CN108667004A - The failure analysis method and device of distribution line - Google Patents

The failure analysis method and device of distribution line Download PDF

Info

Publication number
CN108667004A
CN108667004A CN201810288973.8A CN201810288973A CN108667004A CN 108667004 A CN108667004 A CN 108667004A CN 201810288973 A CN201810288973 A CN 201810288973A CN 108667004 A CN108667004 A CN 108667004A
Authority
CN
China
Prior art keywords
time
tripping
signal
preset
determined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810288973.8A
Other languages
Chinese (zh)
Inventor
李耀鹏
马国雷
王晓峰
于连城
李文娟
韩宝卿
李宝萍
王丹
魏海刚
金金
张广德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Qinghai Electric Power Co Ltd, Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810288973.8A priority Critical patent/CN108667004A/en
Publication of CN108667004A publication Critical patent/CN108667004A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses the failure analysis methods and device of a kind of distribution line.Wherein, this method includes:Obtain distribution line current time remote signals and telemetry, wherein remote signals include:Switching signal and protection signal, telemetry include:Current data;According to remote signals and telemetry, the corresponding fault trip type of distribution line is determined, wherein fault trip type includes one of following:Reclosing tripping, transmission test tripping, trial line charging tripping and extension wire tripping.The present invention solves the low technical problem of accuracy rate of the fault trip judgement of distribution line.

Description

The failure analysis method and device of distribution line
Technical field
The present invention relates to power distribution line areas, in particular to the failure analysis method and device of a kind of distribution line.
Background technology
Currently, control of the power grid transport inspection department point to the whole province's administrative power grid distribution line failure tripping, mainly by different levels The line tripping unsuccessful reclosing situation grasped at this grade of regulation and control center is reflected to monitor in regulation and control center, and provincial company is difficult to slap substantially The distribution line trip condition for holding whole trip conditions of districts and cities and county's company line, especially the whole province is substantially unclear, also lacks Weary effective technological means, can not specific aim carry out line tripping renovation come effectively reduce line tripping rate.
For the low problem of the accuracy rate of the fault trip judgement of distribution line, effective solution side is not yet proposed at present Case.
Invention content
An embodiment of the present invention provides the failure analysis methods and device of a kind of distribution line, at least to solve distribution line Fault trip judgement the low technical problem of accuracy rate.
One side according to the ... of the embodiment of the present invention provides a kind of failure analysis method of distribution line, including:It obtains Remote signals and telemetry of the distribution line at current time, wherein remote signals include:Switching signal and protection signal, Telemetry includes:Current data;According to remote signals and telemetry, the corresponding fault trip type of distribution line is determined, Wherein, fault trip type includes one of following:Reclosing tripping, transmission test tripping, trial line charging tripping and extension wire are jumped Lock.
Further, according to remote signals and telemetry, the corresponding fault trip type of distribution line is determined, including: Judge to whether there is the first preset switches signal in the switching signal at current time, wherein the first preset switches signal is used for table Switchgear on sign distribution line is in gate-dividing state;If it is determined that default being opened there are first in the switching signal at current time OFF signal then judges to whether there is the corresponding default guarantor of the first preset switches signal in the protection signal in the first preset time period Protect signal;If it is determined that there is default protection signal in protection signal in the first preset time period, it is determined that fault trip class Type trips for reclosing.
Further, after determining that fault trip type is reclosing tripping, the above method further includes:When obtaining current The first historical current data and the second historical current data at continuous two moment before quarter;Judge the first historical current data and Whether the second historical current data are less than the first pre-set threshold value;If it is determined that the first historical current data and the second historical current number According to the first history switching signal less than the first pre-set threshold value, then obtained before current time in the second preset time period;Judge It whether there is the second preset switches signal in first history switching signal, wherein the second preset switches signal is for characterizing distribution Switchgear on circuit is in "on" position;If it is determined that there are the second preset switches signal in the first history switching signal, Then judge to get in the second history switching signal got after the second preset switches signal whether have for the first time Two preset switches signals;If it is determined that there is the second preset switches signal in the second history switching signal, it is determined that failure is jumped Lock type trips for transmission test.
Further, judging whether the first historical current data and the second historical current data are less than the first pre-set threshold value Later, the above method further includes:If it is determined that the first historical current data are more than the first pre-set threshold value, and the second historical current number According to less than the first pre-set threshold value, then at the time of the first historical current data correspondences centered on the moment, and obtain central instant The third historical current data and the 4th historical current data at two adjacent moment;Judge third historical current data and the 4th Whether historical current data are less than the first pre-set threshold value;If it is determined that third historical current data and the 4th historical current data are small In the first pre-set threshold value, it is determined that fault trip type trips for transmission test.
Further, after determining that fault trip type is reclosing tripping, the above method further includes:When obtaining current Before or after quarter in third preset time period, there are the quantity of the switching signal of the first preset switches signal;Judging quantity is It is no to be greater than or equal to preset quantity;If it is determined that quantity is greater than or equal to preset quantity, then judge in third preset time period Whether current data is less than the second pre-set threshold value;If it is determined that the current data in third preset time period is less than the second default valve Value, it is determined that fault trip type trips for transmission test.
Further, after determining that fault trip type is reclosing tripping, the above method further includes:When judging current It carves and whether there is the corresponding service information of the first preset switches signal;If it is determined that current time, there are service informations, it is determined that Fault trip type trips for transmission test.
Further, after determining that fault trip type is transmission test tripping, the above method further includes:Judge current It whether there is the second preset switches signal in third history switching signal before moment in the 4th preset time period;If it is determined that There are the second preset switches signal in third history switching signal, then after judging that first time gets the second preset switches signal Whether there is the second preset switches signal in the 4th history switching signal got;If it is determined that the 4th history switching signal In exist the second preset switches signal, it is determined that fault trip type be trial line charging tripping.
Further, after determining that fault trip type is transmission test tripping, the above method further includes:Judge current Whether the historical current data before the moment in the 5th preset time period are less than third pre-set threshold value;If it is determined that the 5th it is default when Between historical current data in section be less than third pre-set threshold value, then judge the 4th before current time in the 6th preset time period Whether there is the second preset switches signal in history switching signal;If it is determined that having second in the 4th history switching signal Preset switches signal, it is determined that fault trip type trips for extension wire.
Further, after determining that fault trip type is reclosing tripping, the above method further includes:It is pre- to obtain first If the corresponding reclosing result of switching signal, wherein reclosing result carries out reclosing operation for characterizing switching devices; In the case that reclosing result is reclosing success, determine that fault trip type trips for reclosing success;In reclosing result In the case of for unsuccessful reclosing, determine that fault trip type trips for unsuccessful reclosing.
Further, after determining the corresponding fault trip type of distribution line, the above method further includes:Obtain first The preset switches signal corresponding trip time, wherein the trip time is for characterizing the time for receiving the first preset switches signal; In the case where reclosing result is reclosing success, the difference of reclosure time and trip time is obtained, distribution line is obtained Corresponding tripping duration, wherein reclosure time is used to characterize the time that switching devices carry out reclosing operation;In reclosing As a result in the case of being unsuccessful reclosing, according to the difference of recovery time and trip time, the corresponding tripping of distribution line is obtained Duration, wherein recovery time include it is following any one:From current time to get restore after first current data it Afterwards, the time of the second preset switches signal is got;From current time to get after restoring in the 7th preset time period the Before one current data is restored, the time of the second preset switches signal is got;From current time to after getting recovery The time of first current data.
Further, according to the difference of recovery time and trip time, the corresponding tripping duration of distribution line is obtained, is wrapped It includes:Judge whether recovery time is less than preset value;If it is determined that recovery time is less than or equal to preset value, then reclosure time is obtained With the difference of trip time, tripping duration is obtained;If it is determined that recovery time is more than preset value, then recovery time and tripping are obtained The difference of time obtains tripping duration.
Another aspect according to the ... of the embodiment of the present invention additionally provides a kind of failure of distribution line and studies and judges device, including:It obtains Modulus block, for obtain distribution line current time remote signals and telemetry, wherein remote signals include:Switch Signal and protection signal, telemetry include:Current data;Determining module, for according to remote signals and telemetry, determining The corresponding fault trip type of distribution line, wherein fault trip type includes one of following:Reclosing tripping, transmission test Tripping, trial line charging tripping and extension wire tripping.
Another aspect according to the ... of the embodiment of the present invention, additionally provides a kind of storage medium, and storage medium includes the journey of storage Sequence, wherein equipment where controlling storage medium when program is run executes the failure analysis method of above-mentioned distribution line.
Another aspect according to the ... of the embodiment of the present invention additionally provides a kind of processor, and processor is used to run program, In, program executes the failure analysis method of above-mentioned distribution line when running.
In embodiments of the present invention, remote signals and telemetry of the distribution line at current time are obtained, according to remote signalling Signal and telemetry determine the corresponding fault trip type of distribution line, to realize to the fault trip of distribution line into The purpose of row comprehensive judgement disclosure satisfy that the demand of judgement fault trip, in order to grasp distribution in time compared with prior art Line tripping situation, realization can targetedly assist carrying out power distribution network production maintenance work, to reach raising distribution The accuracy rate of the fault trip judgement of circuit, improves the technique effect of distribution network circuit reliability, and has when calculating, Occupying system resources are few, low to CPU and request memory, and the advantages of support automatic and manual calculations, and then solve distribution wire The low technical problem of accuracy rate of the fault trip judgement on road.
Description of the drawings
Attached drawing described herein is used to provide further understanding of the present invention, and is constituted part of this application, this hair Bright illustrative embodiments and their description are not constituted improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the failure analysis method of distribution line according to the ... of the embodiment of the present invention;
Fig. 2 is a kind of schematic diagram of the fault type of optional distribution line according to the ... of the embodiment of the present invention;
Fig. 3 is a kind of flow chart of the failure analysis method of optional distribution line according to the ... of the embodiment of the present invention;And
Fig. 4 is that a kind of failure of distribution line according to the ... of the embodiment of the present invention studies and judges the schematic diagram of device.
Specific implementation mode
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The every other embodiment that member is obtained without making creative work should all belong to the model that the present invention protects It encloses.
It should be noted that term " first " in description and claims of this specification and above-mentioned attached drawing, " Two " etc. be for distinguishing similar object, without being used to describe specific sequence or precedence.It should be appreciated that using in this way Data can be interchanged in the appropriate case, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover It includes to be not necessarily limited to for example, containing the process of series of steps or unit, method, system, product or equipment to cover non-exclusive Those of clearly list step or unit, but may include not listing clearly or for these processes, method, product Or the other steps or unit that equipment is intrinsic.
Embodiment 1
According to embodiments of the present invention, a kind of embodiment of the failure analysis method of distribution line is provided, needs to illustrate It is that step shown in the flowchart of the accompanying drawings can execute in the computer system of such as a group of computer-executable instructions, Also, although logical order is shown in flow charts, and it in some cases, can be to be executed different from sequence herein Shown or described step.
Fig. 1 is a kind of flow chart of the failure analysis method of distribution line according to the ... of the embodiment of the present invention, as shown in Figure 1, This method comprises the following steps:
Step S102, remote signals and telemetry of the acquisition distribution line at current time, wherein remote signals packet It includes:Switching signal and protection signal, telemetry include:Current data.
Specifically, above-mentioned remote signals can be " separating brake " of the switchgear on distribution line, " combined floodgate " action pair The switching signal and protection act status signal (i.e. above-mentioned protection signal) answered;Above-mentioned telemetry can pass through biography Sensor remote collection to distribution line on switchgear real time data, in embodiments of the present invention, to acquire electric current number It is described in detail for.
Step S104 determines the corresponding fault trip type of distribution line according to remote signals and telemetry, wherein Fault trip type includes one of following:Reclosing tripping, transmission test tripping, trial line charging tripping and extension wire tripping.
Specifically, as shown in Fig. 2, can in advance by the fault trip of distribution line be divided into generic failure tripping it is (i.e. above-mentioned Reclosing tripping), transmission test tripping, trial line charging tripping and extension wire trip four classes, wherein generic failure trip again It is divided into reclosing success tripping and reclosing two classes of unsuccessful tripping;Transmission test tripping refers to the distribution line and is carrying out transmission examination Test the tripping that switch is generated with protection act caused by operation;Trial line charging tripping refers to the distribution line and draws in progress trial line charging operation The tripping that the switch risen is generated with protection act;Extension wire tripping refers to switch caused by extension wire switching and is produced with protection act Raw tripping.
In a kind of optional scheme, can the fault trip of distribution line be divided into generic failure tripping, transmission in advance Experiment tripping, trial line charging tripping and extension wire four classes of tripping, and pass through the switch remote signals associated by distribution line, protect Shield acts remote signals and the telemetering of current data of circuit are calculated, comprehensive judgement tripping type.
In the above embodiment of the present invention, remote signals and telemetry of the distribution line at current time are obtained, according to Remote signals and telemetry determine the corresponding fault trip type of distribution line, to realize that the failure to distribution line is jumped Lock carries out the purpose of comprehensive judgement, compared with prior art, the demand of judgement fault trip is disclosure satisfy that, in order to grasp in time Distribution line trip condition, realization can be assisted targetedly carrying out power distribution network production maintenance work, be improved to reach The accuracy rate of the fault trip judgement of distribution line, improves the technique effect of distribution network circuit reliability, and have and counting When calculation, occupying system resources are few, low to CPU and request memory, and the advantages of support automatic and manual calculations, and then solve and match The low technical problem of accuracy rate of the fault trip judgement of electric line.
Optionally, in the above embodiment of the present invention, step S104 determines distribution wire according to remote signals and telemetry The corresponding fault trip type in road, including:
Step S1042 judges to whether there is the first preset switches signal in the switching signal at current time, wherein first The switchgear that preset switches signal is used to characterize on distribution line is in gate-dividing state.
Specifically, the first above-mentioned preset switches signal can refer to that the switchgear on distribution line is in separating brake shape State, namely the corresponding signal in the position of the switch in " separating brake ", show occur trip condition on distribution line.
Step S1044, if it is determined that there are the first preset switches signal in the switching signal at current time, then judge first It whether there is the corresponding default protection signal of the first preset switches signal in protection signal in preset time period.
Specifically, the first above-mentioned preset time period can be 1 minute;Above-mentioned default protection signal can be distribution wire The data of any one protection act measuring point on the road.
Step S1046, if it is determined that there is default protection signal in the protection signal in the first preset time period, it is determined that Fault trip type trips for reclosing.
In a kind of optional scheme, since the switchgear on distribution line is more, any one switchgear is in Gate-dividing state can all cause distribution line trip condition occur, the switching signal on distribution line can be acquired in real time, when some There is the switching signal of " separating brake " on time point, and in 1 minute at the time point, there are corresponding protection signals, then can be with Judge that the fault trip type of distribution line trips for generic failure.
Optionally, in the above embodiment of the present invention, in step S1046, determine that fault trip type is that reclosing trips it Afterwards, this method further includes:
Step S106 obtains the first historical current data and the second historical current at continuous two moment before current time Data.
Specifically, the first above-mentioned historical current data and the second historical current data can be continuous two moment acquisitions The current value arrived is used only for distinguishing the current value of two different moments, not limited specifically it, for example, first goes through History current data can be first moment collected current value, and the second historical current data can be second moment acquisition The current value arrived;Alternatively, the first historical current data can be second moment collected current value, the second historical current number According to can be first moment collected current value.
Step S108, judges whether the first historical current data and the second historical current data are less than the first pre-set threshold value.
Specifically, the first above-mentioned pre-set threshold value may include main transformer threshold values and circuit threshold values, wherein main transformer threshold values is 2A, circuit threshold values are 1A.
Step S110, if it is determined that the first historical current data and the second historical current data are less than the first pre-set threshold value, Then obtain the first history switching signal in the second preset time period before current time.
Specifically, the second above-mentioned preset time period can be 15 minutes.
Step S112 judges to whether there is the second preset switches signal in the first history switching signal, wherein second is default The switchgear that switching signal is used to characterize on distribution line is in "on" position.
Specifically, the second above-mentioned preset switches signal can refer to that the switchgear on distribution line is in combined floodgate shape State, namely the corresponding signal in the position of the switch in " combined floodgate ".
Step S114, if it is determined that there are the second preset switches signal in the first history switching signal, then judge for the first time It gets in the second history switching signal got after the second preset switches signal and whether there is the second preset switches letter Number.
Step S116, if it is determined that there is the second preset switches signal in the second history switching signal, it is determined that failure Tripping type trips for transmission test.
Specifically, if after getting " combined floodgate " signal, corresponding " combined floodgate " signal can be got always, then may be used To determine the final state of the switchgear for " combined floodgate " state.
In a kind of optional scheme, transmission test tripping judgement is carried out on the basis of generic failure tripping judges , can include a variety of judgment modes, in the first judgment mode, it can be determined that distribution line is at the time point tripped Whether collected current value of continuous two time points is less than corresponding threshold values before, while before the time point tripped There is " combined floodgate " signal and final state in 15 minutes is " combined floodgate " state, is determined as that transmission test trips if setting up, no It is not then transmission test tripping.
Optionally, in the above embodiment of the present invention, in step S108, judge the first historical current data and the second history electricity Whether flow data is less than after the first pre-set threshold value, and this method further includes:
Step S118, if it is determined that the first historical current data are more than the first pre-set threshold value, and the second historical current data More than the first pre-set threshold value, then at the time of the first historical current data correspondences centered on the moment, and obtain central instant phase The third historical current data and the 4th historical current data at two adjacent moment.
Specifically, two adjacent moment of above-mentioned central instant can be central instant before and after two when It carves, third historical current data and the 4th historical current data are also used only for distinguishing the current value of two different moments, but right It is not especially limited.
Step S120, judges whether third historical current data and the 4th historical current data are less than the first pre-set threshold value.
Step S122, if it is determined that third historical current data and the 4th historical current data are less than the first pre-set threshold value, Then determine that fault trip type trips for transmission test.
In a kind of optional scheme, in second of judgment mode of transmission test tripping, sentence in generic failure tripping On the basis of disconnected, it can further judge whether continuous two time points acquire distribution line before the time point tripped The current value arrived is less than corresponding threshold values, if there are one the current values at time point to be more than the threshold values, can be made with the time point Centered on point, then judge again former and later two moment of central point collected electric current whether be less than the threshold values, if set up if sentence It is set to transmission test tripping, is not otherwise transmission test tripping.
Optionally, in the above embodiment of the present invention, in step S1046, determine that fault trip type is that reclosing trips it Afterwards, this method further includes:
Step S124, before or after acquisition current time in third preset time period, there are the first preset switches signals Switching signal quantity.
Specifically, above-mentioned third preset time period can be 1 hour.
Step S126, judges whether quantity is greater than or equal to preset quantity.
Specifically, above-mentioned preset quantity can be 2 times.
Step S128, if it is determined that quantity is greater than or equal to preset quantity, then judges the electric current in third preset time period Whether data are less than the second pre-set threshold value.
Specifically, the second above-mentioned pre-set threshold value can be 3A.
Step S130, if it is determined that the current data in third preset time period is less than the second pre-set threshold value, it is determined that therefore Hinder tripping type to trip for transmission test.
In a kind of optional scheme, in the third judgment mode of transmission test tripping, sentence in generic failure tripping On the basis of disconnected, it can further judge that whether occurring 2 times or more within a front/rear hour at the time point tripped jumps Lock, and collected current value is less than 3A during this, is determined as that transmission test trips if setting up, and is not otherwise transmission examination Test tripping.
Optionally, in the above embodiment of the present invention, in step S1046, determine that fault trip type is that reclosing trips it Afterwards, this method further includes:
Step S132 judges that current time whether there is the corresponding service information of the first preset switches signal.
Specifically, above-mentioned service information can be that operation maintenance personnel fills in distribution line or main transformer progress inspection and repair shop Repair ticket.
Step S134, if it is determined that current time, there are service informations, it is determined that fault trip type is jumped for transmission test Lock.
In a kind of optional scheme, in the third judgment mode of transmission test tripping, sentence in generic failure tripping On the basis of disconnected, it can further judge that the circuit/main transformer whether there is the repair ticket at the time point, if there is repair ticket, then It is determined as that transmission test trips, is not otherwise transmission test tripping.
Optionally, in the above embodiment of the present invention, in step S116, step S122, step S130 or step S134, really It is after transmission test trips to determine fault trip type, and this method further includes:
Step S136 whether there is in the third history switching signal before judging current time in the 4th preset time period Second preset switches signal.
Specifically, the 4th above-mentioned preset time period can be 5 seconds.
Step S138, if it is determined that there are the second preset switches signal in third history switching signal, then judge for the first time It gets in the 4th history switching signal got after the second preset switches signal and whether there is the second preset switches letter Number.
Step S140, if it is determined that there is the second preset switches signal in the 4th history switching signal, it is determined that failure Tripping type trips for trial line charging.
Specifically, if after getting " combined floodgate " signal, corresponding " combined floodgate " signal can be got always, then may be used To determine the final state of the switchgear for " combined floodgate " state.
In a kind of optional scheme, trial line charging tripping judges to carry out on the basis of transmission test tripping judges, It may determine that and whether there is " combined floodgate " data in 5 seconds before the time point tripped, and the final state of switchgear It " does not close a floodgate " state, is determined as that trial line charging trips if setting up, be not otherwise trial line charging tripping.
Optionally, in the above embodiment of the present invention, in step S116, step S122, step S130 or step S134, really It is after transmission test trips to determine fault trip type, and this method further includes:
Step S142, it is pre- whether the historical current data before judging current time in the 5th preset time period are less than third If threshold values.
Specifically, the 5th above-mentioned preset time period can be 2 days;Above-mentioned third pre-set threshold value can be preset Some threshold values, for example, 1A.
Step S144, if it is determined that the historical current data in the 5th preset time period are less than third pre-set threshold value, then sentence Whether there is the second preset switches signal in the 4th history switching signal before disconnected current time in the 6th preset time period.
Specifically, the 6th above-mentioned preset time period can be 1 day.
Step S146, if it is determined that there is the second preset switches signal in the 4th history switching signal, it is determined that failure Tripping type trips for extension wire.
In a kind of optional scheme, extension wire tripping judge to be carried out on the basis of transmission test tripping judges , it can be determined that before the time point tripped in 2 days, whether collected current value is always less than 1A, and (maximum value is small In 1A), and the previous day switchgear is all " combined floodgate " state (state being not turned off), is determined as siding if setting up Road is tripped, and is not otherwise extension wire tripping.
Optionally, in the above embodiment of the present invention, in step S1046, determine that fault trip type is that reclosing trips it Afterwards, this method further includes:
Step S148 obtains the corresponding reclosing result of the first preset switches signal, wherein reclosing result is for characterizing Switching devices carry out reclosing operation.
Specifically, above-mentioned reclosing result can be the judgement result of reclosing operation.
Step S150, reclosing result be reclosing success in the case of, determine fault trip type be reclosing at Work(trips.
Step S152 determines that fault trip type is lost for reclosing in the case where reclosing result is unsuccessful reclosing Lose tripping.
It, can after the fault trip type for determining distribution line is generic failure tripping in a kind of optional scheme Further to be judged according to reclosing as a result, dividing into reclosing success tripping and the unsuccessful tripping of reclosing, that is, if Reclosing judges that result is reclosing success, then can be determined as reclosing success tripping;If reclosing judgement result is attached most importance to It closes a floodgate unsuccessful, then can be determined as the unsuccessful tripping of reclosing.
Optionally, in the above embodiment of the present invention, in step S104, determine the corresponding fault trip type of distribution line it Afterwards, this method further includes:
Step S154 obtains the first preset switches signal corresponding trip time, wherein the trip time receives for characterizing To the time of the first preset switches signal.
Specifically, the above-mentioned trip time is the time that distribution line trips, and collected can be opened in the time Pass equipment is the corresponding signal of " separating brake " state.
Step S156 obtains reclosure time and trip time in the case where reclosing result is reclosing success Difference obtains the corresponding tripping duration of distribution line, wherein reclosure time carries out reclosing behaviour for characterizing switching devices The time of work.
Step S158, in the case where reclosing result is unsuccessful reclosing, according to the difference of recovery time and trip time Value, obtains the corresponding tripping duration of distribution line, wherein recovery time include it is following any one:From current time to acquisition After first current data after to recovery, the time of the second preset switches signal is got;From current time to getting Before first current data after restoring in 7th preset time period is restored, the time of the second preset switches signal is got; From current time to the time for getting first current data after restoring.
Specifically, the 7th above-mentioned preset time period can be 15 days.
In a kind of optional scheme, after judgement distribution line failure tripping, line tripping duration can also be calculated, Specifically, it if reclosing success, trips duration=reclosure time-trip time;If reclosing is unsuccessful, trip Duration=trip time recovery time-, wherein recovery time can click several rule-likes and be calculated:
The first rule:After the current value at a nearest time point restores normal after tripping, it can will adopt Collect the time of the corresponding signal of " combined floodgate " state of a nearest switchgear as recovery time;
Second of rule:First electric current recovery normal time in 15 days after tripping is calculated, it can will be at this The time of the corresponding signal of " combined floodgate " state of a collected nearest switchgear is as recovery time before time;
The third rule:If not the time of the corresponding signal of " combined floodgate " state of switchgear, can will send out Collected first current value restores the normal time as recovery time after raw tripping.
Optionally, in the above embodiment of the present invention, step S158 is obtained according to the difference of recovery time and trip time The corresponding tripping duration of distribution line, including:
Step S1582, judges whether recovery time is less than preset value.
Specifically, above-mentioned preset value can be 30 seconds.
Step S1584, if it is determined that recovery time is less than or equal to preset value, then obtains reclosure time and trip time Difference obtains tripping duration.
Step S1586, if it is determined that recovery time is more than preset value, then obtains the difference of recovery time and trip time, Obtain tripping duration.
In a kind of optional scheme, if reclosing is unsuccessful, and the recovery time being calculated is less than 30 seconds, then may be used With direct determining tripping duration=reclosure time-trip time;If reclosing is unsuccessful and recovery time for being calculated It is longer, then it can determine tripping duration=trip time recovery time-.
Fig. 3 is a kind of flow chart of the failure analysis method of optional distribution line according to the ... of the embodiment of the present invention, below A kind of preferred embodiment of the present invention is described in detail in conjunction with Fig. 3, as shown in figure 3, this method may include:Acquire remote signalling Signal (including switch division and protection act), judges whether switch is " dividing ", if it is, it is determined as that generic failure trips, And further judge whether reclosing succeeds, if it succeeds, being determined as that reclosing success trips, and calculate generic failure tripping Duration;If it fails, being then determined as the unsuccessful tripping of reclosing, and calculate generic failure tripping duration.Determining general event After barrier tripping, further it can judge that transmission test trips by judging whether to meet either condition:Preceding 2 electric currents are sentenced Disconnected (whether the current value of 2 points is both less than threshold values i.e. before interpretation), central point electric current judges (i.e. by the current value in preceding 2 points More than point centered on the point of threshold values, and judge whether the current value of former and later two points of central point is both less than threshold values) and whether There are repair tickets, when judging to meet either condition, are determined as that transmission test trips.Judging that transmission test trips it Afterwards, it can be determined that switched in 5 seconds whether division (judge to switch in 5 seconds and whether close a floodgate, and end-state be "on" position), such as Fruit meets, then is determined as that trial line charging trips, and calculates trial line charging tripping duration, if conditions are not met, then calculating transmission test tripping Duration;Furthermore it is possible to judge that electric current is always less than threshold values 1A in first 2 days, and the previous day is all "on" position, if it is satisfied, then It is determined as that extension wire trips, and calculates extension wire tripping duration, if conditions are not met, then calculates transmission test tripping duration.
Specifically, if reclosing success, trip duration=reclosure time-tripping time of origin;If reclosing is not Success, then calculate recovery time first, if recovery time is less than 30 seconds, the duration=reclosure time that trips-tripping occurs Time, otherwise, trip duration=recovery time-tripping time of origin, wherein recovery time can be nearest after tripping After the electric current at one time point restores, the time that a nearest switch closes, and can be before first electric current restores in 15 days, A nearest switch closes the time, first electric current recovery time is can also be, if recovery time.
Through the above scheme, by the way that distribution line failure tripping is divided into generic failure tripping, transmission test tripping, tries to send Electric tripping and extension wire four classes of tripping, and pass through the switch remote signals associated by distribution line, protection act remote signalling letter Number and circuit telemetering of current data calculated and make tripping type comprehensive judgement, in order to be jumped to distribution network line Lock situation is controlled in time, can targetedly assist carrying out power distribution network production maintenance work, to further increase power distribution network Circuit reliability.And require, when calculating, have occupying system resources few, it is low to CPU and request memory, and support it is automatic and The characteristics of manual calculations.
Embodiment 2
According to embodiments of the present invention, the embodiment that a kind of failure of distribution line studies and judges device is provided.
Fig. 4 is that a kind of failure of distribution line according to the ... of the embodiment of the present invention studies and judges the schematic diagram of device, as shown in figure 4, The device includes:
Acquisition module 42, for obtain distribution line current time remote signals and telemetry, wherein remote signalling believe Number include:Switching signal and protection signal, telemetry include:Current data.
Specifically, above-mentioned remote signals can be " separating brake " of the switchgear on distribution line, " combined floodgate " action pair The switching signal and protection act status signal (i.e. above-mentioned protection signal) answered;Above-mentioned telemetry can pass through biography Sensor remote collection to distribution line on switchgear real time data, in embodiments of the present invention, to acquire electric current number It is described in detail for.
Determining module 44, for according to remote signals and telemetry, determining the corresponding fault trip type of distribution line, Wherein, fault trip type includes one of following:Reclosing tripping, transmission test tripping, trial line charging tripping and extension wire are jumped Lock.
Specifically, as shown in Fig. 2, can in advance by the fault trip of distribution line be divided into generic failure tripping it is (i.e. above-mentioned Reclosing tripping), transmission test tripping, trial line charging tripping and extension wire trip four classes, wherein generic failure trip again It is divided into reclosing success tripping and reclosing two classes of unsuccessful tripping;Transmission test tripping refers to the distribution line and is carrying out transmission examination Test the tripping that switch is generated with protection act caused by operation;Trial line charging tripping refers to the distribution line and draws in progress trial line charging operation The tripping that the switch risen is generated with protection act;Extension wire tripping refers to switch caused by extension wire switching and is produced with protection act Raw tripping.
In a kind of optional scheme, can the fault trip of distribution line be divided into generic failure tripping, transmission in advance Experiment tripping, trial line charging tripping and extension wire four classes of tripping, and pass through the switch remote signals associated by distribution line, protect Shield acts remote signals and the telemetering of current data of circuit are calculated, comprehensive judgement tripping type.
In the above embodiment of the present invention, remote signals and telemetry of the distribution line at current time are obtained, according to Remote signals and telemetry determine the corresponding fault trip type of distribution line, to realize that the failure to distribution line is jumped Lock carries out the purpose of comprehensive judgement, compared with prior art, the demand of judgement fault trip is disclosure satisfy that, in order to grasp in time Distribution line trip condition, realization can be assisted targetedly carrying out power distribution network production maintenance work, be improved to reach The accuracy rate of the fault trip judgement of distribution line, improves the technique effect of distribution network circuit reliability, and have and counting When calculation, occupying system resources are few, low to CPU and request memory, and the advantages of support automatic and manual calculations, and then solve and match The low technical problem of accuracy rate of the fault trip judgement of electric line.
Embodiment 3
According to embodiments of the present invention, a kind of embodiment of storage medium is provided, storage medium includes the program of storage, In, equipment where controlling storage medium when program is run executes the failure analysis method of the distribution line in above-described embodiment 1.
Embodiment 4
According to embodiments of the present invention, a kind of embodiment of processor is provided, processor is for running program, wherein journey The failure analysis method of the distribution line in above-described embodiment 2 is executed when sort run.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
In the above embodiment of the present invention, all emphasizes particularly on different fields to the description of each embodiment, do not have in some embodiment The part of detailed description may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, for example, the unit division, Ke Yiwei A kind of division of logic function, formula that in actual implementation, there may be another division manner, such as multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module It connects, can be electrical or other forms.
The unit illustrated as separating component may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, you can be located at a place, or may be distributed over multiple On unit.Some or all of unit therein can be selected according to the actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also It is that each unit physically exists alone, it can also be during two or more units be integrated in one unit.Above-mentioned integrated list The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can be stored in a computer read/write memory medium.Based on this understanding, technical scheme of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes:USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can to store program code Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (14)

1. a kind of failure analysis method of distribution line, which is characterized in that including:
Obtain distribution line current time remote signals and telemetry, wherein the remote signals include:Switching signal And protection signal, the telemetry include:Current data;
According to the remote signals and the telemetry, the corresponding fault trip type of the distribution line is determined, wherein institute It includes one of following to state fault trip type:Reclosing tripping, transmission test tripping, trial line charging tripping and extension wire tripping.
2. according to the method described in claim 1, it is characterized in that, according to the remote signals and the telemetry, determine The corresponding fault trip type of the distribution line, including:
Judge to whether there is the first preset switches signal in the switching signal at the current time, wherein described first default opens The switchgear that OFF signal is used to characterize on the distribution line is in gate-dividing state;
If it is determined that there are the first preset switches signal in the switching signal at the current time, then judge first it is default when Between whether there is the corresponding default protection signal of the first preset switches signal in protection signal in section;
If it is determined that in protection signal in first preset time period, there are the default protection signals, it is determined that it is described therefore Hinder tripping type to trip for the reclosing.
3. according to the method described in claim 2, it is characterized in that, determining the fault trip type for reclosing jump After lock, the method further includes:
The first historical current data and the second historical current data at continuous two moment before obtaining the current time;
Judge whether the first historical current data and the second historical current data are less than the first pre-set threshold value;
If it is determined that the first historical current data and the second historical current data are less than first pre-set threshold value, then Obtain the first history switching signal in the second preset time period before the current time;
Judge to whether there is the second preset switches signal in the first history switching signal, wherein second preset switches The switchgear that signal is used to characterize on the distribution line is in "on" position;
If it is determined that there are the second preset switches signal in the first history switching signal, then judge to get for the first time Whether there are second preset switches in the second history switching signal got after the second preset switches signal Signal;
If it is determined that there is the second preset switches signal in the second history switching signal, it is determined that the failure is jumped Lock type trips for the transmission test.
4. according to the method described in claim 3, it is characterized in that, judging the first historical current data and described second Whether historical current data are less than after the first pre-set threshold value, and the method further includes:
If it is determined that the first historical current data are more than first pre-set threshold value, and the second historical current data are small In first pre-set threshold value, then at the time of the first historical current data correspondences centered on the moment, and obtain described in The third historical current data and the 4th historical current data at two adjacent moment of central instant;
Judge whether the third historical current data and the 4th historical current data are less than first pre-set threshold value;
If it is determined that the third historical current data and the 4th historical current data are less than first pre-set threshold value, then Determine that the fault trip type trips for the transmission test.
5. according to the method described in claim 2, it is characterized in that, determining the fault trip type for reclosing jump After lock, the method further includes:
It obtains before or after the current time in third preset time period, there are the switches of the first preset switches signal The quantity of signal;
Judge whether the quantity is greater than or equal to preset quantity;
If it is determined that the quantity is greater than or equal to the preset quantity, then the electric current number in the third preset time period is judged According to whether less than the second pre-set threshold value;
If it is determined that the current data in the third preset time period is less than second pre-set threshold value, it is determined that the failure Tripping type trips for the transmission test.
6. according to the method described in claim 2, it is characterized in that, determining the fault trip type for reclosing jump After lock, the method further includes:
Judge that the current time whether there is the corresponding service information of the first preset switches signal;
If it is determined that the current time, there are the service informations, it is determined that the fault trip type is the transmission test Tripping.
7. the method according to any one of claim 3 to 6, which is characterized in that determining the fault trip type After tripping for the transmission test, the method further includes:
It is default with the presence or absence of second in third history switching signal before judging the current time in the 4th preset time period Switching signal;
If it is determined that there are the second preset switches signal in the third history switching signal, then judge to get for the first time Whether there are second preset switches in the 4th history switching signal got after the second preset switches signal Signal;
If it is determined that there is the second preset switches signal in the 4th history switching signal, it is determined that the failure is jumped Lock type trips for the trial line charging.
8. the method according to any one of claim 3 to 6, which is characterized in that determining the fault trip type After tripping for the transmission test, the method further includes:
Whether the historical current data before judging the current time in the 5th preset time period are less than third pre-set threshold value;
If it is determined that the historical current data in the 5th preset time period are less than the third pre-set threshold value, then described in judgement Whether there is the second preset switches signal in the 4th history switching signal before current time in the 6th preset time period;
If it is determined that there is the second preset switches signal in the 4th history switching signal, it is determined that the failure is jumped Lock type trips for the extension wire.
9. according to the method described in claim 2, it is characterized in that, determining the fault trip type for reclosing jump After lock, the method further includes:
Obtain the corresponding reclosing result of the first preset switches signal, wherein the reclosing result is for characterizing to institute It states switchgear and carries out reclosing operation;
In the case where the reclosing result is reclosing success, determine that the fault trip type is jumped for reclosing success Lock;
In the case where the reclosing result is unsuccessful reclosing, determine that the fault trip type is jumped for unsuccessful reclosing Lock.
10. according to the method described in claim 9, it is characterized in that, determining the corresponding fault trip class of the distribution line After type, the method further includes:
Obtain the first preset switches signal corresponding trip time, wherein the trip time receives institute for characterizing State the time of the first preset switches signal;
In the case where the reclosing result is reclosing success, the difference of reclosure time and the trip time is obtained, Obtain the corresponding tripping duration of the distribution line, wherein the reclosure time carries out the switchgear for characterizing The time of reclosing operation;
In the case where the reclosing result is unsuccessful reclosing, according to the difference of recovery time and the trip time, obtain To the corresponding tripping duration of the distribution line, wherein the recovery time include it is following any one:
After from the current time to first current data got after restoring, the second preset switches signal is got Time;
Before restoring from the current time to first current data got after restoring in the 7th preset time period, obtain To the time of the second preset switches signal;
From the current time to the time for getting first current data after restoring.
11. according to the method described in claim 10, it is characterized in that, according to the difference of recovery time and the trip time, The corresponding tripping duration of the distribution line is obtained, including:
Judge whether the recovery time is less than preset value;
If it is determined that the recovery time is less than or equal to the preset value, then the reclosure time and the trip time are obtained Difference, obtain the tripping duration;
If it is determined that the recovery time is more than the preset value, then the difference of the recovery time and the trip time are obtained Value, obtains the tripping duration.
12. a kind of failure of distribution line studies and judges device, which is characterized in that including:
Acquisition module, for obtain distribution line current time remote signals and telemetry, wherein the remote signals Including:Switching signal and protection signal, the telemetry include:Current data;
Determining module, for according to the remote signals and the telemetry, determining that the corresponding failure of the distribution line is jumped Lock type, wherein the fault trip type includes one of following:Reclosing tripping, transmission test tripping, trial line charging tripping and Extension wire trips.
13. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein run in described program When control the storage medium where equipment perform claim require the failure of the distribution line described in any one of 1 to 11 to study and judge Method.
14. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run Profit requires the failure analysis method of the distribution line described in any one of 1 to 11.
CN201810288973.8A 2018-04-03 2018-04-03 The failure analysis method and device of distribution line Pending CN108667004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810288973.8A CN108667004A (en) 2018-04-03 2018-04-03 The failure analysis method and device of distribution line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810288973.8A CN108667004A (en) 2018-04-03 2018-04-03 The failure analysis method and device of distribution line

Publications (1)

Publication Number Publication Date
CN108667004A true CN108667004A (en) 2018-10-16

Family

ID=63782035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810288973.8A Pending CN108667004A (en) 2018-04-03 2018-04-03 The failure analysis method and device of distribution line

Country Status (1)

Country Link
CN (1) CN108667004A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109490707A (en) * 2018-11-13 2019-03-19 国网江苏省电力有限公司南通供电分公司 The automatic analysis method of electric network fault tripping based on multidimensional multi-source grid operation data
CN113791304A (en) * 2021-08-23 2021-12-14 珠海许继芝电网自动化有限公司 Fault type and fault section identification method
CN114142445A (en) * 2021-11-26 2022-03-04 贵州电网有限责任公司 Electrical operation trial sending method for preventing fault amplification
CN114236372A (en) * 2021-11-18 2022-03-25 中核检修有限公司 Nuclear power station power distribution system running state monitoring device and method
CN116545124A (en) * 2023-07-07 2023-08-04 欧米勒电气有限公司 Digital intelligent switch cabinet comprehensive monitoring system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102937685A (en) * 2012-12-11 2013-02-20 上海市电力公司 Real-time simulation technique-based integrated testing platform for substation
CN105527541A (en) * 2016-01-18 2016-04-27 泰豪软件股份有限公司 Method for judging power distribution line fault tripping
CN105576661A (en) * 2016-03-14 2016-05-11 国网安徽省电力公司 Method for judging power distribution line maintenance and shutdown

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102937685A (en) * 2012-12-11 2013-02-20 上海市电力公司 Real-time simulation technique-based integrated testing platform for substation
CN105527541A (en) * 2016-01-18 2016-04-27 泰豪软件股份有限公司 Method for judging power distribution line fault tripping
CN105576661A (en) * 2016-03-14 2016-05-11 国网安徽省电力公司 Method for judging power distribution line maintenance and shutdown

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109490707A (en) * 2018-11-13 2019-03-19 国网江苏省电力有限公司南通供电分公司 The automatic analysis method of electric network fault tripping based on multidimensional multi-source grid operation data
CN113791304A (en) * 2021-08-23 2021-12-14 珠海许继芝电网自动化有限公司 Fault type and fault section identification method
CN113791304B (en) * 2021-08-23 2024-04-09 珠海许继芝电网自动化有限公司 Fault type and fault section identification method
CN114236372A (en) * 2021-11-18 2022-03-25 中核检修有限公司 Nuclear power station power distribution system running state monitoring device and method
CN114142445A (en) * 2021-11-26 2022-03-04 贵州电网有限责任公司 Electrical operation trial sending method for preventing fault amplification
CN114142445B (en) * 2021-11-26 2024-04-05 贵州电网有限责任公司 Electrical operation test-feeding method for preventing fault expansion
CN116545124A (en) * 2023-07-07 2023-08-04 欧米勒电气有限公司 Digital intelligent switch cabinet comprehensive monitoring system
CN116545124B (en) * 2023-07-07 2023-09-08 欧米勒电气有限公司 Digital intelligent switch cabinet comprehensive monitoring system

Similar Documents

Publication Publication Date Title
CN108667004A (en) The failure analysis method and device of distribution line
CN104766185B (en) Area power grid outage information based on grid power blackout characteristic studies and judges system and method
Su et al. Interconnected network state estimation using randomly delayed measurements
CN107872058A (en) Distribution network integrated protection method fusing self-healing of line
CN105527541B (en) A method of judgement distribution line failure tripping
CN104103019B (en) Operation risk assessment method and assessment system of power distribution network containing distributed power supply
CN107846011A (en) A kind of distribution network failure restoration methods based on main distribution Collaborative Control
CN201234124Y (en) Single-phase grounding failure wire selection automatic processing equipment for low current grounding system
CN104112076B (en) Operation risk assessment method and assessment system based on fuzzy mathematics
CN104166940B (en) Power distribution network operation risk assessment method and assessment system
CN106251599A (en) Remote control function test method and system for charge control electric energy meter
CN107015123B (en) A kind of accurate determination method of transmission line malfunction based on recorder data
US20140108851A1 (en) Online Protection Coordination for Distribution Management System
CN107294089A (en) A kind of intelligent association analysis and evaluation method towards grid event
CN110456234A (en) Fault arc detection method, device and system
CN105224667B (en) Multistation end fault diagnosis based on power grid intelligent monitoring information and aid decision-making method
CN106710164A (en) Power distribution network fault early warning method aiming at multiple factors
CN107508264A (en) A kind of site route protection does not have a power failure drive method
Kumar et al. Outage management system for power distribution network
CN108961472A (en) A kind of autonomous decision-making system of shared bicycle failure and method
CN105337314A (en) Multisource coordination control fault treatment method based on distributed power supply black start technology
JP2003090887A (en) Predication system and prediction method of instantaneous voltage drop by thunderbolt
CN106655128A (en) Partial power off control system of distribution network and distribution network system
CN112749920B (en) Non-fault area power supply recovery method, device, equipment and storage medium
CN111817265B (en) Low-voltage transformer area power distribution protection method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181016

WD01 Invention patent application deemed withdrawn after publication