CN108563860A - A kind of virtual pre-assembly method of steel construction - Google Patents

A kind of virtual pre-assembly method of steel construction Download PDF

Info

Publication number
CN108563860A
CN108563860A CN201810317207.XA CN201810317207A CN108563860A CN 108563860 A CN108563860 A CN 108563860A CN 201810317207 A CN201810317207 A CN 201810317207A CN 108563860 A CN108563860 A CN 108563860A
Authority
CN
China
Prior art keywords
steel construction
construction piece
hole group
preassembling
butt hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810317207.XA
Other languages
Chinese (zh)
Inventor
张鸿
罗洪成
肖伯强
胡义新
黄成伟
王进军
赵磊
冯波
胡永波
徐宝华
刘宁波
王伟
张成林
张亚平
别亚威
宋羽
谢攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201810317207.XA priority Critical patent/CN108563860A/en
Publication of CN108563860A publication Critical patent/CN108563860A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/20Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2219/00Indexing scheme for manipulating 3D models or images for computer graphics
    • G06T2219/20Indexing scheme for editing of 3D models
    • G06T2219/2008Assembling, disassembling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Software Systems (AREA)
  • Computer Graphics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of virtual pre-assembly methods of steel construction, it is used for the virtual preassembling between the steel construction piece of bolt hole connection, the interface of each steel construction piece is provided at least one set of butt hole group, it is provided with digital close view photogrammetric system on four angle points of every group of butt hole group, two neighboring steel construction piece is connected by butt hole group;The centre coordinate of four angle point upper bolt holes of steel construction piece butt hole group is obtained before virtual preassembling using digital close view photogrammetric system, assembly during virtual preassembling using the centre coordinate realization of the bolt hole to two neighboring steel construction piece, the deviation of the centre coordinate of bolt hole on the two neighboring steel construction piece of comparative analysis, and butt hole group position on steel construction piece is corrected by the deviation.The method of the present invention is simple, can be greatly cost-effective compared with entity preassembling and shortens the construction period, especially true for the severe engineering of large complicated engineering and execution conditions.

Description

A kind of virtual pre-assembly method of steel construction
Technical field
The present invention relates to a kind of virtual pre-assembly methods of steel construction, belong to technical field of bridge construction, and in particular to a kind of The construction method of steel construction preassembling.
Background technology
Steel construction is typically all to complete component (including expandable member) in factory, transports build on-site installation composition 's.It is in place to ensure accurately install after component transports to scene, it generally requires and carries out entity preassembling in factory to examine structure Assembly.Plant entities preassembling is exactly by steel members and multilayers such as large-scale cylinder, beam, truss, the supports of segmentation manufacture Steel-frame structure especially uses the large-scale steel structure of high strength exploitation, piecemeal manufacture and the steel sheel structure etc. supplied, The operation process of entirety or the provisional assembling of staged and layered is carried out before manufacture.
Entity preassembling not only needs to occupy place, the equipment of factory, there is provision of moulding bed, expends a large amount of manpower object Power, cost are very high.Recently as the fast development of computer technology, technique is brought for traditional entity preassembling technology The opportunity of innovation.People can by means of new computer and its relevant technologies in CAD environment to entity preassembling process into Row simulation, it is cost-effective to which auxiliary even saves entity preassembling process.
A kind of steel construction preassembling operating automation method is disclosed in Chinese invention patent CN103870657A, Include the following steps:1) assembling members, automatic Organizational Parts splicing number are obtained according to steel construction detail drawing model;2) to detail drawing mould The characteristic information of assembling members extracts in type, according to its actual coordinate of the feature calculation of extraction, generates the theory of each component Measuring control point three-dimensional coordinate, automatic numbering;3) it is numbered according to theoretical measuring control point, to component telltale mark in kind;4) it is sat using three-dimensional Measuring instrument is marked, three-dimensional coordinate measurement is carried out to each telltale mark, obtains each anchor point actual measurement three-dimensional coordinate;5) by each control point Theoretical coordinate and Measured Coordinates comparative analysis propose modification report according to national manufacture of steel structure technical regulation and technological requirement Or preassembling examining report, the authority as Quality Control Links.The intelligent automatic generation at the theoretical control point of the invention, can Greatly reduce the error for manually drafting theoretical control point, processing and production efficiency are high.But it is the problem is that it virtual is spelled It is only to consider that the theoretical coordinate of single steel construction piece in the error of actual coordinate, has ignored steel construction piece connection during dress When both hole position installation when position relative error, therefore this method for instruct actual installation when, still can have installation accuracy Insufficient defect.
It is virtually pre-splicing that a kind of steel construction based on Visualization Model is disclosed in Chinese invention patent CN103336856A Dress method, includes the following steps:Step A obtains the model information of several steel member entities;Step B, to the steel member entity Model information checked;Step C imports the model information in 3-D scanning software, soft by the 3-D scanning Part carries out three dimensions operation to realize preassembling to the scan model.Using the virtual pre-assembly method of the steel construction of the invention It can make splicing accuracy higher, spend human and material resources less, with into can also shorten fabrication cycle, reduce production cost.But it is simultaneously Not disclosing can ensure that the assembled method of adjacent two pieces of steel construction pieces high-precision (is unable to control two neighboring steel construction piece to connect Connect the position of Kong Qun).
Invention content
Present invention aim to overcome the shortcomings of the prior art, it is virtually pre- that the present invention devises a kind of steel construction Assembling method.Not only method is simple for it, but also conveniently and efficiently can be used to instruct the virtual preassembling of steel construction piece.
The invention discloses a kind of virtual pre-assembly methods of steel construction, are used between the steel construction piece of bolt hole connection Virtual preassembling, the interface of each steel construction piece are provided at least one set of butt hole group, on four angle points of every group of butt hole group It is provided with digital close view photogrammetric system, two neighboring steel construction piece is connected by butt hole group;It is utilized before virtual preassembling Digital close view photogrammetric system obtains the centre coordinate of four angle point upper bolt holes of steel construction piece butt hole group, virtual pre-splicing During dress the assembly to two neighboring steel construction piece, the two neighboring steel of comparative analysis are realized using the centre coordinate of the bolt hole The deviation of the centre coordinate of bolt hole on structural member, and butt hole group position on steel construction piece is corrected by the deviation.
In a kind of preferred embodiment of the present invention, specific steps include:(1) preassembling unit is determined:Selected steel knot Component, steel construction piece junction are provided with butt hole group, and photogrammetric tooling is laid on four angle points of butt hole group;(2) Image recognition:Measurement reconciliation of taking pictures is carried out to the butt hole group of steel construction piece interface by digital close view photogrammetric system It calculates, the central three-dimensional of four angle point upper bolt holes of butt hole group under this photogrammetric coordinate system of the selected steel construction piece of acquisition is sat Mark;(3) coordinate conversion and entity preassembling:The Three Dimensional Design Model for importing each steel construction piece is extracted each steel construction piece and is connect Central three-dimensional coordinate at mouthful for the bolt hole of splicing, and instruct preassembling using the central three-dimensional coordinate value;(4) pre-splicing Assembling structure is analyzed, should when the deviation of the central three-dimensional coordinate of the interface of two neighboring steel construction piece is in given range Preassembling unit is qualified, using two steel construction pieces of the splicing qualification to splice more than unit progress next round;When two neighboring steel When the deviation of the central three-dimensional coordinate of the interface of structural member is beyond in given range, analysis deviation reason simultaneously obtains correction knot Fruit instructs the adjustment of the butt hole group position of steel construction piece interface using the correction result.
In a kind of preferred embodiment of the present invention, in step (4), after each segment splicing, single segmental is referred to Mark evaluation then adjusts splicing parameter and splices again, until all indexs are optimal if there is index does not pass through;Work as single segmental After precision passes through, the assembly of two two segments can be carried out;Before carrying out two two segment splicings, ensure that each segment is spliced good and led to Cross precision analysis;After the splicing of two two segments, assembled metrics evaluation is carried out to all segments and is then adjusted if there is index does not pass through Splicing parameter is spliced again, until all indexs are optimal.
In a kind of preferred embodiment of the present invention, before segment is spliced, essence is processed to each steel construction piece Degree is analyzed, and after each qualified, then carries out single segmental splicing.
In a kind of preferred embodiment of the present invention, the evaluation index that steel construction piece is processed precision analysis is:1) Splicing seams both sides girder difference of height;2) crossbeam spacing;3) trial assembly overall length;4) two girder center line;5) side sway;6) cross section is diagonal Line is poor;7) horizontal diagonal line is poor;8) girder port verticality;9) vertical curve line is poor;10) per segment quadrangle difference of height;11) high-strength Spend bolt hole gauge percent of pass.
In a kind of preferred embodiment of the present invention, in step (3), steel construction is obtained by close range photogrammetric system The three dimensional point cloud of part, and shown in the form of threedimensional model.
In a kind of preferred embodiment of the present invention, the display mode of threedimensional model form is as follows:1) guiding structure part Measurement pointcloud;2) Three Dimensional Design Model of guiding structure part in software;3) from the middle design for obtaining bolt hole that designs a model Coordinate value;4) common point conversion is carried out to the measurement point of bolt hole and design point, obtains conversion parameter, is set with conversion parameter pair Meter model is converted, then design a model the position that can be shown to where measurement point.Model be can refer to measurement pointcloud data Carry out correlation data calculation and display.
In a kind of preferred embodiment of the present invention, the side of butt hole group position on deviation correction steel construction piece is utilized Method includes, using the butt hole group on metal material backfill raw steel structural member and redrilling or in pair of new steel construction piece It is drilled with revised butt hole group position on interface.
Compared with prior art and product, the present invention has the advantages that:The method of the present invention is simple, pre- with entity Assembly is compared to can be greatly cost-effective and shortening the construction period, especially for the severe engineering of large complicated engineering and execution conditions So.The technologies such as the adjustment of condition equation are used in virtual preassembling technology, Measured Coordinates can be allowed maximum with theoretical coordinate It is close, while bridge can be allowed to keep linear as possible.Compared with the method for other virtual preassemblings, to the steel of bolt hole connection Structure is assemblied with more significant effect, can be unfolded only by the coordinate position of hole group's angle point by putting to line, then to face To entire rod piece, reflect the location status of entire rod piece comprehensively.It may be noted that the present invention substantially realizes on the whole The preassembling of steel construction piece, thus single component than in the prior art has the precision of bigger with standard component comparison one by one, because Steel construction piece and steel construction piece can have deviation when making itself, if between only considering to realize two steel construction pieces Connection, method used in two documents mentioned in background technology can eliminate above-mentioned assembled deviation really, still When the assembled deviation between the steel construction piece (2 are one group, the case where being connected with each other between two adjacent groups) of multiple segments is What the documents being previously mentioned in background technology did not accounted for, and this is also exactly the inventive point place of the present invention.
Description of the drawings
Fig. 1 is the virtual preassembling process schematic of steel structure member in the prior art.
Fig. 2 is the schematic diagram of the virtual preassembling process of steel structure member of the present invention.
Specific implementation mode
The present invention is described in further details with reference to specific attached drawing and example, convenient for the present invention is well understood, But they do not constitute the present invention and limit.
The purpose of the present invention provides a kind of virtual preassembling technology of steel construction aiming at the above problem.The method Specifically include following steps:(1) structural member measurement data obtains.(2) splice plate design point data acquisition.(3) structural member is spelled Dress.(4) splicing accuracy is analyzed.(5) assembled Three-dimensional Display.
Specifically, the step (1), selectes structural member to be measured, to the hole position for being useful for docking and detecting and characteristic point It is numbered, lays photogrammetric tooling on four angle points of butt hole group, carried out by digital close view photogrammetric system It takes pictures measurement and resolving, you can obtain the tested point three-dimensional coordinate under selected structural member this photogrammetric coordinate system.Step 1 It is the three-dimensional coordinate of each Kong Qunsi angle point in order to obtain structural member.
Specifically, the step (2), the Three Dimensional Design Model of splice plate is imported in preassembling software, is above carried in model It takes in the centre coordinate of the bolt hole of splicing.
Specifically, the step (3) is processed precision analysis before segment is spliced to each structural member, respectively refer to After mark is qualified, then carry out single segmental splicing.After each segment splicing, metrics evaluation is carried out to single segmental, if there is index is not led to It crosses, then adjusts splicing parameter, splice again, until all indexs are optimal.After single segmental precision passes through, it can carry out two-by-two The assembly of segment.Before carrying out two two segment splicings, ensure that each segment splices good and passes through precision analysis.Two two segments are spelled After connecing, assembled metrics evaluation is carried out to all segments and then adjusts splicing parameter if there is index does not pass through, splices again, until Until all indexs are optimal.
Specifically, the step (4) need to analyze assembled data after carrying out assembly to structural member, assembly is tied Fruit is evaluated, and evaluation result is carried out visualization output, and evaluation content is specially 11 indexs:1) splicing seams both sides girder Difference of height;2) crossbeam spacing;3) trial assembly overall length;4) two girder center line;5) side sway;6) cross section diagonal is poor;7) horizontal right Linea angulata is poor;8) girder port verticality;9) vertical curve line is poor (camber);10) per segment quadrangle difference of height;11) high-strength bolt Hole gauge percent of pass.
Table specific as follows:
Specifically, the step (5), the three-dimensional point cloud number of structural member is obtained by close range photogrammetric system IDPMS According to, it is more intuitive in order to make structural member show, it can be shown in the form of threedimensional model.Display mode is as follows:1) guiding structure The measurement pointcloud of part;2) Three Dimensional Design Model of guiding structure part in software;3) middle setting for bolt hole is obtained from designing a model Count coordinate value;4) common point conversion is carried out to the measurement point of bolt hole and design point, conversion parameter is obtained, with conversion parameter pair It designs a model and is converted, then design a model the position that can be shown to where measurement point.Model be can refer to measurement pointcloud number According to progress correlation data calculation and display.
In this method, digital simulation preassembling can be greatly cost-effective compared with entity preassembling and be shortened the construction period, It is especially true for the severe engineering of large complicated engineering and execution conditions.Adjustment of condition equation etc. is used in virtual preassembling technology Technology can allow Measured Coordinates to be approached to the greatest extent with theoretical coordinate, while bridge can be allowed to keep linear as possible.With other The method of virtual preassembling is compared, and is had more significant effect to the steel structure assembling of bolt hole connection, by point to line, then is arrived Face can be deployed into entire rod piece, reflect the position shape of entire rod piece comprehensively only by the coordinate position of hole group's angle point State.

Claims (8)

1. a kind of virtual pre-assembly method of steel construction, it is characterised in that:It is used for the void between the steel construction piece of bolt hole connection Quasi- preassembling, the interface of each steel construction piece are provided at least one set of butt hole group, are set on four angle points of every group of butt hole group It is equipped with digital close view photogrammetric system, two neighboring steel construction piece is connected by butt hole group;Number is utilized before virtual preassembling Word close range photogrammetric system obtains the centre coordinate of four angle point upper bolt holes of steel construction piece butt hole group, virtual preassembling The centre coordinate of the bolt hole is utilized to realize the assembly to two neighboring steel construction piece, the two neighboring steel knot of comparative analysis in the process The deviation of the centre coordinate of bolt hole on component, and butt hole group position on steel construction piece is corrected by the deviation.
2. the virtual pre-assembly method of steel construction according to claim 1, it is characterised in that:Specific steps include:
(1) preassembling unit is determined:Selected steel construction piece, steel construction piece junction is provided with butt hole group, butt hole group's Photogrammetric tooling is laid on four angle points;
(2) image recognition:Survey of taking pictures is carried out to the butt hole group of steel construction piece interface by digital close view photogrammetric system It measures and resolves, the center of four angle point upper bolt holes of butt hole group under this photogrammetric coordinate system of the selected steel construction piece of acquisition Three-dimensional coordinate;
(3) coordinate conversion and entity preassembling:The Three Dimensional Design Model for importing each steel construction piece is extracted each steel construction piece and is connect Central three-dimensional coordinate at mouthful for the bolt hole of splicing, and instruct preassembling using the central three-dimensional coordinate value;
(4) preassembling structural analysis, when the deviation of the central three-dimensional coordinate of the interface of two neighboring steel construction piece is giving When in range, preassembling unit is qualified, using two steel construction pieces of the splicing qualification to splice more than unit progress next round;When When the deviation of the central three-dimensional coordinate of the interface of two neighboring steel construction piece is beyond in given range, analysis deviation reason is simultaneously It is corrected as a result, instructing the adjustment of the butt hole group position of steel construction piece interface using the correction result.
3. the virtual pre-assembly method of steel construction according to claim 2, it is characterised in that:In step (4), each segment is spelled After connecing, metrics evaluation is carried out to single segmental, if there is index does not pass through, then splicing parameter is adjusted and splices again, until all fingers Mark it is optimal until;After single segmental precision passes through, the assembly of two two segments can be carried out;Before carrying out two two segment splicings, protect Each segment is demonstrate,proved to splice good and pass through precision analysis;After the splicing of two two segments, assembled metrics evaluation is carried out to all segments, if There is index not pass through, then adjusts splicing parameter and splice again, until all indexs are optimal.
4. the virtual pre-assembly method of steel construction according to claim 2, it is characterised in that:Before segment is spliced, to every A steel construction piece is processed precision analysis, after each qualified, then carries out single segmental splicing.
5. the virtual pre-assembly method of steel construction according to claim 4, it is characterised in that:Steel construction piece is processed precision The evaluation index of analysis is:1) splicing seams both sides girder difference of height;2) crossbeam spacing;3) trial assembly overall length;4) two girder center line; 5) side sway;6) cross section diagonal is poor;7) horizontal diagonal line is poor;8) girder port verticality;9) vertical curve line is poor;10) it often saves Section quadrangle difference of height;11) high-strength bolt hole gauge percent of pass.
6. the virtual pre-assembly method of steel construction according to claim 1, it is characterised in that:In step (3), taken the photograph by close shot Shadow measuring system obtains the three dimensional point cloud of steel construction piece, and is shown in the form of threedimensional model.
7. the virtual pre-assembly method of steel construction according to claim 6, it is characterised in that:The display side of threedimensional model form Formula is as follows:1) measurement pointcloud of guiding structure part;2) Three Dimensional Design Model of guiding structure part in software;3) from designing a model The middle design coordinate value for obtaining bolt hole;4) common point conversion is carried out to the measurement point of bolt hole and design point, obtains conversion ginseng Number, converts with conversion parameter to designing a model, then design a model the position that can be shown to where measurement point.It can refer to Model carries out correlation data calculation and display to measurement pointcloud data.
8. the virtual pre-assembly method of steel construction according to claim 1, it is characterised in that:Steel construction is corrected using deviation The method of butt hole group position includes on part, using metal material backfill raw steel structural member on butt hole group and redrilling or Person is in new steel construction piece to being drilled with revised butt hole group position on interface.
CN201810317207.XA 2018-04-10 2018-04-10 A kind of virtual pre-assembly method of steel construction Pending CN108563860A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810317207.XA CN108563860A (en) 2018-04-10 2018-04-10 A kind of virtual pre-assembly method of steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810317207.XA CN108563860A (en) 2018-04-10 2018-04-10 A kind of virtual pre-assembly method of steel construction

Publications (1)

Publication Number Publication Date
CN108563860A true CN108563860A (en) 2018-09-21

Family

ID=63534589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810317207.XA Pending CN108563860A (en) 2018-04-10 2018-04-10 A kind of virtual pre-assembly method of steel construction

Country Status (1)

Country Link
CN (1) CN108563860A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109948274A (en) * 2019-03-28 2019-06-28 武汉钢铁有限公司 A kind of pipe line steel side sway determination method and the method for improving pipeline steel quality
CN111259492A (en) * 2020-02-10 2020-06-09 湖南省西城建设有限公司 Point cloud data processing method and device applied to bridge structure pre-assembly and storage medium
CN112302171A (en) * 2020-10-28 2021-02-02 山东方大杭萧钢构科技有限公司 Steel structure pre-assembly method
CN113722789A (en) * 2021-07-22 2021-11-30 河北工业大学 Steel structure bridge virtual assembly method based on 3D laser scanning and process feedback
CN114674225A (en) * 2022-03-25 2022-06-28 北京城建设计发展集团股份有限公司 Prefabricated component assembling surface manufacturing error identification algorithm
CN117197410A (en) * 2023-11-06 2023-12-08 中铁大桥局集团有限公司 Virtual splicing method, device and equipment for steel structure and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370049A (en) * 2015-11-16 2016-03-02 上海振华重工(集团)股份有限公司 Rotating wheel section pre-assembly method for ferris wheel
CN107273607A (en) * 2017-06-13 2017-10-20 北京工业大学 A kind of steel-structure factory building pre-assembly method based on BIM

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370049A (en) * 2015-11-16 2016-03-02 上海振华重工(集团)股份有限公司 Rotating wheel section pre-assembly method for ferris wheel
CN107273607A (en) * 2017-06-13 2017-10-20 北京工业大学 A kind of steel-structure factory building pre-assembly method based on BIM

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李杨等: "数字模拟预拼装理论研究", 《工业建筑》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109948274A (en) * 2019-03-28 2019-06-28 武汉钢铁有限公司 A kind of pipe line steel side sway determination method and the method for improving pipeline steel quality
CN111259492A (en) * 2020-02-10 2020-06-09 湖南省西城建设有限公司 Point cloud data processing method and device applied to bridge structure pre-assembly and storage medium
CN111259492B (en) * 2020-02-10 2023-08-11 湖南省西城建设有限公司 Point cloud data processing method and device applied to bridge structure pre-assembly and storage medium
CN112302171A (en) * 2020-10-28 2021-02-02 山东方大杭萧钢构科技有限公司 Steel structure pre-assembly method
CN112302171B (en) * 2020-10-28 2021-09-21 山东方大杭萧钢构科技有限公司 Steel structure pre-assembly method
CN113722789A (en) * 2021-07-22 2021-11-30 河北工业大学 Steel structure bridge virtual assembly method based on 3D laser scanning and process feedback
CN113722789B (en) * 2021-07-22 2023-08-15 河北工业大学 Virtual steel structure bridge assembling method based on 3D laser scanning and process feedback
CN114674225A (en) * 2022-03-25 2022-06-28 北京城建设计发展集团股份有限公司 Prefabricated component assembling surface manufacturing error identification algorithm
CN114674225B (en) * 2022-03-25 2022-09-20 北京城建设计发展集团股份有限公司 Prefabricated component assembling surface manufacturing error identification algorithm
CN117197410A (en) * 2023-11-06 2023-12-08 中铁大桥局集团有限公司 Virtual splicing method, device and equipment for steel structure and storage medium
CN117197410B (en) * 2023-11-06 2024-03-26 中铁大桥局集团有限公司 Virtual splicing method, device and equipment for steel structure and storage medium

Similar Documents

Publication Publication Date Title
CN108563860A (en) A kind of virtual pre-assembly method of steel construction
CN104499714B (en) Hydromechanical installer engineering construction method based on BIM platforms and robot measurement
CN104792274B (en) A kind of measuring method of circular tunnel convergent deformation
CN111627099B (en) Steel structure non-contact actual measurement real quantity method and system based on three-dimensional scanning technology
CN106886659A (en) The virtual pre-splicing and detection method of steel structure bridge based on 3 D laser scanning and cloud platform
CN109117558A (en) A kind of steel structure bridge digital simulation preassembling construction method
CN112282847B (en) Deformation monitoring method for underground coal mine roadway
CN103901852B (en) A kind of aircraft is fitted to each other face digitized cushioning method
CN108824816B (en) High-altitude long-span net frame sliding, positioning, installing and monitoring method
CN106844960B (en) A kind of method of the reverse modeling of tubular weldment steel structure net rack
CN109815540B (en) Datum line layout method for space curve component
CN113374282B (en) Method for controlling embedded bolt by adopting assumed coordinate system
CN114332402B (en) Steel bridge simulation pre-assembly method integrating ground type and hand-held laser scanning
CN106643582A (en) Large mesh antenna reflector profile high-precision test method
CN108731592A (en) A kind of calibration method based on photogrammetric aircraft manufacturing tooling
CN102518204A (en) Buddha ceremonial canopy and manufacturing method thereof
CN109290739B (en) Manufacturing process of space curve steel tower segment
CN113239429A (en) Method for manufacturing precast assembled bridge of concrete segments
CN114875971A (en) Measuring device suitable for large prefabricated part of fully-assembled subway station and refined installation control method
CN111691691A (en) Method for installing, measuring and positioning box body bending and twisting component and drum node
CN106289195A (en) The method for building up of plateau distance heavy construction Measurement and Control System
CN113844611B (en) Shipbuilding method based on continuous simulation and rapid embarkation of digital dock
CN104729408A (en) Thin and long part assembling method
CN104850724B (en) Aircraft model quick design system and method
CN113865570A (en) Steel structure circular stand column verticality measuring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921

RJ01 Rejection of invention patent application after publication