CN108588552A - Steel pipe, its raw material, its production method and rotary drilling rig drilling rod - Google Patents

Steel pipe, its raw material, its production method and rotary drilling rig drilling rod Download PDF

Info

Publication number
CN108588552A
CN108588552A CN201810260020.0A CN201810260020A CN108588552A CN 108588552 A CN108588552 A CN 108588552A CN 201810260020 A CN201810260020 A CN 201810260020A CN 108588552 A CN108588552 A CN 108588552A
Authority
CN
China
Prior art keywords
steel pipe
pipe
raw material
mentioned
production method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810260020.0A
Other languages
Chinese (zh)
Inventor
凌仲秋
周勇
赵勤
范其良
郭海明
赵映辉
孙群保
朱智禄
张敏
黄佑启
孙群峰
刘启增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENGYANG HUALING CONTINOUS ROLLED PIPE CO Ltd
Hengyang Valin Steel Tube Co Ltd
Original Assignee
HENGYANG HUALING CONTINOUS ROLLED PIPE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENGYANG HUALING CONTINOUS ROLLED PIPE CO Ltd filed Critical HENGYANG HUALING CONTINOUS ROLLED PIPE CO Ltd
Priority to CN201810260020.0A priority Critical patent/CN108588552A/en
Publication of CN108588552A publication Critical patent/CN108588552A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/14Ferrous alloys, e.g. steel alloys containing titanium or zirconium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/32Ferrous alloys, e.g. steel alloys containing chromium with boron
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Thermal Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Heat Treatment Of Steel (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

This application provides a kind of steel pipe, its raw material, its production method and rotary drilling rig drilling rods.In percentage by weight, the raw material of the steel pipe include 0.25~0.33% C, 0.15~0.50% Si, 1.30~1.70% Mn, the P less than or equal to 0.020%, the S less than or equal to 0.015%, 0.012~0.04% Ti and 0.0005~0.0030% B, remaining be Fe and inevitable impurity.In the raw material of the steel pipe, the content of C ensures that the steel pipe to be formed has certain yield strength and preferable welding performance between 0.25~0.33%;The content of Mn can preferably play solution strengthening effect between 1.30~1.70%, and to improve the yield strength of steel pipe, appropriate Ti and B increase the quenching degree of steel.The yield strength for the steel pipe that the raw material is formed can reach 550MPa or more.

Description

Steel pipe, its raw material, its production method and rotary drilling rig drilling rod
Technical field
This application involves steel pipe fields, in particular to a kind of steel pipe, its raw material, its production method and churning driven Machine drilling rod.
Background technology
Rotary drilling rig is a kind of construction machinery of pore-forming operation in suitable building foundation engineering, is primarily adapted for sand, viscosity The soil layers such as soil and slity soil are constructed, in a variety of foundation basic constructions such as building construction, bored concrete pile, diaphragm wall and strengthening of foundation It is used widely.
Rotary drilling rig is with characteristics such as its high efficiency and low stains, oneself becomes domestic and international heavy construction, railway and height at present The main construction equipment of fast Road Bridge Pile Foundation plinth construction.And with the increasing of national basis construction investment, the need of rotary drilling rig The amount of asking is increased sharply.
The rotary drilling rig critical component that drilling rod is rotary drilling rig, rotary drilling rig drilling rod is by several sections of various outer diameters and wall thickness Steel pipe nesting be composed, often save drilling rod be made of seamless steel pipe and the inside and outside drive key being welded thereon.
But the yield strength of the seamless steel pipe of common rotary drilling rig drilling rod is relatively low at present, causes it that cannot meet The demand of high intensity drilling.
Invention content
The main purpose of the application is to provide a kind of steel pipe, its raw material, its production method and rotary drilling rig drilling rod, To solve the problems, such as that steel pipe yield strength in the prior art is relatively low.
To achieve the goals above, according to the one side of the application, a kind of raw material of steel pipe is provided, according to weight hundred Point than meter, the raw material of the steel pipe include 0.25~0.33% C, 0.15~0.50% Si, 1.30~1.70% Mn, be less than Or the P equal to 0.020%, the S less than or equal to 0.015%, 0.012~0.04% Ti and 0.0005~0.0030% B, remaining is Fe and inevitable impurity.
Further, in the raw material of above-mentioned steel pipe, C equivalent≤0.60%.
Further, to achieve the goals above, according to the one side of the application, a kind of making side of steel pipe is provided Method, the production method include:Step S1 is smelted to obtain blank to the raw material of above-mentioned steel pipe;Step S2, to above-mentioned blank It is heated and is perforated, obtain hollow billet;Step S3 carries out tube rolling to above-mentioned hollow billet, obtains hot-rolled pipe;Step S4, to above-mentioned heat Tube rolling carries out thermal expansion processing and Tempering and Quenching, obtains fished pipe.
Further, above-mentioned steps S2 includes:Step S21 obtains hot base to above-mentioned blank heating;Step S22, to upper Hot base is stated into eleven punch 11, obtains above-mentioned hollow billet.
Further, above-mentioned steps S4 includes:Thermal expansion is carried out to above-mentioned hot-rolled pipe, obtains pre- pipe;To above-mentioned pre- pipe Tempering and Quenching is carried out, above-mentioned fished pipe is obtained.
Further, include to the process of above-mentioned pre- pipe progress Tempering and Quenching:Step A1, at 910~930 DEG C, Above-mentioned pre- pipe is heated, 10~20min postcoolings are kept the temperature;Step A2 carries out water cooling to the above-mentioned pre- pipe after heating Quenching;Step A3 is tempered the above-mentioned pre- pipe after water hardening at 630~670 DEG C, keeps the temperature 40~90min, obtains To above-mentioned fished pipe.
Further, after above-mentioned steps S4, above-mentioned production method further includes:Online heat is carried out to above-mentioned fished pipe Sizing, the temperature of preferably above-mentioned online hot size is between 500~650 DEG C.
According to the application's in another aspect, providing a kind of steel pipe, in percentage by weight, the steel pipe include 0.25~ 0.33% C, 0.15~0.50% Si, 1.30~1.70% Mn, the P less than or equal to 0.020%, be less than or equal to The B of 0.015% S, 0.012~0.04% Ti and 0.0005~0.0030%, remaining for Fe and inevitably it is miscellaneous Matter.
Further, in above-mentioned steel pipe, C equivalent≤0.60%.
According to the another aspect of the application, a kind of rotary drilling rig drilling rod is provided, which includes steel Pipe, above-mentioned steel pipe are any above-mentioned steel pipe or the steel pipe that any above-mentioned production method obtains.
Using the technical solution of the application, in the raw material of the steel pipe, the content of C is controlled between 0.25~0.33%, is protected The steel pipe that card is formed has certain yield strength, while can guarantee it with preferable welding performance again;Control the content of Mn Between 1.30~1.70% so that Mn preferably plays solution strengthening effect, to further increase the yield strength of steel pipe, fits Amount addition Ti and B increases the quenching degree of steel.The yield strength for the steel pipe that the raw material is formed can reach 550MPa or more.
Description of the drawings
The accompanying drawings which form a part of this application are used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its explanation do not constitute the improper restriction to the application for explaining the application.In the accompanying drawings:
Fig. 1 shows the flow diagram of the production method of the steel pipe of the application.
Specific implementation mode
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or combination thereof.
It should be understood that when element (such as layer, film, region or substrate) is described as in another element "upper", this yuan Part can be directly on another element, or intermediary element also may be present.Moreover, claims in specification and above In, when description has element " connected " to another element, which " can be directly connected to " to another element, or pass through third Element " electrical connection " is to another element.
As background technology is introduced, the yield strength of steel pipe in the prior art is relatively low, in order to solve skill as above Art problem, present applicant proposes a kind of steel pipe, its raw material, its production method and rotary drilling rig drilling rods.
In a kind of typical embodiment of the application, a kind of raw material of steel pipe is provided, it in percentage by weight, should The raw material of steel pipe include 0.25~0.33% C, 0.15~0.50% Si, 1.30~1.70% Mn, be less than or equal to 0.020% P, the S less than or equal to 0.015%, 0.012~0.04% Ti and 0.0005~0.0030% B, remaining It is Fe and inevitable impurity.
In the raw material of the steel pipe, the content of C is controlled between 0.25~0.33%, ensures that the steel pipe to be formed has centainly Yield strength, while can guarantee it with preferable welding performance again;The content of Mn is controlled between 1.30~1.70% so that Mn preferably plays solution strengthening effect, to further increase the yield strength of steel pipe, the appropriate through hardening added Ti and B and increase steel Property.The yield strength for the steel pipe that the raw material is formed can reach 550MPa or more.
In a kind of embodiment of the application, C equivalent≤0.60% in the raw material of steel pipe is controlled.It can ensure that steel has in this way Preferable intensity, while can guarantee that the calculation formula of C equivalents is CEV=C+ (Mn/6)+[(Cr with preferable welding performance again +Mo+V)/5]+[(Ni+Cu)/15].The percentage composition of corresponding element, works as steel pipe raw material in the raw material of each alphabet steel tube In corresponding element not to be covered when, percentage composition be remnants.
In the typical embodiment of another kind of the application, a kind of production method of steel pipe is provided, as shown in Figure 1, should The production method of steel pipe includes:Step S1 is smelted to obtain blank to the raw material of above-mentioned steel pipe;Step S2, to above-mentioned base Material is heated and is perforated, and hollow billet is obtained;Step S3 carries out tube rolling to above-mentioned hollow billet and obtains hot-rolled pipe;Step S4, to above-mentioned heat Tube rolling carries out thermal expansion processing and Tempering and Quenching, obtains fished pipe, i.e. steel pipe.
The steel pipe of above-mentioned raw material due to being made so that the steel pipe of formation has higher yield strength, to full The application demand of sufficient high intensity.Also, the production method process is simple, and cost is relatively low, and lumber recovery is higher.
In order to further enhance the uniformity and mechanical property of the caliber of obtained hot finished steel pipe, a kind of reality of the application It applies in example, above-mentioned rapid S2 includes:Step S21 obtains hot base to above-mentioned blank heating;Step S22 wears above-mentioned hot base Hole obtains above-mentioned hollow billet.
In the another embodiment of the application, the heating process of above-mentioned steps S21 includes three phases, specially preheats rank Section, heating period and soaking stage.Heating period includes II section of I section of heating and heating, and the soaking stage includes I sections of soaking and equal It is II sections hot.Specifically, the temperature of above-mentioned blank reaches 970~990 DEG C after preheating section heating, after above-mentioned heating I sections heating The temperature of above-mentioned blank reaches 1090~1010 DEG C, after above-mentioned heating II sections heating the temperature of above-mentioned blank reach 1170~ 1190 DEG C, the temperature of above-mentioned blank reaches 1240~1260 DEG C after above-mentioned heating III sections heating, then temperature 1270~ After I sections of 1290 DEG C of soaking and II sections of soaking of soaking, above-mentioned hot base is obtained.By above-mentioned heat stepwise, pipe is made gradually to rise Height arrives soaking temperature, avoids the too fast defect for causing to crack in hot base of heating rate.
Also, the blank in order to further ensure obtaining hot base sufficiently uniformly heats, and ensures that blank heating is kept away simultaneously thoroughly The crystal grain for exempting from long-time heating generation is grown up, in a kind of embodiment in the application, heating time of above-mentioned steps S21 80~ Between 120min.
In order to enable the heating of blank is more uniform, to further avoid occurring heating defect, a kind of reality of the application It applies in example, the time of above-mentioned warm-up phase is 10min~14min, and the time of I sections of heating is 15min~19min, heats II sections Time be 25min~29min, heating III section time be 20min~30min, the time that I of soaking for 20min~ 24min, the time that II of soaking are 10min~14min.
In the another embodiment of the application, above-mentioned steps S3 includes:Above-mentioned hollow billet is rolled, is obtained by step S31 Hollow forging;Step S32 preheat simultaneously sizing or tube reducing to above-mentioned hollow forging, is obtaining hot-rolled pipe, the temperature of preferably above-mentioned preheating is 920~965 DEG C, it can be that subsequent sizing or tube reducing are laid a solid foundation to the preheating of hollow forging, improve treatment effect.
In a kind of embodiment of the application, above-mentioned steps S4 includes:Thermal expansion (i.e. thermal expansion is processed) is carried out to above-mentioned hot-rolled pipe, Obtain pre- pipe;Tempering and Quenching is carried out to above-mentioned pre- pipe, obtains above-mentioned production tube, which can further protect Demonstrate,prove the performance of fished pipe.
In another preferred embodiment of the application, the process for carrying out Tempering and Quenching to above-mentioned pre- pipe includes:Step Rapid A1 heats above-mentioned pre- pipe at 910~930 DEG C, keeps the temperature 10~20min, further ensures steel pipe Austria in this way The uniformity of family name's body, while alloy being made at the uniform velocity to be substantially dissolved in austenite;Step A2, to after heating (due to step A1's Main methods are heating, so after the processing for representing step A1 " after heating " here, and after coming out of the stove) pre- pipe into Row water hardening, to obtain martensitic structure;Step A3, at 630~670 DEG C, to the above-mentioned pre- pipe after water hardening It is tempered, keeps the temperature 40~90min, so that alloying element is fully precipitated from oversaturated solid solution in this way, obtain more Scattered carbide simultaneously makes the tissue after tempering tend to stablize.In the processing procedure, alloys producing is adequately sent out It waves, and then improves the stability of steel duct metallographic structure, improve the plasticity and toughness of seamless steel pipe.
After above-mentioned Tempering and Quenching step, above-mentioned production method can also include online hot size step, preferably on The temperature for stating online hot size is 500~650 DEG C.Sizing after tempering advantageously reduces the deformation in heat treatment process, reduces The ovality of steel pipe.Above-mentioned production method can also include straightening step, and the preferably temperature of straightening step is 450~630 DEG C.It returns Straightening temperature after fire within the above range, advantageously reduces the residual stress generated in straightening process.
In the typical embodiment of another of the application, a kind of steel pipe is provided, in percentage by weight, the steel pipe Including 0.25~0.33% C, 0.15~0.50% Si, 1.30~1.70% Mn, the P less than or equal to 0.020%, small In or equal to 0.015% S, 0.012~0.04% Ti and 0.0005~0.0030% B, remaining is Fe and can not The impurity avoided.
In the steel pipe, the content of C is controlled between 0.25~0.33%, ensures that the steel pipe to be formed has certain surrender strong Degree, while can guarantee it with preferable welding performance again;The content of Mn is controlled between 1.30~1.70% so that Mn is more preferable Ground plays solution strengthening effect, to further increase the yield strength of steel pipe, the appropriate quenching degree added Ti and B and increase steel.It should The yield strength for the steel pipe that raw material is formed can reach 550MPa or more.
In another embodiment of the application, C equivalent≤0.60% in the raw material of steel pipe is controlled.It can ensure steel in this way Have preferable intensity, while can guarantee again with preferable welding performance, the calculation formula of C equivalents be CEV=C+ (Mn/6)+ [(Cr+Mo+V)/5]+[(Ni+Cu)/15].The percentage composition of corresponding element, works as steel pipe in the raw material of each alphabet steel tube In raw material when corresponding element not to be covered, percentage composition is remnants.
In the typical embodiment of another of the application, a kind of rotary drilling rig drilling rod is provided, which includes steel Pipe, the steel pipe are above-mentioned steel pipe or the prepared steel pipe of above-mentioned production method.
The rotary drilling rig drilling rod is due to including above-mentioned steel pipe so that its yield strength is higher, can preferably expire The demand of sufficient high intensity drilling.
In a kind of embodiment, the outer diameter of rotary drilling rig drilling rod is between 100~630mm, and wall thickness is between 8~25mm.
In order to enable those skilled in the art can clearly understand the technical solution of the application, below with reference to tool The embodiment of body illustrates the technical solution of the application.
Embodiment 1
In percentage by weight, the raw material of steel pipe include 0.33% C, 0.50% Si, 1.30% Mn, 0.020% P, 0.015% S, 0.012% Ti and 0.0030% B, remaining be Fe and inevitable impurity.C Equivalent is 0.546%.
Specifically the manufacturing process of steel pipe includes:
The raw material of steel pipe is smelted, obtains blank by step S1.
Specifically, raw material obtains blank by electric furnace smelting, external refining, vacuum outgas and arc continuous casting.
Step S2 heats above-mentioned blank, then uses tapered roller into eleven punch 11, obtains hollow billet.
Specifically, first, blank is heated, heating process includes warm-up phase, I sections of heating, II sections of heating, heating II sections of III sections, I sections of soaking and soaking.The time in each stage be respectively 10min, 15min, 25min, 20min, 20min and 10min.Specifically, the temperature of above-mentioned blank reaches 970 DEG C after preheating section heating, the above-mentioned base after I section of heating of above-mentioned heating The temperature of material reaches 1090 DEG C, and the temperature of above-mentioned blank reaches 1170 DEG C after II section of heating of above-mentioned heating, adds by above-mentioned The temperature of above-mentioned blank reaches 1240 DEG C after III section of heating of heat, then in I section of the soaking of 1270 DEG C of temperature and II section of soaking of soaking Afterwards, above-mentioned hot base is obtained.
Above-mentioned hot base is obtained into hollow billet at 1130 DEG C into eleven punch 11.
Step S3 carries out tube rolling to above-mentioned hollow billet, obtains hot-rolled pipe.
Specifically, above-mentioned hollow billet is subjected to tube rolling first with PQF pipe mills, obtains hollow forging;Medium carries out hollow forging pre- Heat and sizing, obtain hot-rolled pipe.
Step S4 carries out thermal expansion processing and Tempering and Quenching to above-mentioned hot-rolled pipe, obtains fished pipe.
Specifically, by the heating of above-mentioned hot-rolled pipe and thermal expansion, pre- pipe is obtained;Tempering and Quenching is carried out to above-mentioned pre- pipe, Obtain above-mentioned fished pipe.
The process that Tempering and Quenching is carried out to above-mentioned pre- pipe adds above-mentioned pre- pipe specifically, at 910 DEG C Heat keeps the temperature 20min postcoolings;Water hardening is carried out to the above-mentioned pre- pipe after heating, obtains martensitic structure;At 630 DEG C, Above-mentioned pre- pipe after water hardening is tempered, it is air-cooled after heat preservation 90min, obtain fished pipe.
Step S5 carries out online hot size to above-mentioned fished pipe, and the temperature of preferably above-mentioned online hot size is 500 DEG C.
Embodiment 2
With the difference of embodiment 1, the raw material that the raw material of steel pipe includes steel pipe include 0.25% C, 0.15% Si, The B of 1.70% Mn, 0.01% P, 0.011% S, 0.04% Ti and 0.0005%.C equivalents are 0.59%.Also, During carrying out Tempering and Quenching to above-mentioned pre- pipe and obtaining above-mentioned fished pipe, the temperature of heating is 930 DEG C, when heat preservation Between the above-mentioned pre- pipe after water hardening is tempered at 670 DEG C for 10min, keep the temperature air-cooled after 40min, obtain above-mentioned Fished pipe.
Embodiment 3
With the difference of embodiment 1, the raw material of steel pipe include 0.29% C, 0.30% Si, 1.53% Mn, 0.014% P, 0.005% S, 0.024% Ti and 0.0016% B.C equivalents are 0.596%.Also, to above-mentioned During pre- pipe progress Tempering and Quenching obtains above-mentioned fished pipe, the temperature of heating is 920 DEG C, and soaking time is 15min is tempered the above-mentioned pre- pipe after water hardening at 640 DEG C, air-cooled after heat preservation 60min, obtains above-mentioned finished product Steel pipe.
Embodiment 4
With embodiment 3 difference lies in:The raw material of steel pipe further includes 0.1% V, and C equivalents are 0.616%.
Embodiment 5
With embodiment 3 difference lies in:The mistake of above-mentioned fished pipe is obtained carrying out Tempering and Quenching to above-mentioned pre- pipe The temperature of Cheng Zhong, heating are 900 DEG C.
Embodiment 6
With embodiment 3 difference lies in:The mistake of above-mentioned fished pipe is obtained carrying out Tempering and Quenching to above-mentioned pre- pipe The soaking time of Cheng Zhong, heating are 8min.
Embodiment 7
With embodiment 3 difference lies in:The mistake of above-mentioned fished pipe is obtained carrying out Tempering and Quenching to above-mentioned pre- pipe Cheng Zhong, the temperature being tempered to the above-mentioned pre- pipe after water hardening are 580 DEG C.
Embodiment 8
With embodiment 3 difference lies in:The mistake of above-mentioned fished pipe is obtained carrying out Tempering and Quenching to above-mentioned pre- pipe Cheng Zhong, the soaking time being tempered to the above-mentioned pre- pipe after water hardening are 30min.
Embodiment 9
With embodiment 3 difference lies in:The temperature of online hot size is 480 DEG C.
Comparative example 1
With embodiment 3 difference lies in:The raw material of steel pipe includes 0.1% C, and the content of Fe changes correspondingly.
Comparative example 2
With embodiment 3 difference lies in:The raw material of steel pipe includes 0.60% Si, and the content of Fe changes correspondingly.
Comparative example 3
With embodiment 3 difference lies in:The raw material of steel pipe includes 2.0% Mn, and the content of Fe changes correspondingly.
Comparative example 4
With embodiment 3 difference lies in:The raw material of steel pipe includes 0.04% P, and the content of Fe changes correspondingly.
Comparative example 5
With embodiment 3 difference lies in:The raw material of steel pipe includes 0.03% S, and the content of Fe changes correspondingly.
Comparative example 6
With embodiment 3 difference lies in:The raw material of steel pipe includes 0.06% Ti, and the content of Fe changes correspondingly.
Comparative example 7
With embodiment 3 difference lies in:The raw material of steel pipe includes 0.01% B, and the content of Fe changes correspondingly.
According to《The standard method and definition of steel product mechanical property test》Specified in method to embodiment and comparison The seamless steel pipe of example carries out tension test and impact test, test result are shown in Table 1.
Table 1
By the data in above-mentioned table 1 it is found that when steel pipe raw material include 0.25~0.33% C, 0.15~0.50% Si, 1.30~1.70% Mn, the P less than or equal to 0.020%, the S less than or equal to 0.015%, 0.012~0.04% When the B of Ti and 0.0005~0.0030%;And during the Tempering and Quenching of manufacturing process, at 910~930 DEG C, to upper It states pre- pipe to be heated, keeps the temperature 10~20min postcoolings;Water hardening is carried out to the above-mentioned pre- pipe after heating;630~ At 670 DEG C, the above-mentioned pre- pipe after water hardening is tempered, keeps the temperature 40~90min;Also, the temperature of online hot size When between 500~650 DEG C, the tensile strength of prepared steel pipe, yield strength, the contraction percentage of area, elongation percentage, hardness with And the better performances such as room temperature impact of collision.
It can be seen from the above description that the application the above embodiments realize following technique effect:
1), in the raw material of the steel pipe of the application, the content of C is controlled between 0.25~0.33%, ensures the steel pipe to be formed With certain yield strength, while it can guarantee it with preferable welding performance again;Control the content of Mn 1.30~ Between 1.70% so that Mn preferably plays solution strengthening effect, to further increase the yield strength of steel pipe, adds Ti in right amount Increase the quenching degree of steel with B.The yield strength for the steel pipe that the raw material is formed can reach 550MPa or more.
2), the production method of the steel pipe of the application so that the steel pipe of formation has higher yield strength, to meet height The application demand of intensity.
3), in the steel pipe of the application, the content of C is controlled between 0.25~0.33%, ensures that the steel pipe to be formed has one Fixed yield strength, while can guarantee it with preferable welding performance again;The content of Mn is controlled between 1.30~1.70%, So that Mn preferably plays solution strengthening effect, to further increase the yield strength of steel pipe, the appropriate Ti and B that adds increases steel Quenching degree so that there is steel higher impact flexibility, room temperature impact of collision can reach 34J or more.The steel pipe that the raw material is formed Yield strength can reach 550MPa or more.
4), the rotary drilling rig drilling rod of the application is due to including above-mentioned steel pipe so that its yield strength is higher, can Preferably meets the needs of high intensity drilling, while impact flexibility height makes drilling rod be not easy to form fatigue fracture.
The foregoing is merely the preferred embodiments of the application, are not intended to limit this application, for the skill of this field For art personnel, the application can have various modifications and variations.Within the spirit and principles of this application, any made by repair Change, equivalent replacement, improvement etc., should be included within the protection domain of the application.

Claims (10)

1. a kind of raw material of steel pipe, which is characterized in that in percentage by weight, the raw material of the steel pipe includes 0.25~ 0.33% C, 0.15~0.50% Si, 1.30~1.70% Mn, the P less than or equal to 0.020%, be less than or equal to The B of 0.015% S, 0.012~0.04% Ti and 0.0005~0.0030%, remaining for Fe and inevitably it is miscellaneous Matter.
2. the raw material of steel pipe according to claim 1, which is characterized in that in the raw material of the steel pipe, C equivalents≤ 0.60%.
3. a kind of production method of steel pipe, which is characterized in that the production method includes:
Step S1 is smelted to obtain blank to the raw material of steel pipe as claimed in claim 1 or 2;
Step S2 is heated and is perforated to the blank, obtains hollow billet;
Step S3 carries out tube rolling to the hollow billet, obtains hot-rolled pipe;And
Step S4 carries out thermal expansion processing and Tempering and Quenching to the hot-rolled pipe, obtains fished pipe.
4. production method according to claim 3, which is characterized in that the step S2 includes:
Step S21 obtains hot base to the blank heating;And
Step S22 obtains the hollow billet to the hot base into eleven punch 11.
5. production method according to claim 3, which is characterized in that the step S4 includes:
Thermal expansion is carried out to the hot-rolled pipe, obtains pre- pipe;And
Tempering and Quenching is carried out to the pre- pipe, obtains the fished pipe.
6. production method according to claim 5, which is characterized in that carry out the process of Tempering and Quenching to the pre- pipe Including:
Step A1 heats the pre- pipe at 910~930 DEG C, keeps the temperature 10~20min postcoolings;
Step A2 carries out water hardening to the pre- pipe after heating;And
Step A3 is tempered the pre- pipe after water hardening at 630~670 DEG C, keeps the temperature 40~90min, obtains The fished pipe.
7. production method according to claim 5, which is characterized in that after the step S4, the production method is also Including:
Online hot size is carried out to the fished pipe, the temperature of the preferably described online hot size is between 500~650 DEG C.
8. a kind of steel pipe, which is characterized in that in percentage by weight, the steel pipe include 0.25~0.33% C, 0.15~ 0.50% Si, 1.30~1.70% Mn, the P less than or equal to 0.020%, the S less than or equal to 0.015%, 0.012~ 0.04% Ti and 0.0005~0.0030% B, remaining is Fe and inevitable impurity.
9. steel pipe according to claim 8, which is characterized in that in the steel pipe, C equivalent≤0.60%.
10. a kind of rotary drilling rig drilling rod, including steel pipe, which is characterized in that the steel pipe is the steel described in claim 8 or 9 The steel pipe that production method described in any one of pipe or claim 3 to 7 obtains.
CN201810260020.0A 2018-03-27 2018-03-27 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod Pending CN108588552A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810260020.0A CN108588552A (en) 2018-03-27 2018-03-27 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810260020.0A CN108588552A (en) 2018-03-27 2018-03-27 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod

Publications (1)

Publication Number Publication Date
CN108588552A true CN108588552A (en) 2018-09-28

Family

ID=63624738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810260020.0A Pending CN108588552A (en) 2018-03-27 2018-03-27 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod

Country Status (1)

Country Link
CN (1) CN108588552A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108531805A (en) * 2018-03-27 2018-09-14 衡阳华菱连轧管有限公司 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod
CN110410658A (en) * 2019-07-30 2019-11-05 嘉兴三善金属制品有限公司 Polygonal steel pipe and its production technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06184636A (en) * 1992-12-18 1994-07-05 Nippon Steel Corp Production of high strength and high toughness seamless steel pipe excellent in weldability
CN101259582A (en) * 2008-04-28 2008-09-10 江阴市界达特异制管有限公司 Preparation of seamless special-shaped steel pipe for low temperature resistance oil derrick electric transmission pole tower
CN101280391A (en) * 2008-05-08 2008-10-08 攀钢集团成都钢铁有限责任公司 High-strength tough hydraulic prop seamless steel pipe
CN101608282A (en) * 2009-07-03 2009-12-23 天津钢管集团股份有限公司 Anti--40 ℃~-60 ℃ low temperature drill rod material steel pipes and manufacture method thereof
CN101914666A (en) * 2010-09-19 2010-12-15 天津钢管集团股份有限公司 Method for improving transverse impact toughness of seamless steel tube
CN108531805A (en) * 2018-03-27 2018-09-14 衡阳华菱连轧管有限公司 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06184636A (en) * 1992-12-18 1994-07-05 Nippon Steel Corp Production of high strength and high toughness seamless steel pipe excellent in weldability
CN101259582A (en) * 2008-04-28 2008-09-10 江阴市界达特异制管有限公司 Preparation of seamless special-shaped steel pipe for low temperature resistance oil derrick electric transmission pole tower
CN101280391A (en) * 2008-05-08 2008-10-08 攀钢集团成都钢铁有限责任公司 High-strength tough hydraulic prop seamless steel pipe
CN101608282A (en) * 2009-07-03 2009-12-23 天津钢管集团股份有限公司 Anti--40 ℃~-60 ℃ low temperature drill rod material steel pipes and manufacture method thereof
CN101914666A (en) * 2010-09-19 2010-12-15 天津钢管集团股份有限公司 Method for improving transverse impact toughness of seamless steel tube
CN108531805A (en) * 2018-03-27 2018-09-14 衡阳华菱连轧管有限公司 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108531805A (en) * 2018-03-27 2018-09-14 衡阳华菱连轧管有限公司 Steel pipe, its raw material, its production method and rotary drilling rig drilling rod
CN110410658A (en) * 2019-07-30 2019-11-05 嘉兴三善金属制品有限公司 Polygonal steel pipe and its production technology

Similar Documents

Publication Publication Date Title
JP5787492B2 (en) Steel pipe manufacturing method
JP6466573B2 (en) Yield strength 800 MPa class high toughness hot rolled high strength steel and method for producing the same
MX2013004025A (en) Methods of manufacturing steel tubes for drilling rods with improved mechanical properties, and rods made by the same.
JP5439973B2 (en) High-strength thick steel plate having excellent productivity and weldability and excellent drop weight characteristics after PWHT, and method for producing the same
BR102012003529B1 (en) STEEL PIPE AND METHOD FOR THE SAME PRODUCTION
KR20130135354A (en) Steel pipe quenching method
JP5196934B2 (en) High fatigue life quenched and tempered steel pipe and method for manufacturing the same
CN104846273A (en) Low-temperature plasticity high manganese steel plate and processing technology thereof
JP2012122111A (en) Method for producing tmcp and tempering process type high-strength thick steel plate having both excellent productivity and weldability, and excellent in drop-weight characteristic after pwht
JP5477089B2 (en) Manufacturing method of high strength and high toughness steel
JP2010222680A (en) Method for manufacturing high strength high toughness steel excellent in workability
JP2954922B1 (en) Heat treatment method for precipitation hardening high silicon steel products
JP5668547B2 (en) Seamless steel pipe manufacturing method
CN108588552A (en) Steel pipe, its raw material, its production method and rotary drilling rig drilling rod
JP6394809B2 (en) Steel pipe for line pipe and manufacturing method thereof
CN108531805A (en) Steel pipe, its raw material, its production method and rotary drilling rig drilling rod
JP6292366B1 (en) Seamless steel pipe and manufacturing method thereof
JP4043754B2 (en) High strength PC steel bar with excellent delayed fracture characteristics
CN113172116B (en) Preparation method of seamless steel tube, seamless steel tube and drill rod structure
JP6051735B2 (en) Method for producing high-tensile steel sheet with excellent weldability and delayed fracture resistance
JP5589335B2 (en) Manufacturing method of high toughness steel
CN108660371A (en) Steel pipe, its raw material, its production method and rotary drilling rig drilling rod
CN108642372A (en) Steel pipe, its raw material, its production method and rotary drilling rig drilling rod
JP5747398B2 (en) High strength steel
WO2005031020A1 (en) Steel product for induction hardening, induction-hardened member using the same, and methods for producing them

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928

RJ01 Rejection of invention patent application after publication