CN108573342A - State evaluating method, device, computer equipment and the storage medium of power equipment - Google Patents

State evaluating method, device, computer equipment and the storage medium of power equipment Download PDF

Info

Publication number
CN108573342A
CN108573342A CN201810277616.1A CN201810277616A CN108573342A CN 108573342 A CN108573342 A CN 108573342A CN 201810277616 A CN201810277616 A CN 201810277616A CN 108573342 A CN108573342 A CN 108573342A
Authority
CN
China
Prior art keywords
electric power
work
data
equipment
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810277616.1A
Other languages
Chinese (zh)
Inventor
陆国俊
吴国沛
栾乐
刘俊翔
陈国炎
肖天为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201810277616.1A priority Critical patent/CN108573342A/en
Publication of CN108573342A publication Critical patent/CN108573342A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to the state evaluating method of power equipment, device, computer equipment and storage mediums, belong to electronic circuit technology field.The method includes:Determine multiple elements that multiple work about electric power tickets include;Determine the incidence relation between the multiple element and preset multiple dimensions;It receives for the triggering command with the relevant dimension of power equipment;According to the triggering command and the incidence relation, the electric power data of corresponding element is obtained from preset work ticket database;According to the electric power data, power information corresponding with the dimension in the multiple work about electric power ticket is obtained;The condition evaluation results of corresponding power equipment are obtained according to the power information.Above-mentioned technical proposal, solve the problems, such as that electric power data obtains does not cause the assessment to status of electric power not accurate and comprehensive enough comprehensively yet.By therefrom excavating power information to the data analysis of work about electric power ticket, comprehensive and accurate assessment can be carried out to the state of power equipment.

Description

State evaluating method, device, computer equipment and the storage medium of power equipment
Technical field
The present invention relates to electronic circuit technology fields, more particularly to the state evaluating method, device, calculating of power equipment Machine equipment and storage medium.
Background technology
Economic rapid development makes power grid scale constantly expand, and networking power equipment quantity is growing day by day, needs to manage Huge electric power data analyzes the power informations such as status of electric power.Power information tool is analyzed by electric power data There is comprehensively and accurately feature, the production efficiency and the efficiency of management of work about electric power can be effectively improved.But realizing process of the present invention In, inventor has found that at least there are the following problems in the prior art:Domestic power grid industry relative closure, many external electric power numbers It is not particularly suited for domestic electric system according to analysis new technology.In addition, electric power data is mainly obtained by modes such as ammeters at present It takes, the data obtained in this way are not comprehensive enough.Therefore, the power information obtained is also not accurate and comprehensive enough, also can not Comprehensive and accurate assessment is carried out to the state of power equipment.
Invention content
Based on this, the present invention provides the state evaluating method of power equipment, device, computer equipment and storage medium, By therefrom excavating power information to the data analysis of work about electric power ticket, comprehensive and accurate comment can be carried out to the state of power equipment Estimate.
The content of the embodiment of the present invention is as follows:
A kind of state evaluating method of power equipment, includes the following steps:Determine that multiple work about electric power tickets include multiple Element;Determine the incidence relation between the multiple element and preset multiple dimensions;It receives and is directed to and power equipment phase The triggering command of the dimension of pass;According to the triggering command and the incidence relation, obtained from preset work ticket database The electric power data of corresponding element;Include the multiple element and the corresponding electric power of each element in the work ticket database Data, the corresponding electric power data of each element are obtained according to the multiple work about electric power ticket;According to the electric power data, institute is obtained State power information corresponding with the dimension in multiple work about electric power tickets;Corresponding power equipment is obtained according to the power information Condition evaluation results.
It is described according to the triggering command and the incidence relation in one of the embodiments, from preset work ticket Before the step of obtaining the electric power data of corresponding element in database, further include:It is obtained from multiple work about electric power tickets respectively each The corresponding electric power data of a element, according to preset algorithm to invalid data, duplicate data and/or the mistake in the electric power data Accidentally data are handled;Work ticket database is established according to the element and the treated electric power data.
It is described according to the triggering command and the incidence relation in one of the embodiments, from preset work ticket The step of electric power data of corresponding element is obtained in database, including:It is determined according to the triggering command and the incidence relation With the associated element of corresponding dimension, the electric power data of the associated element is obtained from preset work ticket data.
It is described in one of the embodiments, to receive for the triggering command with the relevant dimension of power equipment;According to institute The step of stating triggering command and the incidence relation, the electric power data of corresponding element obtained from preset work ticket database, Including:It receives for the affiliated management unit of equipment, work about electric power ticket attribute, working time, device class, part of appliance, equipment The triggering command of the dimension of producer, unit type or switching manipulation information;According to the triggering command and the incidence relation, from Corresponding power transformation station name, work ticket number, work responsible person, staff, work are obtained in preset work ticket database Task, the element for operating equipment, job site, initial time, end time, process of work and/or equipment running status Electric power data.
It is described in one of the embodiments, to receive for the triggering command with the relevant dimension of power equipment;According to institute Triggering command and the incidence relation are stated, the electric power data of corresponding element is obtained from preset work ticket database;According to institute Electric power data is stated, power information corresponding with the dimension in the multiple work about electric power ticket is obtained;According to the power information The step of obtaining the condition evaluation results of corresponding power equipment, including:Receive the first triggering command for the working time;Root According to the first triggering command and the incidence relation, obtained from preset work ticket database task, operation equipment, The electric power data of initial time and end time obtains the first electric power data;First electric power data is analyzed, is obtained The operation equipment executes the working time needed for the task.
It is described in one of the embodiments, to receive for the triggering command with the relevant dimension of power equipment;According to institute Triggering command and the incidence relation are stated, the electric power data of corresponding element is obtained from preset work ticket database;According to institute Electric power data is stated, power information corresponding with the dimension in the multiple work about electric power ticket is obtained;According to the power information The step of obtaining the condition evaluation results of corresponding power equipment, including:The second triggering received for switching manipulation information refers to It enables;According to second triggering command and the incidence relation, task, operation are obtained from preset work ticket database The electric power data of equipment and equipment running status obtains the second electric power data;Second electric power data is analyzed, is obtained The switching manipulation information of corresponding equipment.
It is described according to the electric power data in one of the embodiments, obtain in the multiple work about electric power ticket with institute The step of stating dimension corresponding power information, including:To the numerical values recited of the electric power data, data amount check and/or frequency into Row analysis, obtains power information corresponding with the dimension in the multiple work about electric power ticket.
It is described in one of the embodiments, that the status assessment knot of corresponding power equipment is obtained according to the power information After the step of fruit, further include:According to the condition evaluation results to the service life of power equipment and following a period of time Interior equipment state, maintenance component and the repair time is estimated.
Correspondingly, the embodiment of the present invention provides a kind of state evaluation device of power equipment, including:Element determining module, The multiple elements for including for determining multiple work about electric power tickets;Relationship determination module, for determine the multiple element in advance Incidence relation between multiple dimensions of setting;Data acquisition module is directed to and the relevant dimension of power equipment for receiving Triggering command;According to the triggering command and the incidence relation, corresponding element is obtained from preset work ticket database Electric power data;Include the multiple element and the corresponding electric power data of each element in the work ticket database, it is each The corresponding electric power data of element is obtained according to the multiple work about electric power ticket;And state estimation module, for according to the electricity Force data obtains power information corresponding with the dimension in the multiple work about electric power ticket;It is obtained according to the power information The condition evaluation results of corresponding power equipment.
The state evaluating method and device of above-mentioned power equipment determine that preset dimensional information and work about electric power ticket include Element between incidence relation, after receiving the triggering command for a certain with the relevant dimension of power equipment, from default Work ticket database in obtain the electric power data of corresponding element, obtain corresponding to the electricity of dimension analysis after to electric power data Force information, and then the state of power equipment is assessed.Each side can be therefrom excavated by the analysis to work about electric power ticket The electric power data in face obtains comprehensive and accurate power information, can be carried out to the state of power equipment by these power informations accurate True assessment.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor Computer program, the processor realize following steps when executing the computer program:Determine that multiple work about electric power tickets include Multiple elements;Determine the incidence relation between the multiple element and preset multiple dimensions;Reception is directed to and electric power The triggering command of device-dependent dimension;According to the triggering command and the incidence relation, from preset work ticket database The middle electric power data for obtaining corresponding element;Include that the multiple element and each element correspond in the work ticket database Electric power data, the corresponding electric power data of each element obtains according to the multiple work about electric power ticket;According to the electric power data, Obtain power information corresponding with the dimension in the multiple work about electric power ticket;Corresponding electricity is obtained according to the power information The condition evaluation results of power equipment.
Above computer equipment, by can therefrom excavate the electric power data of various aspects to the analysis of work about electric power ticket, Comprehensive and accurate power information is obtained, the state of power equipment can accurately be assessed by these power informations.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor Following steps are realized when row:Determine multiple elements that multiple work about electric power tickets include;It determines the multiple element and presets Multiple dimensions between incidence relation;It receives for the triggering command with the relevant dimension of power equipment;According to the triggering Instruction and the incidence relation obtain the electric power data of corresponding element from preset work ticket database;The work poll According to including the multiple element and the corresponding electric power data of each element in library, the corresponding electric power data of each element according to The multiple work about electric power ticket obtains;According to the electric power data, obtain in the multiple work about electric power ticket with the dimension pair The power information answered;The condition evaluation results of corresponding power equipment are obtained according to the power information.
Above computer readable storage medium storing program for executing, by the electricity that can therefrom excavate various aspects to the analysis of work about electric power ticket Force data obtains comprehensive and accurate power information, can accurately be commented the state of power equipment by these power informations Estimate.
Description of the drawings
Fig. 1 is the applied environment figure of the state evaluating method of power equipment in one embodiment;
Fig. 2 is the flow diagram of the state evaluating method of power equipment in one embodiment;
Fig. 3 is work about electric power ticket information visuallization schematic diagram in one embodiment;
Fig. 4 is the flow diagram of the state evaluating method of power equipment in another embodiment;
Fig. 5 is the visualization schematic diagram of power information in one embodiment;
Fig. 6 is the structure diagram of the state evaluation device of power equipment in one embodiment.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The state evaluating method of power equipment provided by the present application can be applied in computer equipment as shown in Figure 1. The computer equipment can be server, and internal structure chart can be as shown in Figure 1.The computer equipment includes total by system Processor, memory, network interface and the database of line connection.Wherein, the processor of the computer equipment is for providing calculating And control ability.The memory of the computer equipment includes non-volatile memory medium, built-in storage.The non-volatile memories are situated between Matter is stored with operating system, computer program and database.The built-in storage is the operating system in non-volatile memory medium Operation with computer program provides environment.The database of the computer equipment is for storing the data such as electric power data.The calculating The network interface of machine equipment is used to communicate by network connection with external terminal.When the computer program is executed by processor with Realize a kind of determination method in pavement disease region.
It will be understood by those skilled in the art that structure shown in Fig. 1, is only tied with the relevant part of application scheme The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment May include either combining certain components than more or fewer components as shown in the figure or being arranged with different components.
The embodiment of the present invention provides a kind of state evaluating method of power equipment, device, computer equipment and storage medium. It is described in detail separately below.
In one embodiment, as shown in Fig. 2, providing a kind of state evaluating method of power equipment, including following step Suddenly:
S201, multiple elements that multiple work about electric power tickets include are determined.
Optionally, the content of the work about electric power ticket may include:Work ticket number, work responsible person, responsible person ID, work Class member, member id, number of members, job site and action, projected operating times, work finish time, scope of power outage, The content of the elements such as comment, these electric power after safety measure, work permit people, work ticket signed by, work ticket approver, power transmission Data type is more, quantity is more, contains a large amount of useful work about electric power data, passes through point of the electric power data to these most originals Analysis can obtain the power information of various aspects.
The sample of work about electric power ticket is as shown in Table 1 and Table 2.Work about electric power ticket packet is can be seen that from the content of the two tables Contain multiple elements and the corresponding electric power data of these elements, electric power data corresponding for task, specific, concrete Work the objects such as targeted accumulator, wind turbine.Task can be determined by the analysis of the electric power data to task Therefore targeted power equipment etc. can determine and the relevant power information of power equipment well.
1 work ticket sample of table
2 work ticket sample (above connecing table 1) of table
This step obtains a large amount of work about electric power ticket, integrates the element that these work about electric power tickets are included, determine need into The element of row analysis.These elements can be the summation for various types of elements that all work about electric power tickets include.
Optionally, the element that each work about electric power ticket is included can also be consistent, therefore, the realization process of this step It can be to determine the element that one of work about electric power ticket is included.
S202, incidence relation between the multiple element and preset multiple dimensions is determined.
This step determines each element in work about electric power ticket and the incidence relation between each dimension.
Optionally, the data volume that includes due to work about electric power ticket is big, type is various, and the present embodiment is from different dimensions To determine power information, multi dimensional analysis of the realization to work about electric power ticket.These dimensions can be according to power production process Demand determines, can also be determined by the conclusion obtained to the preliminary analysis of work about electric power ticket.
Optionally, preset dimension may include the affiliated management unit of equipment, work about electric power ticket attribute, working time, work Measure, part of appliance, personnel depaly information, the fitness of other unit, switching manipulation information, profession, grass-roots unit, time etc. Dimension.It is of course also possible to for other dimensions.The embodiment of the present invention is not limited specific dimension.
There may be interrelated between different elements in work about electric power ticket.The data of some elements must be with other yuan The data of element, which are integrated, can just be better achieved data analysis, and such as initial time and end time, they are used alone and are only capable of As soon as indicating a moment, a certain item work about electric power required by task of completion can determine that if be combined with the time at another moment Time, and then determine to information such as workloads.Certainly, there is also the data that can be used alone, these data can be used as single An only dimension is analyzed, can also be with other elements to combination.
It is alternatively possible to using each element of work about electric power ticket as a dimension, determine that each element is corresponding Power information.
Optionally, a dimension may only exist a corresponding element, it is also possible to which there are multiple corresponding members Element.These incidence relations can be stored in mapping table, be stored in work ticket database.
S203, it receives for the triggering command with the relevant dimension of power equipment;According to the triggering command and the pass Connection relationship obtains the electric power data of corresponding element from preset work ticket database;Include in the work ticket database The multiple element and the corresponding electric power data of each element, the corresponding electric power data of each element is according to the multiple electric power Work ticket obtains.
In this step, associated element is determined according to the triggering command of reception, and from preset work ticket database It is middle to obtain corresponding electric power data.
Optionally, can be with the relevant dimension of power equipment to work about electric power ticket after preliminary analysis, therefrom select To power equipment carry out operation or with the relevant dimension of power equipment, such as:The affiliated management unit of equipment, device class, equipment Component, equipment manufacturer, unit type etc. dimension.
Optionally, work ticket database is for storing the element and the corresponding electricity of each element that work about electric power ticket includes The database of force data.By work ticket database, user need to only provide the element that need to be inquired, you can from the work ticket database It is middle to obtain corresponding electric power data.
S204, according to the electric power data, obtain corresponding with dimension electric power letter in the multiple work about electric power ticket Breath;The condition evaluation results of corresponding power equipment are obtained according to the power information.
In this step, acquired electric power data is analyzed, and then obtains the power information of corresponding dimension.According to These power informations can assess the state of corresponding power equipment, and then can determine that the state of power equipment is commented Estimate result.
Optionally, multiple triggering command can also be received, and the electric power of multiple dimensions is obtained according to these triggering commands Information.The embodiment of the present invention is not limited the number of triggering command.
Optionally, the electricity of all multiple dimensions associated therewith can also be determined after receiving a certain triggering command Force information realizes the assessment of the status of electric power to multiple dimensions simultaneously.
Economic rapid development makes power grid scale constantly expand, and the power equipment quantity of networking is also growing day by day, therefore, Utilities Electric Co. and power department need to manage huge power equipment data.
Work ticket is the writ for permitting working on electrical equipment and system software, and executes and ensure safe practice The written foundation of measure.One shift can only arrange a task within the same time, issue a work ticket.Work Make range with an electric connecting member to be limited.Electric connecting member refers to connecing to bus rod, and match Denso mounted on a certain It sets room, switch place, within the scope of transformer room, be connected to the general name of equipment in same electric loop.Including breaker, keep apart Pass, voltage transformer and current transformer etc..If several tasks need to give same shift when executing, for prevent from working Time, place and safety measure are got wrong and cause the accident, and can only first arrange one of task, issue work responsible person one and open Work ticket.After work ticket is withdrawn in task completion, then arranges second task and issue second work ticket.Operator on duty wants After being connected to work ticket, the safety measure proposed on censorship ticket whether complete.It was found that when wrong or query, it should be to label People is sent out to propose.Responsible person construct after receiving task, task and safety measure that relevant personnel research institute should be organized to propose And necessary preparation is performed before going into operation according to mission requirements.
From the foregoing it can be that work ticket is the important list in power production process, a large amount of useful electric power are contained Creation data.But work ticket is only preserved as the record of the course of work at present, not yet to the data of work ticket and its accumulate The huge data value contained is excavated.
The present embodiment is therefrom excavated the electric power data of various aspects, is obtained by the analysis to multiple work about electric power tickets Comprehensive and accurate evaluating status of electric power result.Electric power data is obtained from preset work ticket database, it can be directly accurate Ground gets target data, and the state of different power equipments can be targetedly obtained simultaneously for different triggering commands Information can effectively improve the status assessment efficiency of power equipment.
In one embodiment, described according to the triggering command and the incidence relation, from preset work ticket data Before the step of obtaining the electric power data of corresponding element in library, further include:Respectively each member is obtained from multiple work about electric power tickets The corresponding electric power data of element, according to preset algorithm to invalid data, duplicate data and/or the error number in the electric power data According to being handled;Work ticket database is established according to the element and the treated electric power data.
Optionally, after obtaining electric power data in numerous work about electric power tickets, therefrom removal may influence electric power data Invalid data and duplicate data, and correct wrong data therein.So that in work ticket database, each electric power data has Corresponding element, each element also have corresponding electric power data.Therefore, inquired element energy later is positioned Determine corresponding electric power data.
Optionally, the present embodiment further includes obtaining the element of multiple work about electric power tickets and the corresponding electricity of each element again Force data, the step of being updated to work ticket database according to these elements and electric power data.
The present embodiment is accomplished that the process for establishing work ticket database.According to treated electric power data and each Corresponding element establishes work ticket database.Later, when needing to obtain electric power data, understanding its corresponding element can be direct Required electric power data is inquired from work ticket database, and there is higher efficiency.
In one embodiment, described according to the triggering command and the incidence relation, from preset work ticket data The step of electric power data of corresponding element is obtained in library, including:According to the triggering command and the incidence relation determine with it is right The associated element of dimension is answered, the electric power data of the associated element is obtained from preset work ticket data.
Optionally, the detailed process of the present embodiment realization can be:Determine that triggering command institute is right according to triggering command first The dimension answered;Mapping table is inquired, element corresponding with the dimension is determined according to the incidence relation in mapping table;According to these elements Corresponding electric power data is obtained from work ticket database.Such data acquisition facilitates direct.
The present embodiment determines required electric power data according to predetermined incidence relation and work ticket database, number It is convenient and efficient according to acquisition process.
In one embodiment, described to receive for the triggering command with the relevant dimension of power equipment;It is touched according to described The step of sending instructions and the incidence relation, the electric power data of corresponding element obtained from preset work ticket database, including: Receive for the affiliated management unit of equipment, work about electric power ticket attribute, the working time, device class, part of appliance, equipment manufacturer, The triggering command of the dimension of unit type or switching manipulation information;According to the triggering command and the incidence relation, from default Work ticket database in obtain corresponding power transformation station name, work ticket number, work responsible person, staff, task, Operate the electric power of the element of equipment, job site, initial time, end time, process of work and/or equipment running status Data.
In the present embodiment, when preset dimension specifically includes the affiliated management unit of equipment, work about electric power ticket attribute, work Between, device class, part of appliance, equipment manufacturer, unit type and switching manipulation information.
Optionally, the affiliated management unit of equipment can refer to according to substation management institute, patrol the units such as fibrillar center, substation.
Work about electric power ticket attribute refers to the first work ticket and Second Working Ticket.Pass through the use of both work tickets Whether situation needs to power off during can determining electric operating, and then can be given birth to from danger and to resident to task The angle of influence living is analyzed.
Working time refers to completing the time (minute, hour, number of days etc.) needed for a job.Specifically, according to work Power information is determined over the day:Statistics participates in the real work number of days of the not commensurate of a certain work, or according to different number of days Count the access times of work about electric power ticket.
Part of appliance refers to the parts etc. of power equipment.It overhauls, replace when in task including execution task The information such as the parts changed can determine whether the corresponding component of corresponding power equipment often goes wrong by these information. In addition it can determine the need for replacing component for the importance of the power equipment from the component or whether need to purchase New power equipment.Furthermore, it is possible to obtain the information such as the manufacturer of each equipment, model, and then which producer can be analyzed Which component be frequently necessary to overhaul;For a certain producer, it may be determined that the equipment of which model of the producer was one section of past Time inner part part record of examination is more.
Optionally, which can also include workload, the fitness of other unit and safety measure etc..
Workload refers to completing the information such as power equipment and the working time needed for a certain task.By to work The analysis that work is measured can determine that commensurate is not directed to the required power equipment of different operating and time, and then can instruct electric power The arrangement of device configuration and working time.
The fitness of other unit refers to that a certain unit completes the cooperation whether a certain task needs other unit. Not commensurate can be obtained by the electric power data of this dimension and is directed to the quantity that different operating needs development cooperating, in turn It can instruct the allotment etc. of power equipment.
Safety measure refers to that it is the safety measure for needing to take to execute task, adopts when by executing task With the implementation effect of defined safety measure and safety measure, it may be determined that the safe implementation capacity of each work about electric power unit.
In the present embodiment, the element that work about electric power ticket includes specifically is power transformation station name, work ticket number, works and be responsible for People, staff, task, operation equipment, job site, initial time, end time, process of work and equipment fortune The elements such as row state.
Optionally, after obtaining multiple work about electric power tickets, can according to work about electric power ticket content to work about electric power ticket into Row statistics and comparison.Such as come the quantity of statistical work ticket, obtained power information such as Fig. 3 institutes from grass-roots unit and operation profession Show, Fig. 3 is work about electric power ticket information visuallization schematic diagram.
The present embodiment determines the dimension corresponding to triggering command according to triggering command first, according to predetermined association Relationship determines element corresponding with the dimension, and then corresponding electric power data is obtained from work ticket database.Pass through multiple dimensions Degree and multiple members usually determine electric power data and carry out targetedly data analysis for each dimension, accurately can comprehensively obtain The status of electric power for taking each dimension improves the production efficiency and the efficiency of management of power equipment.
In one embodiment, described to receive for the triggering command with the relevant dimension of power equipment;It is touched according to described Send instructions and the incidence relation, the electric power data of corresponding element is obtained from preset work ticket database;According to the electricity Force data obtains power information corresponding with the dimension in the multiple work about electric power ticket;It is obtained according to the power information The step of condition evaluation results of corresponding power equipment, including:Receive the first triggering command for the working time;According to institute First triggering command and the incidence relation are stated, task, operation equipment, starting are obtained from preset work ticket database The electric power data of time and end time obtain the first electric power data;First electric power data is analyzed, is obtained described Operation equipment executes the working time needed for the task.
The present embodiment when receiving the triggering command for the working time, according to predetermined incidence relation determine with Working time corresponding element, as:Task, operation equipment, initial time and end time;From work ticket database It is middle to obtain the electric power data of corresponding element, and these electric power datas are analyzed, rule therein is found out, determines that the operation is set The standby working time executed needed for the task.Realization process is simple and convenient, succinctly intuitively determines each operation equipment Executing the time needed for corresponding task.
In one embodiment, described to receive for the triggering command with the relevant dimension of power equipment;It is touched according to described Send instructions and the incidence relation, the electric power data of corresponding element is obtained from preset work ticket database;According to the electricity Force data obtains power information corresponding with the dimension in the multiple work about electric power ticket;It is obtained according to the power information The step of condition evaluation results of corresponding power equipment, including:Receive the second triggering command for switching manipulation information;Root According to second triggering command and the incidence relation, task, operation equipment are obtained from preset work ticket database With the electric power data of equipment running status, the second electric power data is obtained;Second electric power data is analyzed, is corresponded to The switching manipulation information of equipment.
The present embodiment is true according to predetermined incidence relation when receiving the triggering command for switching manipulation information Fixed element corresponding with switching manipulation information, as:Task, operation equipment and equipment running status;From work poll According to the electric power data of acquisition corresponding element in library, and these electric power datas are analyzed, find out rule therein, determined and complete The switching manipulation information of corresponding equipment.Realization process is simple and convenient, succinctly intuitively determines the switching manipulation letter of distinct device Breath.For switch that is long-term motionless and often acting, state may be all bad.So the switching manipulation data for passing through work ticket Can from management data angle come discovering device there are the problem of.
In one embodiment, described according to the electric power data, obtain in the multiple work about electric power ticket with the dimension The step of spending corresponding power information, including:The numerical values recited of the electric power data, data amount check and/or frequency are divided Analysis, obtains power information corresponding with the dimension in the multiple work about electric power ticket.
Optionally, the detailed process of the present embodiment realization can be:Electric power number corresponding for unit type this element According to counting each model of a certain equipment, determine the work times and frequency of the equipment of each model, and calculate each equipment Workload and working efficiency.
Optionally, the detailed process of the present embodiment realization can also be:For the electric power number of initial time and end time According to, both determining difference, and then obtain completing the time needed for a certain work.Furthermore it is possible to initial time at the end of Between counted, determine the beginning and ending time needed for corresponding task.
The present embodiment is handled electric power data according to the concrete form of electric power data, obtains corresponding power information. Data handling procedure is simple, can effectively improve the efficiency of power information determination.
In one embodiment, the condition evaluation results that corresponding power equipment is obtained according to the power information After step, further include:According to the condition evaluation results to the service life of power equipment and in following a period of time Equipment state, maintenance component and repair time are estimated.
Optionally, the rule that power equipment is presented within the past period can be summarized according to obtained condition evaluation results Rule.Therefore, the status of electric power in following a period of time can be predicted according to the rule.
Optionally, the service life etc. of power equipment can also be estimated according to the state of power equipment.
Optionally, work about electric power ticket can also be predicted, automatically generate in following a period of time with power equipment phase The work ticket of pass.
The present embodiment estimates following equipment state by the condition evaluation results of gained, reduces manually to data The process of processing analysis is carried out, while work ticket can be automatically generated, guidance is provided to following work about electric power, effectively improves electricity The efficiency of power work.
In one embodiment, as shown in figure 4, providing a kind of state evaluating method of power equipment, include the following steps:
S401, multiple elements that multiple work about electric power tickets include are determined.
S402, incidence relation between the multiple element and preset multiple dimensions is determined.
S403, the corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm Invalid data, duplicate data and wrong data in the electric power data is handled.
S404, work ticket database is established according to the element and the treated electric power data.
S405, it receives for the triggering command with the relevant dimension of power equipment;According to the triggering command and the pass Connection relationship obtains the electric power data of corresponding element from preset work ticket database.
S406, according to the electric power data, obtain corresponding with dimension electric power letter in the multiple work about electric power ticket Breath;The condition evaluation results of corresponding power equipment are obtained according to the power information.
The present embodiment is therefrom excavated the electric power data of various aspects, is obtained by the analysis to multiple work about electric power tickets Comprehensive and accurate evaluating status of electric power result.Electric power data is obtained from preset work ticket database, it can be directly accurate Ground gets target data, and the state of different power equipments can be targetedly obtained simultaneously for different triggering commands Information can effectively improve the status assessment efficiency of power equipment.
The above method in order to better understand, the state evaluating method of a power equipment of the present invention detailed below Application example.
Acquire the work about electric power ticket information of grid company decades.These electric power data disks are the grid company records of production Initial data, data volume is more and the data precision is high.
1) multiple elements that multiple work about electric power tickets include are determined;Determine the multiple element and preset multiple dimensions Incidence relation between degree.
2) triggering command for this dimension of part of appliance is received;According to the triggering command and the incidence relation, The electric power data of corresponding element (task, operation equipment, equipment running status) is obtained from preset work ticket database.
3) determined the operation of components information of a certain power equipment to get to electric power according to task and equipment running status The visualization schematic diagram of information, the power information of multiple dimensions is as shown in Figure 5.
4) information such as often of which component inspection of the power equipment or operation are determined according to the power information.
It should be noted that for each method embodiment above-mentioned, describes, be all expressed as a series of for simplicity Combination of actions, but those skilled in the art should understand that, the present invention is not limited by the described action sequence, because according to According to the present invention, certain steps may be used other sequences or be carried out at the same time.
Based on thought identical with the state evaluating method of the power equipment in above-described embodiment, the present invention also provides electric power The state evaluation device of equipment, the device can be used for executing the state evaluating method of above-mentioned power equipment.For convenience of description, electric In the structural schematic diagram of the state evaluation device embodiment of power equipment, illustrate only with the relevant part of the embodiment of the present invention, It will be understood by those skilled in the art that the restriction of schematic structure not structure twin installation, may include more more or less than illustrating Component, either combine certain components or different components arrangement.
As described in Figure 6, the state evaluation device of power equipment include element determining module 601, relationship determination module 602, Data acquisition module 603 and state estimation module 604, detailed description are as follows:
Element determining module 601, the multiple elements for including for determining multiple work about electric power tickets.
Relationship determination module 602, for determining being associated between the multiple element and preset multiple dimensions System.
Data acquisition module 603, for receiving for the triggering command with the relevant dimension of power equipment;It is touched according to described Send instructions and the incidence relation, the electric power data of corresponding element is obtained from preset work ticket database;The work ticket Include the multiple element and the corresponding electric power data of each element in database, the corresponding electric power data root of each element It is obtained according to the multiple work about electric power ticket.
And state estimation module 604, for according to the electric power data, obtain in the multiple work about electric power ticket with The corresponding power information of the dimension;The condition evaluation results of corresponding power equipment are obtained according to the power information.
In one embodiment, the shown power information determining device based on work ticket further includes:Data processing module, For obtaining the corresponding electric power data of each element from multiple work about electric power tickets respectively, according to preset algorithm to the electric power Invalid data, duplicate data and/or wrong data in data are handled;Database module, for according to the member The plain and described treated electric power data establishes work ticket database.
In one embodiment, the data acquisition module 603 is additionally operable to be associated with described according to the triggering command System's determination and the associated element of corresponding dimension, obtain the electric power number of the associated element from preset work ticket data According to.
In one embodiment, the data acquisition module 603, including:Command reception submodule is set for receiving to be directed to Standby affiliated management unit, work about electric power ticket attribute, the working time, device class, part of appliance, equipment manufacturer, unit type or The triggering command of the dimension of switching manipulation information;Data acquisition submodule, for being associated with described according to the triggering command System, obtained from preset work ticket database corresponding power transformation station name, work ticket number, work responsible person, staff, Task operates equipment, job site, initial time, end time, process of work and/or equipment running status The electric power data of element.
In one embodiment, the power information determining device based on work ticket further includes:First data processing mould Block, for receiving the first triggering command for the working time;According to the first triggering command and the incidence relation, from pre- If work ticket database in obtain task, operation equipment, initial time and end time electric power data, obtain first Electric power data;First electric power data is analyzed, the operation equipment is obtained and executes work needed for the task Make the time.
In one embodiment, the power information determining device based on work ticket further includes:Second data processing mould Block, for receiving the second triggering command for switching manipulation information;According to second triggering command and the incidence relation, The electric power data for obtaining task from preset work ticket database, operating equipment and equipment running status, obtains second Electric power data;Second electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
In one embodiment, the state estimation module 604 is additionally operable to the numerical values recited to the electric power data, number It is analyzed according to number and/or frequency, obtains power information corresponding with the dimension in the multiple work about electric power ticket.
In one embodiment, the power information determining device based on work ticket further includes:Information estimates module, For according to equipment state of the condition evaluation results to the service life of power equipment and in following a period of time, maintenance Component and repair time are estimated.
It should be noted that the state evaluation device of the power equipment of the present invention and the state of the power equipment of the present invention are commented Estimate method one-to-one correspondence, the technical characteristic and advantage illustrated in the embodiment of the state evaluating method of above-mentioned power equipment Suitable for the embodiment of the state evaluation device of power equipment, particular content can be found in chatting in the method for the present invention embodiment It states, details are not described herein again, hereby give notice that.
In addition, in the embodiment of the state evaluation device of the power equipment of above-mentioned example, the logic of each program module is drawn Divide and is merely illustrative of, can be as needed in practical application, such as the configuration requirement of corresponding hardware or the reality of software Above-mentioned function distribution is completed by different program modules, i.e., filled the status assessment of the power equipment by existing convenient consideration The internal structure set is divided into different program modules, to complete all or part of the functions described above.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory And the computer program that can be run on a processor, processor realize following steps when executing computer program:Determine multiple electricity Multiple elements that power work ticket includes;Determine the incidence relation between the multiple element and preset multiple dimensions;It connects Triggering command of the narrowing pair with the relevant dimension of power equipment;According to the triggering command and the incidence relation, from preset The electric power data of corresponding element is obtained in work ticket database;Include in the work ticket database the multiple element and The corresponding electric power data of each element, the corresponding electric power data of each element are obtained according to the multiple work about electric power ticket;According to The electric power data obtains power information corresponding with the dimension in the multiple work about electric power ticket;Believed according to the electric power Breath obtains the condition evaluation results of corresponding power equipment.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the triggering Instruction and the incidence relation, before in preset work ticket database the step of the electric power data of acquisition corresponding element, also Including:The corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm to the electricity Invalid data, duplicate data and/or wrong data in force data are handled;According to the element and described treated Electric power data establishes work ticket database.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the triggering Instruction and the incidence relation, from preset work ticket database the step of the electric power data of acquisition corresponding element, including:Root According to the triggering command and incidence relation determination and the associated element of corresponding dimension, obtained from preset work ticket data Take the electric power data of the associated element.
In one embodiment, following steps are also realized when processor executes computer program:Described receive is directed to and electricity The triggering command of the device-dependent dimension of power;According to the triggering command and the incidence relation, from preset work ticket data The step of electric power data of corresponding element is obtained in library, including:It receives for the affiliated management unit of equipment, work about electric power ticket category Property, the triggering of dimension of working time, device class, part of appliance, equipment manufacturer, unit type or switching manipulation information refer to It enables;According to the triggering command and the incidence relation, obtained from preset work ticket database corresponding power transformation station name, Work ticket number, work responsible person, staff, task, operation equipment, job site, initial time, the end time, The electric power data of the element of process of work and/or equipment running status.
In one embodiment, following steps are also realized when processor executes computer program:Described receive is directed to and electricity The triggering command of the device-dependent dimension of power;According to the triggering command and the incidence relation, from preset work ticket data The electric power data of corresponding element is obtained in library;According to the electric power data, obtain in the multiple work about electric power ticket with the dimension Spend corresponding power information;The step of condition evaluation results of corresponding power equipment being obtained according to the power information, including: Receive the first triggering command for the working time;According to the first triggering command and the incidence relation, from preset work Make the electric power data for obtaining task in ticket data library, operating equipment, initial time and end time, obtains the first electric power number According to;First electric power data is analyzed, the operation equipment is obtained and executes working time needed for the task.
In one embodiment, following steps are also realized when processor executes computer program:Described receive is directed to and electricity The triggering command of the device-dependent dimension of power;According to the triggering command and the incidence relation, from preset work ticket data The electric power data of corresponding element is obtained in library;According to the electric power data, obtain in the multiple work about electric power ticket with the dimension Spend corresponding power information;The step of condition evaluation results of corresponding power equipment being obtained according to the power information, including: Receive the second triggering command for switching manipulation information;According to second triggering command and the incidence relation, from default Work ticket database in obtain task, operate equipment and equipment running status electric power data, obtain the second electric power number According to;Second electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the electric power Data, the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket, including:To the electric power number According to numerical values recited, data amount check and/or frequency analyzed, obtain corresponding with the dimension in the multiple work about electric power ticket Power information.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the electric power After information obtains the step of condition evaluation results of corresponding power equipment, further include:According to the condition evaluation results pair The service life of power equipment and equipment state, maintenance component and repair time in following a period of time are estimated.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program realizes following steps when being executed by processor:Determine multiple elements that multiple work about electric power tickets include;It determines described more Incidence relation between a element and preset multiple dimensions;It receives and refers to for the triggering with the relevant dimension of power equipment It enables;According to the triggering command and the incidence relation, the electric power number of corresponding element is obtained from preset work ticket database According to;Include the multiple element and the corresponding electric power data of each element, each element pair in the work ticket database The electric power data answered is obtained according to the multiple work about electric power ticket;According to the electric power data, the multiple work about electric power is obtained Power information corresponding with the dimension in ticket;The status assessment knot of corresponding power equipment is obtained according to the power information Fruit.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described to be touched according to described Send instructions and the incidence relation, before in preset work ticket database the step of the electric power data of acquisition corresponding element, Further include:The corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm to described Invalid data, duplicate data and/or wrong data in electric power data are handled;According to the element and the process processing Electric power data establish work ticket database.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described to be touched according to described The step of sending instructions and the incidence relation, the electric power data of corresponding element obtained from preset work ticket database, including: According to the triggering command and incidence relation determination and the associated element of corresponding dimension, from preset work ticket data Obtain the electric power data of the associated element.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described receive for The triggering command of the relevant dimension of power equipment;According to the triggering command and the incidence relation, from preset work poll The step of according to the electric power data for obtaining corresponding element in library, including:It receives for the affiliated management unit of equipment, work about electric power ticket category Property, the triggering of dimension of working time, device class, part of appliance, equipment manufacturer, unit type or switching manipulation information refer to It enables;According to the triggering command and the incidence relation, obtained from preset work ticket database corresponding power transformation station name, Work ticket number, work responsible person, staff, task, operation equipment, job site, initial time, the end time, The electric power data of the element of process of work and/or equipment running status.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described receive for The triggering command of the relevant dimension of power equipment;According to the triggering command and the incidence relation, from preset work poll According to the electric power data for obtaining corresponding element in library;According to the electric power data, obtain in the multiple work about electric power ticket with it is described The corresponding power information of dimension;The step of obtaining the condition evaluation results of corresponding power equipment according to the power information, packet It includes:Receive the first triggering command for the working time;According to the first triggering command and the incidence relation, from preset The electric power data for obtaining task in work ticket database, operating equipment, initial time and end time, obtains the first electric power Data;First electric power data is analyzed, when obtaining the operation equipment and executing the work needed for the task Between.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described receive for The triggering command of the relevant dimension of power equipment;According to the triggering command and the incidence relation, from preset work poll According to the electric power data for obtaining corresponding element in library;According to the electric power data, obtain in the multiple work about electric power ticket with it is described The corresponding power information of dimension;The step of obtaining the condition evaluation results of corresponding power equipment according to the power information, packet It includes:Receive the second triggering command for switching manipulation information;According to second triggering command and the incidence relation, from pre- If work ticket database in obtain task, operate equipment and equipment running status electric power data, obtain the second electric power Data;Second electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described according to the electricity Force data, the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket, including:To the electric power Numerical values recited, data amount check and/or the frequency of data are analyzed, obtain in the multiple work about electric power ticket with the dimension pair The power information answered.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described according to the electricity After force information obtains the step of condition evaluation results of corresponding power equipment, further include:According to the condition evaluation results Service life to the power equipment and equipment state in following a period of time, maintenance component and repair time are estimated.
It will appreciated by the skilled person that realizing all or part of flow in above-described embodiment method, being can It is completed with instructing relevant hardware by computer program, the program can be stored in a computer-readable storage and be situated between In matter, sells or use as independent product.The more specific example (non-exhaustive list) of computer-readable medium includes Below:Electrical connection section (electronic device) with one or more wiring, portable computer diskette box (magnetic device), arbitrary access Memory (RAM), read-only memory (ROM), erasable edit read-only storage (EPROM or flash memory), optical fiber dress It sets and portable optic disk read-only storage (CDROM).It can be printed on it in addition, computer-readable medium can even is that The paper of described program or other suitable media, because can be for example by carrying out optical scanner to paper or other media, then It is handled electronically to obtain described program, then by it into edlin, interpretation or when necessary with other suitable methods Storage is in computer storage.
It should be appreciated that each section of the present invention can be realized with hardware, software, firmware or combination thereof.Above-mentioned In embodiment, software that multiple steps or method can in memory and by suitable instruction execution system be executed with storage Or firmware is realized.It, and in another embodiment, can be under well known in the art for example, if realized with hardware Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal Discrete logic, with suitable combinational logic gate circuit application-specific integrated circuit, programmable gate array (PGA), scene Programmable gate array (FPGA) etc..
The term " comprising " and " having " of the embodiment of the present invention and their any deformations, it is intended that cover non-exclusive Including.Such as contain series of steps or the process, method, system, product or equipment of (module) unit are not limited to The step of listing or unit, but further include the steps that optionally not listing or unit, or further include optionally for these The intrinsic other steps of process, method, product or equipment or unit.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, should not be understood as to the scope of the claims of the present invention Limitation.It should be pointed out that for those of ordinary skill in the art, without departing from the inventive concept of the premise, Various modifications and improvements can be made, these are all within the scope of protection of the present invention.Therefore, the protection domain of patent of the present invention It should be determined by the appended claims.

Claims (10)

1. a kind of state evaluating method of power equipment, which is characterized in that include the following steps:
Determine multiple elements that multiple work about electric power tickets include;
Determine the incidence relation between the multiple element and preset multiple dimensions;
It receives for the triggering command with the relevant dimension of power equipment;According to the triggering command and the incidence relation, from The electric power data of corresponding element is obtained in preset work ticket database;Include the multiple member in the work ticket database The corresponding electric power data of plain and each element, the corresponding electric power data of each element are obtained according to the multiple work about electric power ticket It arrives;
According to the electric power data, power information corresponding with the dimension in the multiple work about electric power ticket is obtained;According to institute It states power information and obtains the condition evaluation results of corresponding power equipment.
2. the state evaluating method of power equipment according to claim 1, which is characterized in that described to be referred to according to the triggering It enables and the incidence relation also wraps before in preset work ticket database the step of the electric power data of acquisition corresponding element It includes:
The corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm to the electric power Invalid data, duplicate data and/or wrong data in data are handled;
Work ticket database is established according to the element and the treated electric power data.
3. the state evaluating method of power equipment according to claim 1, which is characterized in that described to be referred to according to the triggering Order and the incidence relation, from preset work ticket database the step of the electric power data of acquisition corresponding element, including:
According to the triggering command and incidence relation determination and the associated element of corresponding dimension, from preset work poll According to the middle electric power data for obtaining the associated element.
4. the state evaluating method of power equipment according to claim 1, which is characterized in that the reception is directed to and electric power The triggering command of device-dependent dimension;According to the triggering command and the incidence relation, from preset work ticket database The step of middle electric power data for obtaining corresponding element, including:
It receives for the affiliated management unit of equipment, work about electric power ticket attribute, working time, device class, part of appliance, instrument factory The triggering command of the dimension of family, unit type or switching manipulation information;
According to the triggering command and the incidence relation, corresponding power transformation station name is obtained from preset work ticket database Claim, work ticket number, work responsible person, staff, task, operation equipment, job site, initial time, at the end of Between, the electric power data of the element of process of work and/or equipment running status.
5. the state evaluating method of power equipment according to claim 4, which is characterized in that the reception is directed to and electric power The triggering command of device-dependent dimension;According to the triggering command and the incidence relation, from preset work ticket database The middle electric power data for obtaining corresponding element;According to the electric power data, obtain in the multiple work about electric power ticket with the dimension Corresponding power information;The step of condition evaluation results of corresponding power equipment being obtained according to the power information, including:
Receive the first triggering command for the working time;According to the first triggering command and the incidence relation, from default Work ticket database in obtain task, operation equipment, initial time and end time electric power data, obtain first electricity Force data;First electric power data is analyzed, the operation equipment is obtained and executes work needed for the task Time;
And/or
Receive the second triggering command for switching manipulation information;According to second triggering command and the incidence relation, from The electric power data for obtaining task in preset work ticket database, operating equipment and equipment running status obtains the second electricity Force data;Second electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
6. the state evaluating method of power equipment according to claim 1, which is characterized in that described according to the electric power number According to, the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket, including:
The numerical values recited of the electric power data, data amount check and/or frequency are analyzed, the multiple work about electric power ticket is obtained In power information corresponding with the dimension.
7. the state evaluating method of power equipment according to any one of claims 1 to 6, which is characterized in that the basis After the power information obtains the step of condition evaluation results of corresponding power equipment, further include:
According to equipment state of the condition evaluation results to the service life of power equipment and in following a period of time, maintenance Component and repair time are estimated.
8. a kind of state evaluation device of power equipment, which is characterized in that including:
Element determining module, the multiple elements for including for determining multiple work about electric power tickets;
Relationship determination module, for determining the incidence relation between the multiple element and preset multiple dimensions;
Data acquisition module, for receiving for the triggering command with the relevant dimension of power equipment;According to the triggering command With the incidence relation, the electric power data of corresponding element is obtained from preset work ticket database;The work ticket database In include the multiple element and the corresponding electric power data of each element, the corresponding electric power data of each element is according to Multiple work about electric power tickets obtain;
And state estimation module, for according to the electric power data, obtain in the multiple work about electric power ticket with the dimension Corresponding power information;The condition evaluation results of corresponding power equipment are obtained according to the power information.
9. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor Calculation machine program, which is characterized in that the processor is realized when executing the computer program described in any one of claim 1 to 7 Method the step of.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of claim 1 to 7 any one of them method is realized when being executed by processor.
CN201810277616.1A 2018-03-30 2018-03-30 State evaluating method, device, computer equipment and the storage medium of power equipment Pending CN108573342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810277616.1A CN108573342A (en) 2018-03-30 2018-03-30 State evaluating method, device, computer equipment and the storage medium of power equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810277616.1A CN108573342A (en) 2018-03-30 2018-03-30 State evaluating method, device, computer equipment and the storage medium of power equipment

Publications (1)

Publication Number Publication Date
CN108573342A true CN108573342A (en) 2018-09-25

Family

ID=63574524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810277616.1A Pending CN108573342A (en) 2018-03-30 2018-03-30 State evaluating method, device, computer equipment and the storage medium of power equipment

Country Status (1)

Country Link
CN (1) CN108573342A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110956379A (en) * 2019-11-22 2020-04-03 广州供电局有限公司 Security situation awareness method and device, computer equipment and storage medium
CN112070249A (en) * 2020-09-16 2020-12-11 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Intelligent database system and method for evaluating total life of power equipment
CN112330128A (en) * 2020-10-29 2021-02-05 广东电网有限责任公司 Production operation management method, device, equipment and storage medium
CN113627899A (en) * 2021-10-12 2021-11-09 广东电网有限责任公司惠州供电局 Matching ticket writing method, device, system and medium based on electronic operation ticket
CN113642746A (en) * 2021-08-13 2021-11-12 西安热工研究院有限公司 Method for calculating wind field regular inspection maintenance number or planned shutdown number based on work ticket

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034349A (en) * 2007-04-06 2007-09-12 西安万年科技实业有限公司 Data base application system development platform based on functional design
CN106529793A (en) * 2016-11-06 2017-03-22 国网安徽省电力公司 Intelligent anti-mistake method used for power grid maintenance work ticket secondary mode arrangement

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101034349A (en) * 2007-04-06 2007-09-12 西安万年科技实业有限公司 Data base application system development platform based on functional design
CN106529793A (en) * 2016-11-06 2017-03-22 国网安徽省电力公司 Intelligent anti-mistake method used for power grid maintenance work ticket secondary mode arrangement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110956379A (en) * 2019-11-22 2020-04-03 广州供电局有限公司 Security situation awareness method and device, computer equipment and storage medium
CN112070249A (en) * 2020-09-16 2020-12-11 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Intelligent database system and method for evaluating total life of power equipment
CN112330128A (en) * 2020-10-29 2021-02-05 广东电网有限责任公司 Production operation management method, device, equipment and storage medium
CN113642746A (en) * 2021-08-13 2021-11-12 西安热工研究院有限公司 Method for calculating wind field regular inspection maintenance number or planned shutdown number based on work ticket
CN113627899A (en) * 2021-10-12 2021-11-09 广东电网有限责任公司惠州供电局 Matching ticket writing method, device, system and medium based on electronic operation ticket

Similar Documents

Publication Publication Date Title
CN106990328B (en) Distribution network emergency repair abnormal data analysis and fault positioning system and method
CN108573342A (en) State evaluating method, device, computer equipment and the storage medium of power equipment
CN105373655B (en) A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station
CN107167704B (en) Power distribution network fault diagnosis system and method based on CIM model
US8738351B2 (en) Historic storage of dual layer power grid connectivity model
CN106980071A (en) Repairing system and its method of work are visualized based on power grid GIS
Pradeep et al. CIM-based connectivity model for bus-branch topology extraction and exchange
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN107991580B (en) Electrical power distribution network fault location method based on associated weights discreteness multi-source information
CN107317394A (en) Dispatching anti-misoperation method, device and system
CN105119282A (en) On-line calculation system and method for theoretical line loss of power grid
CN113283096B (en) Method for acquiring distribution network line account data and analyzing abnormal data and related device
CN106814286A (en) Distribution Fault Location System, method and server based on polynary fault collection
CN108564261A (en) Method, apparatus and computer equipment are determined based on the power information of work ticket
CN110729724A (en) Automatic low-voltage distribution area topology identification method
CN113722311A (en) Power distribution network power failure range positioning method, system, equipment and medium
CN112288303A (en) Method and device for determining line loss rate
CN110867956A (en) Topology automatic identification system and method based on intelligent platform area
CN109064104A (en) Material equipment management method, system and terminal device
CN105264446B (en) For the instrument and method being connected with surveillance and monitoring and control arrangement
CN106202814B (en) The mapping method of automatic safety device acquisition data and EMS system primary equipment model
CN105335824B (en) Distribution network failure repairing command methods and system based on data center
CN106771570A (en) One kind is based on information-based statistics electrical energy system
CN101441454A (en) Low-frequency unloading and fault circuit tagmeme on-line monitoring implementing method
Dong et al. Enhancing distribution system monitoring and resiliency: A sensor placement optimization tool (SPOT)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180925