CN108594797A - System type power supply master control borad, driving board checking device and its detection method - Google Patents

System type power supply master control borad, driving board checking device and its detection method Download PDF

Info

Publication number
CN108594797A
CN108594797A CN201810749921.6A CN201810749921A CN108594797A CN 108594797 A CN108594797 A CN 108594797A CN 201810749921 A CN201810749921 A CN 201810749921A CN 108594797 A CN108594797 A CN 108594797A
Authority
CN
China
Prior art keywords
master control
control borad
signal
voltage
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810749921.6A
Other languages
Chinese (zh)
Inventor
洪际伟
罗宏波
张明明
杨振华
彭毅
苏竹清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Side's Grand Letter Traffic Equipment Ltd Beijing Nine
Original Assignee
Side's Grand Letter Traffic Equipment Ltd Beijing Nine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Side's Grand Letter Traffic Equipment Ltd Beijing Nine filed Critical Side's Grand Letter Traffic Equipment Ltd Beijing Nine
Priority to CN201810749921.6A priority Critical patent/CN108594797A/en
Publication of CN108594797A publication Critical patent/CN108594797A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24065Real time diagnostics

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Dc-Dc Converters (AREA)

Abstract

The invention discloses a kind of system type power supply master control borad, driving board checking device, including with master control borad, the sequentially connected signal conversion unit of driving plate and monitoring system;Signal conversion unit carries out voltage conversion for carrying out digital-to-analogue conversion to the digital quantity signal received to the on-off model received, and break-make control is carried out to the analog signals received, after converting, then the signal sent will be needed to send;Monitoring system is additionally operable to receive the various feedback signals sent by master control borad come through signal conversion unit transmission, is additionally operable to show the carry out state and data of every experiment for sending various command signals to signal conversion unit;Wherein, command signal includes for selecting the signal of master control borad operating mode, starting the signal of master control borad and simulating the signal of master control borad working condition.The invention also discloses a kind of detection method, solve the problems, such as that master control borad, driving plate testing cost height, efficiency are low in the prior art.

Description

System type power supply master control borad, driving board checking device and its detection method
Technical field
The invention belongs to technical field of automation, are related to system type power supply master control borad, driving board checking device and its detection side Method.
Background technology
The core component of DC600V power supplys manufacturer up to 7 in industry at present, power source internal are inside complete machine Master control borad, driving plate, by each producer's independent design and making.The master control borad controls the whole work process of power supply, in Portion's interface and acquisition aspect are different, but there are certain similitudes in the principle for controlling and detecting various types of signal. Driving plate controls the inversion of entire power supply, and drive signal amplitude is not of uniform size, but in the principle one of control IGBT module conducting It causes.Now it is summarized as follows:Master control borad is power source internal control centre, and function is concentrated, and technical know-how is high, to repair and detection band Carry out very big technical barrier;The appearance and internal circuit principle of master control borad are all different, but the function of master control borad is substantially the same, and is used In the control and detection of DC600V power source internal contactors, the DC600V voltages of input and output AC380V voltage detectings etc..It drives The appearance and internal circuit principle of movable plate also differ, but the function of driving plate is identical, is used to the triggering and conducting of IGBT module And the protection of IGBT module.Master control borad can generally be divided into two major classes, mould with driving plate control with the input/output argument detected Analog quantity signal and digital quantity signal (level signal, pulse signal).Master control borad and driving plate are in maintenance process, without specific Testing standard judge master control borad repair quality, master control borad, driving plate for unknown failure, not reliably with it is intelligentized Equipment is adjusted to carry out fault detect to plate.
In conclusion master control borad is the higher work of difficulty with driving plate joint debugging repair, practitioner needs to be familiar with Whether the various functions and detection method of plate, quality after its repair of ability accurate judgement are qualified.And traditional detection method It then needs master control borad and driving plate being installed on inside power of the whole machine, by peripheral power supply unit and load test equipment to complete machine It just can determine that the normal and failure of master control borad and driving plate after power supply power supply experiment.This method need the more equipment in scene and The power of the whole machine of each producer is as pilot system.This method needs huge goods and materials and time to put into, and actually cost is too high And it is less efficient.
Invention content
The object of the present invention is to provide a kind of system type power supply master control borad, driving board checking device and its detection methods, with solution The problem that certainly master control borad is high with driving plate testing cost, efficiency is low in the prior art.
The first technical solution of the present invention is, a kind of system type power supply master control borad, driving board checking device, including With master control borad, the sequentially connected signal conversion unit of driving plate and monitoring system.
Signal conversion unit believes the switching value received for carrying out digital-to-analogue conversion to the digital quantity signal received Number voltage conversion is carried out, break-make control is carried out to the analog signals that receive, after converting, then will need to send Signal is sent.
Monitoring system is additionally operable to receive through signal conversion unit for sending various command signals to signal conversion unit The various feedback signals sent by master control borad come are transmitted, are additionally operable to show the carry out state and data of every experiment;Wherein, it orders It includes for selecting the signal of master control borad operating mode, the signal for starting master control borad and simulation master control borad working condition to enable signal Signal.
Further, signal conversion unit includes detection plate and relay.
Detection plate, the digital quantity signal sent for receiving master control borad, and retransmited to prison after carrying out digital-to-analogue conversion to it Control system;
Relay, the analog signals for sending out monitoring system are sent to master control borad after relay is attracted, simultaneously Complete the voltage conversion between DC110V on-off models and DC24V on-off models.
Second of technical solution of the present invention is a kind of inspection of system type power supply master control borad, driving board checking device Survey method, implements according to the following steps:
Signal conversion unit is connect by step 1 with master control borad, and switching value to the signal that DC24V is sent out by monitoring system turns The relay of unit is changed, master control borad sends enabling signal to relay, master control borad is sent to by relay control enabling signal Different pins, to select the operating mode of master control borad as inverter pattern or charger pattern;
Step 2, after choosing the operating mode of master control borad, master control borad starts corresponding program according to the selected mode, and Start self-test, when self-test first initializes the on-off model and digital quantity signal of output, while detecting each digital quantity letter of input Number, on-off model and analog signals it is whether normal;
After step 3, self-test are normal, two-way DC600V voltage analogs and two-way AC380V voltage-modes are sent out by monitoring system Analog quantity, wherein first via DC600V voltage analogs signal after the relay contact closure of signal conversion unit, retransmit to Master control borad, the second road DC600V voltage analogs and two-way AC380V voltage analogs are sent to the relay of signal conversion unit The opened point of device starts to start after the first via DC600V voltage analogs that master control borad detection receives are normal;
In step 4, start-up course, master control borad successively sends out four road DC110V switching values to the relay of signal conversion unit Device, connected after the actuating of relay of converted unit first via DC600V voltage analogs, two-way AC380V voltage analogs and Four road DC110V switching values are to master control borad, while relay also connects four road DC24V switching values and is sent to monitoring system;
Master control borad sends out three group pulse digital quantity signals to detection plate again, and digital quantity signal is carried out digital-to-analogue conversion by detection plate Afterwards, transformed voltage analog is sent to monitoring system, master control borad detects that each way switch amount, analog quantity and digital quantity are equal After normal, master control borad completes start-up course;
Step 5, master control borad are completed after starting, and according to the pilot project to be carried out to master control borad, are sent by monitoring system Simulate the analog signals of the various working conditions of master control borad, the analog signals of various working conditions through signal conversion unit after After electric appliance is closed or disconnects, retransmit to master control borad, the operation code shown by master control borad, to judge the work of master control borad at this time Whether normal make state.
Further, the specific method of step 3 is,
When pilot project is input overpotential test:Analog signals by monitoring system output more than rated voltage are to master control Plate;
If master control borad judges that the voltage analog signal of input is exceeded, master control borad can show correct code, then Indicate that this function of master control borad is normal;If master control borad does not show the code, then it represents that this function of master control borad is abnormal;
When pilot project is that input undervoltage is tested:Analog signals by monitoring system output less than rated voltage are to master control Plate;
If master control borad judges that the voltage analog signal of input is not up to entry condition, master control borad can be shown correctly Code, then it represents that this function of master control borad is normal;If master control borad does not show correct code, then it represents that master control borad this Function is abnormal.
Further, the specific method of step 3 is,
When pilot project is output overvoltage, overcurrent or overload test:By monitoring system output two-way be more than specified voltage, Electric current or load and the identical analog signals of numerical value are to signal conversion unit, and connected through the relay in signal conversion unit Afterwards, it retransmits to master control borad;
If master control borad judges that the two-way voltage analog signal of input is higher simultaneously, master control borad can be shown correctly Code, then it represents that this function of master control borad is normal;If master control borad does not show correct code, then it represents that the Xiang Gong of master control borad It can be abnormal;
Pilot project is when exporting under-voltage experiment:It is identical and less than nominal input voltage by monitoring system output two-way Analog signals retransmit after the relay in signal conversion unit is connected to master control borad to signal conversion unit;
If master control borad judges that the two-way voltage analog signal of input is relatively low simultaneously, master control borad can be shown correctly Code, then it represents that this function of master control borad is normal;If master control borad does not show correct code, then it represents that the Xiang Gong of master control borad It can be abnormal.
Further, the specific method of step 3 is,
When pilot project is IGBT Test to Failure:Three road DC24V on-off models to signal is exported by monitoring system to convert Unit, and three tunnel pulse feedback digital quantity signals of shutoff signal converting unit transmission;
If master control borad judges that its own does not receive pulse feedback signal, master control borad shows correct code, then table Show that this function of master control borad is normal;If master control borad does not show correct code, then it represents that this function of master control borad is not just Often.
Further, the specific method of step 3 is,
When pilot project is that overheating protection is tested:By monitoring system output, DC24V on-off models to signal is converted all the way Unit, and shutoff signal converting unit is sent to the DC24V on-off models of master control borad;
If master control borad judges the way switch amount abnormal signal, master control borad can show correct code, then it represents that main This function of controlling plate is normal;If master control borad does not show correct code, then it represents that this function of master control borad is abnormal.
Further, the specific method of step 3 is,
When pilot project is that internal fault is tested:It is converted by different voltage analog to the signal of monitoring system output two-way Unit, and retransmited to master control borad after the relay in signal conversion unit is connected;Wherein voltage analog is less than volume all the way Surely the voltage value inputted, another way voltage analog are equal to the voltage value of specified input;
If master control borad judges that two-way voltage analog signal phase difference is excessively high, master control borad can be shown for correct generation Code, then it represents that this function of master control borad is normal;If master control borad does not show correct code, then it represents that this function of master control borad It is abnormal.
Further, the specific method of step 3 is,
When pilot project is contactor Test to Failure:Four road DC24V on-off models to signal is exported by monitoring system to turn Unit is changed, and four road DC110V switching value feedback signals of random shutoff signal converting unit transmission are therein all the way;
If master control borad detects that DC110V On-off signals are abnormal, master control borad can show correct code, then it represents that master control This function of plate is normal;If master control borad does not show correct code, then it represents that this function of master control borad 1 is abnormal.
Further, the specific method of step 3 is,
When pilot project is precharge Test to Failure:By monitoring system simultaneously export DC600V voltage analogs I and DC600V voltage analogs II and DC600V voltage analogs II are less than the voltage value of specified input, wherein DC600V voltage analogs Amount I is fed directly to master control borad, and DC600V voltage analogs II is sent to signal conversion unit;Input is detected in master control borad When DC600V voltage analogs I is normal, master control borad starts to start, and master control borad first sends out first via DC110V switching values and send when startup To the relay of signal conversion unit, DC600V voltage analogs II is transferred to master control borad after the actuating of relay, master control borad is sentenced Break when DC600V voltage analogs II and crossing less than DC600V voltage analog I, master control borad shows correct code, then it represents that master control This function of plate is normal;If master control borad does not show correct code, then it represents that this function of master control borad is abnormal;
When pilot project is normal work experiment:In the start-up course of master control borad, the real-time Inspection and monitoring system of master control borad with Each on-off model, each voltage analog signal and each pulse feedback digital signal transmitted between master control borad;
When master control borad judges that each on-off model, each voltage analog signal and each pulse feedback digital signal are without exception When, master control borad can show correct code, then it represents that this function of master control borad is normal;If master control borad does not show correct code, Then indicate that this function of master control borad is abnormal.
When the specific method of further step 3 is the normal startup function that pilot project is analog-driven plate:Master control borad Pulse signal is sent in start-up course to driving plate.
When driving plate receives the normal burst signal of master control borad transmission, monitoring system can show the six roads electricity of driving plate Pressure is converted into positive value by negative value, and six road voltage show values are almost the same, then it represents that driving plate this function is normal;If monitoring Six road voltage show value of system is inconsistent, then it represents that this function of driving plate is abnormal.
The invention has the advantages that the input and output by simulating master control borad peripheral data, to master control borad, driving plate Properties experiment is carried out, is monitored with test data for the functional progress overall performance test of institute to master control borad, driving plate, More perfect performance test can not only be carried out to master control borad and driving plate, and its operation is simple, securely and reliably, improves repair Efficiency and qualification rate;Input cost is substantially reduced, maintenance personal is facilitated to master control borad, driving plate more fully understand and tie up It repaiies, the entire properties data tested process and show master control borad by man-machine interface, and the performance of energy intuitive judgment plate is No qualification.
Description of the drawings
Fig. 1 is the module connection figure of system type power supply master control board checking device of the present invention.
In figure, 1. master control borads, 2. signal conversion units, 3. monitoring systems, 4. driving plates.
Specific implementation mode
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
The present invention provides a kind of railway system type power supply master control borad, 4 detection devices of driving plate, including with master control borad 1, driving 4 sequentially connected signal conversion unit 2 of plate and 3 two large divisions of monitoring system are constituted.
Signal conversion unit 2, for being converted to receiving digital quantity signal, on-off model and analog signals, Conversion method to the digital quantity signal received specifically, carry out digital-to-analogue conversion, to the on-off model progress voltage received Conversion carries out break-make control to the analog signals received.After converting, then the signal sent will be needed to send out It goes.
Signal conversion unit 2 is mainly made of detection plate and relay, and the functional independence of detection plate and relay carries respectively For and processing master control borad 1, driving plate 4 work required various conditions.
Detection plate retransmits after carrying out digital-to-analogue conversion to it to prison for receiving the digital quantity signal that master control borad 1 is sent Control system 3;
Relay is used to the analog signals that monitoring system 3 is sent out being sent to master control borad 1 after relay is attracted, simultaneously The voltage conversion between DC110V on-off models and DC24V on-off models is completed, and is converted into the switching value of DC110V Signal is sent to master control borad 1, and the on-off model for being converted into DC24V is sent to monitoring system 3.
Master control borad 1 can send out four road DC110V on-off models in start-up course, through tetra- tunnels actuating of relay Hou Jiang DC110V on-off models are converted to four road DC24V on-off models, and tetra- road DC24V on-off models of Bing Jiang are delivered to monitoring system System 3, to monitor whether master control borad 1 correctly has sent four road DC110V on-off models.
Monitoring system 3, usually touch screen/PLC all-in-one machine, for sending various command signals to signal conversion unit 2, It is additionally operable to receive and transmits the various feedback signals sent by master control borad 1 of coming through signal conversion unit 2;Wherein, command signal packet The signal for selecting 1 operating mode of master control borad is included, the signal of master control borad 1 is started and simulates the signal of 1 working condition of master control borad.
Monitoring system 3 is additionally operable on the touchscreen carry out every test data the display of state and data, with realization pair All data during master control borad 1 is tested are monitored and control.The content being particularly shown includes inputting owning for master control borad 1 Analog signals voltage data, the actuation of 1 roads start-up course Zhong Ge relay of master control borad or off-state, master control borad 1 export Pulse signal, the output voltage signal of driving plate 4 send voltage to monitoring system 3 after the processing of signal conversion unit 2 Display.
System type power supply master control borad, the driving board checking device of the present invention, it is defeated by the input for simulating 1 peripheral data of master control borad Go out, properties experiment is carried out to master control borad 1, driving plate 4, for the functional progress overall performance survey of institute to master control borad 1 Examination is monitored with test data.
The present invention also provides a kind of system type power supply master control borad, driving board checking device and its detection methods, according to following Step is implemented:
Signal conversion unit 2 is connect by step 1 with master control borad 1, driving plate 4, and the simulation of DC24V is sent out by monitoring system 3 It measures to the relay of signal conversion unit 2, master control borad 1 sends enabling signal to relay, by relay control enabling signal hair It send to the different pins of master control borad 1, to select the operating mode of master control borad 1 as inverter pattern or charger pattern;Wherein open Dynamic signal is by the continual normality digital quantity sent out of master control borad 1;
Step 2, after choosing the operating mode of master control borad 1, master control borad 1 starts corresponding program according to the selected mode, And starting self-test, when self-test, first initializes the on-off model and digital quantity signal of output, while detecting each digital quantity of input Whether signal, on-off model and analog signals are normal;Corresponding failure code can be shown when self-test occurs abnormal;
After step 3, self-test are normal, two-way DC600V voltage analogs and two-way AC380V voltages are sent out by monitoring system 3 Analog quantity, wherein first via DC600V voltage analogs signal retransmit after the relay contact closure of signal conversion unit 2 To master control borad 1, the second road DC600V voltage analogs and two-way AC380V voltage analogs are sent to signal conversion unit 2 The opened point of relay starts to start after the first via DC600V voltage analogs that the detection of master control borad 1 receives are normal;
In step 4, start-up course, 1 priority of master control borad sends out four road DC110V switching values to the relay of signal conversion unit 2 Device, connected after the actuating of relay of converted unit 2 first via DC600V voltage analogs, two-way AC380V voltage analogs and Four road DC110V switching values are to master control borad 1, while relay also connects four road DC24V switching values and is sent to monitoring system 3;
Master control borad sends out three group pulse digital quantity signals to detection plate again, and digital quantity signal is carried out digital-to-analogue conversion by detection plate Afterwards, it is converted into voltage analog and is sent to the display voltage swing of monitoring system 3, while detection plate is sent in reception master control borad 1 Three group pulse signals when can synchronize and send out three digital quantity signals to the normally closed point of relay and be sent to master control borad 1, the relay It is controlled by monitoring system 3.Switching value of the master control borad more than detection, four tunnel analog quantitys are main after three railway digital amounts are normal It controls plate 1 and completes start-up course, and normal code is shown on the display window of its own;
Step 5, basis send simulation master control to master control borad 1, the pilot project to be carried out of driving plate 4 by monitoring system 3 The analog signals of 1 various working conditions of plate, the analog signals of various working conditions are closed through the relay of signal conversion unit 2 After closing or disconnecting, retransmit to master control borad 1, the operation code shown by master control borad 1, to judge the work of master control borad 1 at this time Whether state is normal.Pulse signal is sent during master control board starting to driving plate, driving plate receives pulse signal and carries out work Make, driving voltage value is shown by signal conversion unit 2 to monitoring system 3, whether to judge the working condition of driving plate 4 at this time Normally.
Embodiment
A kind of master control borad, driving board checking device using the present invention presented below, fills power supply under railway DC600V vehicles In setting, reality that the master control borad 1 that is produced after 2012 by Wuhan Zheng Yuan Railway Electrics producer, driving plate 4 make a service test Apply example.
By the present invention master control borad, driving board checking device connect with master control borad 1, select the operating mode of master control borad 1 for Stand-by operation after inverter pattern starts self-test, and self-test normally starts master control borad 1 afterwards, when master control borad 1 completes all start-up courses Afterwards, the detection plate in digital quantity signal to signal conversion unit 2 can be sent out, detection plate retransmits after carrying out digital-to-analogue conversion to monitoring System 3 can see that master control borad 1 works required various data and state by monitoring system 3.
Then specific testing experiment project is proceeded by:
When 1, inputting overpotential test:The DC600V voltage analogs I exported by monitoring system 3 and the electricity more than specified input Pressure is worth to master control borad 1;
If master control borad 1 judges that the voltage analog signal of input is exceeded, master control borad 1 can show code 1.0, then table Show that this function of master control borad 1 is normal, if master control borad 1 does not show the code, then it represents that this function of master control borad 1 is not just Often.
2, when input undervoltage is tested:The DC600V voltage analogs I exported by monitoring system 3 and the electricity less than specified input Pressure is worth to master control borad 1;
If master control borad 1 judges that the voltage analog signal of input is not up to entry condition, master control borad 1 can show generation Code 2.0, then it represents that this function of master control borad 1 is normal;If master control borad 1 does not show the code, then it represents that master control borad 1 this Function is abnormal.
3, when pilot project is that output overvoltage is tested:By the output two-way AC380V voltage analogs of monitoring system 3 and simultaneously More than specified input voltage value to signal conversion unit 2, and through in signal conversion unit 2 relay connect after, retransmit To master control borad 1;
If master control borad 1 judges that the two-way voltage analog signal of input is higher simultaneously, master control borad 1 can show code 3.0, then it represents that this function of master control borad 1 is normal;If master control borad 1 does not show the code, then it represents that the Xiang Gong of master control borad 1 It can be abnormal.
4, pilot project is when exporting under-voltage experiment:By the output two-way AC380V voltage analogs of monitoring system 3 and simultaneously Less than specified input voltage value to signal conversion unit 2, and through in signal conversion unit 2 relay connect after retransmit to Master control borad 1;
If master control borad 1 judges that the two-way voltage analog of input is relatively low simultaneously, master control borad 1 can show code 4.0, Then indicate that this function of master control borad 1 is normal;If master control borad 1 does not show the code, then it represents that this function of master control borad 1 is not Normally.
5, when pilot project is that output overcurrent is tested:By the output two-way AC380V current-modes analog quantity of monitoring system 3 and wherein It is more than the voltage value of specified input all the way to signal conversion unit 2, and is sent out again after the relay in signal conversion unit 2 is connected It send to master control borad 1;
If master control borad 1 judges that the two-way voltage analog of input has higher all the way, master control borad 1 can show code 5.0, then it represents that this function of master control borad 1 is normal;If master control borad 1 does not show the code, then it represents that the Xiang Gong of master control borad 1 It can be abnormal.
6, when pilot project is that output overloading is tested:By the output two-way AC380V current-modes analog quantity of monitoring system 3 and simultaneously More than specified input voltage value to signal conversion unit 2, and through in signal conversion unit 2 relay connect after retransmit to Master control borad 1;
If master control borad 1 judges that the two-way voltage analog of input is higher simultaneously, master control borad 1 can show code 6.0, Then indicate that this function of master control borad 1 is normal;If master control borad 1 does not show the code, then it represents that this function of master control borad 1 is not Normally.
7, when pilot project is IGBT Test to Failure:Three road DC24V on-off models to signal is exported by monitoring system 3 to turn Change unit 2, and the three tunnel pulse feedback digital quantity signals that shutoff signal converting unit 2 is transmitted;
If master control borad 1 judges that its own does not receive pulse feedback signal, master control borad 1 show code 7.1,7.2, 7.3 is one such or a variety of, then it represents that this function of master control borad 1 is normal;If master control borad 1 does not show that the code is therein It is one or more, then it represents that this function of master control borad 1 is abnormal.
8, when pilot project is that overheating protection is tested:By the output of monitoring system 3, DC24V on-off models to signal turns all the way Unit 2 is changed, and shutoff signal converting unit 2 is sent to the DC24V on-off models of master control borad 1;
If master control borad 1 judges the way switch amount abnormal signal, master control borad 1 can show code 9.0, then it represents that master control This function of plate 1 is normal;If master control borad 1 does not show the code, then it represents that this function of master control borad 1 is abnormal.
9, when pilot project is that internal fault is tested:The different voltage analog of two-way is exported to signal by monitoring system 3 Converting unit 2, and retransmited to master control borad 1 after the relay in signal conversion unit 2 is connected;Wherein voltage analog all the way Less than the voltage value of specified input, another way voltage analog is equal to the voltage value of specified input;
If master control borad 1 judges that two-way voltage analog signal phase difference is excessively high, master control borad 1 can show code D5, then Indicate that this function of master control borad 1 is normal;If master control borad 1 does not show the code, then it represents that this function of master control borad 1 is not just Often.
10, when pilot project is contactor Test to Failure:Four road DC24V on-off models are exported to letter by monitoring system 3 Number converting unit 2, and four road DC110V switching value feedback signals of random 2 transmission of shutoff signal converting unit are therein all the way;
If master control borad 1 detects that DC110V On-off signals are abnormal, master control borad 1 can show code E1, E2, E3, E4 its In one kind, then it represents that this function of master control borad 1 is normal;If master control borad 1 does not show the code, then it represents that master control borad 1 This function is abnormal.
11, when pilot project is precharge Test to Failure:By monitoring system 3 simultaneously export DC600V voltage analogs I and DC600V voltage analogs II and DC600V voltage analogs II are less than the voltage value of specified input.Wherein DC600V voltage analogs Amount I is fed directly to master control borad 1, and DC600V voltage analogs II is sent to signal conversion unit 2;Input is detected in master control borad 1 When DC600V voltage analogs I is normal, master control borad 1 starts to start, and master control borad 1 first sends out the first via DC110V switching values when startup It is sent to the relay of signal conversion unit 2, DC600V voltage analogs II is transferred to master control borad 1, master control after the actuating of relay When plate 1 judges that DC600V voltage analogs II is crossed less than DC600V voltage analog I, C.0 master control borad 1 shows code, then table Show that this function of master control borad 1 is normal;If master control borad 1 does not show correct code, then it represents that this function of master control borad 1 is not just Often.
12, when pilot project is normal work experiment:In the start-up course of master control borad 1, the detection monitoring in real time of master control borad 1 system Each on-off model, each voltage analog signal and each pulse feedback digital signal transmitted between system 3 and master control borad 1;
When master control borad 1 judges that each on-off model, each voltage analog signal and each pulse feedback digital signal are no different Chang Shi, master control borad 1 can show code OP, then it represents that this function of master control borad 1 is normal;If master control borad 1 does not show the code, Then indicate that this function of master control borad 1 is abnormal.
13, when pilot project is the normal startup function of analog-driven plate:Pulse signal is sent in 1 start-up course of master control borad To driving plate 4;
When driving plate 4 receives the normal burst signal of the transmission of master control borad 1, monitoring system 3 can show the six of driving plate Road voltage is converted into positive value by negative value, and six road voltage show values are almost the same, then it represents that 4 this function of driving plate is normal;Such as 3 six road voltage show value of fruit monitoring system is inconsistent, then it represents that this function of driving plate 4 is abnormal.
After the above experiment experiment is normal, illustrate that master control borad 1, driving plate 4 are up-to-standard.Entire experiment process is by monitoring The touch panel monitor system of system 3 simultaneously shows various analog signals data and on-off model state, and passes through signal conversion unit 2 Interior detection plate carries out signal conversion to master control borad 1, driving plate 4 with relay and is sent to touch screen/PLC all-in-one machine, realizes to whole The data of a experiment are monitored.
It can be seen from above-described embodiment that the detection device energy comprehensive simulated master control borad 1 of the present invention, driving plate 4 be not With the operational data under operating condition, whether analysis master control borad 1, the properties of driving plate 4 are qualified;The detection device can be to master Control plate 1, driving plate 4 all data monitored in real time, its working condition and work in every data are shown by touch screen, it is whole A process is intuitive, clearly;The various operating modes of master control borad 1 can be arranged in the detection device, can simulate master control borad 1 in inverter work State under operation mode and charger operating mode, the testing stand is simple to operate, in use, first connecting master control borad 1 To master control borad 1,4 detection device of driving plate signal conversion unit 2 on, then pass through the touch screen of monitoring system 3 select work State can open test procedure.Solve the problems, such as that 1 testing cost of master control borad is high in the prior art, efficiency is low.

Claims (10)

1. a kind of system type power supply master control borad, driving board checking device, which is characterized in that including with master control borad (1), driving plate (4) Sequentially connected signal conversion unit (2) and monitoring system (3);
The signal conversion unit (2), for carrying out digital-to-analogue conversion to the digital quantity signal received, to the switch received It measures signal and carries out voltage conversion, break-make control is carried out to the analog signals received, after converting, then will need to send out The signal gone is sent;
The monitoring system (3) is additionally operable to receive for sending various command signals to the signal conversion unit (2) The various feedback signals sent by master control borad (1), driving plate (4) come are transmitted through the signal conversion unit (2), are additionally operable to The carry out state and data of the every experiment of display;Wherein, the command signal includes for selecting master control borad (1) operating mode Signal, start master control borad (1) signal and simulation master control borad (1) working condition signal.
2. detection device as described in claim 1, which is characterized in that the signal conversion unit (2) include detection plate and Relay;
The detection plate, the digital quantity signal sent for receiving master control borad (1), and retransmited after carrying out digital-to-analogue conversion to it To monitoring system (3);
The relay, for the analog signals that monitoring system (3) is sent out to be sent to master control borad after relay is attracted (1), the voltage conversion being completed at the same time between DC110V on-off models and DC24V on-off models.
3. a kind of system type power supply master control borad as claimed in claim 1 or 2, the detection method for driving board checking device, feature It is, implements according to the following steps:
The signal conversion unit (2) is connect by step 1 with master control borad (1), and opening for DC24V is sent out by the monitoring system (3) Pass is measured to the relay of signal conversion unit (2), and master control borad (1) sends enabling signal to relay, controlled by relay described in Enabling signal is sent to the different pins of master control borad (1), to select the operating mode of master control borad (1) as inverter pattern or charging Machine pattern;
Step 2, after choosing the operating mode of master control borad (1), master control borad (1) starts corresponding program according to the selected mode, And starting self-test, when self-test, first initializes the on-off model and digital quantity signal of output, while detecting each digital quantity of input Whether signal, on-off model and analog signals are normal;
After step 3, self-test are normal, two-way DC600V voltage analogs and two-way AC380V voltage-modes are sent out by monitoring system (3) Analog quantity, wherein first via DC600V voltage analogs signal retransmit after the relay contact closure of signal conversion unit (2) To master control borad (1), the second road DC600V voltage analogs and two-way AC380V voltage analogs are sent to signal conversion unit (2) opened point of relay starts to open after the first via DC600V voltage analogs that master control borad (1) detection receives are normal It is dynamic;
In step 4, start-up course, the master control borad (1) successively sends out four road DC110V switching values to the signal conversion unit (2) relay connects first via DC600V voltage analogs, two-way AC380V after the actuating of relay of converted unit (2) Voltage analog and four road DC110V switching values are to master control borad (1), while relay is also connected four road DC24V switching values and is sent to Monitoring system (3);
Master control borad (1) sends out three group pulse digital quantity signals to detection plate again, and digital quantity signal is carried out digital-to-analogue conversion by detection plate Afterwards, transformed voltage analog is sent to monitoring system (3), master control borad (1) detects each way switch amount, analog quantity sum number After word amount is normal, master control borad (1) completes start-up course;
Step 5, master control borad (1) are completed after starting, according to master control borad (1) pilot project to be carried out, by monitoring system (3) The analog signals of simulation master control borad (1) various working conditions are sent, the analog signals of various working conditions are converted through signal It after the relay of unit (2) is closed or disconnects, retransmits to master control borad (1), the operation code shown by master control borad (1) is come Judge whether the working condition of master control borad (1) at this time is normal.
4. detection method as claimed in claim 3, which is characterized in that the specific method of the step 3 is,
When the pilot project is input overpotential test:The analog signals of rated voltage are more than extremely by monitoring system (3) output Master control borad (1);
If master control borad (1) judges that the voltage analog signal of input is exceeded, master control borad (1) can show correct code, Then indicate that this function of master control borad (1) is normal;If master control borad (1) does not show the code, then it represents that master control borad (1) this Function is abnormal;
When the pilot project is that input undervoltage is tested:The analog signals of rated voltage are less than extremely by monitoring system (3) output Master control borad (1);
If master control borad (1) judges that the voltage analog signal of input is not up to entry condition, master control borad (1) can be shown just True code, then it represents that this function of master control borad (1) is normal;If master control borad (1) does not show correct code, then it represents that master control This function of plate (1) is abnormal.
5. detection method as claimed in claim 3, which is characterized in that the specific method of the step 3 is,
When the pilot project is output overvoltage, overcurrent or overload test:It is more than by the monitoring system (3) output two-way specified Voltage, electric current or load and the identical analog signals of numerical value to the signal conversion unit (2), and through signal conversion unit (2) it after the relay in is connected, retransmits to master control borad (1);
If master control borad (1) judges that the two-way voltage analog signal of input is higher simultaneously, the master control borad (1) can show Correct code, then it represents that this function of the master control borad (1) is normal;If master control borad (1) does not show correct code, table Show that this function of master control borad (1) is abnormal;
The pilot project is when exporting under-voltage experiment:It is identical by the monitoring system (3) output two-way and less than specified defeated Enter the analog signals of voltage to the signal conversion unit (2), and after the relay in signal conversion unit (2) is connected again It is sent to master control borad (1);
If master control borad (1) judges that the two-way voltage analog signal of input is relatively low simultaneously, master control borad (1) can be shown correctly Code, then it represents that this function of master control borad (1) is normal;If master control borad (1) does not show correct code, then it represents that master control borad (1) this function is abnormal.
6. detection method as claimed in claim 3, which is characterized in that the specific method of the step 3 is,
When the pilot project is IGBT Test to Failure:Three road DC24V on-off models to signal is exported by monitoring system (3) to turn Change unit (2), and three tunnel pulse feedback digital quantity signals of shutoff signal converting unit (2) transmission;
If master control borad (1) judges that its own does not receive pulse feedback digital quantity signal, master control borad (1) shows correct generation Code, then it represents that this function of master control borad (1) is normal;If master control borad (1) does not show correct code, then it represents that master control borad (1) this function is abnormal.
7. detection method as claimed in claim 3, which is characterized in that the specific method of the step 3 is,
When the pilot project is that overheating protection is tested:By monitoring system (3) output, DC24V on-off models to signal turns all the way Unit (2) is changed, and shutoff signal converting unit (2) is sent to the DC24V on-off models of master control borad (1);
If master control borad (1) judges the way switch amount abnormal signal, master control borad (1) can show correct code, then it represents that This function of master control borad (1) is normal;If master control borad (1) does not show correct code, then it represents that this function of master control borad (1) It is abnormal.
8. detection method as claimed in claim 3, which is characterized in that the specific method of the step 3 is,
When the pilot project is that internal fault is tested:By the different voltage analog of monitoring system (3) output two-way to signal Converting unit (2), and retransmited to master control borad (1) after the relay in signal conversion unit (2) is connected;Wherein voltage all the way Analog quantity is less than the voltage value of specified input, and another way voltage analog is equal to the voltage value of specified input;
If master control borad (1) judges that two-way voltage analog signal phase difference is excessively high, master control borad (1) can be shown for correct generation Code, then it represents that this function of master control borad (1) is normal;If master control borad (1) does not show correct code, then it represents that master control borad (1) This function it is abnormal.
9. detection method as claimed in claim 3, which is characterized in that the specific method of the step 3 is,
When the pilot project is contactor Test to Failure:Four road DC24V on-off models are exported to signal by monitoring system (3) Converting unit (2), and four road DC110V switching value feedback signals therein one of random shutoff signal converting unit (2) transmission Road;
If master control borad (1) detects that DC110V On-off signals are abnormal, master control borad (1) can show correct code, then it represents that main This function of controlling plate (1) is normal;If master control borad (1) does not show correct code, then it represents that this function of master control borad 1 is not just Often.
10. detection method as claimed in claim 3, which is characterized in that the specific method of the step 3 is,
When the pilot project is precharge Test to Failure:By monitoring system (3) and meanwhile export DC600V voltage analogs I and DC600V voltage analogs II and DC600V voltage analogs II are less than the voltage value of specified input, wherein DC600V voltage analogs Amount I is fed directly to master control borad (1), and DC600V voltage analogs II is sent to signal conversion unit (2);It is detected in master control borad (1) When the DC600V voltage analogs I of input is normal, master control borad (1) starts to start, and master control borad (1) first sends out the first via when startup DC110V switching values are sent to the relay of signal conversion unit (2), transmit DC600V voltage analogs II after the actuating of relay To master control borad (1), when master control borad (1) judges that DC600V voltage analogs II is crossed less than DC600V voltage analog I, master control borad (1) correct code is shown, then it represents that this function of master control borad (1) is normal;If master control borad (1) does not show correct code, Indicate that this function of master control borad (1) is abnormal;
When the pilot project is normal work experiment:In the start-up course of master control borad (1), master control borad (1) detection monitoring in real time Each on-off model, each voltage analog signal and each pulse feedback number letter transmitted between system (3) and master control borad (1) Number;
When master control borad (1) judges that each on-off model, each voltage analog signal and each pulse feedback digital signal are without exception When, master control borad (1) can show correct code, then it represents that this function of master control borad (1) is normal;If master control borad (1) is not shown Correct code, then it represents that this function of master control borad (1) is abnormal.
CN201810749921.6A 2018-07-10 2018-07-10 System type power supply master control borad, driving board checking device and its detection method Pending CN108594797A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810749921.6A CN108594797A (en) 2018-07-10 2018-07-10 System type power supply master control borad, driving board checking device and its detection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810749921.6A CN108594797A (en) 2018-07-10 2018-07-10 System type power supply master control borad, driving board checking device and its detection method

Publications (1)

Publication Number Publication Date
CN108594797A true CN108594797A (en) 2018-09-28

Family

ID=63617925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810749921.6A Pending CN108594797A (en) 2018-07-10 2018-07-10 System type power supply master control borad, driving board checking device and its detection method

Country Status (1)

Country Link
CN (1) CN108594797A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112526264A (en) * 2020-11-26 2021-03-19 苏州市万松电气有限公司 Single-phase inverter detection system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105137958A (en) * 2015-07-22 2015-12-09 北京九方宏信交通装备有限公司 Railway under-vehicle power supply main control board detection device and detection method
CN206292377U (en) * 2016-12-23 2017-06-30 北京九方宏信交通装备有限公司 Inverter master control borad fault detection means in track traffic

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105137958A (en) * 2015-07-22 2015-12-09 北京九方宏信交通装备有限公司 Railway under-vehicle power supply main control board detection device and detection method
CN206292377U (en) * 2016-12-23 2017-06-30 北京九方宏信交通装备有限公司 Inverter master control borad fault detection means in track traffic

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112526264A (en) * 2020-11-26 2021-03-19 苏州市万松电气有限公司 Single-phase inverter detection system

Similar Documents

Publication Publication Date Title
CN105137958B (en) The detection means and detection method of power supply master control borad under railcar
CN111459138B (en) Turnout fault testing system
CN103440803B (en) The authentic training system of 10kV power distribution equipment real voltage analog current closed loop
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN110927482A (en) Automatic hybrid test system and method for distribution automation feeder terminal equipment
CN106019002A (en) Verification test platform for battery management system and test method thereof
CN101750555A (en) Spare automatic switching comprehensive tester
CN207662978U (en) A kind of voltage-time type feeder automation action logic experimental rig
CN112711829A (en) Intelligent substation secondary equipment batch production intelligent maintenance system
CN212410719U (en) Outdoor signal equipment simulation testing device
CN106774263A (en) A kind of EPS controller tests system and device
CN201319052Y (en) Auto-switch-on integrated tester
CN107102567B (en) Simulation test system and test method
CN104076805A (en) Test system for automatic control equipment of power distribution network
CN104133463A (en) Terminal injection-type feeder automation uninterrupted power test method
CN111458586A (en) Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation
CN108594797A (en) System type power supply master control borad, driving board checking device and its detection method
CN108445286A (en) A kind of three-phase four-wire system electrical energy meter fault simulator
CN206292377U (en) Inverter master control borad fault detection means in track traffic
CN108447360A (en) A kind of three-phase three-wire electric energy meter device for simulating false wiring
CN201230204Y (en) Logic test device for microcomputer type protection monitoring module in power supply and distribution system
CN203520719U (en) 10kV power distribution unit actual voltage simulation current closed-loop all-real training system
CN205899894U (en) Use emulation intelligent ammeter's trouble analogue means
CN203981790U (en) A kind of combined type backup auto-activating device tester
CN106647696A (en) CRH5-type locomotive driver controller ground tester

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928

RJ01 Rejection of invention patent application after publication