CN108539740A - A kind of power grid accident anticipation simulation system and its method - Google Patents

A kind of power grid accident anticipation simulation system and its method Download PDF

Info

Publication number
CN108539740A
CN108539740A CN201810453951.2A CN201810453951A CN108539740A CN 108539740 A CN108539740 A CN 108539740A CN 201810453951 A CN201810453951 A CN 201810453951A CN 108539740 A CN108539740 A CN 108539740A
Authority
CN
China
Prior art keywords
accident
power grid
stability control
simulation
result
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810453951.2A
Other languages
Chinese (zh)
Other versions
CN108539740B (en
Inventor
周良松
姚占东
沈宇亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Fly Fly Intelligent Electric Technology Co Ltd
Original Assignee
Wuhan Fly Fly Intelligent Electric Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Fly Fly Intelligent Electric Technology Co Ltd filed Critical Wuhan Fly Fly Intelligent Electric Technology Co Ltd
Priority to CN201810453951.2A priority Critical patent/CN108539740B/en
Publication of CN108539740A publication Critical patent/CN108539740A/en
Application granted granted Critical
Publication of CN108539740B publication Critical patent/CN108539740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of power grid accident anticipation simulation system and its method, which is realized based on D5000 platforms, including:Power grid accident envisions analog subsystem, stable online management subsystem, safety on line and checks subsystem, power flow transfer scheme database and stability control strategy expert system database.The system obtains the stable information for judging to need by stable online management subsystem, pass through stabilization of power grids result of calculation, the power flow transfer scheme system database of various electric network faults occurs for structure, utilize current Power Flow Information, the power flow transfer scheme of electric network fault, actual Policy Table carries out the result of the action simulation of fault simulation and stability control device in stability control device, gives the result of the action of simulated failure and simulation to safety on line nucleus correcting system, carries out Security Checking.Analog form is envisioned using power grid accident, the failure that analog network may occur simultaneously provides corresponding stability control strategy, then result is sent to safety on line analysis computing system and is checked;When actually occurring 1 accidents of N, 2 accidents of N, dispatcher can make decisions immediately prevents transmission line of electricity successive tripping, and accident was eliminated in the budding period.

Description

A kind of power grid accident anticipation simulation system and its method
Technical field
The present invention relates to electric power network technical fields, and in particular to a kind of power grid accident anticipation simulation system and its method.
Background technology
Currently, China's power grid gradually develops to national network by power distribution network, area power grid, provincial power network and interprovincial power networks, And North America and Europe have formed transnational networking.The stability and reliability of power grid can be improved in Power System Interconnection, can be mutual between power grid It mutually supports, is spare each other, but being also easy to influence each other because being integrally formed after Power System Interconnection, between power grid.Go out in power grid one Now exception or when failure, often occurs the accident of linksystem, so as to cause large-area power-cuts in the weak link of power grid.
The cause of bulk power grid large-scale blackout is all common electric power accident, but compared with minor scale power net, the anti-accident of bulk power grid Ability is stronger, stability higher, frequency and voltage are held in allowable range in most cases, it is ensured that lasting to supply Electricity.But when there are weak link, transmission systems without spare capacity, network structure is unreasonable and there are electromagnetic looped networks etc. to ask for power grid When topic, there is the case where overload and successive tripping in power transmission line Louis, eventually leads to system oscillation, electric network from collapsing.
Therefore to prevent large-scale blackout, the method for operation and the safety ten of power grid are analyzed in time using Power System Simulator Divide important.Existing relay protection and automatic device, Automatic monitoring systems cannot fully meet the requirement of power network development, SCADA system acquisition is systematic steady state information, and the information that SCADA system provides only is monitored processing, shortage pair by EMS The decision support of scheduling.
Invention content
The present invention for the technical problems in the prior art, provides a kind of power grid accident anticipation simulation system and its side Method envisions analog form using power grid accident, and failure that analog network may occur simultaneously provides corresponding stability control strategy, then by result Safety on line analysis computing system is sent to be checked;When actually occurring N-1 accidents, N-2 accidents, dispatcher can make immediately Going out decision prevents transmission line of electricity successive tripping, and accident was eliminated in the budding period.
The technical solution that the present invention solves above-mentioned technical problem is as follows:
On the one hand, the present invention provides a kind of power grid accident anticipation simulation system, which is realized based on D5000 platforms, It is characterized in that, including:Power grid accident envisions analog subsystem, stable online management subsystem, safety on line and checks subsystem, tide Circulation moves scheme database and stability control strategy expert system database;
The power grid accident envisions analog subsystem, for passing through stable online management system power system operating mode and trend Data, voltage and current, active reactive Power Flow Information needed for stable judgement, determine the operation object of simulation system;For to closing Key circuit or equipment carry out accident simulation;
The power flow transfer scheme database, is established by stability Calculation interpretation of result, for storing power flow transfer scheme;
The stability control strategy expert system database passes through the data check of early period, collection and regional power grid stabilimeter It calculates result to establish, for storing known stability control strategy;
The safety on line checks the accident analog result that subsystem is used to envision the power grid accident analog subsystem Security Checking is carried out, analyzes whether existing stability control strategy needs to change.
Further, the power grid accident anticipation analog subsystem is also networked with EMS dispatch automated systems, for receiving The real time data of EMS carries out dynamic security analysis to power grid forecast accident, determines security and stability control strategy.
Further, the power grid accident anticipation analog subsystem includes that stable information collects detection module, fault simulation point Analyse module, intelligent decision module, result transmission check module;
The stable information is collected detection module and is used for so that current net is presented to user with the formal intuition of statistical graph The real-time operating conditions and Power Flow Information of network;
The fault simulation analysis module is determined for analysis according to demand needs regional power grid circuit to be simulated or equipment Information carries out accident simulation, and power flow solutions and accident impact range after intellectual analysis accident distinguish risk size;
The intelligent decision module is used for after analyzing simulated accident, is selected in stability control strategy expert database Policy Table under the corresponding method of operation, the stability control strategy of simulated accident is provided according to power flow transfer result of calculation;
The result transmission checks module and is used to transmit the flow data and stability control strategy that analysis is calculated, and is by simulation Safety on line nucleus correcting system is transmitted to when the fructufy of system, whether after practical Load flow calculation, it is appropriate to check the stability control strategy, Otherwise propose that new steady control is suggested.
Further, the stable online management subsystem includes multiple regions stabilizing control system;
The area stability control system refer to for solve a regional power grid in stable problem be mounted on two and The safety and stability control device of more than two plant stands, the system for the composition that links together through information channel and Communications Interface Unit, It includes:One main website and multiple substations, the main website and substation are with multiple terminal stations through information channel and communication interface phase Connection.
Further,
The main website is arranged in the power plant in load-center substation or with load-center substation same position, for summarizing each station Operating condition information, state estimation is carried out to regional power grid, identifies the method for operation of regional power grid, to regional power grid by giving Fixed contingency set carries out dynamic security estimation, it is online form security and stability control Policy Table or install off-line calculation in advance obtain The control scheme list arrived, and each substation will be transmitted in relation to method of operation information and control scheme list;For receiving master It stands and when outlet is broken down, according to control scheme list, sending out control command simultaneously to main website and each substation will be controlled by each station System order is transmitted to terminal station;
The substation is installed in more important substation or the power plant being connected with substation, is used for acquisition substation operating mode Operation information, and send main website to;For when receiving our station and our station outlet is broken down, according to the control plan in substation Sketch form sends out control command to main website and each substation and control command is transmitted to terminal station by each station simultaneously;
The terminal station is used to receive the control command that each station transmission comes, and execution controls on the spot, and by control result information Send higher level station to.
Further, the power flow transfer scheme database and stability control strategy expert system database are when creating, it then follows with Lower principle:
(1) specification is named
All library name, table name, domain name follow unified naming rule, and carry out necessary explanation, to facilitate design, dimension Shield, inquiry;
(2) reference of control field
In design, database design management tool appropriate is selected, to facilitate the Distributed Design sum number of developer Management is audited according to the concentration of group;It can directly be quoted using unified naming rule if the field of design has existed;It is no Then, it should redesign;
(3) library table Repetitive controller
In the design process, if it find that most of field is all existing, it should suspect whether designed library table is existing; By the inquiry to library table where field and respective design personnel, confirm whether library table repeats really;
(4) con current control
Con current control should be carried out in design, i.e., for the same library table, have control in same time one-man, Other people can only inquire.
On the other hand, the present invention is based on above systems, also provide a kind of power grid accident anticipation analogy method, including following step Suddenly:
Step 1, power system operating mode and flow data, the electricity needed for stable judgement are obtained by stable online management system Current voltage, active reactive Power Flow Information, determine the operation object of simulation system;
Step 2, by stability Calculation interpretation of result, damp transfer scheme database is built;By the data check of early period, receive Collection and regional power grid stability Calculation are as a result, structure power grid stability control strategy expert system database;
Step 3, accident simulation is carried out to critical circuits or equipment by accident simulation system, according to power flow transfer database Flow data after calculating accident analyzes accident impact and risk size;Accident analog result is shown in system in graphical form On interface, heavy duty and overload circuit indicate its flow data with yellow and red numerical respectively;
Step 4, stability control strategy expert system database is called according to result of calculation, is then transmitted to accident analog result Safety on line nucleus correcting system carries out Security Checking, analyzes whether existing stability control strategy needs to change.
The beneficial effects of the invention are as follows:Power grid accident anticipation simulation system is application of the framework on Unified Supporting Platform System, it is complete by acquiring the basic data of static stability analysis, transient stability analysis, dynamic stability analysis, Voltage Stability Analysis At functions such as information filing, statistical query, intellectual analysis;Realize that control centre in normal epoch, carries out power grid critical circuits Operation monitoring, accident simulation, the result of the action analysis, result communication, provide accurately for management and running personnel and other professionals Stability control strategy.
Prediction failure simulation system needs to send result to safety on line nucleus correcting system after simulating accident, online to pacify Whether the handling result that full nucleus correcting system carries out Load flow calculation check simulation system is reliable, finally gives optimal stability control strategy.
Prediction failure simulation system has the function of electric network swim analysis and given accident treatment strategy.From safety and stability control After power flow transfer is obtained in the data that device processed uploads than result of calculation, calculated for simulated failure situation, it can be direct Show that the circuit overloaded under the malfunction and overload degree are obtained easily to analyze region or Partial Load Flow Accident treatment strategy.Once the hazard model imagined in prediction scheme occurs, people can according to set operation sequence and hints on operation, Fast reaction, emergency processing, to achieve the purpose that reduce causality loss or avoid accident.
Description of the drawings
Fig. 1 is present system structure diagram;
Fig. 2 is area stability control system structure diagram of the present invention;
Fig. 3 is the method for the present invention flow chart.
Specific implementation mode
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
On the one hand, the present invention provides a kind of power grid accident anticipation simulation system, which is realized based on D5000 platforms, such as Shown in Fig. 1, including:Power grid accident envisions analog subsystem, stable online management subsystem, safety on line and checks subsystem, tide Circulation moves scheme database and stability control strategy expert system database;
The power grid accident envisions analog subsystem, for passing through stable online management system power system operating mode and trend Data, voltage and current, active reactive Power Flow Information needed for stable judgement, determine the operation object of simulation system;For to closing Key circuit or equipment carry out accident simulation;
The power grid accident anticipation analog subsystem is also networked with EMS dispatch automated systems, for receiving the real-time of EMS Data carry out dynamic security analysis to power grid forecast accident, determine security and stability control strategy.
Power grid accident anticipation analog subsystem include stable information collect detection module, fault simulation analysis module, Module is checked in intelligent decision module, result transmission;
The stable information is collected detection module and is used for so that current net is presented to user with the formal intuition of statistical graph The real-time operating conditions and Power Flow Information of network;
The fault simulation analysis module is determined for analysis according to demand needs regional power grid circuit to be simulated or equipment Information carries out accident simulation, and power flow solutions and accident impact range after intellectual analysis accident distinguish risk size;
The intelligent decision module is used for after analyzing simulated accident, is selected in stability control strategy expert database Policy Table under the corresponding method of operation, the stability control strategy of simulated accident is provided according to power flow transfer result of calculation;
The result transmission checks module and is used to transmit the flow data and stability control strategy that analysis is calculated, and is by simulation Safety on line nucleus correcting system is transmitted to when the fructufy of system, whether after practical Load flow calculation, it is appropriate to check the stability control strategy, Otherwise propose that new steady control is suggested.
The stable online management subsystem includes multiple regions stabilizing control system;
The area stability control system refer to for solve a regional power grid in stable problem be mounted on two and The safety and stability control device of more than two plant stands, the system for the composition that links together through information channel and Communications Interface Unit, Such as Fig. 2 so comprising:One main website and multiple substations, the main website and substation with multiple terminal stations through information channel and Communication interface is connected.
The main website is arranged in the power plant in load-center substation or with load-center substation same position, for summarizing each station Operating condition information, state estimation is carried out to regional power grid, identifies the method for operation of regional power grid, to regional power grid by giving Fixed contingency set carries out dynamic security estimation, it is online form security and stability control Policy Table or install off-line calculation in advance obtain The control scheme list arrived, and each substation will be transmitted in relation to method of operation information and control scheme list;For receiving master It stands and when outlet is broken down, according to control scheme list, sending out control command simultaneously to main website and each substation will be controlled by each station System order is transmitted to terminal station;
The substation is installed in more important substation or the power plant being connected with substation, is used for acquisition substation operating mode Operation information, and send main website to;For when receiving our station and our station outlet is broken down, according to the control plan in substation Sketch form sends out control command to main website and each substation and control command is transmitted to terminal station by each station simultaneously;
The terminal station is used to receive the control command that each station transmission comes, and execution controls on the spot, and by control result information Send higher level station to.
The power flow transfer scheme database, is established by stability Calculation interpretation of result, for storing power flow transfer scheme; The stability control strategy expert system database is built by the data check of early period, collection and regional power grid stability Calculation result It is vertical, for storing known stability control strategy;
The power flow transfer scheme database and stability control strategy expert system database are when creating, it then follows following principle:
(1) specification is named
All library name, table name, domain name follow unified naming rule, and carry out necessary explanation, to facilitate design, dimension Shield, inquiry;
(2) reference of control field
In design, database design management tool appropriate is selected, to facilitate the Distributed Design sum number of developer Management is audited according to the concentration of group;It can directly be quoted using unified naming rule if the field of design has existed;It is no Then, it should redesign;
(3) library table Repetitive controller
In the design process, if it find that most of field is all existing, it should suspect whether designed library table is existing; By the inquiry to library table where field and respective design personnel, confirm whether library table repeats really;
(4) con current control
Con current control should be carried out in design, i.e., for the same library table, have control in same time one-man, Other people can only inquire.
The safety on line checks the accident analog result that subsystem is used to envision the power grid accident analog subsystem Security Checking is carried out, analyzes whether existing stability control strategy needs to change.
On the other hand, the present invention is based on above systems, also provide a kind of power grid accident anticipation analogy method, as shown in figure 3, Include the following steps:
Step 1, power system operating mode and flow data, the electricity needed for stable judgement are obtained by stable online management system Current voltage, active reactive Power Flow Information, determine the operation object of simulation system;
Step 2, by stability Calculation interpretation of result, damp transfer scheme database is built;By the data check of early period, receive Collection and regional power grid stability Calculation are as a result, structure power grid stability control strategy expert system database;
Step 3, accident simulation is carried out to critical circuits or equipment by accident simulation system, according to power flow transfer database Flow data after calculating accident analyzes accident impact and risk size;Accident analog result is shown in system in graphical form On interface, heavy duty and overload circuit indicate its flow data with yellow and red numerical respectively;
Step 4, stability control strategy expert system database is called according to result of calculation, is then transmitted to accident analog result Safety on line nucleus correcting system carries out Security Checking, analyzes whether existing stability control strategy needs to change.
It is application subsystem of the framework on Unified Supporting Platform that power grid accident, which envisions simulation system, static steady by acquiring The basic data of setting analysis, transient stability analysis, dynamic stability analysis, Voltage Stability Analysis completes information filing, statistics is looked into The functions such as inquiry, intellectual analysis;Control centre is realized in normal epoch, power grid critical circuits progress operation monitoring, accident are simulated, The result of the action analysis, result communication, accurate stability control strategy is provided for management and running personnel and other professionals.
Prediction failure simulation system needs to send result to safety on line nucleus correcting system after simulating accident, online to pacify Whether the handling result that full nucleus correcting system carries out Load flow calculation check simulation system is reliable, finally gives optimal stability control strategy.
Prediction failure simulation system has the function of electric network swim analysis and given accident treatment strategy.From safety and stability control After power flow transfer is obtained in the data that device processed uploads than result of calculation, calculated for simulated failure situation, it can be direct Show that the circuit overloaded under the malfunction and overload degree are obtained easily to analyze region or Partial Load Flow Accident treatment strategy.Once the hazard model imagined in prediction scheme occurs, people can according to set operation sequence and hints on operation, Fast reaction, emergency processing, to achieve the purpose that reduce causality loss or avoid accident
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (7)

1. a kind of power grid accident envisions simulation system, which is realized based on D5000 platforms, which is characterized in that including:Power grid thing Therefore anticipation analog subsystem, stable online management subsystem, safety on line check subsystem, power flow transfer scheme database and steady The tactful expert system database of control;
The power grid accident envisions analog subsystem, for passing through stable online management system power system operating mode and trend number According to voltage and current, active reactive Power Flow Information needed for stable judgement determine the operation object of simulation system;For to key Circuit or equipment carry out accident simulation;
The power flow transfer scheme database, is established by stability Calculation interpretation of result, for storing power flow transfer scheme;
The stability control strategy expert system database passes through the data check of early period, collection and regional power grid stability Calculation knot Fruit is established, for storing known stability control strategy;
The safety on line checks the accident analog result progress that subsystem is used to envision the power grid accident analog subsystem Security Checking, analyzes whether existing stability control strategy needs to change.
2. a kind of power grid accident envisions simulation system according to claim 1, which is characterized in that the power grid accident envisions mould Quasi- subsystem is also networked with EMS dispatch automated systems, the real time data for receiving EMS, to power grid forecast accident into action State safety analysis determines security and stability control strategy.
3. a kind of power grid accident envisions simulation system according to claim 2, which is characterized in that the power grid accident envisions mould Quasi- subsystem includes that stable information collects detection module, fault simulation analysis module, intelligent decision module, result transmission check mould Block;
The stable information is collected detection module and is used for so that current network is presented to user with the formal intuition of statistical graph Real-time operating conditions and Power Flow Information;
The fault simulation analysis module is determined for analysis according to demand needs regional power grid circuit or facility information to be simulated, Carry out accident simulation, power flow solutions and accident impact range after intellectual analysis accident, distinguishes risk size;
The intelligent decision module is used for after analyzing simulated accident, selects to correspond in stability control strategy expert database Policy Table under the method for operation provides the stability control strategy of simulated accident according to power flow transfer result of calculation;
The result transmission checks module and is used to transmit the flow data and stability control strategy that analysis is calculated, by simulation system Safety on line nucleus correcting system is transmitted to when fructufy, after practical Load flow calculation, whether appropriate, otherwise if checking the stability control strategy It is proposed that new steady control is suggested.
4. a kind of power grid accident envisions simulation system according to claim 1, which is characterized in that stable online management System includes multiple regions stabilizing control system;
The area stability control system refers to being mounted on two and two to solve the stable problem in a regional power grid The safety and stability control device of the above plant stand, the system for the composition that links together through information channel and Communications Interface Unit, packet It includes:One main website and multiple substations, the main website and substation are connected with multiple terminal stations through information channel and communication interface.
5. a kind of power grid accident envisions simulation system according to claim 4, which is characterized in that
The main website is arranged in the power plant in load-center substation or with load-center substation same position, the fortune for summarizing each station Row work information carries out state estimation to regional power grid, identifies the method for operation of regional power grid, to regional power grid by given Contingency set carries out dynamic security estimation, online to form security and stability control Policy Table or install what off-line calculation obtained in advance Control scheme list, and each substation will be transmitted in relation to method of operation information and control scheme list;For receive main website and When outlet is broken down, according to control scheme list, sends out control command to main website and each substation and simultaneously ordered control by each station Order is transmitted to terminal station;
The substation is installed in more important substation or the power plant being connected with substation, is run for acquisition substation operating mode Information, and send main website to;For when receiving our station and our station outlet is broken down, according to the control strategy in substation Table sends out control command to main website and each substation and control command is transmitted to terminal station by each station simultaneously;
The terminal station is used to receive the control command that each station transmission comes, and execution controls on the spot, and control result information is transmitted It stands to higher level.
6. a kind of power grid accident envisions simulation system according to claim 1, which is characterized in that the power flow transfer scheme number According to library and stability control strategy expert system database when creating, it then follows following principle:
(1) specification is named
All library name, table name, domain name follow unified naming rule, and carry out necessary explanation, to facilitate design, safeguard, look into It askes;
(2) reference of control field
In design, database design management tool appropriate is selected, it is small with the Distributed Design and data that facilitate developer The concentration audit management of group;It can directly be quoted using unified naming rule if the field of design has existed;Otherwise, it answers It redesigns;
(3) library table Repetitive controller
In the design process, if it find that most of field is all existing, it should suspect whether designed library table is existing;Pass through Inquiry to library table where field and respective design personnel, confirms whether library table repeats really;
(4) con current control
Con current control should be carried out in design, i.e., for the same library table, have control in same time one-man, other people It can only be inquired.
7. a kind of power grid accident envisions analogy method, which is characterized in that include the following steps:
Step 1, power system operating mode and flow data are obtained by stable online management system, the voltage electricity needed for stable judgement Stream, active reactive Power Flow Information, determine the operation object of simulation system;
Step 2, by stability Calculation interpretation of result, damp transfer scheme database is built;By the data check of early period, collect and Regional power grid stability Calculation is as a result, structure power grid stability control strategy expert system database;
Step 3, accident simulation is carried out to critical circuits or equipment by accident simulation system, is calculated according to power flow transfer database Flow data after accident analyzes accident impact and risk size;Accident analog result is shown in system interface in graphical form On, heavy duty and overload circuit indicate its flow data with yellow and red numerical respectively;
Step 4, stability control strategy expert system database is called according to result of calculation, is then transmitted to accident analog result online Security Checking system carries out Security Checking, analyzes whether existing stability control strategy needs to change.
CN201810453951.2A 2018-05-14 2018-05-14 Power grid accident forecast simulation system and method thereof Active CN108539740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810453951.2A CN108539740B (en) 2018-05-14 2018-05-14 Power grid accident forecast simulation system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810453951.2A CN108539740B (en) 2018-05-14 2018-05-14 Power grid accident forecast simulation system and method thereof

Publications (2)

Publication Number Publication Date
CN108539740A true CN108539740A (en) 2018-09-14
CN108539740B CN108539740B (en) 2020-06-23

Family

ID=63477352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810453951.2A Active CN108539740B (en) 2018-05-14 2018-05-14 Power grid accident forecast simulation system and method thereof

Country Status (1)

Country Link
CN (1) CN108539740B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109672171A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 Eliminate the Automatic Control Strategy of 500kV transformer overload
CN110890755A (en) * 2019-12-17 2020-03-17 国电南瑞科技股份有限公司 Fault disposal plan online checking and intelligent compiling method and system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105244865A (en) * 2015-07-21 2016-01-13 河南行知专利服务有限公司 Power system safe and stable operation control method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105244865A (en) * 2015-07-21 2016-01-13 河南行知专利服务有限公司 Power system safe and stable operation control method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江千军等: "基于D5000***的电网事故预案推演***设计", 《上海电力学院学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109672171A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 Eliminate the Automatic Control Strategy of 500kV transformer overload
CN110890755A (en) * 2019-12-17 2020-03-17 国电南瑞科技股份有限公司 Fault disposal plan online checking and intelligent compiling method and system

Also Published As

Publication number Publication date
CN108539740B (en) 2020-06-23

Similar Documents

Publication Publication Date Title
US9166407B2 (en) Implementing substation automation load transfer function
Papic et al. Survey of tools for risk assessment of cascading outages
CN110429714B (en) Cloud platform intelligent power distribution system based on big data
EP2397926A2 (en) A self-healing power grid and method thereof
CN108931972A (en) A kind of substation secondary device condition intelligent diagnostic method based on model-driven
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN109787224B (en) Method for generating regional power grid load transfer strategy for preventing cascading overload
CN105244865A (en) Power system safe and stable operation control method
CN108683187A (en) A kind of EMS grid monitoring systems based on big data
CN107844891A (en) A kind of method for judging Power grid structure and changing and calculating schedule risk value
CN111680872A (en) Power grid risk calculation method based on multi-source data fusion
CN102118061A (en) Method and system for centralized control of regional power grid
CN113364120A (en) Method, device and equipment for checking control process of intelligent substation and storage medium
Hajian-Hoseinabadi Availability comparison of various power substation automation architectures
CN108539740A (en) A kind of power grid accident anticipation simulation system and its method
CN111327477A (en) Substation area control protection method and system based on edge calculation
CN105162091B (en) A kind of Risk assessment of cascading failure in power system method for considering Risk of Information System
CN109193947A (en) Power distribution room monitoring method, device, server and computer readable storage medium
CN111929528A (en) Monitoring and early warning method for fault risk of urban power grid equipment
CN102611085B (en) Intertripping simulation analysis method
CN105375463B (en) A kind of electric power netting safe running control method based on SCADA system
CN106651113A (en) Dispatcher operation risk evaluation method based on advanced N-1 analysis
CN110930015A (en) Method and system for preventing large-scale power distribution network accidents
CN112736925B (en) Distribution network operation mode optimization method
CN211127301U (en) Intelligent substation secondary equipment operation and maintenance management and control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant