CN108590171A - A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs - Google Patents

A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs Download PDF

Info

Publication number
CN108590171A
CN108590171A CN201810083395.4A CN201810083395A CN108590171A CN 108590171 A CN108590171 A CN 108590171A CN 201810083395 A CN201810083395 A CN 201810083395A CN 108590171 A CN108590171 A CN 108590171A
Authority
CN
China
Prior art keywords
climbing
frame body
template
installation
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810083395.4A
Other languages
Chinese (zh)
Inventor
沈世祥
田俊
章春建
范海辉
吉建锋
沈永亮
刘红佩
常秀萍
朱成杰
秦忠贵
沈志军
高勇军
洪晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JIANGZHONG GROUP CO Ltd
Original Assignee
JIANGSU JIANGZHONG GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JIANGZHONG GROUP CO Ltd filed Critical JIANGSU JIANGZHONG GROUP CO Ltd
Priority to CN201810083395.4A priority Critical patent/CN108590171A/en
Publication of CN108590171A publication Critical patent/CN108590171A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of pre-splicing separate types of steel and wood composite from climbing frame body template construction method, it is characterised in that:The method of climbing of installation method and climbing support including climbing support;Hydraulic climbing frame can integrally climb in the present invention, also can list Pin climb, stability of climbing is good;It is easy to operate, it is safe, a large amount of working hours and material can be saved;Climbing support once after assembling, until top is not landed, saves construction site, and reduce the damage of damaging of template, particularly panel;Comprehensive operating platform is provided, unit in charge of construction is not necessarily to set up operating platform and waste material and labour again;Structure construction error is small, and correction is simple, and construction error can be eliminated successively;Climbing speed is fast, can improve engineering construction speed;For template from climbing, it is secondary to substantially reduce hanging for tower crane for original place cleaning;Change the pawl direction of Commutating box, realizes the power and energy for promoting climbing frame or guide rail;When often climbing a terraced shelves, oil cylinder is voluntarily adjusted, and ensures while the frame body to climb synchronizes.

Description

A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs
Technical field
The present invention relates to building engineering fields more particularly to a kind of pre-splicing separate type of steel and wood composite to be applied from frame body template of climbing Work method.
Background technology
High building steel reinforced concrete combination frame -- concrete core barrel structure system is the main of modernization high-rise building Structure type, using hydraulic pressure from the frame body template construction that climbs be ensure high building Core Walls Structure speed of application and quality best method it One, it is used by more and more units in charge of construction.
For high-rise, Super High full-situ shear wall structure cylinder, elevator shaft, industry and the vertical cylinder of municipal structures Construction need using a kind of efficient hydraulic pressure from climbing support.
Invention content
The technical problem to be solved in the present invention is to provide a kind of pre-splicing separate types of steel and wood composite from climbing frame body template construction Method, it is complicated from the frame body template frame that climbs to solve general hydraulic pressure, the slow problem of climbing speed.
In order to solve the above technical problems, the technical scheme is that:A kind of pre-splicing separate type of steel and wood composite is from climbing support Body template construction method, innovative point are:Installation method and climbing support including climbing support climb method specific method such as Under:
The installation method of climbing support:
S1:Installation of embedded parts:It before concrete placings, climbs cone and is fixed on panel by stressed bolt, when concrete pours, climb to bore to be located at and pour It builds in region and connects attached wall plate in the other end for climbing cone;Double embedded part hanging seats are mounted on attached wall plate;Attached wall plate and double embedded part hanging seats It is respectively positioned on outside concrete placings region;
S2:Load-bearing tripod is installed:Load-bearing tripod hanger lifting by way of by tripod crossbeam gib head with it is pre-buried Double embedded part hanging seats of part mount;And it is horizontally disposed with main landing beam in the upper surface of load-bearing tripod;
S3:Main landing slab and rear moving device are installed:It is horizontally mounted main landing slab on main platform and installation can on main landing slab The rear moving device moved in the horizontal direction;
S4:Truss is moved after installation and safeguards steel pipe:Several rear shifting truss vertically stacked are installed on main landing slab, and Steel pipe is safeguarded in setting on the side far from metope on rear shifting truss;After being laid on rear shifting truss again after installation maintenance steel pipe Move truss platform plate;
S5:Installation form:Plank sheathing is installed between rear steel moving truss and wall concrete placings region;The end of plank sheathing is moved with rear One end of device is connected;
S6:The installation of hydraulic control system:
S6.1:L-shaped hydraulic control platform hanger, hydraulic control platform and load-bearing tripod structure are installed on load-bearing tripod Rectangular structure;
S6.2:Hydraulic control platform guardrail is installed in the lower section of hydraulic control platform hanger and is laid with control platform plate:Hydraulic pressure control Platform guardrail processed is connected with hydraulic control platform hanger;
S6.3:A pair of of Commutating box is respectively set at hydraulic cylinder both ends, and upper end Commutating box is connected to the crossbeam hook of load-bearing tripod Head;
S7:The installation of lifting rail:Lifting rail is vertically between double embedded part hanging seats, and lifting rail and hydraulic control Another commutation capsule of system.
The method of climbing of climbing support:
S1:It pours and is moved after completing template:After completing concrete placings, template is moved afterwards in the horizontal direction by the driving of rear moving device;And Double embedded part hanging seats are installed on attached wall plate;
S2:Guide rail is promoted:The Commutating box of the hydraulic cylinder other end coordinates climbing upwards for driving lifting rail with lifting rail, simultaneously Adjusting the support of the attached wall on load-bearing tripod keeps frame body integral inclined;
S3:Frame body is promoted:After guide rail is promoted in place, hangs liter frame body in place and adjust frame body level;
S4:Template moves forward and pours:Template from rear moving device drives edge dampening square to Forward and casting concrete;Repeat S1- The step of S4.
Further, attached wall support is adjusted again when the guide rail is less than 5cm when climbing close to the double embedded part hanging seats of last layer.
Further, it is 5 ° to 7 ° that the attached wall support, which adjusts frame body hypsokinesis,.
The advantage of the invention is that:
1)Hydraulic climbing frame can integrally climb in the present invention, also can list Pin climb, stability of climbing is good;It is easy to operate, safety Height can save a large amount of working hours and material;Climbing support once after assembling, until top is not landed, saves construction site, and subtract The damage of damaging of template, particularly panel is lacked;Hydraulic climbing process is more steady, synchronous, safe.
2)Comprehensive operating platform is provided in the present invention, unit in charge of construction is not necessarily to set up operating platform and waste material again Material and labour;Structure construction error is small, and correction is simple, and construction error can be eliminated successively;Climbing speed is fast, can improve engineering Speed of application;For template from climbing, it is secondary to substantially reduce hanging for tower crane for original place cleaning;Commutating box is progress power biography between climbing frame and guide rail The important component passed changes the pawl direction of Commutating box, realizes the power and energy for promoting climbing frame or guide rail;Often climbing a terraced shelves When, oil cylinder is voluntarily adjusted, and ensures while the frame body to climb synchronizes.
Description of the drawings
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 to Fig. 5 is that a kind of pre-splicing formula of steel wood of the present invention detaches hydraulic pressure and climbs flow from climbing support.
Specific implementation mode
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this It is bright to be limited among the embodiment described range.
If figure is to a kind of 1 pre-splicing separate type of steel and wood composite shown in fig. 5 from the frame body template construction method that climbs, including climb The specific method is as follows for the installation method of frame and the method for climbing of climbing support:
The installation method of climbing support:
S1:Installation of embedded parts:It before concrete placings, climbs cone and is fixed on panel by stressed bolt, when concrete pours, climb to bore to be located at and pour It builds in region and connects attached wall plate in the other end for climbing cone;Double embedded part hanging seats are mounted on attached wall plate;Attached wall plate and double embedded part hanging seats Concrete is respectively positioned on to pour outside region;
S2:Load-bearing tripod is installed:Load-bearing tripod hanger lifting by way of by tripod crossbeam gib head with it is pre-buried Double embedded part hanging seats of part mount;And it is horizontally disposed with main landing beam in the upper surface of load-bearing tripod;
S3:Main landing slab and rear moving device are installed:It is horizontally mounted main landing slab on main platform and installation can on main landing slab The rear moving device moved in the horizontal direction;
S4:Truss is moved after installation and safeguards steel pipe:Several rear shifting truss 3 vertically stacked are installed on main landing slab, And steel pipe is safeguarded in setting on the side far from metope on rear shifting truss 3;Again on rear shifting truss upper berth after installation maintenance steel pipe If moving truss platform plate afterwards;
S5:Installation form 1:Plank sheathing is installed between rear shifting truss and wall concrete placings region;The end of plank sheathing is moved with rear One end of device is connected;
S6:The installation of hydraulic control system 2:
S6.1 installs L-shaped hydraulic control platform hanger, hydraulic control platform and load-bearing tripod structure on load-bearing tripod Rectangular structure;
S6.2:Hydraulic control platform guardrail is installed in the lower section of hydraulic control platform hanger and is laid with control platform plate:Hydraulic pressure control Platform guardrail processed is connected with hydraulic control platform hanger;
S6.3:A pair of of Commutating box is respectively set at hydraulic cylinder both ends, and upper end Commutating box is connected to the crossbeam hook of load-bearing tripod Head;
S7:The installation of lifting rail:Lifting rail is vertically between double embedded part hanging seats, and lifting rail and hydraulic control Another commutation capsule of system.
The method of climbing of climbing support:
S1:It pours and is moved after completing template:After completing concrete placings, template is moved afterwards in the horizontal direction by the driving of rear moving device;And Double embedded part hanging seats are installed on attached wall plate;
S2:Guide rail is promoted:The Commutating box of the hydraulic cylinder other end coordinates climbing upwards for driving lifting rail with lifting rail, simultaneously Adjusting the support of the attached wall on load-bearing tripod keeps frame body integral inclined;
S3:Frame body is promoted:After guide rail is promoted in place, hangs liter frame body in place and adjust frame body level;
S4:Template moves forward and pours:Template from rear moving device drives edge dampening square to Forward and casting concrete;Repeat S1- The step of S4.
Guide rail adjusts attached wall support again when being less than 5cm close to the double embedded part hanging seats of last layer when climbing.
It is 5 ° to 7 ° that attached wall support, which adjusts frame body hypsokinesis,.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation Merely illustrating the principles of the invention described in book, without departing from the spirit and scope of the present invention, the present invention also has Various changes and modifications, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention It is defined by the appending claims and its equivalent thereof.

Claims (3)

  1. The frame body template construction method 1. a kind of pre-splicing separate type of steel and wood composite is climbed certainly, it is characterised in that:Peace including climbing support The specific method is as follows for dress method and the method for climbing of climbing support:
    The installation method of climbing support:
    S1:Installation of embedded parts:It before concrete placings, climbs cone and is fixed on panel by stressed bolt, when concrete pours, climb to bore to be located at and pour It builds in region and connects attached wall plate in the other end for climbing cone;Double embedded part hanging seats are mounted on attached wall plate;Attached wall plate and double embedded part hanging seats It is respectively positioned on outside concrete placings region;
    S2:Load-bearing tripod is installed:Load-bearing tripod hanger lifting by way of by tripod crossbeam gib head with it is pre-buried Double embedded part hanging seats of part mount;And it is horizontally disposed with main landing beam in the upper surface of load-bearing tripod;
    S3:Main landing slab and rear moving device are installed:It is horizontally mounted main landing slab on main platform and installation can on main landing slab The rear moving device moved in the horizontal direction;
    S4:Truss is moved after installation and safeguards steel pipe:Several rear shifting truss vertically stacked are installed on main landing slab, and Steel pipe is safeguarded in setting on the side far from metope on rear shifting truss;After being laid on rear shifting truss again after installation maintenance steel pipe Move truss platform plate;
    S5:Installation form:Plank sheathing is installed between rear steel moving truss and wall concrete pour region;The end of plank sheathing is filled with rear move The one end set is connected;
    S6:The installation of hydraulic control system:
    S6.1 installs L-shaped hydraulic control platform hanger, hydraulic control platform and load-bearing tripod structure on load-bearing tripod Rectangular structure;
    S6.2:Hydraulic control platform guardrail is installed in the lower section of hydraulic control platform hanger and is laid with control platform plate:Hydraulic pressure control Platform guardrail processed is connected with hydraulic control platform hanger;
    S6.3:A pair of of Commutating box is respectively set at hydraulic cylinder both ends, and upper end Commutating box is connected to the crossbeam hook of load-bearing tripod Head;
    S7:The installation of lifting rail:Lifting rail is vertically between double embedded part hanging seats, and lifting rail and hydraulic control Another commutation capsule of system;
    The method of climbing of climbing support:
    S1:It pours and is moved after completing template:After completing concrete placings, template is moved afterwards in the horizontal direction by the driving of rear moving device;And Double embedded part hanging seats are installed on attached wall plate;
    S2:Guide rail is promoted:The Commutating box of the hydraulic cylinder other end coordinates climbing upwards for driving lifting rail with lifting rail, simultaneously Adjusting the support of the attached wall on load-bearing tripod keeps frame body integral inclined;
    S3:Frame body is promoted:After guide rail is promoted in place, hangs liter frame body in place and adjust frame body level;
    S4:Template moves forward and pours:Template is from rear moving device drives edge dampening square to Forward fixation and casting concrete; The step of repeating S1-S4.
  2. The frame body template construction method 2. the pre-splicing separate type of a kind of steel and wood composite according to claim 1 is climbed certainly, feature It is:The guide rail adjusts attached wall support again when being less than 5cm close to the double embedded part hanging seats of last layer when climbing.
  3. The frame body template construction method 3. the pre-splicing separate type of a kind of steel and wood composite according to claim 1 is climbed certainly, feature It is:It is 5 ° to 7 ° that the attached wall support, which adjusts frame body hypsokinesis,.
CN201810083395.4A 2018-01-29 2018-01-29 A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs Pending CN108590171A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810083395.4A CN108590171A (en) 2018-01-29 2018-01-29 A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810083395.4A CN108590171A (en) 2018-01-29 2018-01-29 A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs

Publications (1)

Publication Number Publication Date
CN108590171A true CN108590171A (en) 2018-09-28

Family

ID=63608373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810083395.4A Pending CN108590171A (en) 2018-01-29 2018-01-29 A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs

Country Status (1)

Country Link
CN (1) CN108590171A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109721010A (en) * 2019-01-23 2019-05-07 深圳市特辰科技股份有限公司 A kind of hook type linkage mechanism
US20220307276A1 (en) * 2016-04-08 2022-09-29 Peri Se Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2908673Y (en) * 2006-06-29 2007-06-06 北京卓良模板有限公司 Building shuttering
CN202023360U (en) * 2011-04-15 2011-11-02 江苏中原建设集团有限公司 Hydraulic climbing die plate for building construction
CN202850484U (en) * 2012-05-02 2013-04-03 江苏长安建设集团有限公司 Safety mechanism for building construction climbing template
CN105401717A (en) * 2015-12-14 2016-03-16 中交一公局第三工程有限公司 Novel climbing formwork frame body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2908673Y (en) * 2006-06-29 2007-06-06 北京卓良模板有限公司 Building shuttering
CN202023360U (en) * 2011-04-15 2011-11-02 江苏中原建设集团有限公司 Hydraulic climbing die plate for building construction
CN202850484U (en) * 2012-05-02 2013-04-03 江苏长安建设集团有限公司 Safety mechanism for building construction climbing template
CN105401717A (en) * 2015-12-14 2016-03-16 中交一公局第三工程有限公司 Novel climbing formwork frame body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220307276A1 (en) * 2016-04-08 2022-09-29 Peri Se Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure
CN109721010A (en) * 2019-01-23 2019-05-07 深圳市特辰科技股份有限公司 A kind of hook type linkage mechanism

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN101892742B (en) High low building-cross deformation joint low section shear wall construction method
CN102080357B (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
WO2022142999A1 (en) Hoisting device for bridge water surface pile tie beam and construction method therefor
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN109113320B (en) Construction operation method in elevator shaft
WO2023240813A1 (en) Steel platform deformation construction structure and method for construction of sloping wall of core tube
CN102022123B (en) Integral lining method for tunnel with altered diameter by model board trolley
CN112458918A (en) High-pier hydraulic jacking integral steel frame platform formwork turnover construction system and construction method
CN108331336A (en) The integrated lifting steel plateform system and its construction method of floor synchronous construction
AU2019409113A1 (en) Building site device having a climbing formwork and an elevator system
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN110080526A (en) A kind of basement reversed construction method by stages
CN108383015B (en) Hoisting device is assisted to super high-rise creeping formwork
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN113090014A (en) High-rise assembled building integral operation platform and construction method and application thereof
CN108590171A (en) A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs
CN111749140A (en) Truss integral lifting type bridge high pier creeping formwork device and construction method
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN108286332A (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN102733608A (en) Construction method for spray head layer of granulation tower
CN213836318U (en) Bridge floor wet joint hangs mould structure
EP1835076A1 (en) Method and arrangement for moving a bridge
CN113216257A (en) Full hoisting construction method for assembled subway station in pile anchor enclosing structure system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928