CN108532710A - Construction landscape rainwater recycle utilizes facility and its construction method - Google Patents
Construction landscape rainwater recycle utilizes facility and its construction method Download PDFInfo
- Publication number
- CN108532710A CN108532710A CN201810253401.6A CN201810253401A CN108532710A CN 108532710 A CN108532710 A CN 108532710A CN 201810253401 A CN201810253401 A CN 201810253401A CN 108532710 A CN108532710 A CN 108532710A
- Authority
- CN
- China
- Prior art keywords
- water
- collection pipe
- collapse
- water collection
- drain bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
The invention discloses construction landscape rainwater recycles to utilize facility, including rain water collecting system, water storage stocking system and promotion utilize the circulatory system, rain water collecting system includes collapse drain bar, permeate water collection pipe, non-woven fabrics pervious bed and permeability cell, infiltration water collection pipe is submissive to be fixed on building top, collapse drain bar is laid on around infiltration water collection pipe, non-woven fabrics pervious bed is covered in collapse drain bar, it permeates on water collection pipe, collapse drain bar is equipped with transmission layer with the permeable interlayer of non-woven fabrics, permeability cell is connected to infiltration water collection pipe and protrudes from except non-woven fabrics pervious bed, infiltration water collection pipe is connected to water storage stocking system, water storage stocking system is connected to using the circulatory system by pipeline with promotion.The invention also discloses the construction methods of the facility.Present invention can ensure that there is the top of building rainwater of vegetable layer smoothly to circulate, collect, rainwater-collecting efficiency is improved.
Description
Technical field
The present invention relates to a kind of rainwater recycle facility and associated construction methods, more specifically, it relates to a kind of building scape
It sees rainwater recycle and utilizes facility and its construction method.
Background technology
Since city water resource problem in short supply becomes increasingly conspicuous, rainwater is as a kind of most basic, most direct, most economical water
Resource is increasingly valued by people.The utilization of urban rainwater can not only provide new water supply for the production and living of the mankind
Water source, and in adjusting and recharge of groundwater resource, prevent Urban Flood Waterlogging and improve water environment etc. play it is important
Effect.The utilization rate for improving urban rainwater is also to build the important measures of slug fluidization, but current rainwater recycle facility is not yet
It is commonly used, and there is also more shortcomings for function and efficiency.Urban rainwater recvery facility spininess is to ward, such as road at present
Face, roof balcony are laid, and rainwater recycle facility structure is relatively easy, and operation is difficult less, but urban construction at present is more next
More pay attention to afforestation project, also largely covering vegetation constructs manmade landscape, artificial landscape to many top of building, due to soil suction-operated and
Resistance, rainwater flowing velocity and direction will receive very big influence, and rainwater recycle facility also must accordingly be changed in the case
Into the working efficiency of rainwater recycle facility otherwise can be influenced.The utility model patent of Publication No. CN207079825U is in 2018
Disclose a kind of skyscraper device for recycling rainwater on March 9, in, which is related to building rainwater recycle using field, packet
Building body is included, building body top is equipped with water storage board, and water storage board is used to collect the rainwater of building body top surface, is equipped among water storage board
Dmp filter case is placed below in hole, water storage board, and rainwater is flowed out from hush pipe after Rose Box filtering, is cased with outside hush pipe
Protective case, protective case are internally provided with outer tube, are equipped with spiral inner tube inside outer tube, silencing cotton layer is equipped between outer tube and inner tube,
Hush pipe bottom end is provided with buffer board, and buffer board slows down damage of the gravity to pipeline, rainwater when rainwater falls and flowed out from hush pipe,
Settling tank is flowed into, is equipped with the rainwater beds of precipitation in settling tank, first layer is metalling, and the second layer is active carbon layer, and third layer is thin
Sand bed is provided with water outlet on settling tank, and after water tank water is full, extra rainwater is flowed out from water outlet, and water tank bottom end is set
There is outlet pipe to be connected with the suction pump on ground.But the utility model is suitable for directly receiving rainwater, if building top covering is planted
Quilt, then the rainwater-collecting of this kind of device for recycling rainwater is less efficient.
Invention content
Current city top of building largely covers vegetation construction manmade landscape, artificial landscape, and traditional urban rainwater recycles facility
Not applicable, rainwater-collecting is less efficient, and to overcome this defect, the present invention provides a kind of buildings can ensure that vegetable layer
Top rainwater is smoothly circulated, is collected, and the construction landscape rainwater recycle for improving rainwater-collecting efficiency utilizes facility.
The technical scheme is that:Construction landscape rainwater recycle utilizes facility, including rain water collecting system, water storage storage
It includes collapse drain bar, infiltration water collection pipe, non-woven fabrics pervious bed that system and promotion, which utilize the circulatory system, rain water collecting system,
And permeability cell, infiltration water collection pipe is submissive to be fixed on building top, and collapse drain bar is laid on around infiltration water collection pipe, nothing
Woven fabric pervious bed is covered in collapse drain bar, permeates on water collection pipe, and collapse drain bar is equipped with the permeable interlayer of non-woven fabrics
Transmission layer, permeability cell are connected to infiltration water collection pipe and protrude from except non-woven fabrics pervious bed, and infiltration water collection pipe is connected to storage
Water stocking system, water storage stocking system are connected to using the circulatory system by pipeline with promotion.Construction landscape vegetative coverage is in nonwoven
On cloth pervious bed, permeability cell then runs through non-woven fabrics pervious bed and vegetable layer and atmosphere, collapse drain bar can support nonwoven
Cloth pervious bed and vegetable layer are hanging, effectively prevent vegetable layer to collapse obstruction flow due to the weight of itself and water moisture self restraint, transmission
Layer can be connected to the water stream channel of infiltration water collection pipe, simultaneously because permeability cell is connected to outside atmosphere, can be substantially improved and be fallen
The osmotic pressure that rainwater on vegetable layer permeates downwards reduces rain penetration resistance, guides water flowing extra in soil, accelerates rain
Confluence of the water into infiltration water collection pipe.This construction landscape rainwater recycle is using facility by rain water collecting system, water storage storage system
System is promoted and is formed using the part such as circulatory system, wherein rainwater-collecting facility using collapse drain bar, non-woven fabrics pervious bed,
The combination of water collection pipe, permeability cell is permeated, realizes the collection of Omnibearing Infiltration water and functional in organized water drainage, Ke Yiyou at the top of whole building
Effect reduces the water pressure come due to top upper layer of soil bathyliminion, and system has both functional in organized water drainage and waterproof layer defencive function, fits
For planted roof and basement roof;The system is by permeating rainwater-collecting, water storage storage, promoting setting using cycle simultaneously
Meter meets design requirement of the country to sponge urban architecture cell rainwater recycle.Therefore, this construction landscape rainwater recycle utilizes system
System can become the buildings such as underground engineering and be not necessarily to the collection in a organized way for looking for slope that can be formed infiltration water, orientation draining, recycling profit
Ideal solution.
Preferably, the cross section of infiltration water collection pipe is in the shape of circular upper part and square lower part, it is semicircle at the top of infiltration water collection pipe
Cylinder, bottom are square column face, and infiltration water collection pipe bottom plane is affixed with building top ground, the one of infiltration water collection pipe bottom
A side is equipped with inlet opening.The shape of infiltration water collection pipe circular upper part and square lower part both flowed down to collapse conducive to rainwater from along tube top
Collect on drain bar, and fitted closely with building top ground convenient for infiltration water collection pipe bottom, reduces leakage.Water is permeated to collect
Inlet opening is arranged in pipe unilateral side, not only generates and collects rainwater effect, but also conducive to flow is formed, generates the effect of delivering rainwater.
Preferably, collapse drain bar is made of waterproof material, including plate base and the boss to gather on plate base, boss
It is fixedly arranged on the top surface of plate base.Boss can form support to non-woven fabrics pervious bed and vegetable layer, while the gap between boss again can shape
At transmission layer, ensure unobstructed drainage space, it is ensured that this construction landscape rainwater recycle efficiently collects rainwater function using facility
It realizes.
Preferably, plate base and boss are an integral molding structure, boss is hollow-core construction, and the opening of boss is located at plate substrate
Face.The collapse drain bar of such structure had not only been convenient for being processed with the high-volume of injection molding forming method, but also can pass through the embedding of boss
Set fastens the connection conveniently realized between collapse drain bar and extends.
Preferably, water storage stocking system includes observation well and water storing tank, water storing tank position is received less than observation well, infiltration water
Collector passes on the observation well borehole wall, and water storing tank is connected to by water inlet pipe with observation well, and water inlet pipe water inlet end is located at the observation well borehole wall
On.Observation well main function is precipitation filtering, is permeated in the rainwater input observation well that water collection pipe is collected, the silt in rainwater is miscellaneous
Matter settles in observing well, after more clear water savings to certain water level, by water inlet pipe enter the water storing tank of capacity bigger into
The a large amount of savings of row.
Preferably, being equipped with inspection-pit at the top of water storing tank, water storing tank is communicated with maintenance bottom.It is arranged at the top of water storing tank
Inspection-pit can facilitate and check water storing tank savings water, when water storing tank is completely full of, can diffuse out in inspection-pit, consequently facilitating peace in time
The reasonable utilization of row's savings water.
Preferably, the promotion includes inspection shaft, overflow pipe and lift pump using the circulatory system, overflow pipe is connected to inspection
It looks between well and inspection-pit, the water lift pipe passed to outside inspection-pit is equipped in water storing tank, lift pump is set to water lift tube end.In water storing tank
Water spill-over when, can be flowed in inspection shaft through overflow pipe, then from inspection shaft proceed by pipeline distribution, convey the rainwater of recycling.
The rainwater of recycling can also be directly taken from water storing tank by the pumping of lift pump.
Preferably, protruding the engaging portion of structure and building top ground in building top, collapse drain bar is bent into
Angle be adapted between prominent structural facades, building top ground angle and facade and the building top for being covered in prominent structure respectively
On portion ground, it is equipped with fluid sealant between collapse drain bar and the facade of prominent structure and the upper edge of collapse drain bar passes through overvoltage
Item is fixed.The prominent structure such as ventilation well is usually had on building, collapse drain bar is opened from the facade of these protrusion structures
Begin to cover, the gap of collapse drain bar and facade can be eliminated by fluid sealant, upper edge press strip, rain when preventing from raining on facade
Water is flowed into and is penetrated further between collapse drain bar and building top ground, influences the smooth or even rainwater of collapse drain bar
Collecting effect.
Preferably, infiltration water collection pipe be arranged into it is latticed.It permeates water collection pipe and carries out latticed laying, be conducive to realize
Comprehensive infiltration water is collected at the top of whole building.
The construction landscape rainwater recycle utilizes the construction method of facility, includes the following steps:
A. cleaning building top ground, it is ensured that top plate is smooth clean, if any local out-of-flatness, should use cement mortar screeding, such as
There is local ponding to remove in time;
B. rain water collecting system is built:It is laid with collapse drain bar and infiltration water collection pipe, it is by infiltration water collection pipe patch fixed,
Collapse drain bar is closely overlapped with infiltration water collection pipe, and permeability cell is connected on infiltration water collection pipe;
C. it is laid with non-woven fabrics on collapse drain bar and infiltration water collection pipe, forms non-woven fabrics pervious bed, permeability cell runs through nothing
Woven fabric;
D. earthwork back-filling in layers, with earthwork covering collapse drain bar, infiltration water collection pipe and non-woven fabrics pervious bed;
E. it builds water storage stocking system and is promoted and utilize the circulatory system, and establish and connect with rain water collecting system.
The construction landscape rainwater recycle can be built up by this construction method and utilizes facility, and is ensured smoothly to realize and preset work(
Energy.
The beneficial effects of the invention are as follows:
Improving has the top of building rainwater-collecting efficiency of vegetable layer.The present invention passes through the collapse drain bar of large area, infiltration
Water collection pipe, which is laid with, can be achieved comprehensive soil backwater collection, and the collapse drain bar used has the function of collapse, can protect
Card draining is unobstructed, additionally by installation permeability cell, makes vapour lock minimum in infiltration water collection pipe, utilizes soil layer discharge pressure difference principle
Guiding infiltration water is flowed into rainwater collection collector, achievees the purpose that efficiently to collect infiltration water and draining in a organized way.
Preferably protect top of building.With the application of the invention, infiltration draining is smoothly unobstructed, it can greatly mitigate top of building
Component and waterproof layer hydraulic pressure reduce channeling water and leak, to preferably protect top of building and waterproof layer.
It is safeguarded conducive to the growth of top of building vegetable layer.The present invention is equipped with permeability cell, and is collected with entire infiltration water
Pipe connects, and increases the gas permeability of soil, ensures that vegetable layer plant has compared with high-survival rate and grows fine.
Effect is comprehensively utilized with better rainwater recycle.The present invention is aided with water storage storage using rain water collecting system as core
Deposit system and promotion are mating using the circulatory system, can obtain the effect of better rainwater recycle comprehensive utilization.
Reduce overall cost cost.With the application of the invention, also can smoothly realize collection without building sloping layer in building top
The directed flow of rainwater reduces overall cost cost.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the present invention;
Fig. 2 is a kind of partial structural diagram of the present invention;
Fig. 3 is a kind of structural schematic diagram that water collection pipe is permeated in the present invention.
In figure, 1- collapse drain bars, 2- infiltration water collection pipes, 3- non-woven fabrics pervious beds, 4- permeability cells, 5- observation wells,
6- water storing tanks, 7- water inlet pipes, 8- inspection-pits, 9- inspection shafts, 10- overflow pipes, 11- lift pumps, 12- water lift pipes, 13- ground cements
Layer, 14- embedded bar concrete foundations, 15- vegetable layers, 16- facades, 17- waterproof layers, 18- screed-coats, the inlet openings 19-.
Specific implementation mode
The invention will be further described for specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figure 1, Figure 2, Figure 3 shows, construction landscape rainwater recycle utilizes facility, is applied to the underground garage of top covering vegetation.
This facility includes rain water collecting system, water storage stocking system and is promoted using the circulatory system, and rain water collecting system includes collapse
Drain bar 1, infiltration water collection pipe 2, non-woven fabrics pervious bed 3 and permeability cell 4, infiltration water collection pipe 2 is submissive to be fixed at the top of garage
On the waterproof layer 17 on ground, collapse drain bar 1 is laid on the waterproof layer 17 of the garage top ground around infiltration water collection pipe 2
It goes up and sealing glue sticking is used to reinforce, non-woven fabrics pervious bed 3 is covered in collapse drain bar 1, permeates on water collection pipe 2, collapse
Be equipped with transmission layer between drain bar 1 and non-woven fabrics pervious bed 3, permeability cell 4 with permeate that water collection pipe 2 is connected to and to protrude from non-woven fabrics saturating
Except water layer 3, infiltration water collection pipe 2 is connected to water storage stocking system, and water storage stocking system is passed through with promotion using the circulatory system
Pipeline is connected to.The soil of vegetable layer 15 is covered on non-woven fabrics pervious bed 3.Infiltration water collection pipe 2 passes through three-way connection or four-way
Connector interweave connection, be arranged into it is latticed, and permeability cell 4 be connected to infiltration 2 crosslinking of water collection pipe at three-way connection or four-way
On connector.The cross section for permeating water collection pipe 2 is in the mushroom of circular upper part and square lower part, and 2 top of infiltration water collection pipe is semi-cylindrical, bottom
Portion is square column face, and infiltration 2 bottom plane of water collection pipe is affixed with the waterproof layer 17 on garage top ground cement layer 13 to be used in combination
Pipe fixing piece is fixed, and a side of 2 bottom of infiltration water collection pipe is equipped with the inlet opening 19 of equally distributed ellipse.It is anti-collapse
It falls into drain bar 1 to be made of PVC material, including plate base and the boss that gathers on plate base, boss are fixedly arranged on the top surface of plate base side by side
Regular ranks, plate base and boss integrated injection molding are arranged into, boss is hollow-core construction, and the opening of boss is located at plate basal surface.Such as
Collapse drain bar 1 needs spreading, the boss of two pieces of 1 marginal portions of collapse drain bar of docking is socketed, you can by two pieces
Collapse drain bar 1 docks, and increases by one of glass glue sticking on the basis of boss is socketed, it is ensured that lap seal.It is pushed up in building
The engaging portion of the prominent structure and building top ground such as portion's ventilation shaft, elevator, collapse drain bar 1 is bent in 90 ° to be pasted respectively
It overlays on the facade and garage top ground of prominent structure, i.e., collapse drain bar 1 is extended downwardly from the facade of prominent structure
And make to sprawl on building top ground after turning under 90 ° of bendings, it is equipped with fluid sealant between collapse drain bar 1 and the facade of prominent structure
And the upper edge of collapse drain bar 1 is fixed by press strip.Water storage stocking system includes observation well 5 and the water storage made of fiberglass
Tank 6,6 position of water storing tank are passed to less than observation well 5, infiltration water collection pipe 2 on observation 5 borehole wall of well, and water storing tank 6 passes through water inlet pipe 7
It is connected to observation well 5,7 water inlet end of water inlet pipe is located on observation 5 borehole wall of well and slightly below permeates water collection pipe 2.6 top of water storing tank
Equipped with inspection-pit 8, water storing tank 6 is communicated with 8 bottom of inspection-pit.The promotion includes inspection shaft 9, overflow pipe 10 using the circulatory system
With lift pump 11, overflow pipe 10 is connected between inspection shaft 9 and inspection-pit 8, and the water lift passed to outside inspection-pit 8 is equipped in water storing tank 6
Pipe 12, lift pump 11 are set to the bottom end of water lift pipe 12 in water storing tank 6.
Collapse drain bar 1 can support non-woven fabrics pervious bed 3 and vegetable layer 15 is hanging, effectively prevent vegetable layer 15 because of itself
And water moisture self restraint weight and collapse obstruction flow, transmission layer can with infiltration water collection pipe 2 water stream channel be connected to, simultaneously because
Permeability cell 4 is connected to outside atmosphere, can substantially improve the osmotic pressure that the rainwater fallen on vegetable layer 15 permeates downwards, reduces rainwater
Osmotic resistance guides water flowing extra in soil, accelerates confluence of the rainwater into infiltration water collection pipe 2.Permeate water collection pipe 2
In the rainwater input observation well 5 of collection, the silt impurity in rainwater settles in observing well 5, and more clear water is put aside to certain
After water level, the water storing tank 6 that capacity bigger is entered by water inlet pipe is largely put aside.It, can be through overflowing when water spill-over in water storing tank 6
Water pipe 10 flows in inspection shaft 9, then proceeds by pipeline distribution from inspection shaft 9, conveys the rainwater of recycling.Can also directly it pass through
The rainwater of recycling is directly taken in the pumping of lift pump from water storing tank.
The construction landscape rainwater recycle utilizes the construction method of facility, includes the following steps:
Clear up garage top ground, it is ensured that top plate is smooth clean, local out-of-flatness position is formed with cement mortar screeding levelling
Layer 18, is removed in time if any local ponding.After cleaning waterproof layer 17 is formed with waterproof roll covering garage top ground;
Build rain water collecting system:It is laid with collapse drain bar 1 and infiltration water collection pipe 2, by infiltration water collection pipe 2 in waterproof layer
Patch ground is fixed on 17, and collapse drain bar 1 is closely overlapped with infiltration water collection pipe 2, and the edge of collapse drain bar 1 is tight against infiltration
2 two bottom sides vertical plane of water collection pipe breaks fluid sealant in the junction of collapse drain bar 1, infiltration water collection pipe 2.It will breathe freely
Pipe 4 is connected on the connection connector between infiltration water collection pipe 2;
It is laid with non-woven fabrics on collapse drain bar 1 and infiltration water collection pipe 2, forms non-woven fabrics pervious bed 3, trepanning on non-woven fabrics
Permeability cell 4 is set to pass through;
Earthwork back-filling in layers, with earthwork covering collapse drain bar 1, infiltration water collection pipe 2 and non-woven fabrics pervious bed 3.Wait for nonwoven
It after the completion of cloth paves, is immediately checked for checking and accepting, be backfilled immediately after qualified, backfill is carried out from a side to the other side, forbids vehicle direct
It rolls on collapse drain bar 1, first layer backfilling of earthwork thickness control is in 500mm thickness or so, thereafter back-filling in layers.Backfill
Material must meet design requirement, forbid containing earthwork such as building waste, block stones.Permeability cell position backfilling of earthwork need to be backfilled manually;
It builds water storage stocking system and is promoted and utilize the circulatory system:Observation well 5, inspection-pit 8 and inspection shaft 9 are built with brick, will be oozed
Permeable collecting pipe 2 is passed through observation well 5, water inlet pipe 7 is installed between observation well 5 and inspection-pit 8, between inspection-pit 8 and inspection shaft 9
Overflow pipe 10 is installed, water storing tank 6 is lifted, water storing tank 6 is placed in embedded bar concrete foundation 14, is then installed on water storing tank 6
Lift pump 11 and water lift pipe 12.
Embodiment 2:
The present invention is used for the landscape platform of office building.Collapse drain bar 1 is made of PET material.Remaining is the same as embodiment 1.
Claims (10)
1. construction landscape rainwater recycle utilizes facility, it is characterized in that including rain water collecting system, water storage stocking system and promoting profit
With the circulatory system, rain water collecting system includes collapse drain bar(1), infiltration water collection pipe(2), non-woven fabrics pervious bed(3)And
Permeability cell(4), permeate water collection pipe(2)It is submissive to be fixed on building top, collapse drain bar(1)It is laid on infiltration water collection pipe
(2)Around, non-woven fabrics pervious bed(3)It is covered in collapse drain bar(1), infiltration water collection pipe(2)On, collapse drain bar
(1)With non-woven fabrics pervious bed(3)Between be equipped with transmission layer, permeability cell(4)With infiltration water collection pipe(2)It is connected to and protrudes from non-woven fabrics
Pervious bed(3)Except, permeate water collection pipe(2)It is connected to water storage stocking system, water storage stocking system utilizes cyclic system with promotion
System is connected to by pipeline.
2. construction landscape rainwater recycle according to claim 1 utilizes facility, it is characterized in that infiltration water collection pipe(2)Cross
Section is in the shape of circular upper part and square lower part, permeates water collection pipe(2)Top is semi-cylindrical, and bottom is square column face, permeates water collection pipe
(2)Bottom plane is affixed with building top ground, permeates water collection pipe(2)One side of bottom is equipped with inlet opening.
3. construction landscape rainwater recycle according to claim 1 utilizes facility, it is characterized in that collapse drain bar(1)With anti-
Water material is made, including plate base and the boss that gathers on plate base, boss are fixedly arranged on the top surface of plate base.
4. construction landscape rainwater recycle according to claim 3 utilizes facility, it is characterized in that plate base and boss are integrated into
Type structure, boss are hollow-core construction, and the opening of boss is located at plate basal surface.
5. construction landscape rainwater recycle according to claim 1 utilizes facility, it is characterized in that water storage stocking system includes seeing
Cha Jing(5)And water storing tank(6), water storing tank(6)Position is less than observation well(5), permeate water collection pipe(2)Pass to observation well(5)Well
On wall, water storing tank(6)Pass through water inlet pipe(7)With observation well(5)Connection, water inlet pipe(7)Water inlet end is located at observation well(5)The borehole wall
On.
6. construction landscape rainwater recycle according to claim 5 utilizes facility, it is characterized in that water storing tank(6)Top is equipped with inspection
Well workover(8), water storing tank(6)With inspection-pit(8)Bottom communicates.
7. construction landscape rainwater recycle according to claim 6 utilizes facility, it is characterized in that described promoted utilizes cyclic system
System includes inspection shaft(9), overflow pipe(10)And lift pump(11), overflow pipe(10)It is connected to inspection shaft(9)And inspection-pit(8)
Between, water storing tank(6)Interior be equipped with passes to inspection-pit(8)Outer water lift pipe(12), lift pump(11)Set on water lift pipe(12)End.
8. construction landscape rainwater recycle according to claim 1 utilizes facility, it is characterized in that protruding structure in building top
With the engaging portion on building top ground, collapse drain bar(1)It is bent into the angle between prominent structural facades, building top ground
The angle of adaptation is simultaneously covered on the facade and building top ground of prominent structure respectively, collapse drain bar(1)It is tied with prominent
Fluid sealant and collapse drain bar are equipped between the facade of structure(1)Upper edge by cross press strip fix.
9. construction landscape rainwater recycle according to any one of claim 1 to 8 utilizes facility, it is characterized in that infiltration water is received
Collector(2)It is arranged into latticed.
10. construction landscape rainwater recycle described in claim 1 utilizes the construction method of facility, it is characterized in that including following step
Suddenly:
Clear up building top ground, it is ensured that top plate is smooth clean, if any local out-of-flatness, should use cement mortar screeding, if any
Local ponding is removed in time;
Build rain water collecting system:It is laid with collapse drain bar(1)With infiltration water collection pipe(2), water collection pipe will be permeated(2)Patch
Ground is fixed, collapse drain bar(1)With infiltration water collection pipe(2)Close overlap joint, and by permeability cell(4)Infiltration water is connected to collect
Pipe(2)On;
In collapse drain bar(1)With infiltration water collection pipe(2)Upper laying non-woven fabrics forms non-woven fabrics pervious bed(3), permeability cell
(4)Through non-woven fabrics;
Earthwork back-filling in layers covers collapse drain bar with the earthwork(1), infiltration water collection pipe(2)With non-woven fabrics pervious bed(3);
It builds water storage stocking system and is promoted and utilize the circulatory system, and establish and connect with rain water collecting system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810253401.6A CN108532710A (en) | 2018-03-26 | 2018-03-26 | Construction landscape rainwater recycle utilizes facility and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810253401.6A CN108532710A (en) | 2018-03-26 | 2018-03-26 | Construction landscape rainwater recycle utilizes facility and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108532710A true CN108532710A (en) | 2018-09-14 |
Family
ID=63484782
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810253401.6A Pending CN108532710A (en) | 2018-03-26 | 2018-03-26 | Construction landscape rainwater recycle utilizes facility and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108532710A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158761A (en) * | 2019-06-21 | 2019-08-23 | 甘肃省建筑设计研究院有限公司 | House each household multifunctional greening landscape node under three-dimensional space |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008175047A (en) * | 2006-12-18 | 2008-07-31 | Shinichi Kaneko | Rain gutter snow melting device |
CN201574532U (en) * | 2009-12-07 | 2010-09-08 | 时学工 | Roof processed with greening technology |
CN204326390U (en) * | 2014-12-16 | 2015-05-13 | 陕西华建防水工程有限公司 | Shed deckhead drainage system |
CN205369740U (en) * | 2016-01-06 | 2016-07-06 | 南通沪望塑料科技发展有限公司 | Zero slope protection siphon drainage collecting system of pds |
-
2018
- 2018-03-26 CN CN201810253401.6A patent/CN108532710A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008175047A (en) * | 2006-12-18 | 2008-07-31 | Shinichi Kaneko | Rain gutter snow melting device |
CN201574532U (en) * | 2009-12-07 | 2010-09-08 | 时学工 | Roof processed with greening technology |
CN204326390U (en) * | 2014-12-16 | 2015-05-13 | 陕西华建防水工程有限公司 | Shed deckhead drainage system |
CN205369740U (en) * | 2016-01-06 | 2016-07-06 | 南通沪望塑料科技发展有限公司 | Zero slope protection siphon drainage collecting system of pds |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158761A (en) * | 2019-06-21 | 2019-08-23 | 甘肃省建筑设计研究院有限公司 | House each household multifunctional greening landscape node under three-dimensional space |
CN110158761B (en) * | 2019-06-21 | 2024-05-28 | 甘肃省建筑设计研究院有限公司 | Multifunctional greening landscape node for each house under three-dimensional space |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105714911B (en) | The low rainwater treatment that influences in region utilizes system and region rainwater treatment method | |
CN106638918B (en) | Construction method of sponge urban rainwater collection system | |
CN105089142B (en) | Low elevation greenbelt rainwater regulation scheduling pool and distributed rainwater regulation scheduling pool system | |
CN207538161U (en) | A kind of underground engineering top plate siphon drainage collection system | |
CN106759825A (en) | A kind of construction method of sponge urban green space water storage system | |
CN103046565B (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN105544648B (en) | A kind of water storage device and water storage method collected, store and recycle rainwater | |
CN205348354U (en) | System that utilizes is handled to regional low rainwater that influences | |
CN212436771U (en) | Solar drip irrigation system for ecological reinforced soil slope structure | |
CN111792779B (en) | Residential area waterscape system | |
CN205189099U (en) | Water storage device of collection, storage and cyclic utilization rainwater | |
CN110965420A (en) | Construction structure and construction method for road reconstruction and upgrading sponge city | |
CN106760257A (en) | A kind of photovoltaic afforests the system for reclaiming rainwater of composite roof | |
CN206245444U (en) | Rainwater penetration system | |
CN111642369B (en) | Solar drip irrigation system for ecological reinforced soil slope structure and laying method thereof | |
CN1252361C (en) | Water resource recovering systems | |
CN108532710A (en) | Construction landscape rainwater recycle utilizes facility and its construction method | |
CN208137074U (en) | A kind of construction landscape rainwater recycle utilizes system | |
CN206477382U (en) | Rainwater recycle comprehensively utilizes structure | |
CN214800636U (en) | Concealed pipe salt discharge, separation and control foundation structure for saline-alkali soil improvement | |
CN109024645A (en) | Integrated water-stop curtain, sponge city water cycle system and method | |
CN106917473A (en) | A kind of photovoltaic afforests the rainwater recycle method of composite roof | |
CN208594095U (en) | A kind of wetland structure combined using wetland technology and rainwater storage | |
CN208009393U (en) | A kind of non-dankly base manure slot backfill structure based on sponge city | |
CN112854364A (en) | Green land precipitation treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180914 |
|
RJ01 | Rejection of invention patent application after publication |