CN108590003A - The segmented curtain skeleton structure not being generally aligned in the same plane - Google Patents
The segmented curtain skeleton structure not being generally aligned in the same plane Download PDFInfo
- Publication number
- CN108590003A CN108590003A CN201810612693.8A CN201810612693A CN108590003A CN 108590003 A CN108590003 A CN 108590003A CN 201810612693 A CN201810612693 A CN 201810612693A CN 108590003 A CN108590003 A CN 108590003A
- Authority
- CN
- China
- Prior art keywords
- keel
- fixed
- adjustment
- same plane
- generally aligned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses the segmented curtain skeleton structures not being generally aligned in the same plane, including being respectively arranged with left keel and right keel at left and right sides of top slat iron, left and right keel structure is symmetrical, pass through top slat iron, sheet glass is fixed for left keel and right keel, the left keel include fixed keel, adjust keel and waterproof cover, there is gap in the junction of the fixed keel and adjustment keel, fluid sealant is filled in gap, the fixed keel and adjustment keel are provided with waterproof cover towards outside, it avoids rainwater to penetrate into fixed keel by waterproof cover and adjusts the junction of keel, the fixed keel are in Different Plane with adjustment keel, the left keel and right keel are provided with fixed pendant towards building body direction middle part, the installation site of left and right keel is adjusted by fixed pendant.
Description
Technical field
The present invention relates to a kind of keel structures, and in particular to the segmented curtain skeleton structure not being generally aligned in the same plane.
Background technology
Glass curtain wall is one of most important ornament materials in the world today, by the family widely as all kinds of buildings
Exterior wall uses, and the maximum feature for assigning building is by the aesthetics of architecture, building function, building energy conservation and building structure etc.
Factor is organically united, building is enable to show different tones from different perspectives, with sunlight, moonlight, light
Variation gives dynamic U.S..
Growing with current building trade, the moulding of building also begins to become various, and traditional four
The building of four directions side can be adopted without challenge, some landmarks and purpose-built for the personnel of building field
The building rotation angle master arrived with the structure of many new designs, such as this rotational mouldings of Dubai Ka Yanta, external observation
If being realized by exterior curtain wall, but this rotary curtain wall is also in primary stage, the effect of various aspects at present
Fruit is all poor, and the vulnerable part that internal water-impervious part and connector belong to needs to be observed in real time, replaces in time,
Prodigious manpower and materials can be consumed in this way.This is first, secondly exactly actual in use, window is because moulding needs to generate
Stress it is big, and concentrate, in skyscraper, the rhegma of window can be caused because of many external interference factors, is existed in this way
It is very dangerous in skyscraper, above two is existing rotary curtain wall urgent problem, and the present inventor is directed to
Above-mentioned defect in the prior art, the technical solution of proposition are above-mentioned many to solve the problems, such as.
Invention content
The technical problem to be solved by the present invention is to the adjustment of current keel structure to be not easy, and without using segmentation knot
Structure is kept in check many, and it is an object of the present invention to provide the segmented curtain skeleton not being generally aligned in the same plane in this way in building external styling
Structure solves the problem above-mentioned.
The present invention is achieved through the following technical solutions:
It is respectively arranged with left keel and the right side at left and right sides of the segmented curtain skeleton structure not being generally aligned in the same plane, including top slat iron
Keel, left and right keel structure is symmetrical, and sheet glass is fixed by top slat iron, left keel and right keel, the left dragon
Bone includes fixed keel, adjustment keel and waterproof cover, and there is gap in the junction of the fixed keel and adjustment keel, is filled out in gap
Filled with fluid sealant, the fixed keel and adjustment keel are provided with waterproof cover towards outside, avoid rainwater from penetrating by waterproof cover
Fixed keel and the junction for adjusting keel, the fixed keel are in Different Plane, the left keel and the right side with adjustment keel
Keel are provided with fixed pendant towards building body direction middle part, pass through the installation site that fixed pendant adjusts left and right keel.Current
On the market, usually all it is curtain wall to be fixed by one whole keel, such structural strength using integrated keel structure
Height, but when needing to be adjusted, this curtain wall construction is dumb, can not accomplish to adjust in real time, it is whole in actual construction
The keel installation of root is also relatively difficult, higher to positioning accuracy request.
Present specification uses segmented curtain wall, i.e., curtain wall is carried out modularized processing, the keel of surrounding can be divided into
Multistage, installation when convenient for construction, and installation accuracy is of less demanding.Two keel used substitute current main joist,
, can be preferably moulding to the progress of the external styling of building using two keel not in conplane effect, and use
Two keel can arbitrarily adjust the position of keel, in the case where ensureing that is in a keel central axes, there is preferable extension
Property, curtain wall can be allowed to show more postures.
Further, the top slat iron is also connect with fixed hanging plate, and the fixed hanging plate is fixedly connected with building body, will
Curtain wall is fixed.The connection of top slat iron and fixed hanging plate is to provide a support force for entire curtain wall, and entire curtain wall is allowed to have one
The base position of entire curtain wall can be fixed by the supporting point for a stress point, can be in the tune of later stage progress position
When whole, there is better surplus to be adjusted.
Further, the fixed keel are provided with hollow pipe in the middle part of top slat iron, the fixed keel, by hollow
Pipe will be discharged from fixed keel with the water that keel gap location penetrates into is adjusted.The hollow pipe is arranged at the middle part of left and right keel, because
The rainwater of floor is often accumulated, and the quality of curtain wall is usually relatively light, can not bear very heavy weight rainwater accumulation, if rain
If the residual moistures such as water can not be discharged in time, residual moisture penetrates into inside keel, may cause to corrode to connector, or
Person oozes in fluid sealant, influences the performance of fluid sealant.Moisture can be exported using hollow pipe, passes through leading on top slat iron
Water-bound, the moisture that upper layer can be put down to product are discharged downwards by hollow pipe.
Further, the hollow pipe is arranged in the sleeve of fixed keel, described by sleeve fixation hollow pipe position
Sleeve is connect with the inner surface of fixed keel.The purpose that sleeve is arranged is that common hollow pipe quality is softer, in the big stream of reply
When the water impact of amount, it is likely that because impact force is excessive, and causes hollow pipe displacement or fall off, be unfavorable for carrying out draining work
Industry.Hollow pipe is set with using sleeve, the anti-impact force of hollow pipe can be improved while firm hollow pipe.
Further, the fixed keel are connect by hook with waterproof cover with adjustment keel, at two after being attached
The upper waterproof antirusting paint of junction spraying.Zinc content is high in coating, can form hard, wear-resisting paint film, strong adhesive force, anti-corrosion
Performance, water resistance are excellent, and can provide protection to local damaged area, ensure the structural strength of junction.Using hook into
Row connection, is capable of providing enough frictional force, allows waterproof cover and two keel to be attached, waterproof cover is avoided to fall off.
Compared with prior art, the present invention having the following advantages and advantages:
1, the segmented curtain skeleton structure that the present invention is not generally aligned in the same plane can allow curtain wall to do using segmentation keel structure
Go out more moulding;
2, the segmented curtain skeleton structure that the present invention is not generally aligned in the same plane, can effectively carry out waterproof, and drainage effect
By force.
Description of the drawings
Attached drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes one of the application
Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is scheme of installation of the present invention.
Fig. 2 is the fixed pendant partial enlarged view of the present invention.
Fig. 3 is inventive structure schematic diagram.
Fig. 4 is the left keel partial enlarged view of the present invention.
Label and corresponding parts title in attached drawing:
1- top slat irons, the left keel of 2-, 21- fix keel, and 22- adjusts keel, 23- waterproof covers, 24- hollow pipes, 25- sleeves, 3-
Right keel, 4- sheet glass, 5- fix hanging plate, and 6- fixes pendant.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiment and attached drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make
For limitation of the invention.
Embodiment
As shown in Fig. 1 ~ 4, the segmented curtain skeleton structure that the present invention is not generally aligned in the same plane, including top slat iron 1 or so
Both sides are respectively arranged with left keel 2 and right keel 3, and left and right keel structure is symmetrical, pass through top slat iron 1, left keel 2 and right dragon
Sheet glass 4 is fixed bone 3, and the left keel 2 include fixed keel 21, adjustment keel 22 and waterproof cover 23, the fixation
There is gap in the junction of keel 21 and adjustment keel 22, and fluid sealant, the fixed keel 21 and adjustment keel are filled in gap
22 are provided with waterproof cover 23 towards outside, avoid rainwater to penetrate into fixed keel 21 by waterproof cover 23 and adjust the connection of keel 22
Place, the fixed keel 21 are in Different Plane, the left keel 2 and right keel 3 towards in building body direction with adjustment keel 22
Portion is provided with fixed pendant 6, and the installation site of left and right keel is adjusted by fixed pendant 6.It is current on the market, usually all adopt
With integrated keel structure, curtain wall is fixed by one whole keel, such structural strength is high, but is being adjusted
When whole, this curtain wall construction is dumb, can not accomplish to adjust in real time, and in actual construction, whole keel installation also compares
Difficulty is higher to positioning accuracy request.
Present specification uses segmented curtain wall, i.e., curtain wall is carried out modularized processing, the keel of surrounding can be divided into
Multistage, installation when convenient for construction, and installation accuracy is of less demanding.Two keel used substitute current main joist,
, can be preferably moulding to the progress of the external styling of building using two keel not in conplane effect, and use
Two keel can arbitrarily adjust the position of keel, in the case where ensureing that is in a keel central axes, there is preferable extension
Property, curtain wall can be allowed to show more postures.
The top slat iron 1 is also connect with fixed hanging plate 5, and the fixed hanging plate 5 is fixedly connected with building body, by curtain wall into
Row is fixed.The connection of top slat iron and fixed hanging plate is to provide a support force for entire curtain wall, and allowing entire curtain wall, there are one stress
The base position of entire curtain wall can be fixed by the supporting point for point, can be had when carrying out the adjustment of position in the later stage
Better surplus is adjusted.
The fixed keel 2 are provided with hollow pipe 24, pass through hollow pipe 24 close to top slat iron 1,2 middle part of the fixed keel
The water penetrated into from fixed keel 21 with adjustment 22 gap location of keel is discharged.The hollow pipe is arranged at the middle part of left and right keel, because
It is often accumulated for the rainwater of floor, and the quality of curtain wall is usually relatively light, can not bear very heavy weight rainwater accumulation, if
If the residual moistures such as rainwater can not be discharged in time, residual moisture penetrates into inside keel, may cause to corrode to connector,
Or ooze in fluid sealant, influence the performance of fluid sealant.Moisture can be exported using hollow pipe, by top slat iron
Water guide structure, the moisture that upper layer can be put down to product are discharged downwards by hollow pipe.
The hollow pipe 24 is arranged in the sleeve 25 of fixed keel 2, described by 25 fixation hollow pipe of sleeve, 24 position
Sleeve 25 is connect with the inner surface of fixed keel 2.The purpose that sleeve is arranged is that common hollow pipe quality is softer, is coping with
When the water impact of big flow, it is likely that because impact force is excessive, and causes hollow pipe displacement or fall off, be unfavorable for being arranged
Water operation.Hollow pipe is set with using sleeve, the anti-impact force of hollow pipe can be improved while firm hollow pipe.
The fixed keel 21 are connect by hook with waterproof cover 23 with adjustment keel 22, are connected at two after being attached
The upper waterproof antirusting paint of place's spraying.Zinc content is high in coating, can form hard, wear-resisting paint film, strong adhesive force, anti-corrosive properties
Energy, water resistance are excellent, and can provide protection to local damaged area, ensure the structural strength of junction.It is carried out using hook
Connection, is capable of providing enough frictional force, allows waterproof cover and two keel to be attached, waterproof cover is avoided to fall off.
Above-described specific implementation mode has carried out further the purpose of the present invention, technical solution and advantageous effect
It is described in detail, it should be understood that the foregoing is merely the specific implementation mode of the present invention, is not intended to limit the present invention
Protection domain, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include
Within protection scope of the present invention.
Claims (5)
1. the segmented curtain skeleton structure not being generally aligned in the same plane, which is characterized in that including top slat iron(1)Distinguish the left and right sides
It is provided with left keel(2)With right keel(3), left and right keel structure is symmetrical, passes through top slat iron(1), left keel(2)With right dragon
Bone(3)By sheet glass(4)It is fixed, the left keel(2)Including fixed keel(21), adjustment keel(22)And waterproof cover
(23), the fixed keel(21)With adjustment keel(22)Junction have a gap, fluid sealant, the fixation are filled in gap
Keel(21)With adjustment keel(22)Outside is provided with waterproof cover(23), pass through waterproof cover(23)It avoids rainwater from penetrating into fix
Keel(21)With adjustment keel(22)Junction, the fixed keel(21)With adjustment keel(22)In Different Plane, institute
State left keel(2)With right keel(3)It is provided with fixed pendant in the middle part of towards building body direction(6), pass through fixed pendant(6)Adjustment is left
The installation site of right keel.
2. the segmented curtain skeleton structure according to claim 1 not being generally aligned in the same plane, which is characterized in that the cross
Skeleton(1)Also with fixed hanging plate(5)Connection, the fixed hanging plate(5)It is fixedly connected with building body, curtain wall is fixed.
3. the segmented curtain skeleton structure according to claim 1 not being generally aligned in the same plane, which is characterized in that described solid
Determine keel(2)Close to top slat iron(1), the fixed keel(2)Middle part is provided with hollow pipe(24), pass through hollow pipe(24)It will be from
Fixed keel(21)With adjustment keel(22)The water discharge that gap location penetrates into.
4. the segmented curtain skeleton structure according to claim 3 not being generally aligned in the same plane, which is characterized in that the sky
Heart pipe(24)Setting is in fixed keel(2)Sleeve(25)It is interior, pass through sleeve(25)Fixation hollow pipe(24)Position, the sleeve
(25)With fixed keel(2)Inner surface connection.
5. the segmented curtain skeleton structure according to claim 1 not being generally aligned in the same plane, which is characterized in that described solid
Determine keel(21)With adjustment keel(22)Pass through hook and waterproof cover(23)Connection, after being attached in two junction sprayings
Waterproof antirusting paint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810612693.8A CN108590003B (en) | 2018-06-14 | 2018-06-14 | Sectional type curtain wall keel structure not located in different planes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810612693.8A CN108590003B (en) | 2018-06-14 | 2018-06-14 | Sectional type curtain wall keel structure not located in different planes |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108590003A true CN108590003A (en) | 2018-09-28 |
CN108590003B CN108590003B (en) | 2020-01-31 |
Family
ID=63628548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810612693.8A Active CN108590003B (en) | 2018-06-14 | 2018-06-14 | Sectional type curtain wall keel structure not located in different planes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108590003B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201176651Y (en) * | 2008-03-27 | 2009-01-07 | 珠海兴业幕墙工程有限公司 | Keel support system of BIPV curtain wall |
CN101956438A (en) * | 2010-10-22 | 2011-01-26 | 泛华建设集团有限公司 | Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof |
CN102359211A (en) * | 2011-09-29 | 2012-02-22 | 湖南省金为型材有限公司 | Suspension type curtain wall |
CN202359706U (en) * | 2011-11-11 | 2012-08-01 | 沈阳远大铝业工程有限公司 | Non-uniplanar curtain wall connecting structure |
CN202519847U (en) * | 2012-03-07 | 2012-11-07 | 沈阳远大铝业工程有限公司 | Special-shaped keel for curtain wall |
CN202925723U (en) * | 2012-11-20 | 2013-05-08 | 中国建筑西南设计研究院有限公司 | Open stone curtain wall system |
CN203129375U (en) * | 2012-12-28 | 2013-08-14 | 中建三局装饰有限公司 | Curtain wall T-shaped hanging piece installation device |
CN105064560A (en) * | 2015-07-31 | 2015-11-18 | 湖南省金为型材有限公司 | Keel and curtain wall system with keel |
CN107060168A (en) * | 2017-05-24 | 2017-08-18 | 杭州坤石建筑工程咨询有限公司 | A kind of grid system in curtain wall system |
CN107654034A (en) * | 2017-09-12 | 2018-02-02 | 李寨真 | Self heat insulation wall and its manufacture craft |
-
2018
- 2018-06-14 CN CN201810612693.8A patent/CN108590003B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201176651Y (en) * | 2008-03-27 | 2009-01-07 | 珠海兴业幕墙工程有限公司 | Keel support system of BIPV curtain wall |
CN101956438A (en) * | 2010-10-22 | 2011-01-26 | 泛华建设集团有限公司 | Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof |
CN102359211A (en) * | 2011-09-29 | 2012-02-22 | 湖南省金为型材有限公司 | Suspension type curtain wall |
CN202359706U (en) * | 2011-11-11 | 2012-08-01 | 沈阳远大铝业工程有限公司 | Non-uniplanar curtain wall connecting structure |
CN202519847U (en) * | 2012-03-07 | 2012-11-07 | 沈阳远大铝业工程有限公司 | Special-shaped keel for curtain wall |
CN202925723U (en) * | 2012-11-20 | 2013-05-08 | 中国建筑西南设计研究院有限公司 | Open stone curtain wall system |
CN203129375U (en) * | 2012-12-28 | 2013-08-14 | 中建三局装饰有限公司 | Curtain wall T-shaped hanging piece installation device |
CN105064560A (en) * | 2015-07-31 | 2015-11-18 | 湖南省金为型材有限公司 | Keel and curtain wall system with keel |
CN105064560B (en) * | 2015-07-31 | 2017-12-08 | 湖南省金为型材有限公司 | Keel and the curtain wall system with the keel |
CN107060168A (en) * | 2017-05-24 | 2017-08-18 | 杭州坤石建筑工程咨询有限公司 | A kind of grid system in curtain wall system |
CN107654034A (en) * | 2017-09-12 | 2018-02-02 | 李寨真 | Self heat insulation wall and its manufacture craft |
Also Published As
Publication number | Publication date |
---|---|
CN108590003B (en) | 2020-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207863243U (en) | A kind of waterproof curtain wall | |
CN108915137A (en) | A kind of the open style curtain wall waterproof construction and its construction method | |
CN108590003A (en) | The segmented curtain skeleton structure not being generally aligned in the same plane | |
CN208168645U (en) | A kind of exterior window waterproof construction in masonry project | |
CN201818066U (en) | Anti-leakage balcony and balcony type overhead ecological garden | |
CN108590000B (en) | Rotation type curtain wall construction | |
CN209556742U (en) | A kind of rain-proof window mounting structure | |
CN206554287U (en) | Section bar docks waterproof construction and glass sunlight house | |
CN206385691U (en) | A kind of steel construction drag-line point supported glass skylight | |
CN208996221U (en) | A kind of bathroom leakage preventing structure | |
CN208792643U (en) | Gutter node waterproof structure in a kind of colored steel roof | |
CN204024326U (en) | A kind of structure preventing outer eaves door and window mouth seepage from intaking | |
CN208183982U (en) | Waterproof construction at the intensive pipeline of outer wall of basement | |
CN208379948U (en) | A kind of structure of exterior wall finish layer | |
CN208280492U (en) | A kind of exterior wall coating structure | |
CN214329419U (en) | Residential outer wall structure | |
CN216740114U (en) | Building outer wall is with antiseep structure that protecting effect is good | |
CN216840296U (en) | Connecting structure for steel structure awning for stone plate veneer | |
CN215291613U (en) | Structural leakage drainage treatment device | |
CN108314920A (en) | A kind of art paint | |
CN215829656U (en) | Cast-in-place concrete wall connection structure for sunlight room | |
CN204676972U (en) | A kind of machine room and communication iron tower flexible engagement structure | |
CN209144990U (en) | A kind of balcony water proof building structure | |
CN209891961U (en) | Canopy formula window node waterproof construction | |
CN204456430U (en) | A kind of rain-tight balcony |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190828 Address after: 610000 Wuye 102 Building, Shuanglin Road, Chenghua District, Chengdu City, Sichuan Province Applicant after: Wuye Group Decoration Engineering Co., Ltd. Address before: 610063 No. 9 Wuye Road, Jinjiang District, Chengdu City, Sichuan Province Applicant before: China MCC5 Group Corp., Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |