CN108571005A - 导管架施工工艺 - Google Patents
导管架施工工艺 Download PDFInfo
- Publication number
- CN108571005A CN108571005A CN201810255814.8A CN201810255814A CN108571005A CN 108571005 A CN108571005 A CN 108571005A CN 201810255814 A CN201810255814 A CN 201810255814A CN 108571005 A CN108571005 A CN 108571005A
- Authority
- CN
- China
- Prior art keywords
- jacket
- piling bar
- barge
- piling
- face plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
- E02B2017/0047—Methods for placing the offshore structure using a barge
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明一种导管架施工工艺,其特征在于:所述工艺包含有以下步骤:步骤1、驳船带动导管架至目标位置;步骤2、驳船的压载舱开始加载压载水,使得驳船倾斜2~3°;步骤3、导管架向下滑移至翻转板上;步骤4、吊装;步骤5、将钢桩起吊至翻转位;步骤6、***起桩器;步骤7、卷扬机上卷绕的锁链的末端上的燕尾钩挂钩在钢桩的尾部;步骤8、吊机通过起桩器带动竖向的钢桩***导管架的钢桩孔内;钢桩在重力作用下下沉一端距离后起桩器脱离钢桩;步骤9、重复步骤5~8,直至导管架的钢桩孔内***所有的钢桩。本发明一种导管架施工工艺,运输、作业均极其方便。
Description
技术领域
本发明涉及一种导管架施工工艺,尤其是涉及一种在海洋施工中对导管架和钢桩进行翻转、安装的工艺。
背景技术
目前,在海洋风电等施工过程中需要先行安装导管架,导管架体积庞大、重量极重,采用竖向方式运输的话不但装卸船困难,而且航运过程中的抗风浪能力极差,不利于施工安全;而导管架就位后还需要安装钢桩进行固定,大型导管架的钢桩往往达到上百米长,因此只能进行横向放置在甲板上后进行运输,航运至目的地后翻转至竖向,在翻转的过程中需要利用塞入钢桩头部的起桩器进行固定从而方便吊机作业;但是,起桩器的安装过程中如今缺乏有效的导入方式,往往采用击打的方式进行,从而不到效率低下,而且安全性、操作规范性较差。
发明内容
本发明的目的在于克服上述不足,提供一种运输、作业均极其方便的导管架施工工艺。
本发明的目的是这样实现的:
一种导管架施工工艺,其特征在于:所述工艺包含有以下步骤:
步骤1、驳船带动导管架至目标位置,且驳船的甲板上安装有滑道,导管架横向搁置于该滑道上;
步骤2、驳船的压载舱开始加载压载水,使得驳船倾斜2~3°,并且导管架的大头端位于下降端、小头端位于上升端,同时,所述驳船在导管架的大头端设置有翻转板,该翻转板的底面中部与驳船的甲板相铰接,翻转板的一半悬空于驳船外,另一半搁置在甲板上,且翻转板的顶面与滑道面相齐平;
步骤3、导管架向下滑移至翻转板上,此时导管架的四个角上通过缆索分别被拖船拖住,当导管架的重心滑移至翻转饭的悬空端时,翻转板翻转带动导管架入水;整个过程避免导管架与甲板端部发生碰擦;
步骤4、吊机起吊导管架的小头端开始上升,脱开与导管架小头端相连的两条拖船的缆索,在上升的同时,导管架的大头端上的压载舱加载压载水,直至导管架竖向吊装完毕后导管架大头端断开与两条拖船的缆索;
步骤5、将钢桩起吊至翻转位,且钢桩搁置在翻桩器上,该翻桩器为一铰接于甲板尾部上的翻转件,该翻转件的顶面上设置有供钢桩嵌入的U形槽;钢桩的侧壁上设置有一穿孔,一绳索的头部穿过穿孔后连接至起桩器的头部,该绳索的尾部经一定滑轮后连接至卷扬机;
步骤6、卷扬机工作,通过绳索带动起桩器全部***钢桩的头部内,起桩器通入高压气体膨胀后与钢桩实现连接,随后断开绳索;
步骤7、卷扬机上卷绕的锁链的末端上的燕尾钩挂钩在钢桩的尾部;卷扬机工作、吊机对起桩器进行起吊,钢桩在翻桩器的作用下由水平横向翻转至垂直竖向;
步骤8、吊机通过起桩器带动竖向的钢桩***导管架的钢桩孔内;钢桩在重力作用下下沉一端距离后起桩器脱离钢桩;
步骤9、重复步骤5~8,直至导管架的钢桩孔内***所有的钢桩。
与现有技术相比,本发明的有益效果是:
本发明在导管架安装过程中对驳船进行压载处理使得其倾斜后滑落导管架,不但提高了作业效率,而且避免对导管架早上碰擦;同时,在钢桩的起吊翻转过程中,利用绳索牵引的方式装入起桩器,避免了对起桩器和钢桩造成损伤,而且作业方便、更为安全可靠。
附图说明
图1为本发明一种导管架施工工艺中钢桩起吊的状态示意图。
图2为本发明一种导管架施工工艺中钢桩翻转时的状态示意图。
图3为本发明一种导管架施工工艺中钢桩插桩时的局部示意图。
具体实施方式
参见图1~3,本发明涉及的一种导管架施工工艺,所述工艺包含有以下步骤:
步骤1、驳船带动导管架至目标位置,且驳船的甲板上安装有滑道,导管架横向搁置于该滑道上;
步骤2、驳船的压载舱开始加载压载水,使得驳船倾斜2~3°,并且导管架的大头端位于下降端、小头端位于上升端,同时,所述驳船在导管架的大头端设置有翻转板,该翻转板的底面中部与驳船的甲板相铰接,翻转板的一半悬空于驳船外,另一半搁置在甲板上,且翻转板的顶面与滑道面相齐平;
步骤3、导管架向下滑移至翻转板上,此时导管架的四个角上通过缆索分别被拖船拖住,当导管架的重心滑移至翻转饭的悬空端时,翻转板翻转带动导管架入水;整个过程避免导管架与甲板端部发生碰擦;
步骤4、吊机起吊导管架的小头端开始上升,脱开与导管架小头端相连的两条拖船的缆索,在上升的同时,导管架的大头端上的压载舱加载压载水,直至导管架竖向吊装完毕后导管架大头端断开与两条拖船的缆索;
步骤5、将钢桩起吊至翻转位,且钢桩搁置在翻桩器上,该翻桩器为一铰接于甲板尾部上的翻转件,该翻转件的顶面上设置有供钢桩嵌入的U形槽;钢桩的侧壁上设置有一穿孔,一绳索的头部穿过穿孔后连接至起桩器的头部,该绳索的尾部经一定滑轮后连接至卷扬机;
步骤6、卷扬机工作,通过绳索带动起桩器全部***钢桩的头部内,起桩器通入高压气体膨胀后与钢桩实现连接,随后断开绳索;
步骤7、卷扬机上卷绕的锁链的末端上的燕尾钩挂钩在钢桩的尾部;卷扬机工作、吊机对起桩器进行起吊,钢桩在翻桩器的作用下由水平横向翻转至垂直竖向;
步骤8、吊机通过起桩器带动竖向的钢桩***导管架的钢桩孔内;钢桩在重力作用下下沉一端距离后起桩器脱离钢桩;
步骤9、重复步骤5~8,直至导管架的钢桩孔内***所有的钢桩;
另外:需要注意的是,上述具体实施方式仅为本专利的一个优化方案,本领域的技术人员根据上述构思所做的任何改动或改进,均在本专利的保护范围之内。
Claims (1)
1.一种导管架施工工艺,其特征在于:所述工艺包含有以下步骤:
步骤1、驳船带动导管架至目标位置,且驳船的甲板上安装有滑道,导管架横向搁置于该滑道上;
步骤2、驳船的压载舱开始加载压载水,使得驳船倾斜2~3°,并且导管架的大头端位于下降端、小头端位于上升端,同时,所述驳船在导管架的大头端设置有翻转板,该翻转板的底面中部与驳船的甲板相铰接,翻转板的一半悬空于驳船外,另一半搁置在甲板上,且翻转板的顶面与滑道面相齐平;
步骤3、导管架向下滑移至翻转板上,此时导管架的四个角上通过缆索分别被拖船拖住,当导管架的重心滑移至翻转饭的悬空端时,翻转板翻转带动导管架入水;整个过程避免导管架与甲板端部发生碰擦;
步骤4、吊机起吊导管架的小头端开始上升,脱开与导管架小头端相连的两条拖船的缆索,在上升的同时,导管架的大头端上的压载舱加载压载水,直至导管架竖向吊装完毕后导管架大头端断开与两条拖船的缆索;
步骤5、将钢桩起吊至翻转位,且钢桩搁置在翻桩器上,该翻桩器为一铰接于甲板尾部上的翻转件,该翻转件的顶面上设置有供钢桩嵌入的U形槽;钢桩的侧壁上设置有一穿孔,一绳索的头部穿过穿孔后连接至起桩器的头部,该绳索的尾部经一定滑轮后连接至卷扬机;
步骤6、卷扬机工作,通过绳索带动起桩器全部***钢桩的头部内,起桩器通入高压气体膨胀后与钢桩实现连接,随后断开绳索;
步骤7、卷扬机上卷绕的锁链的末端上的燕尾钩挂钩在钢桩的尾部;卷扬机工作、吊机对起桩器进行起吊,钢桩在翻桩器的作用下由水平横向翻转至垂直竖向;
步骤8、吊机通过起桩器带动竖向的钢桩***导管架的钢桩孔内;钢桩在重力作用下下沉一端距离后起桩器脱离钢桩;
步骤9、重复步骤5~8,直至导管架的钢桩孔内***所有的钢桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810255814.8A CN108571005B (zh) | 2018-03-27 | 2018-03-27 | 导管架施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810255814.8A CN108571005B (zh) | 2018-03-27 | 2018-03-27 | 导管架施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108571005A true CN108571005A (zh) | 2018-09-25 |
CN108571005B CN108571005B (zh) | 2020-09-11 |
Family
ID=63574011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810255814.8A Active CN108571005B (zh) | 2018-03-27 | 2018-03-27 | 导管架施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108571005B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629568A (zh) * | 2018-12-30 | 2019-04-16 | 中交第三航务工程局有限公司江苏分公司 | 海上风电导管架基础钢管桩用浮式稳桩平台的沉桩工艺 |
CN109775632A (zh) * | 2019-02-20 | 2019-05-21 | 海洋石油工程(青岛)有限公司 | 导管架轴线整片翻身吊装的工艺 |
CN112982399A (zh) * | 2021-02-05 | 2021-06-18 | 保利长大工程有限公司 | 固定臂式架起重船沉桩施工方法 |
CN113463644A (zh) * | 2021-07-07 | 2021-10-01 | 中交第一航务工程局有限公司 | 吸力桩导管架吊浮安装方法 |
CN113638416A (zh) * | 2021-07-23 | 2021-11-12 | 江苏华西村海洋工程服务有限公司 | 水下导向架施工工艺 |
CN115367075A (zh) * | 2022-09-13 | 2022-11-22 | 中交第三航务工程局有限公司江苏分公司 | 一种深水海域海上风电工程导管架基础鹰嘴钩翻桩方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006037397A (ja) * | 2004-07-23 | 2006-02-09 | Kinsho Bussan Kk | 洋上風力発電施設の施工方法 |
CN102312438A (zh) * | 2010-07-02 | 2012-01-11 | 南通市海洋水建工程有限公司 | 海上潮间带风电场大型钢管桩打桩施工设备 |
CN202745060U (zh) * | 2012-08-27 | 2013-02-20 | 天津海德天润海上工程技术有限公司 | 一种适用于深水井口平台导管架水下超长钢桩的水上起桩翻身机构 |
CN205369230U (zh) * | 2016-01-20 | 2016-07-06 | 中铁隆工程集团有限公司 | 一种抗拔桩与水下混凝土企口连接机构 |
-
2018
- 2018-03-27 CN CN201810255814.8A patent/CN108571005B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006037397A (ja) * | 2004-07-23 | 2006-02-09 | Kinsho Bussan Kk | 洋上風力発電施設の施工方法 |
CN102312438A (zh) * | 2010-07-02 | 2012-01-11 | 南通市海洋水建工程有限公司 | 海上潮间带风电场大型钢管桩打桩施工设备 |
CN202745060U (zh) * | 2012-08-27 | 2013-02-20 | 天津海德天润海上工程技术有限公司 | 一种适用于深水井口平台导管架水下超长钢桩的水上起桩翻身机构 |
CN205369230U (zh) * | 2016-01-20 | 2016-07-06 | 中铁隆工程集团有限公司 | 一种抗拔桩与水下混凝土企口连接机构 |
Non-Patent Citations (2)
Title |
---|
周晖: "《海洋工程结构设计》", 31 December 2013, 上海交通大学出版社 * |
弓海霞等: "海洋平台钢桩起吊的内胀式吊桩原理分析及试验验证", 《船舶工程》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629568A (zh) * | 2018-12-30 | 2019-04-16 | 中交第三航务工程局有限公司江苏分公司 | 海上风电导管架基础钢管桩用浮式稳桩平台的沉桩工艺 |
CN109775632A (zh) * | 2019-02-20 | 2019-05-21 | 海洋石油工程(青岛)有限公司 | 导管架轴线整片翻身吊装的工艺 |
CN109775632B (zh) * | 2019-02-20 | 2020-12-08 | 海洋石油工程(青岛)有限公司 | 导管架轴线整片翻身吊装的工艺 |
CN112982399A (zh) * | 2021-02-05 | 2021-06-18 | 保利长大工程有限公司 | 固定臂式架起重船沉桩施工方法 |
CN113463644A (zh) * | 2021-07-07 | 2021-10-01 | 中交第一航务工程局有限公司 | 吸力桩导管架吊浮安装方法 |
CN113638416A (zh) * | 2021-07-23 | 2021-11-12 | 江苏华西村海洋工程服务有限公司 | 水下导向架施工工艺 |
CN115367075A (zh) * | 2022-09-13 | 2022-11-22 | 中交第三航务工程局有限公司江苏分公司 | 一种深水海域海上风电工程导管架基础鹰嘴钩翻桩方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108571005B (zh) | 2020-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108571005A (zh) | 导管架施工工艺 | |
CN103228530B (zh) | 浮体结构物作业***、浮体结构物、作业船及浮体结构物的作业方法 | |
US7234409B2 (en) | Vessel for transporting wind turbines, methods of moving a wind turbine, and a wind turbine for an off-shore wind farm | |
CA2390884C (en) | Method and system for installing and transporting an offshore wind power station at sea | |
US8911178B2 (en) | Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine | |
EP2327838A2 (en) | A foundation construction platform used in a beach or offshore areas | |
CN100579860C (zh) | 运输风轮机的船舶、移动风轮机的方法和近海风力农场的风轮机 | |
CN204473079U (zh) | 海上风机整机运输与安装专用船 | |
WO2003066427A1 (en) | Vessel for installation of erect structures | |
CN104527937A (zh) | 海上风机整机运输与安装专用船及方法 | |
US5127767A (en) | Method and a device for mounting the piles associated with the installation of a pile-founded offshore platform | |
CN103373447B (zh) | 一种导管架拆除船及导管架拆除方法 | |
US20100164230A1 (en) | Installation for harvesting ocean currents (IHOC) and methods and means for its delivery, installation and servicing | |
EP3209548A1 (en) | Method for transporting a structure with buoyancy over water using a vessel, and vessel applied in the method | |
CN103373446B (zh) | 导管架拆除船及拆除方法 | |
CN105692449B (zh) | 自升式钻井平台桩腿接长合拢的方法 | |
CN207944358U (zh) | 一种海上钢箱梁吊装快速拆卸支墩 | |
NO331621B1 (no) | Fremgangsmate for a fjerne et understell av en bore- eller produksjonsrigg samt fartoy forsynt med en anordning for denne | |
WO2022084336A1 (en) | Offshore wind turbine assembly vessel | |
CN207904921U (zh) | 一种简易水上打桩设备 | |
CN113772016B (zh) | 一种大吨位重力式锚固基础的安装辅助***及方法 | |
JP7495801B2 (ja) | 浮体式水上構造物の組立装置及び組立て方法 | |
CN202557747U (zh) | 导管架拆除船 | |
CN204370422U (zh) | 筒式柴油打桩锤的吊装起动双作用锤架 | |
CN210151774U (zh) | 一种用于海上风电单桩基础钢管桩起吊立桩的工装 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |