Publication number
CN108661189A
CN108661189A CN201810759557.1A CN201810759557A CN108661189A CN 108661189 A CN108661189 A CN 108661189A CN 201810759557 A CN201810759557 A CN 201810759557A CN 108661189 A CN108661189 A CN 108661189A
Authority
CN
China
Prior art keywords
pole unit
unit
steel
plate
steel box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810759557.1A
Other languages
Chinese (zh)
Other versions
CN108661189B (en
Inventor
杨灵
冯先德
许名志
金军良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Changtian International Engineering Co Ltd
Original Assignee
Zhongye Changtian International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Changtian International Engineering Co Ltd filed Critical Zhongye Changtian International Engineering Co Ltd
Priority to CN201810759557.1A priority Critical patent/CN108661189B/en
Priority claimed from CN201810759557.1A external-priority patent/CN108661189B/en
Publication of CN108661189A publication Critical patent/CN108661189A/en
Application granted granted Critical
Publication of CN108661189B publication Critical patent/CN108661189B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/246Post to post connections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of steel box columns to splice node, including upper pole unit and lower pole unit, the connection unit for connecting the upper pole unit and lower pole unit is equipped between the upper pole unit and lower pole unit, one end of the connection unit is fixed in the inner wall of end of the lower pole unit, and the other end of the connection unit is higher by the lower pole unit and affixed with the inner wall of end of upper pole unit after the upper pole unit docking is inserted into.The invention also discloses the installation method that a kind of steel box column splices node, including pre-manufactured steel pole unit, lifting each unit, docks and be fixed temporarily, welding.The steel box column splicing node and its installation method of the present invention is suitable for resistance of super high-rise steel structures and bears the steel column of special load and the higher special steel of safe class, has many advantages, such as that safety economy is convenient, splicing accuracy is high, intensity is good, quality.

Description

A kind of steel box column splicing node and its installation method
Technical field
The invention belongs to structural engineering technical field more particularly to a kind of steel box column splicing node and its installation sides Method.
Background technology
As China's increasing environmental pollution, resource constraint enhancing, construction industry recruitment cost rise, tradition is labor-intensive Construction industry face transition pressure, green building and building industrialization are increasingly becoming the development trend of current building trade.Steel knot Structure is built with prefabrication, in-site installation, material high-strength light, transportation cost are low and green low-carbon environment-friendly is can be recycled Advantage is the optimum carrier of building industrialization.
Resistance of super high-rise steel structures, the pillar generally use for bearing special load and the higher extraordinary steel construction of safe class Steel box column, steel box column need to carry out merogenesis, factory's segmental machining, scene splicing, lifting according to site operation.Currently, China's steel building joint connection in site, such as column splices with column, beam and beam splicing, beam and column are connect still with site welding or bolt It welds based on Hybrid connections, presses more《More high-rise civil building steel structure node details of construction》(16G519) is selected, wherein such as Fig. 1 Shown in Fig. 3, steel box column splices the conventionally employed upper and lower otic placode 6 of node, is positioned using double plate bolt connecting mode, This traditional connection positioning is simple and practical for small bore steel column, for the steel box column in large-scale or super-huge section, due to Do not account for 6 welding deviation of lower ear plate and the adverse effect of the double plate changing of the relative positions, scene often occur segmented column dislocation up and down compared with Big problem causes steel box column splicing efficiency low, influences steel box column joining quality, secondly the soldering of stitching portion, steel Column section is put more energy into it is difficult to ensure that high quality completion, causes the stitching portion of column often to become structure short slab.
In addition, connection of the Zhong Yejianyan institutes for steel column on-site consolidation and column and beam in steel building, by upper and lower Node area is arranged in column, site welding is reduced, or avoid site welding completely by high-strength bolt connection, without using tradition splicing Being fixed temporarily for upper lower prop is realized by otic placode 6 and connecting plate 7 in node, but this application be mostly bear the industry of conventional load with Civilian steel building, steel box column section is smaller, does not account for putting more energy into inside column.For resistance of super high-rise steel structures, bear spy The steel column of different load and the higher extraordinary steel construction of safe class need to be set since its section is big (short side >=1.5m) in section Ribbed stiffener is set, and uses the splicing node, the processing of seam crossing ribbed stiffener is also it is contemplated that and for the special steel knot for bearing dynamic load Structure, such as derrick of copper-mine, steel structure bridge construction of structures require using level-one groove full penetration weld realize upper lower prop etc. it is strong Connection;According to《Code for acceptance of construction quality of steel structures》The I and II weld seam of GB50205 design requirement complete penetraction and fusion in weldings should use Ultrasonic examination carries out internal flaw inspection, when ultrasonic examination cannot judge defect, should use radiographic inspection, right Live joining quality proposes high requirement, is related to the scene splicing skill of the box arch of such steel construction building at present Art scheme almost without.
Invention content
The technical problem to be solved in the present invention is to overcome the shortcomings of the prior art, provide a kind of safety economy it is convenient, Splicing accuracy is high, intensity is good, quality and can effectively be directed to and bear special load and the higher extraordinary steel construction of safe class Steel box column splices node and its installation method.
In order to solve the above technical problems, technical solution proposed by the present invention is:
A kind of steel box column splices node, including upper pole unit and lower pole unit, the upper pole unit and lower pole unit it Between be equipped with connection unit for connecting the upper pole unit and lower pole unit, one end of the connection unit be fixed in it is described under The other end of the inner wall of end of pole unit, the connection unit is higher by the lower pole unit and is inserted into the upper pole unit docking It is affixed with the inner wall of end of upper pole unit afterwards.
Above-mentioned steel box column splices node, it is preferred that the connection unit is put more energy into including circumferential connecting plate, the first circumferential direction Rib and the second circumferential ribbed stiffener, the described second circumferential ribbed stiffener are arranged in parallel in the inside of the circumferential connecting plate, and described first Circumferential ribbed stiffener is vertically installed between the circumferential connecting plate and the second circumferential ribbed stiffener, the circumferential direction connecting plate, the first ring The connection unit of i shaped cross section is connected and composed to ribbed stiffener and the second circumferential ribbed stiffener.
Above-mentioned steel box column splices node, it is preferred that the described second circumferential ribbed stiffener encloses in the circumferential structure constituted Side is equipped with the manhole unit for entering inside steel box column for worker and carrying out operation.
Above-mentioned steel box column splices node, it is preferred that is equipped with and flushes on the upper pole unit and lower pole unit The plate mutual cooperation that is located by connecting of pole unit or the plate that is located by connecting of lower prop unit port, the upper pole unit and lower pole unit, The plate that is located by connecting is equipped with bolt hole, the mutually matched plate that is located by connecting after the upper pole unit and lower prop unit spliced Bolt hole in be equipped with and be located by connecting bolt.
Above-mentioned steel box column splices node, it is preferred that the lower pole unit includes polylith lower prop steel plate, under the polylith Affixed composition steel box column structure between column steel plate is arranged with multiple welded with lower prop ribbed stiffener on the inside of the lower prop steel plate.
Above-mentioned steel box column splices node, it is preferred that the upper pole unit includes polylith upper prop steel plate, on the polylith Affixed composition steel box column structure between column steel plate is arranged with multiple upper prop ribbed stiffeners on the inside of the upper prop steel plate.
Above-mentioned steel box column splices node, it is preferred that the lower end of the upper prop ribbed stiffener is reserved with single for the connection The bell socket that the end of member is inserted into, the bell socket match with the connection unit.
Above-mentioned steel box column splices node, it is preferred that on every column side of the upper pole unit and lower pole unit at least If there are one the plates that is located by connecting.
A kind of installation method of steel box column splicing node, includes the following steps,
S1, steel box column section and each element size, pre-processed upper pole unit, lower pole unit are selected according to calculating And connection unit, one end of connection unit is welded in the end of lower pole unit, and manhole unit is reserved in connection unit;
Pole unit on S2, lifting, the other end that the bell socket of upper pole unit is aligned to connection unit dock insertion;
The plate that is located by connecting of S3, upper pole unit and lower pole unit dock successively to be agreed with, and the bolt that will be located by connecting is inserted into docking Be located by connecting in plate and tighten fixation;
S4, the welding for carrying out pole unit and lower prop unit spliced seam crossing, are entered by manhole unit in steel box column Portion carries out the weld job of pole unit, lower pole unit and connection unit bell and spigot, by connection unit respectively with upper prop ribbed stiffener It is welded and fixed with welded with lower prop ribbed stiffener.
Above-mentioned installation method, the step S4 further include later step S5 and S6,
S5, the plate that is located by connecting is cut off, and completes whole weld seams;
S6, steel structure coating operation within the scope of weld seam and both sides is carried out, operation is spliced at steel box column scene up and down of completing.
Compared with the prior art, the advantages of the present invention are as follows:
The steel box column splicing node of the present invention, including upper pole unit, lower pole unit and connection unit, connection unit are affixed An end part for pole unit, upper pole unit are realized by being inserted into the connection unit exposed under the end of lower pole unit and exposing Docking, can well ensure the splicing precision and splicing intensity of upper pole unit and lower pole unit, and then improve the quality of splicing, realize The equal strong ties of steel box column top and the bottom have the advantages that safety, economic, convenient, steel box column of the invention splicing in addition Node is applicable not only to the industry that bearing load is more conventional, column section is smaller and is built with civilian steel, applies also for Super High steel knot The steel column of special load and the higher special steel of safe class is built and born to structure, as superelevation steel construction, derrick of copper-mine, Steel structure bridge etc., it is big (short side >=1.5m) in box-type section, it can still be adopted in the case that ribbed stiffener need to be set in section With the splicing node of the present invention, to realize the equal strong ties of column and column.
Description of the drawings
Fig. 1 is the elevation of the box-type section column scene splicing of the prior art in background technology.
Fig. 2 is schematic cross-sectional views of the Fig. 1 along the directions A-A.
Fig. 3 is schematic cross-sectional views of the Fig. 1 along the directions B-B.
Fig. 4 is the elevation of the steel box column splicing node of embodiment.
Fig. 5 is schematic cross-sectional views of the Fig. 4 along the directions C-C.
Fig. 6 is the partial enlarged view (upper pole unit and lower prop unit spliced state) of D in Fig. 4.
Marginal data:
1, upper pole unit;11, upper prop steel plate;12, upper prop ribbed stiffener;121, bell socket;2, lower pole unit;21, lower prop Steel plate;22, welded with lower prop ribbed stiffener;3, connection unit;31, circumferential connecting plate;32, the first circumferential ribbed stiffener;33, the second circumferential direction is put more energy into Rib;4, manhole unit;5, be located by connecting plate;51, be located by connecting bolt;6, otic placode;7, connecting plate.
Specific implementation mode
To facilitate the understanding of the present invention, the present invention is done below in conjunction with Figure of description and preferred embodiment more complete Face meticulously describes, but protection scope of the present invention is not limited to following specific examples.
As shown in Figures 4 to 6, the steel box column of the present embodiment splices node, including upper pole unit 1 and lower pole unit 2, on The connection unit 3 for connecting upper pole unit 1 and lower pole unit 2 is equipped between pole unit 1 and lower pole unit 2, connection unit 3 One end is fixed in the inner wall of end of lower pole unit 2, and the other end of connection unit 3 is higher by lower pole unit 2 and is docked in upper pole unit 1 It is affixed with the inner wall of end of upper pole unit 1 after insertion.Specifically, the other end of connection unit 3 expose 2 end 10 of lower pole unit~ 15cm.Upper pole unit 1 realizes docking by being inserted into the connection unit 3 exposed, can well ensure upper pole unit 1 and lower pole unit 2 Splicing precision and splicing intensity, and then improve the quality of splicing, realize the equal strong ties of steel box column top and the bottom.
In the present embodiment, connection unit 3 includes 32 and second circumferential ribbed stiffener of the 31, first circumferential ribbed stiffener of circumferential connecting plate 33, the second circumferential ribbed stiffener 33 is arranged in parallel in the inside of circumferential connecting plate 31, and the first circumferential ribbed stiffener 32 is vertically installed in ring To between connecting plate 31 and the second circumferential ribbed stiffener 33, circumferential 32 and second circumferential direction of ribbed stiffener of circumferential connecting plate 31, first is put more energy into Rib 33 connects and composes the connection unit 3 of i shaped cross section.The connection unit 3 of I-shaped circumferential direction stiffening rib structure, is on the one hand reduced The possibility of seam crossing stress concentration, on the other hand when structure bears sound load, the I-shaped circumferential direction of seam crossing is put more energy into Rib can increase the rigidity of column, reduce the possibility of local buckling, be particularly suitable for the steel column structure of heavy section.
In the present embodiment, the second circumferential ribbed stiffener 33 encloses to be equipped on the inside of the circumferential structure constituted enters box for worker The manhole unit 4 of operation is carried out inside steel column.Specifically, general bond length >=600mm, so as to worker enter box house into It can be passed through when the operations such as row welding, anti-corrosion.
In the present embodiment, it is equipped on upper pole unit 1 and lower pole unit 2 and flushes in 2 port of pole unit 1 or lower pole unit The plate 5 that is located by connecting, the mutual cooperation of plate 5 that is located by connecting of upper pole unit 1 and lower pole unit 2, the plate 5 that is located by connecting is equipped with bolt Hole, mutually matched be located by connecting in the bolt hole of plate 5 is equipped with the spiral shell that is located by connecting after upper pole unit 1 and the splicing of lower pole unit 2 Bolt 51.Specifically, the plate 5 that is located by connecting is made by angle steel.The plate 5 that is located by connecting is convenient for Dock With Precision Position and is fixed temporarily, The positioning in traditional otic placode splicing scheme between its column section is avoided to fix due to not accounting for upper lower ear plate welding partially Difference and the adverse effect of the double plate changing of the relative positions easily realize the Dock With Precision Position of upper pole unit 1 and lower pole unit 2 using the plate 5 that is located by connecting Be fixed temporarily, and then ensure follow-up weld job quality.
In the present embodiment, lower pole unit 2 includes polylith lower prop steel plate 21, affixed composition box between polylith lower prop steel plate 21 The inside of steel column structure, lower prop steel plate 21 is arranged with multiple welded with lower prop ribbed stiffener 22, and upper pole unit 1 includes polylith upper prop steel plate 11, affixed composition steel box column structure between polylith upper prop steel plate 11, the inside of upper prop steel plate 11 is arranged with multiple upper props and adds Strength rib 12.The strength and stiffness that longitudinal stiffener can guarantee lower pole unit 2 and upper pole unit 1 are set, Super High steel knot is suitable for The steel column of special load and the higher extraordinary steel construction of safe class is built, born to structure, such as superelevation steel construction, mine well Frame, steel structure bridge etc..
In the present embodiment, the lower end of upper prop ribbed stiffener 12 is reserved with the bell socket of the end insertion for connection unit 3 121, bell socket 121 matches with connection unit 3.Specifically, 12 lower end of upper prop ribbed stiffener corresponds to the position of circumferential connecting plate 31 It sets and is reserved with notch, notch size is corresponding with the size that circumferential connecting plate 31 is exposed.Bell socket 121 is set by upper pole unit 1 Upper prop ribbed stiffener 12 and the circumferential connecting plate 31 of connection unit 3 also account for, mutual socket joint cooperation is formed in structure Form, then in seam crossing welding, the structural strength of seam crossing is increased, bonding strength is improved, between realization column and column etc. Strong ties avoid traditional splicing seams intensity, insufficient rigidity this weak tendency, especially suitable for resistance of super high-rise steel structures, bear The steel column of special load and the higher extraordinary steel construction of safe class, such as superelevation steel construction, derrick of copper-mine, steel structural bridge Beam etc..
In the present embodiment, at least provided with the plate 5 that is located by connecting on every column side of upper pole unit 1 and lower pole unit 2.Often Column side, which is respectively provided with, is located by connecting plate 5 to ensure upper precise positioning between pole unit 1 and lower pole unit 2 and connection, prevents certain Deviation, which occurs, in the connection positioning of column side causes integrated connection positioning deviation occur.
The present embodiment additionally provides a kind of method of the above-mentioned steel box column splicing node of installation, includes the following steps,
S1, steel box column section and each element size, pre-processed upper pole unit 1, lower prop list are selected according to calculating One end of connection unit 3 is welded in the end of lower pole unit 2, and reserves manhole in connection unit 3 by member 2 and connection unit 3 Unit 4;
After S2, each component are transported to construction site, the bell socket 121 of upper pole unit 1 is aligned and connects by pole unit 1 in lifting The other end docking of order member 3 is inserted into;
The plate 5 that is located by connecting of S3, upper pole unit 1 and lower pole unit 2 dock successively to be agreed with, and the bolt 51 that will be located by connecting is inserted into Docking is located by connecting in plate 5 and tightens fixation, and pole unit 1 and lower pole unit 2 is fixed temporarily in realization;
S4, the groove full penetration welding for carrying out pole unit 1 and lower 2 post jamb of pole unit splicing seam crossing, pass through manhole list Member 4 enters the weld job that pole unit 1, lower pole unit 2 and 3 bell and spigot of connection unit are carried out inside steel box column, respectively will Upper prop ribbed stiffener 12 and welded with lower prop ribbed stiffener 22 are welded and fixed with 31 and first circumferential ribbed stiffener 32 of circumferential connecting plate;
S5, the plate 5 that is located by connecting for being fixed temporarily pole unit 1 and lower pole unit 2 is cut off, and completes whole weld seams, so far, Slitless connection, formation are whole for the edge joint position of upper pole unit 1 and lower pole unit 2;
S6, steel structure coating operation within the scope of weld seam and both sides is carried out, operation is spliced at steel box column scene up and down of completing.
Although the present invention has been disclosed as a preferred embodiment, however, it is not intended to limit the invention.It is any to be familiar with ability The technical staff in domain, without deviating from the scope of the technical scheme of the present invention, all using the technology contents pair of the disclosure above Technical solution of the present invention makes many possible changes and modifications, or is revised as the equivalent embodiment of equivalent variations.Therefore, every Without departing from the content of technical solution of the present invention, according to the present invention technical spirit any simple modification made to the above embodiment, Equivalent variations and modification, all shall fall within the protection scope of the technical scheme of the invention.

Claims (10)

1. a kind of steel box column splices node, including upper pole unit (1) and lower pole unit (2), it is characterised in that:The upper prop list The connection unit (3) for connecting the upper pole unit (1) and lower pole unit (2) is equipped between first (1) and lower pole unit (2), One end of the connection unit (3) is fixed in the inner wall of end of the lower pole unit (2), the other end of the connection unit (3) It is higher by the lower pole unit (2) and affixed with the inner wall of end of upper pole unit (1) after upper pole unit (1) docking is inserted into.
2. steel box column according to claim 1 splices node, it is characterised in that:The connection unit (3) includes circumferential direction Connecting plate (31), the first circumferential ribbed stiffener (32) and the second circumferential ribbed stiffener (33), the described second circumferential ribbed stiffener (33) are parallel It is set to the inside of the circumferential connecting plate (31), the described first circumferential ribbed stiffener (32) is vertically installed in the circumferential connecting plate (31) between the second circumferential ribbed stiffener (33), the circumferential direction connecting plate (31), the first circumferential ribbed stiffener (32) and second are circumferential Ribbed stiffener (33) connects and composes the connection unit (3) of i shaped cross section.
3. steel box column according to claim 2 splices node, it is characterised in that:Described second circumferential ribbed stiffener (33) is enclosed Close the manhole unit (4) for being equipped on the inside of the circumferential structure constituted and entering inside steel box column for worker and carrying out operation.
4. steel box column according to claim 2 splices node, it is characterised in that:The upper pole unit (1) and lower prop list It is equipped with the plate that is located by connecting (5) for flushing in pole unit (1) or lower pole unit (2) port, the upper pole unit on first (2) (1) it cooperates with the plate that is located by connecting of lower pole unit (2) (5), the plate that is located by connecting (5) is equipped with bolt hole, described After upper pole unit (1) and lower pole unit (2) splicing the spiral shell that is located by connecting is equipped in the bolt hole of the mutually matched plate that is located by connecting (5) Bolt (51).
5. steel box column according to claim 2 splices node, it is characterised in that:The lower pole unit (2) includes polylith Lower prop steel plate (21), affixed composition steel box column structure between the polylith lower prop steel plate (21), the lower prop steel plate (21) Inside is arranged with multiple welded with lower prop ribbed stiffener (22).
6. steel box column according to claim 5 splices node, it is characterised in that:The upper pole unit (1) includes polylith Upper prop steel plate (11), affixed composition steel box column structure between the polylith upper prop steel plate (11), the upper prop steel plate (11) Inside is arranged with multiple upper prop ribbed stiffeners (12).
7. steel box column according to claim 6 splices node, it is characterised in that:The lower end of the upper prop ribbed stiffener (12) It is reserved with the bell socket (121) being inserted into for the end of the connection unit (3), the bell socket (121) and the connection Unit (3) matches.
8. steel box column according to claim 4 splices node, it is characterised in that:The upper pole unit (1) and lower prop list At least provided with a plate that is located by connecting (5) on every column side of first (2).
9. a kind of installation method of steel box column splicing node, it is characterised in that:Include the following steps,
S1, steel box column section and each element size, pre-processed upper pole unit (1), lower pole unit are selected according to calculating (2) and connection unit (3), one end of connection unit (3) is welded in the end of lower pole unit (2), and in connection unit (3) Reserved manhole unit (4);
Pole unit (1) on S2, lifting, by the other end pair of bell socket (121) the alignment connection unit (3) of upper pole unit (1) Patch into;
The plate that is located by connecting (5) of S3, upper pole unit (1) and lower pole unit (2) dock successively to be agreed with, and will be located by connecting bolt (51) It is inserted into the plate that is located by connecting (5) of docking and tightens fixation;
S4, the welding for carrying out pole unit (1) and lower pole unit (2) splicing seam crossing, enter box steel by manhole unit (4) The weld job that pole unit (1), lower pole unit (2) and connection unit (3) bell and spigot are carried out inside column, by connection unit (3) It is welded and fixed respectively with upper prop ribbed stiffener (12) and welded with lower prop ribbed stiffener (22).
10. the installation method of steel box column splicing node according to claim 9, it is characterised in that:The step S4 it After further include step S5 and S6,
S5, the plate that is located by connecting (5) is cut off, and completes whole weld seams;
S6, steel structure coating operation within the scope of weld seam and both sides is carried out, operation is spliced at steel box column scene up and down of completing.
CN201810759557.1A 2018-07-11 Box-type steel column splicing joint and installation method thereof Active CN108661189B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810759557.1A CN108661189B (en) 2018-07-11 Box-type steel column splicing joint and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810759557.1A CN108661189B (en) 2018-07-11 Box-type steel column splicing joint and installation method thereof

Publications (2)

Publication Number Publication Date
CN108661189A true CN108661189A (en) 2018-10-16
CN108661189B CN108661189B (en) 2023-12-29

Family

ID=

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359579A (en) * 2019-08-15 2019-10-22 中冶南方都市环保工程技术股份有限公司 A kind of rigid connection node and method of steel column and concrete column
CN110374340A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A kind of large eccentricity steel structure hoisting butt joint auxiliary device and auxiliary tool
CN112049303A (en) * 2020-08-26 2020-12-08 中国核电工程有限公司 Steel plate assembly at bottom of floor slab, construction method of steel plate assembly, floor slab and construction method of floor slab
CN112376692A (en) * 2020-11-04 2021-02-19 重庆大学 Splicing node and splicing method between box type modular steel structure building boxes
CN112502451A (en) * 2020-11-06 2021-03-16 上海建工二建集团有限公司 Device for preventing stiff column from connecting deviation
CN112814153A (en) * 2020-12-31 2021-05-18 中国建筑第八工程局有限公司 Box-type steel column butt joint connection structure with different wall thicknesses and construction method thereof
CN114856279A (en) * 2022-04-28 2022-08-05 中交一公局集团有限公司 Built-in antidetonation is fallen and is fallen automatic weld assembled steel construction
CN114856280A (en) * 2022-04-28 2022-08-05 中交一公局集团有限公司 Automatic welding assembly type steel structure with built-in pipeline
CN114856278A (en) * 2022-04-28 2022-08-05 中交一公局集团有限公司 Assembly method of automatic welding assembly type steel structure with built-in pipeline
WO2023123177A1 (en) * 2021-12-28 2023-07-06 海南大学 Fabricated reinforced concrete beam-column joint

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10227064A (en) * 1997-02-18 1998-08-25 Housing Tamura:Kk Post jointing method
CN201722776U (en) * 2010-01-27 2011-01-26 江苏省电力设计院 Beam column nodal point suitable for square steel pipe column
CN104264792A (en) * 2014-09-03 2015-01-07 西安建筑科技大学 Beam column node of layered-assembly-type steel structure
CN205206143U (en) * 2015-12-04 2016-05-04 上海通用金属结构工程有限公司 Location structure of high -speed joint pipe post
CN106545028A (en) * 2015-09-16 2017-03-29 上海宝冶集团有限公司 Light Steel-Structure Factory with Steel rim of a cup post method for rapidly mounting
CN207538204U (en) * 2017-09-27 2018-06-26 杭萧钢构(广东)有限公司 A kind of insertable steel box column docks node
CN115710975A (en) * 2022-09-09 2023-02-24 中国十七冶集团有限公司 Beam-column joint of assembled integral concrete frame structure and connecting method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10227064A (en) * 1997-02-18 1998-08-25 Housing Tamura:Kk Post jointing method
CN201722776U (en) * 2010-01-27 2011-01-26 江苏省电力设计院 Beam column nodal point suitable for square steel pipe column
CN104264792A (en) * 2014-09-03 2015-01-07 西安建筑科技大学 Beam column node of layered-assembly-type steel structure
CN106545028A (en) * 2015-09-16 2017-03-29 上海宝冶集团有限公司 Light Steel-Structure Factory with Steel rim of a cup post method for rapidly mounting
CN205206143U (en) * 2015-12-04 2016-05-04 上海通用金属结构工程有限公司 Location structure of high -speed joint pipe post
CN207538204U (en) * 2017-09-27 2018-06-26 杭萧钢构(广东)有限公司 A kind of insertable steel box column docks node
CN115710975A (en) * 2022-09-09 2023-02-24 中国十七冶集团有限公司 Beam-column joint of assembled integral concrete frame structure and connecting method thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374340A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A kind of large eccentricity steel structure hoisting butt joint auxiliary device and auxiliary tool
CN110374340B (en) * 2019-07-22 2021-05-18 中铁大桥局集团有限公司 Large eccentric steel structure hoisting butt joint auxiliary device and auxiliary tool
CN110359579A (en) * 2019-08-15 2019-10-22 中冶南方都市环保工程技术股份有限公司 A kind of rigid connection node and method of steel column and concrete column
CN112049303A (en) * 2020-08-26 2020-12-08 中国核电工程有限公司 Steel plate assembly at bottom of floor slab, construction method of steel plate assembly, floor slab and construction method of floor slab
CN112376692A (en) * 2020-11-04 2021-02-19 重庆大学 Splicing node and splicing method between box type modular steel structure building boxes
CN112502451A (en) * 2020-11-06 2021-03-16 上海建工二建集团有限公司 Device for preventing stiff column from connecting deviation
CN112814153A (en) * 2020-12-31 2021-05-18 中国建筑第八工程局有限公司 Box-type steel column butt joint connection structure with different wall thicknesses and construction method thereof
CN112814153B (en) * 2020-12-31 2022-07-12 中国建筑第八工程局有限公司 Box-type steel column butt joint connection structure with different wall thicknesses and construction method thereof
WO2023123177A1 (en) * 2021-12-28 2023-07-06 海南大学 Fabricated reinforced concrete beam-column joint
CN114856279A (en) * 2022-04-28 2022-08-05 中交一公局集团有限公司 Built-in antidetonation is fallen and is fallen automatic weld assembled steel construction
CN114856280A (en) * 2022-04-28 2022-08-05 中交一公局集团有限公司 Automatic welding assembly type steel structure with built-in pipeline
CN114856278A (en) * 2022-04-28 2022-08-05 中交一公局集团有限公司 Assembly method of automatic welding assembly type steel structure with built-in pipeline

Similar Documents

Publication Publication Date Title
CN102277825B (en) Steel truss bridge and method for fabricating same
CN104712089B (en) Open the compound shear attachment structure of net
CN101839074B (en) Steel frame reinforcing column and reinforcing method thereof
CN103015537B (en) Beam-column joint connecting device of assembled steel structure system
CN102936924A (en) Girder embedding ribbed through partition square concrete filled steel tube column-H-shaped girder combination nodes
CN208563599U (en) A kind of steel box column splicing node
CN108468384A (en) Assembled self-recovery energy-consumption type frame core tube structure system
CN110258795A (en) A kind of complete bolted prefabricated assembled bean column node
CN110792170A (en) Reinforced connecting node structure of box type integrated building module and installation method thereof
CN105971827A (en) Transfer ring beam for concrete cylinder and steel cylinder combined tower and construction method thereof
CN108661189A (en) A kind of steel box column splicing node and its installation method
CN104196261A (en) Connection joint for existing concrete column and added steel beams
CN206337654U (en) A kind of beam-column connection structure of steel-structure factory building
WO2023035412A1 (en) Special-shaped double-layer tower bridge structure and manufacturing method therefor
CN102392491A (en) Connecting joint for beam, column and inclined strut of box section of boiler steel frame and construction method thereof
CN105888286B (en) A kind of method that groove profile collar extension plate moves up reinforcement Steel Tube Joint
CN212562024U (en) Eccentric arrangement connecting structure of steel plate concrete shear wall and steel reinforced concrete column
CN208396067U (en) Vertical bolt weldering mixing splicing node
CN212426749U (en) Hybrid reinforced concrete joint section
CN210216729U (en) Node device for rigidly connecting assembled truss steel beam and steel column
CN112681798A (en) End plate connecting node reinforcing structure and construction method thereof
CN106835950A (en) Concrete-filled steel tube arch arch rib truss H type web member all welded type coupling configurations
CN108661189B (en) Box-type steel column splicing joint and installation method thereof
CN110359555A (en) The bean column node of assembling type steel structure built-in inserted plate quadrate steel pipe column clamping plate connection
Tebbett The Last Five Years' Experience in Steel Platform Repairs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant