CN108590000A - A kind of rotary curtain wall construction - Google Patents

A kind of rotary curtain wall construction Download PDF

Info

Publication number
CN108590000A
CN108590000A CN201810447146.9A CN201810447146A CN108590000A CN 108590000 A CN108590000 A CN 108590000A CN 201810447146 A CN201810447146 A CN 201810447146A CN 108590000 A CN108590000 A CN 108590000A
Authority
CN
China
Prior art keywords
keel
fixed
curtain wall
adjustment
wall construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810447146.9A
Other languages
Chinese (zh)
Other versions
CN108590000B (en
Inventor
彭德坤
肖子良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuye Group Decoration Engineering Co., Ltd.
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201810447146.9A priority Critical patent/CN108590000B/en
Publication of CN108590000A publication Critical patent/CN108590000A/en
Application granted granted Critical
Publication of CN108590000B publication Critical patent/CN108590000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/962Curtain walls comprising panels attached to the structure through mullions or transoms with angles or corners in the curtain wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a kind of rotary curtain wall constructions, including being respectively arranged with left keel and right keel at left and right sides of top slat iron, left and right keel structure is symmetrical, pass through top slat iron, sheet glass is fixed for left keel and right keel, the left keel include fixed keel, adjust keel and waterproof cover, there is gap in the junction of the fixed keel and adjustment keel, fluid sealant is filled in gap, the fixed keel and adjustment keel are provided with waterproof cover towards outside, it avoids rainwater to penetrate into fixed keel by waterproof cover and adjusts the junction of keel, the fixed keel and adjustment keel are interlaced, by changing stagger angle, sheet glass position is allowed to be changed.In current building field, in such a way that cambered exterior wall design has become and is guided in industry, there is the region that many buildings have arc curtain wall to use, or even the building for thering is whole building object all to use arc curtain wall, such as Ka Yanta one kind of Dubai.

Description

A kind of rotary curtain wall construction
Technical field
The present invention relates to a kind of curtain wall constructions, and in particular to a kind of rotary curtain wall construction.
Background technology
Glass curtain wall is one of most important ornament materials in the world today, by the family widely as all kinds of buildings Exterior wall uses, and the maximum feature for assigning building is by the aesthetics of architecture, building function, building energy conservation and building structure etc. Factor is organically united, building is enable to show different tones from different perspectives, with sunlight, moonlight, light Variation gives dynamic U.S..
Growing with current building trade, the moulding of building also begins to become various, and traditional four The building of four directions side can be adopted without challenge, some landmarks and purpose-built for the personnel of building field The building rotation angle master arrived with the structure of many new designs, such as this rotational mouldings of Dubai Ka Yanta, external observation If being realized by exterior curtain wall, but this rotary curtain wall is also in primary stage, the effect of various aspects at present Fruit is all poor, and the vulnerable part that internal water-impervious part and connector belong to needs to be observed in real time, replaces in time, Prodigious manpower and materials can be consumed in this way.This is first, secondly exactly actual in use, window is because moulding needs to generate Stress it is big, and concentrate, in skyscraper, the rhegma of window can be caused because of many external interference factors, is existed in this way It is very dangerous in skyscraper, above two is existing rotary curtain wall urgent problem, and the present inventor is directed to Above-mentioned defect in the prior art, the technical solution of proposition are above-mentioned many to solve the problems, such as.
Invention content
Connector between the technical problems to be solved by the invention curtain wall that rotary building body outside is installed at present is very Rapid wear, the window installed on curtain wall have stress concentration point, can reduce the service life of window, and increase the danger of window breakage Danger, the application are designed to provide a kind of rotary curtain wall construction, solve the problem above-mentioned.
The present invention is achieved through the following technical solutions:
Left keel and right keel, left and right dragon are respectively arranged at left and right sides of a kind of rotary curtain wall construction, including top slat iron Bone structure is symmetrical, and sheet glass is fixed by top slat iron, left keel and right keel, and the left keel include fixed dragon There is gap in the junction of bone, adjustment keel and waterproof cover, the fixed keel and adjustment keel, and fluid sealant is filled in gap, The fixed keel and adjustment keel are provided with waterproof cover towards outside, avoid rainwater from penetrating into fixed keel and tune by waterproof cover The junction of whole keel, the fixed keel and adjustment keel it is interlaced, by change stagger angle, allow sheet glass position into Row changes.In current building field, in such a way that cambered exterior wall design has become and guided in industry, has and much build The region that object has arc curtain wall to use is built, or even the building for thering is whole building object all to use arc curtain wall, such as Dubai Ka Yanta it is a kind of.Curtain wall used by current this rotary building body, it is all relatively rough, occur in actual use Many problems, such as situations such as service life is low, and the water proofing property of curtain wall is poor, and wind resistance anti-vibration resistance is poor, in view of this, in present specification The rotary curtain wall construction used, by detaching left and right keel, left keel and right keel structure are completely the same, wherein left It is provided with fixed keel and adjustment keel in keel, is provided with certain gap between the keel built in the two, this gap Whether distance is configured positioned at crosswind face according to height and keel, vertical with wind face or highly higher, its between keel Gap is bigger, and the ductility of the fluid sealant being arranged in the gap by built-in keel, fluid sealant itself is preferable, can allow each curtain Wall has certain displacement, improves the ability of curtain wall anti seismic efficiency and ant wind load.It adjusts keel and fixes keel towards building The outside of body is because can receive to expose to wind and rain, if fluid sealant is directly exposed to outside, service life can substantially reduce, and close The bad replacement of sealing can be guided rainwater so being wrapped up the part outwardly of two keel using waterproof cover, And interior furring channels can be protected, its service life is improved, and improve the water resistance of entire curtain wall.And fix keel and tune Being staggered of whole keel be easy for carrying out with the rotation angle of building body it is corresponding because the external side in building will allow glass, keel, transversum Frame forms a radian, and several this curtain wall constructions to be allowed to form a smooth, smooth curved surface, needs towards building body The keel of interior this side carry out angle change, and angle changing is changed according to the radian of building body, as radian is bigger, two dragons Angle between bone is bigger, allows sheet glass that can have enough radians to be bent, and carries out moulding.
Further, the angle that the fixed keel interlock with adjustment keel is 0~10 degree.Fixed keel and adjustment keel Stagger angle be arranged between 0~10 degree, according to exterior wall required radian variation, allow stagger angle between each keel It is changed therewith, required radian is bigger, and the angle between keel staggeredly increases therewith, and radian reduces, stagger angle Reduce therewith.
Further, the top slat iron is also connect with fixed hanging plate, and the fixed hanging plate is fixedly connected with building body, will Curtain wall is fixed.The connection of top slat iron and fixed hanging plate is to provide a support force for entire curtain wall, and entire curtain wall is allowed to have one The base position of entire curtain wall can be fixed by the supporting point for a stress point, can be in the tune of later stage progress position When whole, there is better surplus to be adjusted.
Further, the top slat iron, left keel and right keel surround a quadrangle polymorphic structure, four corner difference For the angle A, B, C, D, wherein the three of the rectangular configuration corner angle A, B, C is in the same plane, steady by being arranged on the glass sheet Fixed pad, sheet glass is fixed into the polymorphic structure of quadrangle.It, can be with the progress of building body in order to ensure that entire curtain wall has certain radian Match, using this polymorphic structure, the outline border of curtain wall can be allowed to go out there are one cornicult, form a prominent angle, all curtain walls into After row is assembled, this prominent angle can allow curtain wall externally to have certain radian, and the protrusion angle formed can guide water Discharge, avoids rainwater from accumulating.In the prior art, typically one jiao of glass of polymorphic structure by external force break it is curved, Glass can be allowed to generate a prodigious stress concentration in this way, glass is easy for can be damaged by inside and outside force effect, the application text One is installed according to corresponding radian in the polymorphic structure used in part and stablize pad, by stablizing pad with A, B, C three-point shape into one Plane allows entire frame structure to form a four side structures, and glass is fixed in this frame, glass can be avoided stress occur The case where concentration, ensures the service life and safety of entire curtain wall.
Further, it is provided with hollow pipe in the middle part of the fixed keel, it will be from fixed keel and adjustment dragon by hollow pipe The water discharge penetrated at spatium interosseum.The hollow pipe is arranged at the middle part of left and right keel, because the rainwater of floor is often accumulated, and The quality of curtain wall is usually relatively light, very heavy weight rainwater accumulation can not be born, if the residual moistures such as rainwater can not be timely If discharge, residual moisture penetrates into inside keel, may cause to corrode to connector, or ooze in fluid sealant, influences close The performance of sealing.Moisture can be exported using hollow pipe, it, can be by the flat product in upper layer by the water guide structure on top slat iron Moisture discharged downwards by hollow pipe.
Further, the left keel and right keel are provided with fixed pendant towards building body direction middle part, pass through fixed hang Part adjusts the installation site of left and right keel.After the completion of the keel installation of left and right, fine position can be carried out by fixed pendant, and Adjustment surplus is reserved on fixed pendant to need to carry out in connector when being safeguarded, convenient for dismantling curtain wall When replacement, it is convenient for replacing.
Compared with prior art, the present invention having the following advantages and advantages:
1, a kind of rotary curtain wall construction of the present invention, improves the service life of rotary cladding glass, reduces it and generates breakage Probability;
2, a kind of rotary curtain wall construction of the present invention, effectively allows curtain wall that can be matched with building body radian, passes through friendship The keel of mistake setting are adjusted, convenient for controlling sheet glass radian;
Description of the drawings
Attached drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the rotation building body schematic diagram that rotary curtain wall uses.
Fig. 2 is overall schematic after the installation of rotary curtain wall.
Fig. 3 is schematic structural view of the invention.
Fig. 4 is hollow pipe partial enlarged view.
Fig. 5 is fixed pendant partial enlarged view.
Label and corresponding parts title in attached drawing:
1- top slat irons, the left keel of 2-, 21- fix keel, and 22- adjusts keel, 23- waterproof covers, 24- hollow pipes, the right dragons of 3- Bone, 4- sheet glass, 5- fix hanging plate, and 6- fixes pendant.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment
As shown in Fig. 1~5, a kind of rotary curtain wall construction of the present invention, including 1 left and right sides of top slat iron are respectively arranged with a left side Keel 2 and right keel 3, left and right keel structure is symmetrical, is carried out sheet glass 4 by top slat iron 1, left keel 2 and right keel 3 Fixed, the left keel 2 include fixed keel 21, adjust keel 22 and waterproof cover 23, the fixed keel 21 and adjustment keel There is gap in 22 junction, and fluid sealant is filled in gap, and the fixed keel 21 and adjustment keel 22 are provided with towards outside Waterproof cover 23 avoids rainwater from penetrating into fixed keel 21 and adjusts the junction of keel 22, the fixed keel by waterproof cover 23 21 is interlaced with adjustment keel 22, by changing stagger angle, 4 position of sheet glass is allowed to be changed.Current building field In, in such a way that cambered exterior wall design has become and guided in industry, there are many buildings to have the use of arc curtain wall Region, or even the building that there is whole building object all to use arc curtain wall, for example the Ka Yanta of Dubai is a kind of.Current Curtain wall used by this rotary building body, it is all relatively rough, occur many problems, such as service life in actual use It is low, situations such as water proofing property of curtain wall is poor, and wind resistance anti-vibration resistance is poor, in view of this, the rotary curtain wall knot used in present specification Structure, by detaching left and right keel, left keel and right keel structure are completely the same, wherein being provided with fixed dragon in left keel Bone is provided with the gap of about 0.1~0.5cm, this clearance distance is according to height with adjustment keel between the keel built in the two Whether degree and keel are configured positioned at crosswind face, or height vertical with wind face is higher, its gap between keel is bigger, lead to The fluid sealant being arranged in the gap of built-in keel is crossed, the ductility of fluid sealant itself is preferable, each curtain wall can be allowed to have certain Displacement improves the ability of curtain wall anti seismic efficiency and ant wind load.Adjust keel and fixed keel towards the outside of building body because For that can receive to expose to wind and rain, if fluid sealant is directly exposed to outside, service life can substantially reduce, and fluid sealant is bad more It changes, so being wrapped up the part outwardly of two keel using waterproof cover, rainwater can be guided, and can protect Interior furring channels are protected, improve its service life, and improve the water resistance of entire curtain wall.And it fixes keel and adjusts the friendship of keel Mistake setting be easy for carrying out with the rotation angle of building body it is corresponding because the external side in building to allow glass, keel, top slat iron formed one Radian, and several this curtain wall constructions to be allowed to form a smooth, smooth curved surface, need the dragon towards this side in building body Bone carries out angle change, and angle changing is changed according to the radian of building body, as radian is bigger, the folder between two keel Angle is bigger, allows sheet glass that can have enough radians to be bent, and carries out moulding.
In actual installation, first fixed hanging plate is installed with building body, after fixed hanging plate is fixed, by entire curtain wall It is lifted on the precalculated position of predetermined altitude, because the radian of building body is different, the buildings curtain wall construction You Yu on each position The radian of body itself is corresponded to, and after being lifted on precalculated position, top slat iron is fixed on fixed hanging plate, the glass of entire curtain wall The work such as installation are all completed in factory, after transport to scene, can directly be carried out being erected at Lou Tishang.
The angle that the fixed keel 21 interlock with adjustment keel 22 is 0~10 degree.Fixed keel and the friendship for adjusting keel Alternate angle degree is arranged between 0~10 degree, according to exterior wall required radian variation, allow stagger angle between each keel therewith It is changed, required radian is bigger, and the angle between keel staggeredly increases therewith, and radian reduces, and stagger angle is therewith Reduce.Specifically, be usually all that keel carry out frame connection in the prior art, present specification same anti-rolling chock by Two keel that can be staggeredly are formed, and using two keel, can effectively eliminate wind load using its gap, additionally it is possible to The appearance for effectively changing entire curtain wall allows it that can preferably coordinate with building body.
The top slat iron 1 is also connect with fixed hanging plate 5, and the fixed hanging plate 5 is fixedly connected with building body, by curtain wall into Row is fixed.The connection of top slat iron and fixed hanging plate is to provide a support force for entire curtain wall, and allowing entire curtain wall, there are one stress The base position of entire curtain wall can be fixed by the supporting point for point, can be had when carrying out the adjustment of position in the later stage Better surplus is adjusted.It can be convenient for installing using this built-in fitting, installation speed can be improved, need to install When curtain wall construction, can quickly it be installed.
The top slat iron 1, left keel 2 and right keel 3 surround a quadrangle polymorphic structure, four corners be respectively A, B, C, the angles D, wherein the three of the rectangular configuration corner angle A, B, C are in the same plane, stablize pad by being arranged on sheet glass 4 41, sheet glass is fixed into the polymorphic structure of quadrangle.It, can be with the progress of building body in order to ensure that entire curtain wall has certain radian Match, using this polymorphic structure, the outline border of curtain wall can be allowed to go out there are one cornicult, form a prominent angle, all curtain walls into After row is assembled, this prominent angle can allow curtain wall externally to have certain radian, and the protrusion angle formed can guide water Discharge, avoids rainwater from accumulating.In the prior art, typically one jiao of glass of polymorphic structure by external force break it is curved, Glass can be allowed to generate a prodigious stress concentration in this way, glass is easy for can be damaged by inside and outside force effect, the application text One is installed according to corresponding radian in the polymorphic structure used in part and stablize pad, by stablizing pad with A, B, C three-point shape into one Plane allows entire frame structure to form a four side structures, and glass is fixed in this frame, glass can be avoided stress occur The case where concentration, ensures the service life and safety of entire curtain wall.
21 middle part of the fixed keel is provided with hollow pipe 24, will be from fixed keel 21 and adjustment keel by hollow pipe 24 The water discharge that 22 gap locations penetrate into.The hollow pipe is arranged at the middle part of left and right keel, because the rainwater of floor is often accumulated, and The quality of curtain wall is usually relatively light, very heavy weight rainwater accumulation can not be born, if the residual moistures such as rainwater can not be timely If discharge, residual moisture penetrates into inside keel, may cause to corrode to connector, or ooze in fluid sealant, influences close The performance of sealing.Moisture can be exported using hollow pipe, it, can be by the flat product in upper layer by the water guide structure on top slat iron Moisture discharged downwards by hollow pipe.The hollow pipe, there are one opening, can allow top slat iron in place parallel with top slat iron setting Interior ponding, is directly discharged into and is wherein drained.
The left keel 2 and right keel 3 are provided with fixed pendant 6 towards building body direction middle part, pass through fixed pendant 6 and adjust The installation site of left and right keel.After the completion of the keel installation of left and right, fine position, and fixed extension can be carried out by fixed pendant Be reserved on part adjustment surplus can when being safeguarded, convenient for being dismantled to curtain wall, when connector is replaced, It is convenient for replacing.
Above-described specific implementation mode has carried out further the purpose of the present invention, technical solution and advantageous effect It is described in detail, it should be understood that the foregoing is merely the specific implementation mode of the present invention, is not intended to limit the present invention Protection domain, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (6)

1. a kind of rotary curtain wall construction, which is characterized in that including being respectively arranged with left keel (2) at left and right sides of top slat iron (1) With right keel (3), left and right keel structure is symmetrical, by top slat iron (1), left keel (2) and right keel (3) by sheet glass (4) it is fixed, the left keel (2) include fixed keel (21), adjustment keel (22) and waterproof cover (23), the fixed dragon There is gap in the junction of bone (21) and adjustment keel (22), and fluid sealant, the fixed keel (21) and adjustment are filled in gap Keel (22) are provided with waterproof cover (23) towards outside, avoid rainwater from penetrating into fixed keel (21) and adjustment by waterproof cover (23) The junction of keel (22), the fixed keel (21) and adjustment keel (22) are interlaced, by changing stagger angle, allow glass Glass piece (4) position is changed.
2. a kind of rotary curtain wall construction according to claim 1, which is characterized in that the fixed keel (21) and adjustment The angle that keel (22) interlock is 0~10 degree.
3. a kind of rotary curtain wall construction according to claim 1, which is characterized in that the top slat iron (1) also with fixation Hanging plate (5) connects, and the fixed hanging plate (5) is fixedly connected with building body, curtain wall is fixed.
4. a kind of rotary curtain wall construction according to claim 1, which is characterized in that the top slat iron (1), left keel (2) and right keel (3) surround a quadrangle polymorphic structure, and four corners are respectively the angle A, B, C, D, and wherein the three of rectangular configuration The angles a corner A, B, C are in the same plane, stablize pad (41) by being arranged on sheet glass (4), sheet glass is fixed into four In the polymorphic structure of angle.
5. a kind of rotary curtain wall construction according to claim 1, which is characterized in that the fixed keel (2) are close to horizontal Skeleton (1) is provided with hollow pipe (24) in the middle part of the fixed keel (2), by hollow pipe (24) will from fixed keel (21) with Adjust the water discharge that keel (22) gap location penetrates into.
6. a kind of rotary curtain wall construction according to claim 1, which is characterized in that the left keel (2) and right keel (3) building body direction middle part is provided with fixed pendant (6), passes through the installation site that fixed pendant (6) adjusts left and right keel.
CN201810447146.9A 2018-05-11 2018-05-11 Rotation type curtain wall construction Active CN108590000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810447146.9A CN108590000B (en) 2018-05-11 2018-05-11 Rotation type curtain wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810447146.9A CN108590000B (en) 2018-05-11 2018-05-11 Rotation type curtain wall construction

Publications (2)

Publication Number Publication Date
CN108590000A true CN108590000A (en) 2018-09-28
CN108590000B CN108590000B (en) 2020-05-19

Family

ID=63636701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810447146.9A Active CN108590000B (en) 2018-05-11 2018-05-11 Rotation type curtain wall construction

Country Status (1)

Country Link
CN (1) CN108590000B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216468A (en) * 2021-04-20 2021-08-06 四川嘉寓门窗幕墙有限公司 Curtain wall capable of adjusting inclination angle of panel
CN115045422A (en) * 2022-06-20 2022-09-13 山东泓顺建筑工程有限公司 Building glass curtain wall mounting structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088718A (en) * 1996-09-11 1998-04-07 Nippon Alum Co Ltd Mullion joint construction
CN103015594A (en) * 2012-12-26 2013-04-03 湖北科翼建筑科技研究有限公司 Fit formation and installation method of panel of arc-shaped glass curtain wall
CN205954963U (en) * 2016-08-24 2017-02-15 中机中联工程有限公司 Twistable warp curtain system
CN206034707U (en) * 2016-08-31 2017-03-22 中机中联工程有限公司 Hidden frame curtain wall multi -angle corner
CN206143986U (en) * 2016-10-28 2017-05-03 北京丽贝亚幕墙工程有限公司 Unit curtain of adaptable arbitrary corner
CN206917026U (en) * 2017-06-14 2018-01-23 中国建筑第六工程局有限公司 A kind of steel disc shape node component for special-shaped Curtain wall frame
CN107642188A (en) * 2017-10-10 2018-01-30 金刚幕墙集团有限公司 One kind dislocation hyperboloid type unitized curtain wall
CN107956289A (en) * 2017-11-30 2018-04-24 杨晶 A kind of fireproof heat-preservation decoration curtain wall installation method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088718A (en) * 1996-09-11 1998-04-07 Nippon Alum Co Ltd Mullion joint construction
CN103015594A (en) * 2012-12-26 2013-04-03 湖北科翼建筑科技研究有限公司 Fit formation and installation method of panel of arc-shaped glass curtain wall
CN205954963U (en) * 2016-08-24 2017-02-15 中机中联工程有限公司 Twistable warp curtain system
CN206034707U (en) * 2016-08-31 2017-03-22 中机中联工程有限公司 Hidden frame curtain wall multi -angle corner
CN206143986U (en) * 2016-10-28 2017-05-03 北京丽贝亚幕墙工程有限公司 Unit curtain of adaptable arbitrary corner
CN206917026U (en) * 2017-06-14 2018-01-23 中国建筑第六工程局有限公司 A kind of steel disc shape node component for special-shaped Curtain wall frame
CN107642188A (en) * 2017-10-10 2018-01-30 金刚幕墙集团有限公司 One kind dislocation hyperboloid type unitized curtain wall
CN107956289A (en) * 2017-11-30 2018-04-24 杨晶 A kind of fireproof heat-preservation decoration curtain wall installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216468A (en) * 2021-04-20 2021-08-06 四川嘉寓门窗幕墙有限公司 Curtain wall capable of adjusting inclination angle of panel
CN115045422A (en) * 2022-06-20 2022-09-13 山东泓顺建筑工程有限公司 Building glass curtain wall mounting structure and construction method thereof
CN115045422B (en) * 2022-06-20 2024-04-19 山东泓顺建筑工程有限公司 Building glass curtain wall mounting structure and construction method thereof

Also Published As

Publication number Publication date
CN108590000B (en) 2020-05-19

Similar Documents

Publication Publication Date Title
CN108590000A (en) A kind of rotary curtain wall construction
CN104652670B (en) It is a kind of can indoor location glass curtain wall system
CN206655311U (en) A kind of prefabricated assembling type reinforced concrete floats window member
CN213597280U (en) Waterproof stone curtain wall
CN213626212U (en) Energy-saving drainage curtain wall structure
CN217759518U (en) Indoor suspended ceiling structure between structural settlement joints
CN108193813A (en) Open cell formula stone curtain wall
CN210002601U (en) type building facade
CN212836327U (en) Edge folding structure for color plate at brick wall
CN205104870U (en) Novel slot type crane span structure of taking shelter from rain of becalming
CN211850247U (en) Embedded lamp area formula stone material curtain wall construction
CN208981671U (en) A kind of French building eave structure
CN208310158U (en) Construction protection crosshead
CN206873773U (en) A kind of installation fixed structure of circular glass lighting roof
CN208294338U (en) It is a kind of for installing the window opening of external window of building
CN104612341A (en) Canopy
CN110984447A (en) Embedded lamp area formula stone material curtain wall construction
CN209358224U (en) It is installed on the lightning-arrest band structure of parapet
CN211200848U (en) Reinforcing mechanism of closed internal circulation type breathing curtain wall
CN107327055A (en) The bright frame system of glass curtain wall
CN108590003B (en) Sectional type curtain wall keel structure not located in different planes
CN204370644U (en) A kind of novel bright frame glass curtain wall
CN212295233U (en) Hanging plate type curtain wall
CN209384387U (en) Connection structure between a kind of cabinet in novel box type house
CN114809860B (en) Detachable window sleeve mounting structure of curtain wall opening window

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190827

Address after: 610000 Wuye 102 Building, Shuanglin Road, Chenghua District, Chengdu City, Sichuan Province

Applicant after: Wuye Group Decoration Engineering Co., Ltd.

Address before: 610063 No. 9 Wuye Road, Jinjiang District, Chengdu City, Sichuan Province

Applicant before: China MCC5 Group Corp., Ltd.

GR01 Patent grant
GR01 Patent grant