CN108628958A - A kind of power grid GIS date storage method based on tense - Google Patents

A kind of power grid GIS date storage method based on tense Download PDF

Info

Publication number
CN108628958A
CN108628958A CN201810330680.1A CN201810330680A CN108628958A CN 108628958 A CN108628958 A CN 108628958A CN 201810330680 A CN201810330680 A CN 201810330680A CN 108628958 A CN108628958 A CN 108628958A
Authority
CN
China
Prior art keywords
data
ground state
increment
power grid
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810330680.1A
Other languages
Chinese (zh)
Inventor
李申章
张雪坚
何映军
彭晓平
段琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Information Center of Yunnan Power Grid Co Ltd
Original Assignee
Information Center of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Information Center of Yunnan Power Grid Co Ltd filed Critical Information Center of Yunnan Power Grid Co Ltd
Priority to CN201810330680.1A priority Critical patent/CN108628958A/en
Publication of CN108628958A publication Critical patent/CN108628958A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A kind of power grid GIS date storage method based on tense, includes the following steps:A, entire electric network data is first divided into power grid GIS data and operation of power networks data;B, it is that power grid GIS data and operation of power networks data establish ground state;C, the time for correcting state is set according to the change frequency of power grid GIS data and operation of power networks data;D, judge whether the data have had ground state according to the amendment state time of setting, if having there is ground state, differential file is merged into corresponding ground state version, form increment amendment state and just establish ground state version on the basis of current state if without ground state;E, every correction time for correcting state just repeats previous action.The present invention can realize science, timely record operation of power networks state, and the construction of power grid is made to be developed towards the direction of science, reasonable, energy conservation and environmental protection, sustainable etc..

Description

A kind of power grid GIS date storage method based on tense
Technical field
The present invention relates to electric power GIS mass data storage inquiring technology field, specially a kind of power grid GISs based on tense Date storage method.
Background technology
Growing with power grid scale, power network development transition process is accelerating, how accurate and visual displaying electricity Network planning mould, wiring Vicissitude situation, predict the problem of following Electric Power Network Planning construction patterns receive much attention as one.Tradition Generalized information system can only reflect the state at power grid a certain moment, lack in terms of historical information retrospect and the following power network development prediction Effective support.And Temporal GIS plays back the historical upheaval of quickly displaying Net Frame of Electric Network topology by the time, passes through different time The Net Frame of Electric Network comparative analysis of section goes out the difference of two history nodes of power grid, the appearance of Temporal GIS will to Regulation and Planning forecast plays a significant role, and will promote electric power GIS in grid equipment functional location, topological network data in electric network information Status as " data source header " and value in system.
Spatial object has 3 basic attributes:Space attribute, thematic attribute and time attribute, traditional GIS are empty in processing Between object when, only focus on space attribute and thematic attribute, cause traditional GIS that can only handle the current state or a certain of data The snapshot of historic state, and the dynamic change of data at any time can not be recorded, Time-Series analysis and tense processing can not be carried out.It is geographical The variation of object is closely related with the time, in order to track and record variation, needs to introduce temporal information in GIS, here it is when State GIS needs the main problem solved.
Invention content
The present invention is directed to the storage query demand of electrical network mass data, it is proposed that a kind of power grid GIS data based on tense Storage method is analyzed with the reliable memory and quick multi-condition inquiry of supporting electrical network mass data.
The technical scheme is that:
A kind of power grid GIS date storage method based on tense, includes the following steps:
A, entire electric network data is first divided into power grid GIS data and operation of power networks data;
B, it is that power grid GIS data and operation of power networks data establish ground state;
C, the time for correcting state is set according to the change frequency of power grid GIS data and operation of power networks data;
D, judge whether the data have had ground state according to the amendment state time of setting, if having there is ground state, by difference In Piece file mergence to corresponding ground state version, forms increment amendment state and just established on the basis of current state if without ground state Ground state version;
E, every correction time for correcting state just repeats previous action.
The newest operation data of power grid is stored in latest data version repository by the present invention, and historical data version is stored in and is gone through In history versions of data library, merges transition by triggering redundancy, redundant data is merged, efficiently solves versions of data more Concurrent, the problem of merging during new, it ensure that the consistency and integrality of data, effectively increase the management of historical data It is horizontal.
The present invention stores power grid GIS data using temporal extending, multistage version technique, supports electric network data model Lifecycle management meets the historical evolution for recording electric network data model and planning and design application demand.Raw Production, scheduling, metering, meteorological, on-line monitoring and GIS geography information are associated.The data of business scope by institutional framework, Functional location, the fields such as device id are associated with geography information.Creation data is associated with GIS can analyze defect distribution situation, Scheduling data are associated with the distribution situation that can analyze load with GIS, and continuous data is associated with GIS can analyze electricity consumption distribution Situation, weather environment are associated with the correlation that can analyze the factors such as equipment and weather environment with on-line monitoring with GIS.
The performance requirement that the present invention is quickly accessed towards historical data, in a manner of " moon baseline+engineering residual quantity ", i.e., every The moon 1 current state of power network resources is subjected to the storage of full dose snapshot, as the baseline of this month;Each engineering generates later Incremental data increment stores;Section may be implemented in this way, and laterally inquiry and the longitudinal of device history inquire:
(1) section is laterally inquired
The electric network data for inquiring and browsing any one tense accesses of that month ground state snapshot data and multiple works later The increment of journey is superimposed engineering increment by ground state snapshot and is obtained with;
(2) device history is inquired
Engineering increment is inquired by equipment, the increment variation feelings for all engineerings that the equipment is participated in can be retrieved Condition;
(3) incremental model as unit of engineering
On ground state snapshot basis, electric network model is divided by tense electric network model along the variation of time shaft is with engineering The increment chain of unit corresponds to newly-built, modification and the electric network model deleted the figure that an electricity power engineering generates in each increment Topology and attribute change;
Using the temporal extending of ground state snapshot+incremental implementation electric network data model, the modification historical process of electric network data from certain A ground state snapshot 1 starts, and each electricity power engineering is recorded in an increment modification of electric network data model, is followed successively by increasing 2,3 ... i-1, i, j, k are measured to the latest edition of electric network model.The correction time is arranged in each increment, and judging by the correction time should Whether increment has ground state.If there is ground state, differential file is merged into corresponding ground state version, if without ground state, just with Ground state version is established on the basis of the increment;
(4) Data Sheet Design
Engineering information table records each capital construction, industry expansion, the information of technological transformation project and the increasing in corresponding increment information table Measure ID;Ground state SNAPSHOT INFO table stores the ground state snapshot metadata of every month;Increment information table is ground state snapshot or each work The metadata of Cheng Zengliang;The ground state and incremental data of every month is all stored in a data and concentrates, and divides table to store by device type, It is divided into power network resources figure table and power network resources attribute list, establishes spatial index and device id index.
The beneficial effects of the invention are as follows:The operation of power networks data of different moments are compared, obtain power grid when different The operating status at quarter analyzes the variation tendency of the operating status of power grid, using variation tendency, to the maintenance work in power grid future Accurate Prediction is made, the construction of power grid is made to be developed towards the directions such as science, reasonable, energy conservation and environmental protection, sustainable.
Description of the drawings
Fig. 1 is that the power grid GIS data provided by the invention based on tense store, extract and show process;
Fig. 2 is the power grid GIS data storage procedure provided by the invention based on tense;
Fig. 3 is the power grid GIS data storage principle provided by the invention based on tense;
Fig. 4 is the power grid GIS Data Storage Models provided by the invention based on tense;
Fig. 5 is the power grid GIS datum number storage provided by the invention based on tense according to table structure.
Specific implementation mode
A kind of power grid GIS date storage method based on tense, the temporal feature, space characteristics and attributive character of power grid Data organization is carried out according to Spatio-Temporal Data Model for Spatial, data displaying is carried out by tense after data storage, extraction and application processing. Detailed process includes the following steps:
A, it includes that power grid is set entire electric network data to be first divided into power grid GIS data and operation of power networks data power grid GIS data Standby spatial data, administrative region vector data and administrative region image data, operation of power networks data include production, scheduling, meter The data such as amount, meteorological, on-line monitoring;
B, it establishes ground state for power grid GIS data and operation of power networks data and inquires putting into operation the time for grid equipment, existing administration The vector data in region and the creation time of image data establish the ground state version of GIS data on the basis of the time;Inquiry life The earliest time of the data such as production, scheduling, metering, meteorological, on-line monitoring, establishes the base of operation of power networks data on the basis of the time State version;
C, the time GIS data update for correcting state is set according to the change frequency of power grid GIS data and operation of power networks data Frequency is relatively low, and the correction time that 1 year is GIS data is arranged.The data updates frequency such as production, scheduling, metering, meteorological, on-line monitoring Rate is higher, and the correction time that one month is operation of power networks data is arranged;
D, judge whether the data have had ground state according to the amendment state time of setting, if having there is ground state, by difference In Piece file mergence to corresponding ground state version, forms increment amendment state and just established on the basis of current state if without ground state Ground state version using the ground state version time of power grid GIS data as starting point, each year the spatial data and administrative area to grid equipment Vector data, the image data in domain are modified, and changed data just judge it, are newly-increased data, just with The ground state version for increasing data newly is established on the basis of the time;It is that the data are just merged into corresponding ground state version by the data changed In, and establish increment and correct state;Using the ground state version time of the data such as production, scheduling, metering, meteorology, on-line monitoring as starting point, Each moon is modified operation of power networks data, and changed data just judge it, is newly-increased data, just with The ground state version for increasing data newly is established on the basis of the time.It is that the data are just merged into corresponding ground state version by the data changed In, and establish increment and correct state.
E, every correction time for correcting state just repeats previous action.The vector data and image data of administrative region do not have It is stored in relational database, needs manually per year to be modified it.And the spatial data of grid equipment, the life of power grid The data such as production, scheduling, metering, meteorological, on-line monitoring are stored in relational database, and configuration data synchronous task is monthly to power grid Operation data is modified.

Claims (4)

1. a kind of power grid GIS date storage method based on tense, which is characterized in that include the following steps:
A, entire electric network data is first divided into power grid GIS data and operation of power networks data;
B, it is that power grid GIS data and operation of power networks data establish ground state;
C, the time for correcting state is set according to the change frequency of power grid GIS data and operation of power networks data;
D, judge whether the data have had ground state according to the amendment state time of setting, if having there is ground state, by differential file It is merged into corresponding ground state version, forms increment amendment state and just establish ground state on the basis of current state if without ground state Version;
E, every correction time for correcting state just repeats previous action.
2. a kind of power grid GIS date storage method based on tense according to claim 1, which is characterized in that will be formed Newest power grid GIS data and operation data be stored in latest data version repository, historical data version is all stored in history In versions of data library, merges transition by triggering redundancy, redundant data is merged, makes to obtain in versions of data renewal process Concurrently, merge, ensure that the consistency and integrality of data.
3. a kind of power grid GIS date storage method based on tense according to claim 1, which is characterized in that power grid GIS Data and operation data use the temporal extending of Dike-pond modes, multistage version technique, support the Life cycle of electric network model Management meets the historical evolution for recording electric network model and planning and design application demand.
4. a kind of power grid GIS date storage method based on tense according to claim 1, which is characterized in that described to build Vertical ground state is to use in a manner of " moon baseline+engineering residual quantity ", i.e., at monthly No. 1, the current state of power network resources is carried out complete Measure snapshot storage, as the ground state snapshot of this month;The incremental data increment storage that each engineering generates later, to realize section Laterally longitudinal inquiry of inquiry and device history:
(1) section is laterally inquired
The electric network data for inquiring and browsing any one tense accesses of that month ground state snapshot data and multiple engineerings later Increment is superimposed engineering increment by ground state snapshot and obtains;
(2) device history is inquired
Engineering increment is inquired by equipment, the increment situation of change for all engineerings that the equipment is participated in can be retrieved;
(3) incremental model as unit of engineering
On ground state snapshot basis, variation of the tense electric network model by electric network model along time shaft is divided into as unit of engineering Increment chain, correspond to newly-built, modification and the electric network model deleted the graph topology that electricity power engineering generates in each increment And attribute change;
Using the temporal extending of ground state snapshot+incremental implementation electric network data model, the modification historical process of electric network data is from some base State snapshot 1 starts, and each electricity power engineering is recorded in an increment modification of electric network data model, be followed successively by increment 2, 3 ... i-1, i, j, k to electric network model latest edition;The correction time is arranged in each increment, judges the increment by the correction time Whether ground state is had.If there is ground state, differential file is merged into corresponding ground state version, if without ground state, just with the increasing Ground state version is established on the basis of amount;
(4) Data Sheet Design
Engineering information table records each capital construction, industry expansion, the information of technological transformation project and the increment in corresponding increment information table ID;Ground state SNAPSHOT INFO table stores the ground state snapshot metadata of every month;Increment information table is ground state snapshot or each engineering The metadata of increment;The ground state and incremental data of every month is all stored in a data and concentrates, and divides table to store by device type, point For power network resources figure table and power network resources attribute list, spatial index and device id index are established.
CN201810330680.1A 2018-04-13 2018-04-13 A kind of power grid GIS date storage method based on tense Pending CN108628958A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810330680.1A CN108628958A (en) 2018-04-13 2018-04-13 A kind of power grid GIS date storage method based on tense

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810330680.1A CN108628958A (en) 2018-04-13 2018-04-13 A kind of power grid GIS date storage method based on tense

Publications (1)

Publication Number Publication Date
CN108628958A true CN108628958A (en) 2018-10-09

Family

ID=63705324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810330680.1A Pending CN108628958A (en) 2018-04-13 2018-04-13 A kind of power grid GIS date storage method based on tense

Country Status (1)

Country Link
CN (1) CN108628958A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110633539A (en) * 2019-09-24 2019-12-31 国网重庆市电力公司电力科学研究院 PSASP data management method and readable storage medium
CN110674152A (en) * 2019-09-24 2020-01-10 京东数字科技控股有限公司 Data synchronization method and device, storage medium and electronic equipment
CN110941617A (en) * 2019-11-26 2020-03-31 昆明能讯科技有限责任公司 Power grid GIS data storage method based on version control
CN111324379A (en) * 2020-01-15 2020-06-23 携程旅游网络技术(上海)有限公司 Model deployment system based on general SOA service
CN111582745A (en) * 2020-05-14 2020-08-25 昆明能讯科技有限责任公司 Power grid planning data dynamic digital map control method based on temporal GIS

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101593208A (en) * 2009-07-09 2009-12-02 浙江大学 A kind of ancestor ground space-time data storage means of the dynamic correction extended model based on ground state
CN102375827A (en) * 2010-08-16 2012-03-14 北京国科恒通电气自动化科技有限公司 Method for fast loading versioned electricity network model database
CN103150366A (en) * 2013-03-07 2013-06-12 南京国图信息产业股份有限公司 Temporal geographic information system (GIS) data management and presentation method
CN106250389A (en) * 2016-07-15 2016-12-21 西安测绘研究所 A kind of geographical spatial data method for edition management updated towards dynamic increment
US20180006715A1 (en) * 2015-05-07 2018-01-04 Centre For Development Of Telematics Gis based centralized fiber fault localization system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101593208A (en) * 2009-07-09 2009-12-02 浙江大学 A kind of ancestor ground space-time data storage means of the dynamic correction extended model based on ground state
CN102375827A (en) * 2010-08-16 2012-03-14 北京国科恒通电气自动化科技有限公司 Method for fast loading versioned electricity network model database
CN103150366A (en) * 2013-03-07 2013-06-12 南京国图信息产业股份有限公司 Temporal geographic information system (GIS) data management and presentation method
US20180006715A1 (en) * 2015-05-07 2018-01-04 Centre For Development Of Telematics Gis based centralized fiber fault localization system
CN106250389A (en) * 2016-07-15 2016-12-21 西安测绘研究所 A kind of geographical spatial data method for edition management updated towards dynamic increment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李申章: ""基于基态修正模型的电力GIS时态模型研究"", 《中国管理信息化》 *
齐庆超: ""一种多基态修正时空数据模型改进的方法"", 《测绘科学》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110633539A (en) * 2019-09-24 2019-12-31 国网重庆市电力公司电力科学研究院 PSASP data management method and readable storage medium
CN110674152A (en) * 2019-09-24 2020-01-10 京东数字科技控股有限公司 Data synchronization method and device, storage medium and electronic equipment
CN110941617A (en) * 2019-11-26 2020-03-31 昆明能讯科技有限责任公司 Power grid GIS data storage method based on version control
CN111324379A (en) * 2020-01-15 2020-06-23 携程旅游网络技术(上海)有限公司 Model deployment system based on general SOA service
CN111324379B (en) * 2020-01-15 2023-06-09 携程旅游网络技术(上海)有限公司 Model deployment system based on general SOA service
CN111582745A (en) * 2020-05-14 2020-08-25 昆明能讯科技有限责任公司 Power grid planning data dynamic digital map control method based on temporal GIS

Similar Documents

Publication Publication Date Title
CN108628958A (en) A kind of power grid GIS date storage method based on tense
CN105278373A (en) Method for realizing comprehensive information processing system of transformer substation
CN108876019A (en) A kind of electro-load forecast method and system based on big data
CN102999573A (en) Cache updating method for stripped GIS (Geographic Information System) map elements
CN107832876A (en) Subregion peak load Forecasting Methodology based on MapReduce frameworks
CN105205185B (en) The method of data interaction and data modeling between monitoring system and management information system
JP2019213299A (en) Energy operation device, method, and system
CN110941617A (en) Power grid GIS data storage method based on version control
Bugaets et al. Information system to support regional hydrological monitoring and forecasting
CN104299056A (en) Distribution network planning basic technology supporting platform
CN105574188A (en) Method and system for managing data in different dimensions and at different layers
CN111159154A (en) Energy data warehouse system
CN106845837B (en) Power transmission and transformation project environment sensitive area monitoring system and method based on big data technology
CN108763256A (en) A kind of electric power GIS Temporal Model construction method based on Dike-pond modes
CN103955863A (en) Method for processing power network monitoring device data
CN103279555B (en) PI point automatic maintenance methods and device based on operation system
CN103345485B (en) A kind of mainframe platform dynamic statement automatic generation method and system
CN113610661A (en) Graph database-based power grid topology version management tool and method
CN113807573A (en) Construction prediction analysis method and system based on data management and three-dimensional search
Kotriwala et al. Load classification and forecasting for temporary power installations
CN113204534A (en) SCADA measurement data acquisition and storage method and system based on stream calculation
JP5561643B2 (en) Demand forecasting device and water operation monitoring system
CN114595839A (en) Intelligent electric energy meter fault reason analysis method and system
Tang et al. Short-term work team scheduling models for effective road repair and management
CN107908476A (en) Data processing method and device based on distributed type assemblies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181009