CN108526425A - 一种复合金属连铸装置及连铸方法 - Google Patents

一种复合金属连铸装置及连铸方法 Download PDF

Info

Publication number
CN108526425A
CN108526425A CN201810293808.1A CN201810293808A CN108526425A CN 108526425 A CN108526425 A CN 108526425A CN 201810293808 A CN201810293808 A CN 201810293808A CN 108526425 A CN108526425 A CN 108526425A
Authority
CN
China
Prior art keywords
liquid
crystallizer
metal
isolator
composite metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810293808.1A
Other languages
English (en)
Other versions
CN108526425B (zh
Inventor
黄玉平
廖相巍
许孟春
唐雪峰
郭庆涛
李德军
康伟
贾吉祥
赵成林
陈东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201810293808.1A priority Critical patent/CN108526425B/zh
Publication of CN108526425A publication Critical patent/CN108526425A/zh
Application granted granted Critical
Publication of CN108526425B publication Critical patent/CN108526425B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/14Plants for continuous casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/007Continuous casting of metals, i.e. casting in indefinite lengths of composite ingots, i.e. two or more molten metals of different compositions being used to integrally cast the ingots
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/053Means for oscillating the moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D19/00Casting in, on, or around objects which form part of the product
    • B22D19/16Casting in, on, or around objects which form part of the product for making compound objects cast of two or more different metals, e.g. for making rolls for rolling mills

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

本发明公开一种复合金属连铸装置,包括结晶器和中间包,隔离器悬置于结晶器内,二者之间构成筒状空间,使得结晶器分成内外两个腔体;隔离器与结晶器顶部对齐;内腔体上端为基体金属液浇口,外腔体上端为复合金属液浇口,隔离器顶部设有固定臂,固定臂与结晶器振动台连接固定,保证隔离器与结晶器同步振动;中间包内部设有S形隔离墙,将内部隔离成基体金属液承接槽和复合金属液承接槽,基体金属液承接槽和复合金属液承接槽分别通过基体金属液长水口和复合金属液长水口,注入结晶器中的基体金属液浇口和复合金属液浇口。

Description

一种复合金属连铸装置及连铸方法
技术领域
本发明涉及冶金连铸技术,特别涉及一种复合金属连铸装置及连铸方法。
背景技术
复合钢材,如:管材、棒线材、板材等,是兼具基体钢材的力学性能和复合金属的耐腐蚀等性能的复合钢材。在使用过程中,能够极大地提高钢材的使用寿命及美观程度,是钢材应用的发展方向。其中,能够实现基体金属与复合金属冶金复合的方法很少,并且成本很高,比如电热喷涂等,导致用户无法承担其高昂的价格。
因此,急需一种既能实现基体金属与复合金属冶金复合,又能以较低的成本和较高的生产效率生产的复合钢坯制造方法。
发明内容
针对目前现有技术的缺陷,本发明的目的就是通过提供一种有效的复合金属连铸的方法及装置,得到冶金复合状态的复合金属坯料。
本发明目的是通过下面的技术方案实现的:
一种复合金属连铸装置,包括结晶器和中间包,其特征在于:隔离器悬置于结晶器内,二者之间构成筒状空间,使得结晶器分成内外两个腔体;隔离器与结晶器顶部对齐;内腔体上端为基体金属液浇口,外腔体上端为复合金属液浇口,隔离器顶部设有固定臂,固定臂与结晶器振动台连接固定,保证隔离器与结晶器同步振动;中间包内部设有S形隔离墙,将内部隔离成基体金属液承接槽和复合金属液承接槽,基体金属液承接槽和复合金属液承接槽分别通过基体金属液长水口和复合金属液长水口,注入结晶器中的基体金属液浇口和复合金属液浇口。
隔离器材质为耐火材料,内置钢筋骨架,长度小于结晶器。
一种复合金属连铸方法,其特征在于包括如下步骤:
1)将隔离器加热至700~1300℃,与结晶器一起安装在连铸机上;
2)将基体金属液和复合金属液同时分别注入中间包的基体金属液承接槽和复合金属液承接槽;
3)基体金属液和复合金属液分别从基体金属液长水口和复合金属液长水口,同时注入基体金属液浇口和复合金属液浇口;引锭杆封住结晶器底部;
4)与结晶器内壁接触的复合金属液被冷却凝固结壳,被引锭杆拉出结晶器时与隔离器接触的部分处于半固态;
5)注入隔离器的基体金属液没有凝固,随引锭杆离开隔离器后,基体金属液与复合金属凝壳里层的半固态部分接触,并将其部分熔化,形成混合层;
6)随着铸坯下行,在冷却***的作用下,坯壳继续凝固,直至铸坯全部凝固,实现了基体金属与复合金属的冶金熔合,获得冶金熔合复合金属坯。
本发明的有益效果:⑴基体金属与复合金属实现真正意义上的冶金复合,结合层强度高;⑵基体金属与复合金属之间有混合层,可实现复合层到基体性能的逐渐过渡,利于轧制过程的质量控制;⑶基体金属与复合金属之间的混合层厚度可控,利于复合金属材质量控制;⑷既适用于板材又适用于线材;⑸液态金属直接复合浇铸,无需为了实现冶金复合再次加热,高效且节省能源。
附图说明
图1为隔离器与结晶器剖面主视图;
图2为隔离器与结晶器剖面俯视图;
图3为复合金属连铸机工作示意图;
图4为复合金属连铸机中间包结构示意图;
其中:隔离器1、结晶器2、基体金属液3、复合金属液4、引锭杆5、混合层6、基体金属液浇口7、复合金属液浇口8、固定臂9、复合金属液长水口10、基体金属液长水口11、中间包12、基体金属液承接槽13、复合金属液承接槽14、隔离墙15。
具体实施方式
下面结合具体实施例进行说明:
实施例1:
铁素体430不锈钢与低碳钢Q345钢复合连铸:
1)将隔离器1加热至700~800℃,与结晶器2一起安装在连铸机上;
2)将Q345钢液和430不锈钢液同时分别注入中间包12的基体金属液承接槽13和复合金属液承接槽14;
3)Q345钢液和430不锈钢液分别从基体金属液长水口11和复合金属液长水口10,同时注入基体钢液浇口7和复合钢液浇口8。引锭杆5封住结晶器底部;
4)与结晶器2内壁接触的430不锈钢液被冷却凝固结壳,在被引锭杆5拉出结晶器2时与隔离器1接触的部分处于半固态;
5)注入隔离器1的Q345钢液没有凝固,随引锭杆离开隔离器1后,Q345钢液与430不锈钢凝壳里层的半固态部分接触,并将其部分熔化,形成混合层6。混合层厚度约为5mm;
6)随着铸坯下行,在冷却***的作用下,坯壳继续凝固,直至铸坯全部凝固,实现了 430不锈钢与Q345钢的冶金熔合。
实施例2:
奥氏体316不锈钢与低碳钢Q235钢复合连铸:
1)将隔离器1加热至730~830℃,与结晶器2一起安装在连铸机上;
2)将Q235钢液和316不锈钢液同时分别注入中间包12的基体金属液承接槽13和复合金属液承接槽14;
3)Q235钢液和316不锈钢液分别从基体金属液长水口11和复合金属液长水口10,同时注入基体钢液浇口7和复合钢液浇口8。引锭杆5封住结晶器底部;
4)注入隔离器1的Q235钢液没有凝固,随引锭杆离开隔离器1后,Q235钢液与316不锈钢凝壳里层的半固态部分接触,并将其部分熔化,形成混合层6。混合层厚度约为6mm;
5)随着铸坯下行,在冷却***的作用下,坯壳继续凝固,直至铸坯全部凝固,实现了 316不锈钢与Q235钢的冶金熔合。

Claims (3)

1.一种复合金属连铸装置,包括结晶器和中间包,其特征在于:隔离器悬置于结晶器内,二者之间构成筒状空间,使得结晶器分成内外两个腔体;隔离器与结晶器顶部对齐;内腔体上端为基体金属液浇口,外腔体上端为复合金属液浇口,隔离器顶部设有固定臂,固定臂与结晶器振动台连接固定,保证隔离器与结晶器同步振动;中间包内部设有S形隔离墙,将内部隔离成基体金属液承接槽和复合金属液承接槽,基体金属液承接槽和复合金属液承接槽分别通过基体金属液长水口和复合金属液长水口,注入结晶器中的基体金属液浇口和复合金属液浇口。
2.根据利用权利要求1所述的复合金属连铸装置,其特征在于:隔离器材质为耐火材料,内置钢筋骨架,长度小于结晶器。
3.一种根据权利要求1或2所述的复合金属连铸方法,其特征在于包括如下步骤:
1)将隔离器加热至700~1300℃,与结晶器一起安装在连铸机上;
2)将基体金属液和复合金属液同时分别注入中间包的基体金属液承接槽和复合金属液承接槽;
3)基体金属液和复合金属液分别从基体金属液长水口和复合金属液长水口,同时注入基体金属液浇口和复合金属液浇口;引锭杆封住结晶器底部;
4)与结晶器内壁接触的复合金属液被冷却凝固结壳,被引锭杆拉出结晶器时与隔离器接触的部分处于半固态;
5)注入隔离器的基体金属液没有凝固,随引锭杆离开隔离器后,基体金属液与复合金属凝壳里层的半固态部分接触,并将其部分熔化,形成混合层;
6)随着铸坯下行,在冷却***的作用下,坯壳继续凝固,直至铸坯全部凝固,实现了基体金属与复合金属的冶金熔合,获得冶金熔合复合金属坯。
CN201810293808.1A 2018-03-30 2018-03-30 一种复合金属连铸装置及连铸方法 Active CN108526425B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810293808.1A CN108526425B (zh) 2018-03-30 2018-03-30 一种复合金属连铸装置及连铸方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810293808.1A CN108526425B (zh) 2018-03-30 2018-03-30 一种复合金属连铸装置及连铸方法

Publications (2)

Publication Number Publication Date
CN108526425A true CN108526425A (zh) 2018-09-14
CN108526425B CN108526425B (zh) 2020-09-01

Family

ID=63481815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810293808.1A Active CN108526425B (zh) 2018-03-30 2018-03-30 一种复合金属连铸装置及连铸方法

Country Status (1)

Country Link
CN (1) CN108526425B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113857463A (zh) * 2021-09-06 2021-12-31 盐城市联鑫钢铁有限公司 一种复合不锈钢浇注工艺和装置

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3353934A (en) * 1962-08-14 1967-11-21 Reynolds Metals Co Composite-ingot
JPS61266155A (ja) * 1985-05-22 1986-11-25 Sumitomo Metal Ind Ltd クラツド鋳片の連続鋳造方法及びその装置
JPS6216854A (ja) * 1985-07-15 1987-01-26 Kawasaki Steel Corp クラツド材の連続製造方法およびその装置
GB2204518B (en) * 1987-05-13 1991-03-06 Dundee College Of Technology Casting apparatus
JPH06297091A (ja) * 1993-04-19 1994-10-25 Nippon Steel Corp 複合金属材料の連続鋳造方法及び装置
JPH08141704A (ja) * 1994-11-17 1996-06-04 Kobe Steel Ltd AlまたはAl合金の電磁界鋳造装置および電磁界鋳造方法
JPH08294755A (ja) * 1995-04-24 1996-11-12 Nippon Steel Corp 4鍋積載式取鍋交換装置
CN1174106A (zh) * 1997-04-15 1998-02-25 华南理工大学 以连续及半连续铸造方式制备梯度材料的方法
DE102004011152A1 (de) * 2004-03-08 2005-12-15 Mislavskyy, Oleksandr Stranggussverfahren der plattierten Rohblöcke und die Vorrichtung für die Durchführung dieses Gussverfahren
US20070215313A1 (en) * 2006-03-01 2007-09-20 Wagstaff Robert B Sequential casting of metals having high co-efficients of contraction
CN201534212U (zh) * 2009-09-25 2010-07-28 大连理工大学 一种复层金属铸锭的半连续铸造装置
CN101795791A (zh) * 2007-08-29 2010-08-04 诺维尔里斯公司 具有相同或相似收缩系数的金属的连续铸造
JP2012086250A (ja) * 2010-10-20 2012-05-10 Toyota Motor Corp アルミニウム合金クラッド材の製造方法
CN102672124A (zh) * 2012-04-25 2012-09-19 莱芜钢铁集团有限公司 一种梯度钢铁材料的连铸设备和连铸方法
CN102740996A (zh) * 2010-02-11 2012-10-17 诺维尔里斯公司 具有金属温度补偿的复合锭铸造
CN103648683A (zh) * 2011-07-12 2014-03-19 法国肯联铝业 多合金立式半连续浇铸法
CN104959557A (zh) * 2015-07-24 2015-10-07 渤海大学 双金属复层圆坯电磁连铸方法及设备
CN106735000A (zh) * 2016-11-14 2017-05-31 东北大学 一种三层包覆铸锭的半连铸装置及方法

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3353934A (en) * 1962-08-14 1967-11-21 Reynolds Metals Co Composite-ingot
JPS61266155A (ja) * 1985-05-22 1986-11-25 Sumitomo Metal Ind Ltd クラツド鋳片の連続鋳造方法及びその装置
JPS6216854A (ja) * 1985-07-15 1987-01-26 Kawasaki Steel Corp クラツド材の連続製造方法およびその装置
GB2204518B (en) * 1987-05-13 1991-03-06 Dundee College Of Technology Casting apparatus
JPH06297091A (ja) * 1993-04-19 1994-10-25 Nippon Steel Corp 複合金属材料の連続鋳造方法及び装置
JPH08141704A (ja) * 1994-11-17 1996-06-04 Kobe Steel Ltd AlまたはAl合金の電磁界鋳造装置および電磁界鋳造方法
JPH08294755A (ja) * 1995-04-24 1996-11-12 Nippon Steel Corp 4鍋積載式取鍋交換装置
CN1174106A (zh) * 1997-04-15 1998-02-25 华南理工大学 以连续及半连续铸造方式制备梯度材料的方法
DE102004011152A1 (de) * 2004-03-08 2005-12-15 Mislavskyy, Oleksandr Stranggussverfahren der plattierten Rohblöcke und die Vorrichtung für die Durchführung dieses Gussverfahren
CN101394958A (zh) * 2006-03-01 2009-03-25 诺韦利斯公司 具有高收缩系数的连铸金属
US20070215313A1 (en) * 2006-03-01 2007-09-20 Wagstaff Robert B Sequential casting of metals having high co-efficients of contraction
CN101795791A (zh) * 2007-08-29 2010-08-04 诺维尔里斯公司 具有相同或相似收缩系数的金属的连续铸造
US7882887B2 (en) * 2007-08-29 2011-02-08 Novelis Inc. Sequential casting of metals having the same or similar co-efficients of contraction
CN201534212U (zh) * 2009-09-25 2010-07-28 大连理工大学 一种复层金属铸锭的半连续铸造装置
CN102740996A (zh) * 2010-02-11 2012-10-17 诺维尔里斯公司 具有金属温度补偿的复合锭铸造
JP2013519524A (ja) * 2010-02-11 2013-05-30 ノベリス・インコーポレイテッド 金属温度補償を伴う複合インゴットの鋳造
JP2012086250A (ja) * 2010-10-20 2012-05-10 Toyota Motor Corp アルミニウム合金クラッド材の製造方法
CN103648683A (zh) * 2011-07-12 2014-03-19 法国肯联铝业 多合金立式半连续浇铸法
CN102672124A (zh) * 2012-04-25 2012-09-19 莱芜钢铁集团有限公司 一种梯度钢铁材料的连铸设备和连铸方法
CN104959557A (zh) * 2015-07-24 2015-10-07 渤海大学 双金属复层圆坯电磁连铸方法及设备
CN106735000A (zh) * 2016-11-14 2017-05-31 东北大学 一种三层包覆铸锭的半连铸装置及方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113857463A (zh) * 2021-09-06 2021-12-31 盐城市联鑫钢铁有限公司 一种复合不锈钢浇注工艺和装置

Also Published As

Publication number Publication date
CN108526425B (zh) 2020-09-01

Similar Documents

Publication Publication Date Title
CN106457371A (zh) 钢带的半连续铸造
CN106111931A (zh) 一种金属包覆材料固/液连铸复合成形设备与工艺方法
CN105935752A (zh) 一种控制铸坯中心质量的立式电磁搅拌方法
CN102248136A (zh) 一种连铸坯开浇防漏钢工艺方法
CN108526425A (zh) 一种复合金属连铸装置及连铸方法
CN104959557B (zh) 双金属复层圆坯电磁连铸方法
CN102554191B (zh) 铝镁合金复合铸造装置
CN102974794B (zh) 一种降低连铸钢包或中间钢包钢水过热度的装置和方法
CN103978159A (zh) 一种单缸风冷发动机缸盖的浇注***
CA2999637C (en) Continuous casting process of metal
CN204975244U (zh) 双金属复层圆坯电磁连铸设备
CN104722729A (zh) 一种连铸铸坯内部质量改善用的形核投射装置及方法
CN108655357A (zh) 一种金属熔融连续铸造方法
RU2381867C2 (ru) Способ фасонного литья в кокиль крупногабаритных отливок из магниевых сплавов
CN106513602A (zh) 一种钢丝铝的连续生产线工艺流程
PL71106B1 (zh)
CN102115838B (zh) 一种铝合金、其制成的用于铝合金铸件成形的芯撑及该芯撑的制备
JPS60148655A (ja) コ−ルドチヤンバダイカストマシン
KR20000005255A (ko) 금속의 수직 연속 주조용 2개 재료로된 잉곳주형
CN109047727A (zh) 一种制造冶金复合金属坯料的装置及方法
CN108950113A (zh) 一种铸件及其加工方法
JPS6040653A (ja) 真空溶解連続鋳造法
RU2093299C1 (ru) Способ получения непрерывнолитых полых биметаллических заготовок
JPH09164465A (ja) 竪型ダイカスト法および装置
JP2005144461A (ja) 鋳造品の冷却方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant