grouting materials by forming steel reinforcement abutting joints jointing Existing reinforcing bar is destroyed from the extraction in grouting material, meanwhile, it also avoids due to grouting caused by the problem of stress concentration that pin is brought Expect cleavage fracture.By the way that assembly concrete bridge structure prefabricated components are made above, the bar connecting is closed complete with slurry pin bank Grout sleeve structure provides reliable connection method for bar connecting, contributes to the company for solving Large-size rebar in bridge structure Problem is connect, and processing technology is simple, can be widely applied in prefabricated concrete structure, there is wide future in engineering applications.
Description of the drawings
Fig. 1 is the stereochemical structure decomposed schematic diagram that bar connecting of the present invention closes full grout sleeve with slurry pin bank;
Fig. 2 is that bar connecting of the present invention starches the full grout sleeve use state diagram of pin bank conjunction;
Fig. 3 is that bar connecting of the present invention starches the full grout sleeve of pin bank conjunction with embodiment schematic diagram.
Specific implementation mode
Below in conjunction with drawings and embodiments, the invention will be further described.
It please join shown in Fig. 1-2, the present invention provides a kind of bar connecting full grout sleeve of slurry pin bank conjunction, including grout sleeve Body 1, pin hole 2, pin 3, injected hole 4, plasma discharge hole 5, UHPC grouting materials 6 are connected reinforcing bar 7.
In present embodiment, the grout sleeve body 1 is in hollow columnar.It is described to be cut using seamless steel pipe saw, technique letter It is single.
In the present embodiment, the pin hole 2 includes at least four, and the pin hole is respectively set to the grouting The both ends of sleeve body 1 and symmetrical structure is formed, pin actual quantity and pin stretch into after being inserted into the pin hole in grouting material Length determines that grouting material will not occur for guarantee from grout sleeve body according to required adhesion strength between grouting material and grout sleeve body Middle extraction destroys.
In the present embodiment, the pin 3 includes the head of a nail 31 and the nail rod 32 extended by the head of a nail, the nail rod packet The second segment 322 for including the first segment 321 extended from the head of a nail and being extended from the first segment to the direction far from the head of a nail; The outer surface of the first segment 321 is equipped with external screw thread, and the inner wall of the pin hole 2 is equipped with the interior spiral shell coordinated with the external screw thread Line, the pin 3 are engaged in the internal thread by the external screw thread by are fixed on the grout sleeve body 1, and with foot The fixed function for enough having the head of a nail 31 of area ensure that the pin 3 and the grout sleeve body 1 form entirety.
In the present embodiment, the second segment 322 extends to the depth in the grout sleeve body 1 and the pin The quantity of nail 3 is determined according to required adhesion strength between the UHPC grouting materials 6 and the grout sleeve body 1, it is therefore prevented that described UHPC grouting materials 6, which occur extracting from the grout sleeve body 1, to be destroyed.
More preferably, in the present embodiment, the cross-sectional area of the first segment 321 is more than the cross of the second segment 322 Area of section.It realizes that the second segment 322 can directly be pierced by the pin hole 2, is convenient for Fast Installation.And the first segment 321 section bearing capacities are more than the second segment 322, and the first segment 321 will not be because of processing screw thread and as the pin 3 Stress weakness section is conducive to engineering manufacture and using reliable.
In the present embodiment, the injected hole 4 and the plasma discharge hole 5 are circle, are filled with plastics in Engineering operation Starch pipe matching.It further includes from the injected hole 4 to far from the filling that the bar connecting slurry pin bank, which closes full grout sleeve structure, Starch the injected hole wall extension and extend from the plasma discharge hole 5 to far from 1 direction of grout sleeve body that 1 direction of sleeve body extends Plasma discharge hole wall extension, the injected hole wall extension and plasma discharge hole wall extension be conducive in Engineering operation with the modeling Material grout pipe is connected and fixed, in order to which engineering construction operates.
In the present embodiment, the injected hole 4 and the plasma discharge hole 5 extend through the grout sleeve body 1 and mutually Interval setting;The injected hole 4 and the plasma discharge hole 5 are arranged side by side along the axis direction of the grout sleeve body 1, and are respectively positioned on Between two pin holes 2.
Two connected reinforcing bars 7 are by 1 both ends of grout sleeve body to being inserted into and to 1 both ends of grout sleeve body It is blocked, by pouring into the UHPC grouting materials 6 by the grouting port 4 until being flowed out by the thick liquid discharge mouth 5.
In engineering construction, the injection UHPC grouting materials 6 in the injected hole 4, when 6 note of UHPC grouting materials After the full grout sleeve body 1, there is the UHPC to fill along the plasma discharge hole 5 of 1 axis spacing parallel arranging of the grout sleeve body Slurry 6 is discharged, and is conducive to the direction that the UHPC grouting materials 6 are filled in the grout sleeve body 1, prevent unfilled feelings in this way Condition occurs and the UHPC grouting materials 6 pour in down a chimney situation in the plasma discharge hole 5.
In the present embodiment, the UHPC grouting materials 6 poured into the grout sleeve body 1 are by modified more suitable Together in the material of grouting.Compared to general strength cement-based grouting material, grouting material and reinforcing bar can be increased using the UHPC grouting materials 6 Adhesion strength, therefore anchorage length of the connected reinforcing bar 7 in the grout sleeve body 1 can be effectively reduced, described in guarantee The reinforcing bar length for being connected component reserved joint when 7 diameter of reinforcing bar increases will not be long to which the grout sleeve body 1 is grown Degree will not be long, and transport easy to process and construction while ensures the reliability of structure connection, using the UHPC grouting materials 6 It is also prevented from the cleavage fracture of grouting material.The connected reinforcing bar 7 is the reinforcing bar being relatively large in diameter used in science of bridge building, but Common bar connecting is can also be used for, purposes of the present invention is more extensive.
Bar connecting of the present invention closes full grout sleeve with slurry pin bank and carries out the docking connection of precast concrete steel bar stress Method be:
When concrete prefabricated element factory makes prefabricated components, by connected one 7 end of connected reinforcing bar It is inserted into the grout sleeve body 1 of one end, 7 head of connected reinforcing bar reaches the specified of 1 middle part of the grout sleeve body Position, the port of the other end of the grout sleeve body 1 and the template of prefabricated components are fixed.By the plastics grout pipe with it is described Injected hole 4 is connected and fixed, and the plastics grout pipe and the plasma discharge hole 5 are connected and fixed.Then concrete members are poured and are supported It protects to prescribed strength.After precast concrete is transported to construction site, hoisting prefabricated component is carried out, and component is stayed to the institute set Grout sleeve body 1 is stated to be directed at another connected connected reinforcing bar 7 and be inserted into slowly, in place by prefabricated components splicing, 1 both ends of grout sleeve body are blocked, by the UHPC grouting materials 6 being stirred from the low of the grout sleeve body 1 4 pressure of the injected hole at position pours into, and the UHPC grouting materials 6 is made to be discharged from positioned at the plasma discharge hole 5 of high level, blocks The plasma discharge hole 5, the maintenance of UHPC grouting materials 6 form to defined intensity and are connected the jointing that reinforcing bar 7 docks.
Bar connecting of the present invention closes the process that full grout sleeve is embodied in precast segment assembly bridge pier with slurry pin bank It is as follows:
It please join shown in Fig. 3, step 1:It is first that concrete pier is segmented prefabricated in factory's progress, it is processed in prefabricated components The bar connecting is closed full grout sleeve structure with slurry pin bank and is installed to connected 7 end of reinforcing bar described in member bottom section by factory, And it is inserted into the bar connecting slurry pin bank and closes full grout sleeve structure to prescribed depth, the other end of the grout sleeve body 1 Mouth is fixed with prefabricated components mold, and casting concrete is simultaneously conserved to prescribed strength, and demoulding is stacked for use;
Step 2:When prefabricated components in-site installation, it will be embedded in described in prefabricated components bottom described in being connected on reinforcing bar 7 Bar connecting closes full grout sleeve structure alignment bottom segment same position with slurry pin bank and stretches out the exposed connected reinforcing bar 7 Head, and decline slowly by crane, until prefabricated components are installed in place, and after prefabricated components are corrected and are fixed temporarily, envelope Stifled splicing seams, and the bar connecting from low level closes 4 pressure injection of the injected hole of full grout sleeve structure with slurry pin bank and stirs The UHPC grouting materials 6 mixed, until the plasma discharge hole 5 of seam total cross-section and grouting 1 high level of grout sleeve body There are the UHPC grouting materials 6 to be discharged, is conserved to defined intensity after blocking in time, complete the vertical applied force reinforcing bar of prefabricated components The grouting of grout sleeve body 1 connection.
Compared to the prior art, the full grout sleeve of bar connecting of the invention slurry pin bank conjunction passes through institute by the pin It states external screw thread to be engaged in the internal thread and be fixed on the grout sleeve body, the second segment extends to the grout sleeve body Interior, the pin and the grout sleeve bodily form are integral, and the grout sleeve body is improved from structure and is filled with internal filling Adhesion strength between slurry.Pin centralized arrangement is made at sleeve both ends in the mechanical snap for effectively improving sleeve and grouting material With, while avoiding the occurrence of sleeve-grouting material sliding rupture, also avoid sleeve stress maximum position punching to sleeve carry Weakening caused by power.From grout sleeve body both ends to two connected reinforcing bars of insertion, then to grout sleeve body both ends It is blocked, then pours into mating ultra-high performance concrete (Ultra High Performance from the injected hole Concrete, UHPC) grouting material, until the plasma discharge hole has the UHPC grouting materials to flow out, grouting works are completed, by supporting Shield, the adhesion strength of reinforcing bar and grouting material can be improved, be avoided out using UHPC grouting materials by forming steel reinforcement abutting joints jointing Existing reinforcing bar is destroyed from the extraction in grouting material, meanwhile, it also avoids due to grouting caused by the problem of stress concentration that pin is brought Expect cleavage fracture.By the way that assembly concrete bridge structure prefabricated components are made above, the bar connecting is closed complete with slurry pin bank Grout sleeve structure provides reliable connection method for bar connecting, contributes to the company for solving Large-size rebar in bridge structure Problem is connect, and processing technology is simple, can be widely applied in prefabricated concrete structure, there is wide future in engineering applications.
Example the above is only the implementation of the present invention is not intended to limit the scope of the invention, every to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (7)

1. a kind of bar connecting closes full grout sleeve with slurry pin bank, which is characterized in that include in hollow columnar grout sleeve body, Through the grout sleeve body setting pin hole, be inserted into the pin hole and be fixed on the grout sleeve body pin, Extend through the injected hole and plasma discharge hole, the UHPC for pouring into the grout sleeve body of the grout sleeve body and spaced setting Grouting material and two connected reinforcing bars;The injected hole and the plasma discharge hole along the grout sleeve body axis direction side by side Setting, two connected reinforcing bars are by grout sleeve body both ends to being inserted into and being sealed to grout sleeve body both ends It is stifled, by pouring into the UHPC grouting materials by the grouting port until being flowed out by the thick liquid discharge mouth.
2. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the pin hole packet At least four are included, and the pin hole divides equally the both ends formation symmetrical structure for being set to the grout sleeve body, pin actual number Amount and pin stretch into the length in grouting material according to adhesion strength between grouting material and grout sleeve body after being inserted into the pin hole It adjusts.
3. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the pin includes The head of a nail and the nail rod extended by the head of a nail, the nail rod include the first segment extended from the head of a nail and from the first segment to The second segment that direction far from the head of a nail extends;The outer surface of the first segment is equipped with external screw thread, the inner wall of the pin hole Equipped with the internal thread coordinated with the external screw thread, the pin is engaged in the internal thread by the external screw thread by is fixed on institute Grout sleeve body is stated, the second segment extends in the grout sleeve body.
4. bar connecting according to claim 3 closes full grout sleeve with slurry pin bank, which is characterized in that the first segment Cross-sectional area is more than the cross-sectional area of the second segment, and for easy for installation, and the first segment section bearing capacity is big In the second segment, for processing screw thread, the pin is fixed to be formed with the grout sleeve body stress by the first segment It is whole.
5. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the injected hole and The plasma discharge hole is circle, pours into the grouting material in the injected hole as the UHPC grouting materials of no steel fibre, prevents from filling Slurry directly bears the pin extruding force and cleaves;The UHPC grouting materials increase grouting material and the connected reinforcing bar Adhesion strength, the anchorage length of the connected reinforcing bar in the grout sleeve body is reduced, to reduce the grouting Sleeve body length.
6. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the bar connecting It further includes from the injected hole to the slip casting far from the extension of grout sleeve body direction to close full grout sleeve structure with slurry pin bank Hole wall extension and the plasma discharge hole wall extension extended from the plasma discharge hole to separate grout sleeve body direction.
7. bar connecting according to claim 2 closes full grout sleeve with slurry pin bank, which is characterized in that the injected hole and The plasma discharge hole is respectively positioned between two pin holes.
CN201810392426.4A 2018-04-27 2018-04-27 A kind of bar connecting full grout sleeve of slurry pin bank conjunction Pending CN108678287A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810392426.4A CN108678287A (en) 2018-04-27 2018-04-27 A kind of bar connecting full grout sleeve of slurry pin bank conjunction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810392426.4A CN108678287A (en) 2018-04-27 2018-04-27 A kind of bar connecting full grout sleeve of slurry pin bank conjunction

Publications (1)

Publication Number Publication Date
CN108678287A true CN108678287A (en) 2018-10-19

Family

ID=63802528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810392426.4A Pending CN108678287A (en) 2018-04-27 2018-04-27 A kind of bar connecting full grout sleeve of slurry pin bank conjunction

Country Status (1)

Country Link
CN (1) CN108678287A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284660A (en) * 2019-07-22 2019-09-27 西安建筑科技大学 It is a kind of in a row three and muscle connection can the fixed grout sleeve of self compaction
CN110656733A (en) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 Pre-grouting type full-grouting sleeve structure and construction method
CN111719861A (en) * 2020-06-29 2020-09-29 中冶天工集团天津有限公司 Construction device and construction method for grouting plugging of fabricated building
CN112282217A (en) * 2019-07-25 2021-01-29 沈阳建筑大学 Special-shaped grouting sleeve for steel bar connection and preparation method thereof
CN113530295A (en) * 2021-07-19 2021-10-22 彭超 Prefabricated assembly type historic building reinforcing and mounting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997017511A1 (en) * 1995-11-10 1997-05-15 Tokyo Tekko Co., Ltd. Mortar filling type reinforcement joint
CN103758292A (en) * 2014-01-24 2014-04-30 东南大学 Shearing reinforcing type full-grouting sleeve
CN103899044A (en) * 2014-04-10 2014-07-02 东南大学 Full-grouting sleeve embedded with cones
CN204266475U (en) * 2014-11-28 2015-04-15 沈阳建筑大学 A kind of reinforcing steel bar connecting sleeve tube
CN106088483A (en) * 2016-07-29 2016-11-09 上海建工二建集团有限公司 A kind of grout sleeve and using method
CN106812258A (en) * 2016-12-29 2017-06-09 合肥工业大学 A kind of full grout sleeves of GFRP

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997017511A1 (en) * 1995-11-10 1997-05-15 Tokyo Tekko Co., Ltd. Mortar filling type reinforcement joint
CN103758292A (en) * 2014-01-24 2014-04-30 东南大学 Shearing reinforcing type full-grouting sleeve
CN103899044A (en) * 2014-04-10 2014-07-02 东南大学 Full-grouting sleeve embedded with cones
CN204266475U (en) * 2014-11-28 2015-04-15 沈阳建筑大学 A kind of reinforcing steel bar connecting sleeve tube
CN106088483A (en) * 2016-07-29 2016-11-09 上海建工二建集团有限公司 A kind of grout sleeve and using method
CN106812258A (en) * 2016-12-29 2017-06-09 合肥工业大学 A kind of full grout sleeves of GFRP

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284660A (en) * 2019-07-22 2019-09-27 西安建筑科技大学 It is a kind of in a row three and muscle connection can the fixed grout sleeve of self compaction
CN112282217A (en) * 2019-07-25 2021-01-29 沈阳建筑大学 Special-shaped grouting sleeve for steel bar connection and preparation method thereof
CN110656733A (en) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 Pre-grouting type full-grouting sleeve structure and construction method
CN111719861A (en) * 2020-06-29 2020-09-29 中冶天工集团天津有限公司 Construction device and construction method for grouting plugging of fabricated building
CN113530295A (en) * 2021-07-19 2021-10-22 彭超 Prefabricated assembly type historic building reinforcing and mounting structure

Similar Documents

Publication Publication Date Title
CN108678287A (en) A kind of bar connecting full grout sleeve of slurry pin bank conjunction
CN102425310B (en) Assembly-type residential shear wall structural wall body vertical connection construction method
CN100577923C (en) Prestressed concrete steel pipe congruent pile and its manufacture and construction method
CN107700361B (en) A kind of dumb-bell shape grout sleeve and the method for carrying out assembly construction with the grout sleeve
CN207700443U (en) Exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey
CN202391019U (en) End part thickened grouting connector of steel bar
CN103485334B (en) Bi-layer plastic-bushing inverted-arch cambered hollow special-shaped pile and construction method
CN103726586B (en) H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN108252458A (en) The cast-in-place connection of bean column node precast beam reinforced bar half grout sleeve component and its application
CN104264909A (en) Precast concrete members connected by locking and anchoring pier heads and grouting variable diameter sleeve, prefabricated concrete member and manufacturing method of prefabricated concrete member
CN108265629A (en) A kind of half grouting reinforced steel coupling sleeve of prefabricated assembled column
CN103726589B (en) I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice
CN104963461A (en) Connection method of steel bars between prefabricated parts by adopting steel fiber mortar grouting sleeve
CN109440623A (en) The interim splicing structure of concrete segment precast bridge
CN112853946A (en) Grouting sleeve, grouting sleeve connected assembled pier and construction method thereof
CN110700439B (en) Prefabricated assembly type shear wall rapid formwork erecting connection construction method
CN108708452A (en) The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method
CN220550582U (en) Concrete pile with drum part and root pile for prefabricating pile foundation structure
CN212103637U (en) Quick connection structure between prefabricated pier stud and base
US11753936B2 (en) Composite support system based on steel-concrete support and shotcrete arch and construction process thereof
CN106958203A (en) The packaged type bridges grouting connecting-type sleeve of large scale high intensity half
CN206706588U (en) Packaged type bridges are integrally in the milk connecting-type sleeve with large scale high intensity
CN110539398A (en) Construction method of prefabricated bridge deck steel-concrete composite beam
CN207646727U (en) A kind of precast prestressed anti-pulling pipe piles
CN203594025U (en) Bi-layer plastic-bushing inverted-arch cambered hollow special-shaped pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019