CN108590703A - Tunnel arch and its installation method with elastic slip casting bag - Google Patents

Tunnel arch and its installation method with elastic slip casting bag Download PDF

Info

Publication number
CN108590703A
CN108590703A CN201810352403.0A CN201810352403A CN108590703A CN 108590703 A CN108590703 A CN 108590703A CN 201810352403 A CN201810352403 A CN 201810352403A CN 108590703 A CN108590703 A CN 108590703A
Authority
CN
China
Prior art keywords
slip casting
arch
casting bag
country rock
elastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810352403.0A
Other languages
Chinese (zh)
Inventor
陈胜玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810352403.0A priority Critical patent/CN108590703A/en
Publication of CN108590703A publication Critical patent/CN108590703A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses the tunnel archs and its installation method of flexible slip casting bag.What arch was contacted with country rock is provided with slip casting bag on one side, slip casting bag is made of flexible elastic material, slip casting bag is adhesively glued at the arch back side, after arch installation, slurries are injected in slip casting bag, slip casting bag expands, and is full of the gap of arch and irregular country rock, and arch is bonded closely with country rock after grout cures.Compared with prior art, the advantages that present invention can give full play to the high capacity of arch, uniform force, of low cost, speed of application is fast, easy to operate, safe is widely portable in various drill+blast tunnels constructions.

Description

Tunnel arch and its installation method with elastic slip casting bag
Technical field
The invention belongs to Tunnel Engineering drill bursting construction field, it is related to the tunnel arch with elastic slip casting bag and its installation Method.
Background technology
Arch stability to tunnel and is applied using one of most important support unit during drilling and blasting method tunneling The personal safety of worker person plays an important role.But it is meticulous regardless of excavating, excavation face is all rough, arch It is difficult to closely, be comprehensively in direct contact with country rock, even if it is also part to have contact;It is not in place along with setting up, it may be said that Arch and country rock are not closely connected, there is partially or fully hanging state.In this case, arch majority is by concentration of local The effect of load or Eccentric Load, arch at this time is easily to deform(It is readily bent or surrenders).For this purpose, arch is used after setting up The wedgings such as cushion block, voussoir are allowed to give full play to support action with the distribution of adjustment force.Test result shows that arch connects with country rock Contact is more, and contact is closer, and the bearing capacity of arch is higher.《Railway tunnel work construction technology guide》Middle regulation:" along arch Outer rim is every 2 meters with gad or concrete precast block wedging ", but due to country rock surface irregularity, it is irregular to follow, encircle per Pin Voussoir size needed for frame is all different, and manufacturing cost is very high;After the completion of arch is set up, wedge is squeezed between arch and the gap of country rock Block, labor intensity is big, and the vibration force struck may shake the finger stone fallen in country rock, threaten the safety of construction personnel, because This is not fitted closely in Practical Project middle arch rack with country rock completely..
Invention content
The purpose of the present invention be exactly in order to overcome the problems of the above-mentioned prior art, provide it is a kind of can be completely tight with country rock The tunnel arch of closely connected conjunction, it has, and uniform force, high capacity, of low cost, speed of application is fast, easy to operate, safe etc. Advantage.
The purpose of the present invention can be achieved through the following technical solutions:
Tunnel arch with elastic slip casting bag, which is characterized in that include n including arch and encircle section, wherein n is not less than 1 Positive integer, described n encircles in section, each one side m flexible resilient slip casting bag of setting for encircleing section and being contacted with country rock, and wherein m is Positive integer not less than 1, the slip casting bag are provided with Grouting Pipe and exhaust pipe, and the Grouting Pipe connects filling system.
Preferably, the material of the slip casting bag is elastic geomembrane.
Preferably, the width of the slip casting bag is no more than 1.5 times of arch section width, and maximum volume is not less than arch after expansion The volume in gap between section and country rock.
Preferably, the slip casting bag is adhesively glued in the one side that arch section is contacted with country rock.
Preferably, the slip casting bag side is provided with Grouting Pipe, and the other side is provided with exhaust pipe, the Grouting Pipe and Exhaust pipe is furnished with pipe stopper.
The installation method of tunnel arch with elastic slip casting bag, this method specifically include following steps:
Step 1:After tunnel excavation, the volume in gap between arch section and country rock is obtained with three-dimensional laser scanner scanning;
Step 2:The width for choosing slip casting bag is not more than 1.5 times of arch section width, and maximum volume is not less than arch section after expansion The slip casting bag of the volume in gap between country rock, by its with gluing knot arch section in the one side of the contact of country rock;
Step 3:Set up arch section;
Step 4:Connect Grouting Pipe and filling system;
Step 5:Valve is opened, grouting pump is started, slurries are injected into slip casting bag, and record the reading of flowmeter and pressure gauge;
Step 6:Reach arch maximum when flow meter reading is equal to the volume in gap or pressure gauge reading between arch section and country rock and hold When carrying power, stop slip casting, disconnect Grouting Pipe and filling system, Grouting Pipe and exhaust pipe are blocked with pipe stopper.
Compared with prior art, the invention has the characteristics that:
1. slip casting bag material is flexible elastic material, in bag after the sufficient slurries of injection, no matter how uneven excavation face is, and note Slurry bag can be filled up completely the gap between arch and country rock, make arch uniform force, can give full play to the bearing capacity of arch;
2. slip casting bag is made of common earth working material, of low cost;
3. slip casting bag is installed using adhesive type, simple and fast;
4. finger stone is fallen caused by avoiding conventional method impact wedge block possibility, safe.
Description of the drawings
Fig. 1 is the tunnel arch overall schematic for having in embodiment 1 elastic slip casting bag;
Fig. 2 is certain section of arch elasticity slip casting bag grouting filling schematic diagram in embodiment 1;
Description of symbols in figure:
1-arch section, 2-country rocks, 3-slip casting bags, 31-slurries, 32-glue, 33-Grouting Pipes, 34-exhaust pipes, 35-pluggings Plug, 6-filling systems, 61-flowmeters, 62-pressure gauges, 63-valves, 64-grouting pumps.
Specific implementation mode
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
1 frame of tunnel arch with elastic slip casting bag, structure is as depicted in figs. 1 and 2, including two arch sections 1, each to encircle section 1 1 slip casting bag 3 is arranged in the one side contacted with country rock 2.Slip casting bag 3 is made of elastic geomembrane, and width is arch 1 width 1.5 of section Times, maximum volume is equal to the volume in gap between arch section 1 and country rock 2 after expansion, and 3 side of slip casting bag is provided with Grouting Pipe 33, separately Side is provided with exhaust pipe 34, and slip casting bag 3 is fixed on glue 32 on arch.After arch is set up, Grouting Pipe 33 connects with filling system 6 It connects, after the completion of slip casting, Grouting Pipe 33 and exhaust pipe 34 is blocked with pipe stopper 35.
The installation method of tunnel arch with elastic slip casting bag, this method specifically include following steps:
Step 1:After tunnel excavation, the volume in gap between arch section 1 and country rock 2 is obtained with three-dimensional laser scanner scanning;
Step 2:1.5 times that width is equal to arch section width are chosen, and maximum volume is equal between arch section 1 and country rock 2 after expansion The slip casting bag 3 of the volume in gap, by its with glue 32 be bonded in arch section 1 in the one side of the contact of country rock 2;
Step 3:Set up arch section 1;
Step 4:Connect Grouting Pipe 33 and filling system 6;
Step 5:Valve 63 is opened, grouting pump 64 is started, slurries 31 are injected into slip casting bag 3, and record flowmeter 61 and pressure gauge 62 reading;
Step 6:Reach arch when the reading of flowmeter 61 is equal to the volume in gap or the reading of pressure gauge 62 between arch section 1 and country rock 2 When maximum load capacity, stop slip casting, disconnect Grouting Pipe 33 and filling system 6, Grouting Pipe 33 and exhaust pipe are blocked with pipe stopper 35 34。
The above description of the embodiments is intended to facilitate ordinary skill in the art to understand and use the invention. Person skilled in the art obviously easily can make various modifications to these embodiments, and described herein general Principle is applied in other embodiment without having to go through creative labor.Therefore, the present invention is not limited to the above embodiments, ability Field technique personnel announcement according to the present invention, improvement and modification made without departing from the scope of the present invention all should be the present invention's Within protection domain.

Claims (7)

1. the tunnel arch with elastic slip casting bag, which is characterized in that include n including arch and encircle section(1), wherein n is not small In 1 positive integer, described n arch section(1)In, each encircle section(1)With country rock(2)M flexible resilient is arranged in the one side of contact Slip casting bag(3), wherein m is the positive integer not less than 1, the slip casting bag(3)It is provided with Grouting Pipe(33)And exhaust pipe(34), The Grouting Pipe(33)Connect filling system(6).
2. the tunnel arch with elastic slip casting bag according to claim 1, which is characterized in that the slip casting bag(3) Material be elastic geomembrane.
3. the tunnel arch with elastic slip casting bag according to claim 2, which is characterized in that the elastic geomembrane It is at least one layer of.
4. the tunnel arch with elastic slip casting bag according to claim 1, which is characterized in that slip casting bag(3)Width No more than arch section(1)1.5 times of width, maximum volume is not less than arch section after expansion(1)With country rock(2)Between gap volume.
5. the tunnel arch with elastic slip casting bag according to claim 1, which is characterized in that slip casting bag(3)By glue (32)It is bonded in arch section(1)With country rock(2)In the one side of contact.
6. the tunnel arch with elastic slip casting bag according to claim 1, which is characterized in that slip casting bag(3)Side is set It is equipped with Grouting Pipe(33), the other side is provided with exhaust pipe(34), Grouting Pipe(33)And exhaust pipe(34)Equipped with pipe stopper(35).
7. a kind of such as claim 1 to 6 any one of them has the installation method of the tunnel arch of elastic slip casting bag, feature It is, this method specifically includes following steps:
Step 1:After tunnel excavation, arch section is obtained with three-dimensional laser scanner scanning(1)With country rock(2)Between gap volume;
Step 2:Choose slip casting bag(3)Width no more than arch section(1)1.5 times of width, and maximum volume is not small after expansion In arch section(1)With country rock(2)Between gap volume slip casting bag(3), used glue(32)It is bonded in arch section(1)With country rock (2)Contact one side on;
Step 3:Set up arch section(1);
Step 4:Connect Grouting Pipe(33)With filling system(6);
Step 5:Open valve(63), start grouting pump(64), by slurries(31)Inject slip casting bag(3), and record flowmeter (61)And pressure gauge(62)Reading;
Step 6:Work as flowmeter(61)Reading is equal to arch section(1)With country rock(2)Between gap volume or pressure gauge(62)Reading When reaching arch maximum load capacity, stop slip casting, disconnects Grouting Pipe(33)With filling system(6), use pipe stopper(35)Block note Slurry pipe(33)And exhaust pipe(34).
CN201810352403.0A 2018-04-19 2018-04-19 Tunnel arch and its installation method with elastic slip casting bag Pending CN108590703A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810352403.0A CN108590703A (en) 2018-04-19 2018-04-19 Tunnel arch and its installation method with elastic slip casting bag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810352403.0A CN108590703A (en) 2018-04-19 2018-04-19 Tunnel arch and its installation method with elastic slip casting bag

Publications (1)

Publication Number Publication Date
CN108590703A true CN108590703A (en) 2018-09-28

Family

ID=63613758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810352403.0A Pending CN108590703A (en) 2018-04-19 2018-04-19 Tunnel arch and its installation method with elastic slip casting bag

Country Status (1)

Country Link
CN (1) CN108590703A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798121A (en) * 2019-03-22 2019-05-24 中建八局轨道交通建设有限公司 The construction method of existing structure bottom plate is worn under bored tunnel is closely connected
CN109882193A (en) * 2019-04-08 2019-06-14 安徽理工大学 A kind of circulation internal pressure loading method of large scale simulation roadway support body
CN109931077A (en) * 2019-03-29 2019-06-25 中南大学 Support system and its construction method for Segment rehabilitation
CN110094215A (en) * 2019-05-30 2019-08-06 三峡大学 Non-newtonian fluid liner supporting structure and construction method
CN111305871A (en) * 2020-03-09 2020-06-19 南昌大学 Telescopic grouting filling type shield segment soil supporting device and construction method
CN113982656A (en) * 2021-11-17 2022-01-28 山东建筑大学 Steel-film composite restrained arch frame for roadway (tunnel) support and construction process
CN114109441A (en) * 2021-10-08 2022-03-01 陕西同人应用材料有限公司 Composite cavity vacuum tension elastic die and rapid construction process using same
CN114857367A (en) * 2022-04-02 2022-08-05 中国一冶集团有限公司 Post-grouting expansive underground pipeline joint plugging structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4895480A (en) * 1987-09-11 1990-01-23 Signode Corporation Method and apparatus for formation of a tunnel lining
CN103790597A (en) * 2014-01-26 2014-05-14 太原理工大学 Active backfilling support method with pressure support used
CN107191197A (en) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method
CN206668280U (en) * 2017-04-24 2017-11-24 黄河勘测规划设计有限公司 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4895480A (en) * 1987-09-11 1990-01-23 Signode Corporation Method and apparatus for formation of a tunnel lining
CN103790597A (en) * 2014-01-26 2014-05-14 太原理工大学 Active backfilling support method with pressure support used
CN206668280U (en) * 2017-04-24 2017-11-24 黄河勘测规划设计有限公司 Beans gravel rockfill grouting prefabricated pipe section suitable for double-shielded TBM construction
CN107191197A (en) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798121A (en) * 2019-03-22 2019-05-24 中建八局轨道交通建设有限公司 The construction method of existing structure bottom plate is worn under bored tunnel is closely connected
CN109931077A (en) * 2019-03-29 2019-06-25 中南大学 Support system and its construction method for Segment rehabilitation
CN109882193A (en) * 2019-04-08 2019-06-14 安徽理工大学 A kind of circulation internal pressure loading method of large scale simulation roadway support body
CN109882193B (en) * 2019-04-08 2021-10-01 安徽理工大学 Cyclic internal pressure loading method for large-size simulation roadway support body
CN110094215A (en) * 2019-05-30 2019-08-06 三峡大学 Non-newtonian fluid liner supporting structure and construction method
CN111305871A (en) * 2020-03-09 2020-06-19 南昌大学 Telescopic grouting filling type shield segment soil supporting device and construction method
CN114109441A (en) * 2021-10-08 2022-03-01 陕西同人应用材料有限公司 Composite cavity vacuum tension elastic die and rapid construction process using same
CN114109441B (en) * 2021-10-08 2024-05-28 陕西同人应用材料有限公司 Composite cavity vacuum tension elastic die and rapid construction process using same
CN113982656A (en) * 2021-11-17 2022-01-28 山东建筑大学 Steel-film composite restrained arch frame for roadway (tunnel) support and construction process
CN113982656B (en) * 2021-11-17 2024-01-09 山东建筑大学 Steel-film composite constraint arch frame for roadway (tunnel) support and construction process
CN114857367A (en) * 2022-04-02 2022-08-05 中国一冶集团有限公司 Post-grouting expansive underground pipeline joint plugging structure

Similar Documents

Publication Publication Date Title
CN108590703A (en) Tunnel arch and its installation method with elastic slip casting bag
CN105545322B (en) For controlling the safeguard structure and support system and method that tunnel wall rock deformation destroys
CN103603683B (en) Pocket type slip casting anchoring process
CN103195442A (en) Even-grouting structure of coal mine tunnel and construction technology thereof
CN109098742B (en) A kind of list anchor focuses the steel tendon and its method for protecting support of formula full length fastening
CN203223229U (en) Coal mine roadway uniformly distributing grouting structure
CN103993902B (en) A kind of mash gas pumping drilling two step slip-casting hole-sealing method
CN107060116A (en) A kind of high-pressure slip-casting blocking method stitched for building settlement
CN205445625U (en) A protective structure and strut system for controlling tunnel country rock deforming and breaking
CN204875481U (en) Arched bridge of main mound thrust can balance
CN108708742A (en) Combined retaining structure for concrete pipe sheet anchor pole deviation
CN108868827A (en) Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN106761841B (en) Working face tailgate fractured coal grouting reinforcement method
CN106703850A (en) Novel hydraulic expanded recyclable anchor rod
CN204921007U (en) Process systems is strutted in stock slip casting
CN103498685B (en) Very soft rock roadway base plate and two helps release window supporting device
CN207153830U (en) A kind of dregs processing unit
CN108868854A (en) Expansion shell type friction bolt-anchor cable combined support structure
CN209508989U (en) Highway slope protection structure and slope protection system
CN204385726U (en) A kind of anchoring pile
CN203080534U (en) Supporting structure of fractured rock mass side slope
Lunardi et al. The reinforcement of the core face: history and state of the art of the Italian technology that has revolutionized the world of tunneling. Some reflections
CN108590702A (en) Tunnel arch and its installation method with back sticking type granular media filling baggy fabric
CN105089687A (en) Bolt-grouting supporting process system
CN105040694A (en) Silicone grouting stopper for high-pressure grouting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180928