CN108626533A CN201810430738.XA CN201810430738A CN108626533A CN 108626533 A CN108626533 A CN 108626533A CN 201810430738 A CN201810430738 A CN 201810430738A CN 108626533 A CN108626533 A CN 108626533A
Authority
CN
China
Prior art keywords
stud
column
supporting block
installation method
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810430738.XA
Other languages
Chinese (zh)
Inventor
杨昕
张友星
王思维
史朋朋
王寅吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Petroleum Construction Engineering Co Ltd
Original Assignee
Sichuan Petroleum Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Petroleum Construction Engineering Co Ltd filed Critical Sichuan Petroleum Construction Engineering Co Ltd
Priority to CN201810430738.XA priority Critical patent/CN108626533A/en
Publication of CN108626533A publication Critical patent/CN108626533A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M7/00Details of attaching or adjusting engine beds, frames, or supporting-legs on foundation or base; Attaching non-moving engine parts, e.g. cylinder blocks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L3/00Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
    • C10L3/06Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
    • C10L3/10Working-up natural gas or synthetic natural gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M9/00Special layout of foundations with respect to machinery to be supported

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)

Abstract

The present invention provides a kind of large-scale petroleum natural gas processing tower installation methods, including:Pour treating column (for example, dethanizer, the DHX towers and debutanizing tower etc.) column foot for being vertically embedded with stud;Polylith supporting block is set on column foot, adjusts polylith supporting block so that its supporting surface is in same level;It is set with guide device at the top of stud;Treating column is hung to above column foot, under hang, stud described in guide means guide and insertion process tower skirt preformed hole, after all studs are inserted into skirt preformed hole and treating column is seated in supporting block, dismantle guide device, it screws and supporting block and column foot one-piece casting is completed into treating column lifting with stud matching used nut.The present invention can ensure that quick, high quality completes large-scale treating column lifting work, reduce the lifting operation time, save spending, increase benefit, and guide device can be recycled.

Description

A kind of large-scale petroleum natural gas processing tower installation method
Technical field
The present invention relates to oil & gas equipment mounting technique fields, more particularly, it is natural to be related to a kind of large-scale petroleum Gas disposal tower installation method is particularly suitable for tower height and is higher than 10 meters, and petroleum gas treating column of the weight more than 200 tons is installed.
Background technology
In the installation of petroleum gas, for Large Towers class, some separate unit weight is close to 500 tons, scene Hoisting difficulty is big, security risk is high, once equipment is sling, needs to be installed in place as early as possible, reduces hoisting process risk.Due to such Large scale equipment skirt aperture and the stud of fixed equipment are closely sized to, while when Equipment Foundations pour, the prefabricated precision of stud Not enough, it when leading to equipment hoisting, it is difficult to which stud is quickly penetrated skirt hole, generally requires crowbar and stud is corrected or beaten It is again prefabricated to fall entire basis, carrying out correcting process to stud is easy to damage stud screw thread, or even reduces stud itself Mechanical property increases construction and operation risk;If destroy entire basis it is again prefabricated if can increase original basis expense of destroying, again It is new to pour expense and large-scale crane lease expenses, cause construction cost to increase significantly.
Invention content
It is above-mentioned existing in the prior art it is an object of the present invention to solving for the deficiencies in the prior art One or more problems.For example, one of the objects of the present invention is to provide a kind of lifting in place quickly, quality is high, risk is small Large-scale petroleum natural gas processing tower (for example, weight reaches hundreds of tons for the treatment of column) installation method.
To achieve the goals above, of the invention to provide a kind of large-scale petroleum natural gas processing tower installation method, it is described Installation method may comprise steps of:The treating column column foot for being vertically embedded with stud is poured in precalculated position;Institute Column foot surface setting polylith supporting block is stated, adjusts polylith supporting block to ensure that the supporting surface of all supporting blocks is in same level It is interior;It is set with guide device at the top of the stud, the guide device includes coaxial bottom positioning section and top boot segment, The bottom positioning section can be set at the top of the stud, and the boot segment has engaging portion, extension and top, the knot Conjunction portion is connect with positioning section, and engaging portion connect with top and have and is gradually reduced to top-direction along engaging portion by the extension Radial dimension, the radial dimension at the top is less than the radial dimension of the stud, treating column is hung to above column foot, under Hang, stud described in guide means guide and insertion process tower skirt preformed hole, wait for all studs be inserted into skirt preformed hole and After treating column is seated in supporting block, dismantle guide device, screw with the matching used nut of stud, supporting block is whole with column foot Body pours, and completes treating column lifting.
In an exemplary embodiment of the large-scale petroleum natural gas processing tower installation method of the present invention, the supporting block It is formed by stacking by polylith support thin plate, thin plate quantity is supported by increase and decrease to ensure that the supporting surface of the polylith supporting block is in same In one horizontal plane.Preferably, the support thin plate can be metallic plate.
In an exemplary embodiment of the large-scale petroleum natural gas processing tower installation method of the present invention, the polylith branch The thickness of bracer differs, and to preset supporting block according to the different parts required thickness of the treating column, reaching makes all The supporting surface of bracer constitutes same level.
In an exemplary embodiment of the large-scale petroleum natural gas processing tower installation method of the present invention, the guiding dress The bottom positioning section and top boot segment set are integrally formed, the bottom positioning section and the stud screw-thread fit.
In an exemplary embodiment of the large-scale petroleum natural gas processing tower installation method of the present invention, the top is drawn It can be cone to lead section, and cone angle is 55 °~60 °.
In an exemplary embodiment of the large-scale petroleum natural gas processing tower installation method of the present invention, the guiding dress It is 120 millimeters~180 to set length, and the length of the positioning section is 60 millimeters~120 millimeters, and the guiding segment length is 40 millimeters ~90 millimeters.
In an exemplary embodiment of the large-scale petroleum natural gas processing tower installation method of the present invention, the treating column Refer to that height is higher than 10 meters, weight is more than 100 tons for the treatment of column, the treating column include dethanizer, DHX towers, debutanizing tower, Desulfurizing tower, amine liquid regenerator, molecular sieve water separation tower, condensate stabilization tower and sour water stripping (SWS) tower.
Compared with prior art, the advantageous effect of installation method of the invention includes:By shifting to an earlier date in stud before lifting Bottom assembly guiding structure may be implemented quickly to penetrate stud into skirt preformed hole, it is ensured that quick, high quality completes large-scale processing Tower crane fills work, and Reusability may be implemented in the guide device;Before being seated column foot by treating column, in treating column tower Holding multiple pieces supporting block on base can make column foot surface quickly smooth, reduce the lifting operation time, save spending, increase Benefit.
Description of the drawings
By the description carried out below in conjunction with the accompanying drawings, above and other purpose of the invention and feature will become more clear Chu, wherein:
Fig. 1 shows the stream of large-scale petroleum natural gas processing tower installation method according to an illustrative embodiment of the invention Journey schematic diagram.
Fig. 2 shows drawing for large-scale petroleum natural gas processing tower installation method according to an illustrative embodiment of the invention Lead the structural schematic diagram of device.
Specific implementation mode
Hereinafter, a kind of large-scale petroleum day according to the present invention will be described in detail in conjunction with attached drawing and exemplary embodiment Right gas disposal tower installation method.
Specifically, the one side of installation method of the invention is by before treating column lifts, at the top of column foot stud The top radial dimension of assembly guiding structure, guide device is less than stud diameter, may be implemented quickly to guide column foot stud in this way Across processing tower skirt preformed hole, also, the guide device can be taken out from stud, and Reusability may be implemented.It is another Aspect, due to pouring level etc., the case where column foot surface is likely to occur out-of-flatness, therefore, by before lifting, existing in advance Supporting block is arranged in column foot surface, keeps treating column surface of base quickly levelling by adjusting the height of supporting block, greatly saves The treating column lifting operation time, reduce difficulty of construction.
Fig. 1 shows the stream of large-scale petroleum natural gas processing tower installation method according to an illustrative embodiment of the invention Journey schematic diagram.Fig. 2 shows large-scale petroleum natural gas processing tower installation methods according to an illustrative embodiment of the invention The structural schematic diagram of guide device.
The present invention's provides a kind of large-scale petroleum natural gas processing tower installation method.It is natural in the large-scale petroleum of the present invention In one exemplary embodiment of gas disposal tower installation method, the installation method may comprise steps of:
Step S01 pours the treating column column foot for being vertically embedded with stud in precalculated position.
According to the needs of construction, the basis for the treatment of column is made in precalculated position.The basis for the treatment of column can use concrete It pours.The stud along vertical method is embedded in treating column column foot, the stud, which can intert, such as to be entered to handle the skirt of tower bottom Seat preformed hole is with fixing process tower.The stud can be studs, and the lower part of stud is fixed in basis, and top passes through spiral shell Female and gasket is connect with processing tower skirt.The stud being embedded in processing tower foundation can be equidistant more double end spiral shells Column.For example, it may be 20 studs.
Step S02 can support the supporting block for the treatment of column column foot surface is pre-buried, and adjust supporting block height, be all The surface of supporting block is in same level.
In this example, the supporting block be it is spaced be placed on surface of base, for example, supporting block can be close to institute Stud is stated, the both sides of stud are placed on.The shape of supporting block can have any shape, for example, the shape of supporting block can be long It is rectangular, round and carve type etc..The supporting block can be that the materials such as wood or metal are prepared into, it is preferred that in order to have Better intensity and hardness, the supporting block are prepared by metal.
In this example, the supporting block can be formed by stacking by polylith support thin plate, pass through the support thin plate of polylith Superposition forms supporting block.The height of supporting block can support thin plate quantity to adjust by increase and decrease.By adjusting the quantity of thin plate To ensure that the supporting surface of the polylith supporting block is in same level.For example, according to construction requirement, scale point can be passed through Not Ce Liang each position supporting block height, by increase and decrease support thin plate to realize that the supporting block of all positions is highly consistent.
It in this example, can be by shifting to an earlier date the supporting block of prefabricated different-thickness, with according to needed for treating column different parts Different supporting block height is arranged in thickness, and to reach, so that the supporting surface (for example, upper surface) of all supporting blocks is constituted same Horizontal plane.The support thin plate can be iron plate, steel plate etc., but the support thin plate of the present invention is without being limited thereto, for example, copper coin etc. its His material.
More than, in order to preferably support treating column, the placement interval of supporting block can be with appropriate small, between supporting block It is to place at equal intervals.
Step S03 installs dismountable guide device at the top of the pre-buried stud of processing tower foundation.
In this example, due in site operation, stud and processing tower skirt preformed hole be closely sized to and stud Prefabricated precision is inadequate, it is difficult to penetrate stud into preformed hole.Therefore, it is needed at the top of each stud before treating column lifting One top radial dimension of installation is much smaller than the guide device of reserved bore dia, to increase between stud and processing tower skirt hole wall Gap, especially stud starts to penetrate the initial stage of processing tower skirt preformed hole, and guide device quickly can guide stud to penetrate Skirt preformed hole.
In this example, the guide device includes positioning section and lead segment, and positioning section can be set in the stud.
There is lead segment engaging portion, extension, top, the engaging portion to be connect with positioning section, and the extension will combine Portion connect with top and has along engaging portion to the diminishing radial dimension of top-direction, and the radial dimension at the top is less than The radial dimension of the stud.Preferably, the length of the positioning section is 60 millimeters~120 millimeters, and the guiding segment length is 40 millimeters~90 millimeters, the length of the engaging portion can be 10 millimeters~20 millimeters, and the length of the extension can be 20 Millimeter~50 millimeters, the guide device length are 120 millimeters~180.Certainly, guide device of the invention and each section Length is without being limited thereto, and the corresponding portion length to guide device and guide device can be needed to make tune according to different work areas It is whole.
For example, the guide device of the present invention is as shown in Fig. 2, in order to make stud preferably import skirt preformed hole, guiding dress Set can be positioning section 1 be cylindrical structure, the extension of lead segment 2 and top constitute a conical structure, lead segment Engaging portion combined with positioning section, for cylinder.It, can be in positioning section in order to keep guide device more secured with Stud connection Portion be arranged internal thread (being not shown in Fig. 2) with the screw-thread fit on stud.The diameter and dimension of inner screw thread of positioning section are necessary With reference to thread size on stud, it is easy for installation and removal.Preferably, guide device component falls off in order to prevent, guide device Positioning section can be integrally formed with boot segment, for example, can be tapered by the processing of short circuit one end by processing whole rod iron, separately It is processed into threaded cylindrical positioning section in one end.Certainly, certainly, guide device may be by two independent positioning sections with Boot segment is connected with each other the guide cylinder of (for example, welding) composition.The positioning section of the lower part length total with engaging portion can be It 70 millimeters~120 millimeters, preferably can be with 100 millimeters~110 millimeters.The length of the positioning section can be 60 millimeters~80 millis Rice, it is preferred that can be 65 millimeters~75 millimeters.In order to preferably make stud import skirt preformed hole, the upper cone section (i.e. extension and top) length is 40 millimeters~90 millimeters, preferably can be with 50 millimeters~70 millimeters;The circle of the conical section Cone angle is 55 degree~65 degree, it is preferable that can be 58 degree~62 degree, it is furthermore preferred that coning angle can be 60 degree.Certainly, of the invention Guide device each section length it is without being limited thereto, can be according in work progress, the size of the stud in basis and processing The size of tower is adjusted.
In this example, the material for preparing guide device can be iron, steel, copper etc..But the present invention's prepares material It is without being limited thereto.
Step S04, treating column lifting.
In this example, it is, for example, possible to use crane or tower crane lift treating column.It is hung to properly in treating column Position after, by the top of the skirt preformed hole alignment guidance device for the treatment of column.Radial dimension size due to stud and processing The size of tower skirt preformed hole is close, and stud is not that can penetrate skirt preformed hole well.What is be set on stud draws The radial dimension of stud will be much smaller than by leading the top radial dimension of device, more be much smaller than the radial dimension of skirt preformed hole, because This, guide device can quickly guide stud and insertion process tower skirt preformed hole, can dramatically speed up the installation speed for the treatment of column Degree.Then slowly under hang treating column, wait for that the stud on the basis of all treating columns is entirely insertable skirt preformed hole and treating column is located After on lip block, guide device at this moment can be dismantled, is screwed with the matching used nut of stud with fixing process tower.Then By lip block and processing tower foundation one-piece casting, treating column lifting is completed.
Here guide device can be taken out after treating column is seated on column foot from stud, and guide device may be implemented Reusability, reduce cost.
In this example, treating column according to the present invention refers to the Large Towers in petroleum gas field, for example, can be with Refer to height and be higher than 10 meters, even higher than 15 meters of Large Towers, weight is more than 100 tons of Large Towers.The method of the present invention is especially suitable For being highly higher than 12 meters, weight is more than 200 tons of Large Towers.The type of tower can be dethanizer, DHX towers, debutanizing tower, Desulfurizing tower, amine liquid regenerator, molecular sieve water separation tower, condensate stabilization tower, sour water stripping (SWS) tower etc..More precisely, described big The type of type tower may include, for example, desulfurizing tower (DN3400 × 35187mm, 482000Kg), dethanizer (DN3500 × 33200mm, 225000Kg) debutanizing tower (DN3200 × 35350mm, 148400Kg) etc..
More than, it should be noted that there is no sequencings with the step S03 by the step S02.Step S02 and step Rapid S03 can be carried out at the same time, sequentially progress that can not also be successively.
In conclusion the installation method of the present invention by before lifting in advance in stud bottom assembly guiding structure, can be with Stud is quickly penetrated skirt preformed hole by realization, it is ensured that quickly, high quality completes large-scale treating column and lift work, and described draw It leads device and Reusability may be implemented.Before being seated column foot by treating column, the holding multiple pieces supporting block on treating column column foot can So that column foot surface is quickly smooth, reduce the lifting operation time, saves spending, increase benefit.
Although above by describing the present invention in conjunction with exemplary embodiment, those skilled in the art should be clear Chu can carry out exemplary embodiment of the present invention each in the case where not departing from spirit and scope defined by claim Kind modifications and changes.

Claims (8)

1. a kind of large-scale petroleum natural gas processing tower installation method, which is characterized in that the installation method includes the following steps:
The treating column column foot for being vertically embedded with stud is poured in precalculated position;
Polylith supporting block is set on the column foot surface, adjusts polylith supporting block to ensure that the supporting surface of all supporting blocks is in same In one horizontal plane;
It is set with guide device at the top of the stud, the guide device includes that coaxial bottom positioning section and top guide Section, the bottom positioning section can be set in the stud, and the boot segment has engaging portion, extension and top, the knot Conjunction portion is connect with positioning section, and engaging portion connect with top and have and is gradually reduced to top-direction along engaging portion by the extension Radial dimension, the radial dimension at the top is less than the radial dimension of the stud;
Treating column is hung to above column foot, under hang, stud described in guide means guide and insertion process tower skirt preformed hole wait for institute There is stud to be inserted into skirt preformed hole and after treating column is seated in supporting block, dismantles guide device, screw mating with stud Supporting block and column foot one-piece casting are completed treating column lifting by the nut used.
2. large-scale petroleum natural gas processing tower installation method according to claim 1, which is characterized in that the supporting block by Polylith support thin plate is formed by stacking, and supports thin plate quantity by increase and decrease to ensure that the supporting surface of the polylith supporting block is in same In horizontal plane.
3. large-scale petroleum natural gas processing tower installation method according to claim 2, which is characterized in that the support thin plate For metallic plate.
4. large-scale petroleum natural gas processing tower installation method according to claim 1, which is characterized in that the polylith support The thickness of block differs, and with the different parts required thickness according to the treating column come precast support block, makes to own to reach The supporting surface of supporting block constitutes same level.
5. large-scale petroleum natural gas processing tower installation method according to claim 1, which is characterized in that the guide device Bottom positioning section and top boot segment be integrally formed, the bottom positioning section and the stud screw-thread fit.
6. large-scale petroleum natural gas processing tower installation method according to claim 1 or 5, which is characterized in that the top For boot segment in cone, cone angle is 55 °~60 °.
7. large-scale petroleum natural gas processing tower installation method according to claim 1, which is characterized in that the guide device Length is 120 millimeters~180, and the length of the positioning section is 60 millimeters~120 millimeters, the guiding segment length for 40 millimeters~ 90 millimeters.
8. large-scale petroleum natural gas processing tower installation method according to claim 1, which is characterized in that the treating column is Refer to height and be higher than 10 meters, weight is more than 100 tons for the treatment of column, and the treating column includes dethanizer, DHX towers, debutanizing tower, takes off Sulphur tower, amine liquid regenerator, molecular sieve water separation tower, condensate stabilization tower and sour water stripping (SWS) tower.
CN201810430738.XA 2018-05-08 2018-05-08 A kind of large-scale petroleum natural gas processing tower installation method Pending CN108626533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810430738.XA CN108626533A (en) 2018-05-08 2018-05-08 A kind of large-scale petroleum natural gas processing tower installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810430738.XA CN108626533A (en) 2018-05-08 2018-05-08 A kind of large-scale petroleum natural gas processing tower installation method

Publications (1)

Publication Number Publication Date
CN108626533A true CN108626533A (en) 2018-10-09

Family

ID=63695778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810430738.XA Pending CN108626533A (en) 2018-05-08 2018-05-08 A kind of large-scale petroleum natural gas processing tower installation method

Country Status (1)

Country Link
CN (1) CN108626533A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202073113U (en) * 2011-04-07 2011-12-14 华锐风电科技(集团)股份有限公司 Foundation bolt base post-grouting supporting device
CN203641779U (en) * 2013-12-17 2014-06-11 中建七局第四建筑有限公司 Steel column foundation bolt guiding cone
US20140157688A1 (en) * 2012-12-06 2014-06-12 Udecx, Llc Modified pier for modular, portable, interlocking system
KR20150015687A (en) * 2013-08-01 2015-02-11 주식회사 서강 concrete base for adjusting horizontal level
GB2534934A (en) * 2015-02-06 2016-08-10 J K H Drainage Units Ltd Foundation assembly
CN107201848A (en) * 2017-03-28 2017-09-26 上海电气风电集团有限公司 A kind of concrete tower installs leveling method
CN107327023A (en) * 2017-07-25 2017-11-07 中国化学工程第三建设有限公司 A kind of steel structure module installs installation method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202073113U (en) * 2011-04-07 2011-12-14 华锐风电科技(集团)股份有限公司 Foundation bolt base post-grouting supporting device
US20140157688A1 (en) * 2012-12-06 2014-06-12 Udecx, Llc Modified pier for modular, portable, interlocking system
KR20150015687A (en) * 2013-08-01 2015-02-11 주식회사 서강 concrete base for adjusting horizontal level
CN203641779U (en) * 2013-12-17 2014-06-11 中建七局第四建筑有限公司 Steel column foundation bolt guiding cone
GB2534934A (en) * 2015-02-06 2016-08-10 J K H Drainage Units Ltd Foundation assembly
CN107201848A (en) * 2017-03-28 2017-09-26 上海电气风电集团有限公司 A kind of concrete tower installs leveling method
CN107327023A (en) * 2017-07-25 2017-11-07 中国化学工程第三建设有限公司 A kind of steel structure module installs installation method

Similar Documents

Publication Publication Date Title
CN106460355B (en) The pedestal of wind turbine
CN107313589A (en) Outer wall of basement one side steel form support system and its construction method
CN108756890A (en) A kind of sliding mode system being in the milk for vertical shaft concreting and rock mass
CN106639336A (en) Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN106013435A (en) Node fixing structure for prefabricated structure type end beam column and mounting method
CN207714310U (en) A kind of lowering device for reinforcing cage
CN108626533A (en) A kind of large-scale petroleum natural gas processing tower installation method
CN106368234B (en) A kind of new rim of a cup basis box steel column construction technique
CN206800800U (en) Horizontal reinforcement distance piece
CN212427504U (en) Prefabricated post construction structures
CN206143796U (en) Rim of a cup basis box steel column and mounting adjustment fixing device
CN107989368A (en) A kind of form bracing system of large span suspended structure at high altitude
CN207295768U (en) Device for piping lane top plate of constructing
CN109945019B (en) Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
GB2469031A (en) Setting out a floor of a building
CN208793970U (en) A kind of detachable laboratory camera support
CN207363110U (en) Novel concrete supporting beam
CN107642240B (en) A method of strengthening concrete girder steel is installed in concrete bearing
CN105952002A (en) Large-scale terrace steel plate embedding device and construction method
CN206599367U (en) The auxiliary hoisting device of small-bore manually digging hole pile cages
CN107221867B (en) The pre-buried installation method of distribution box on a kind of concrete wall
CN106948841A (en) High ferro tunnel pre-buried channel flow installation mold automatic lifting system and installation method
CN206396762U (en) The underwater grouting formwork structure that a kind of pole section is increased

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination