CN108492658A - Portable electric meter wiring emulating instrument - Google Patents

Portable electric meter wiring emulating instrument Download PDF

Info

Publication number
CN108492658A
CN108492658A CN201810276470.9A CN201810276470A CN108492658A CN 108492658 A CN108492658 A CN 108492658A CN 201810276470 A CN201810276470 A CN 201810276470A CN 108492658 A CN108492658 A CN 108492658A
Authority
CN
China
Prior art keywords
phase
voltage
circuit
power amplifier
portable electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810276470.9A
Other languages
Chinese (zh)
Other versions
CN108492658B (en
Inventor
旷良富
李立军
周旋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810276470.9A priority Critical patent/CN108492658B/en
Publication of CN108492658A publication Critical patent/CN108492658A/en
Application granted granted Critical
Publication of CN108492658B publication Critical patent/CN108492658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/06Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
    • G09B23/18Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism
    • G09B23/187Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism for measuring instruments

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Computational Mathematics (AREA)
  • Algebra (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Physics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Measuring Phase Differences (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of portable electric meter wiring emulating instruments, including:Voltage-phase translation circuit, for the another two-phase voltage by single-phase voltage output and 120 ° of the single-phase voltage phase mutual deviation;The voltage-phase translation circuit includes sequentially connected first reduction voltage circuit, the first phase-shift circuit, the first negative circuit, the first power amplifier and the first booster circuit and sequentially connected second phase-shift circuit, the second negative circuit, the second power amplifier and the second booster circuit;The input terminal of second phase-shift circuit is also connect with the output end of first negative circuit;Further include three-phase current generation module, three-phase alternating current is generated for passing through single-phase voltage;The three-phase current generation module includes at least sequentially connected second reduction voltage circuit, shaping circuit and microcontroller.The present invention can provide three-phase voltage and electric current in the place to operate schools of only single phase poaer supply, and the various false wiring forms that simulation electric energy meter is likely to occur facilitate student to learn from practical application.

Description

Portable electric meter wiring emulating instrument
Technical field
The present invention relates to a kind of emulator, more particularly to a kind of portable electric meter wiring emulating instrument.
Background technology
Generally three-phase four-wire system electric energy meter is used to carry out three-phase electric energy metering, the correctness of wiring in low voltage power distribution network The economic benefit of the accurate and power generation of metering is directly affected, important behaviour is exactly line loss exception.To improve marketing personnel It to the analytical judgment ability of false wiring of electric energy meter, needs on the spot to practice using meter, electricity is inputted under measuring error wiring state The voltage current phase relationship of energy table, misjudgment wiring type calculate more positive coefficient, but general power supply branch cannot carry For such coach concourse and equipment.
Invention content
The present invention provides a kind of portable solution, can provide three-phase electricity in the place to operate schools of only single phase poaer supply Pressure and electric current, the various false wiring forms that simulation electric energy meter is likely to occur, facilitate student to learn from practical application.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of portable electric meter wiring emulating instrument, including:
Voltage-phase translation circuit includes at least sequentially connected first reduction voltage circuit, the first phase-shift circuit, the first reverse phase electricity Road, the first power amplifier and the first booster circuit and sequentially connected second phase-shift circuit, the second negative circuit, the second work( Discharge road and the second booster circuit;The input terminal of second phase-shift circuit also connects with the output end of first negative circuit It connects;First phase-shift circuit is used for the first 0-90 ° of phase voltage U1 phase shifts after first reduction voltage circuit decompression;It should The voltage of 0-90 ° of phase shift obtains the voltage of 180-270 ° of phase shift through the first negative circuit reverse phase, through the first power amplifier and First booster circuit obtains the second phase voltage U2;The voltage of 180-270 ° of simultaneous phase shifting is arrived through the second phase-shift circuit phase shift 270-360 °, then the voltage of 90-180 ° of phase shift is obtained through the second negative circuit, by the second power amplifier and the second booster circuit Obtain third phase voltage U3;
Three-phase current generation module includes at least sequentially connected second reduction voltage circuit, shaping circuit and microcontroller;Single-phase voltage Sine voltage is formed through the second reduction voltage circuit and shaping circuit;The microcontroller is by setting three different delays, by this Sine voltage is converted to three-phase sine wave voltage and is exported;The three-phase sine wave voltage is converted through a D/A successively respectively Circuit, a power amplifier and a up-flow circuit form three-phase current.
Preferably, the three-phase sine wave voltage is respectively successively through the first D/A conversion circuits, third power amplifier and first It flows up circuit and forms phase current I1;Successively mutually electricity is formed through the 2nd D/A conversion circuits, the 4th power amplifier and the second up-flow circuit Flow I2;Successively phase current I3 is formed through the 3rd D/A conversion circuits, the 5th power amplifier and third up-flow circuit.
Preferably, the voltage-phase translation circuit, further include be connected to the first negative circuit and the first power amplifier it Between the first follower, and the second follower for being connected between the second negative circuit and the second power amplifier;Described first Follower and the second follower are used for impedance matching, isolation voltage influencing each other between reverse phase and power amplifier.
Preferably, the voltage-phase translation circuit further includes between the first follower and the first power amplifier and Commutation circuit between two followers and the second power amplifier;The commutation circuit for changing output voltage phase sequence.
Preferably, the output loop of three different delayed time of the microcontroller by setting delay between 0~0.02 second, The sine voltage is converted into 50Hz three-phase sine wave voltages.
Preferably, the voltage-phase translation circuit and three-phase current generation module are arranged in a babinet.
Preferably, keyboard is provided on the babinet, the keyboard is connected to the commutation circuit, for adjusting described change Circuitry phase carries out two-phase output voltage phase sequence and exchanges;The keyboard is additionally coupled to AVR single chip, for setting the AVR monolithics Machine parameter regulation three-phase current phase sequence and three-phase current and voltage angle.
Preferably, the keyboard includes at least:
First button, the positive and negative phase sequence for voltage to be arranged;
Second button, third button and the 4th button press sequence decision three-phase output current sequence for passing through, and pass through weight 180 ° of the corresponding anti-phase of button for adjusting and pressing is pressed again;
5th button and the 6th button, the plus-minus for adjusting three-phase current phase.
Preferably, display unit is additionally provided on the babinet, the display unit is connect with microcontroller, for showing State the phase sequence and phase of the voltage phase sequence and three-phase current of keyboard setting.
Preferably, the display unit is LCD liquid crystal display screen.
Compared with prior art, beneficial effects of the present invention:The portable electric meter wiring emulating instrument of the present invention is based on resistance Hold phase shift and generate three-phase voltage, be based on microcontroller synchronization triggering and generate three-phase current, completes to can be changed by single phase poaer supply generation three-phase The voltage and current of phase sequence, phase, for the teaching that three-phase four-wire system false wiring of electric energy meter judges, and in only single-phase electricity The place in source provides three-phase simulation voltage and current and provides study for debugging efforts to only have the place to operate schools of single phase poaer supply The solution of three-phase and four-line false wiring of electric energy meter is judged with practice;And the portable electric meter wiring emulating instrument of the present invention Small and exquisite portable, manufacturing cost is low, easy to use, has reached the function of professional work platform.
Description of the drawings:
Fig. 1 is that the three-phase voltage of the present invention generates principle schematic;
Fig. 2 is voltage-phase translation circuit block diagram in one embodiment of the invention;
Fig. 3 is voltage-phase translation circuit figure in one embodiment of the invention;
Fig. 4 is voltage-phase translation circuit block diagram in another preferred embodiment of the present invention;
Fig. 5 is voltage-phase translation circuit figure in another preferred embodiment of the present invention;
Fig. 6 is three-phase current generation module block diagram in one embodiment of the invention;
Fig. 7 is one embodiment of the invention middle case front panel schematic diagram;
Fig. 8 is that program chart is arranged in keyboard of the present invention;
Fig. 9 is the wiring diagram with three-phase four-wire system electric energy meter when the present invention uses.
Specific implementation mode
With reference to test example and specific implementation mode, the present invention is described in further detail.But this should not be understood It is only limitted to embodiment below for the range of the above-mentioned theme of the present invention, it is all that this is belonged to based on the technology that the content of present invention is realized The range of invention.
In one embodiment, portable electric meter wiring emulating instrument, including:
Voltage-phase translation circuit, for the another two-phase electricity by single-phase voltage output and 120 ° of the single-phase voltage phase mutual deviation Pressure.The principle that its three-phase voltage generates is as shown in Figure 1:The sinusoidal voltage of 120 ° of three-phase voltage i.e. three phase mutual deviation, using shifting Single-phase voltage is converted to three-phase voltage by the mode of phase;Although the phase-shift circuit phase shift range of resistance capacitance composition is only 0-90 °, But 180-270 ° of phase-shift phase can be obtained by reverse phase, therefore, passes through 240 ° of phase shift and reverse phase twice, you can obtain mutual deviation 120 ° of sinusoidal voltage.
Specifically, as Figure 2-3, a kind of portable electric meter wiring emulating instrument, including:
Voltage-phase translation circuit includes at least sequentially connected first reduction voltage circuit, the first phase-shift circuit, the first reverse phase electricity Road, the first power amplifier and the first booster circuit and sequentially connected second phase-shift circuit, the second negative circuit, the second work( Discharge road and the second booster circuit;The input terminal of second phase-shift circuit also connects with the output end of first negative circuit It connects;First phase-shift circuit is used for the first 0-90 ° of phase voltage U1 phase shifts after first reduction voltage circuit decompression;It should The voltage of 0-90 ° of phase shift obtains the voltage of 180-270 ° of phase shift through the first negative circuit reverse phase, through the first power amplifier and First booster circuit obtains the second phase voltage U2;The voltage of 180-270 ° of simultaneous phase shifting is arrived through the second phase-shift circuit phase shift 270-360 °, then the voltage of 90-180 ° of phase shift is obtained through the second negative circuit, by the second power amplifier and the second booster circuit Obtain third phase voltage U3.
In another preferred embodiment, as illustrated in figures 4-5, the voltage-phase translation circuit, further includes being connected to first The first follower between negative circuit and the first power amplifier, and be connected to the second negative circuit and the second power amplifier it Between the second follower;First follower and the second follower, are used for impedance matching, isolation voltage reverse phase and power amplifier it Between influence each other.
In another preferred embodiment, the voltage-phase translation circuit further includes the first follower and the first power amplifier electricity Commutation circuit between road and between the second follower and the second power amplifier;The commutation circuit is for changing output voltage Phase sequence, commutation circuit described in the present embodiment preferably uses a selecting switch into line output voltage Phase-Sequence Transformation.
The output power of the two-phase voltage generated by above-mentioned phase shift system is little, cannot be directly used to bringing onto load and generates institute Electric current is needed, therefore, the portable electric meter wiring emulating instrument of an embodiment further includes three-phase current generation module, for passing through list Phase voltage generates three-phase alternating current, is dropped as shown in fig. 6, the three-phase current generation module includes at least sequentially connected second Volt circuit, shaping circuit and microcontroller, preferred AVR single chip in the present embodiment;Single-phase voltage is through the second reduction voltage circuit and shaping Circuit forms sine voltage;The sine voltage is converted to three by the AVR single chip by setting three different delays Phase sine voltage is exported;Further, the AVR single chip is by setting delay three between 0~0.02 second Different delays, the three-phase sine wave voltage which is converted to 50Hz export;The three-phase sine-wave electricity Pressure forms three-phase current through a D/A conversion circuits, a power amplifier and a up-flow circuit successively;Specifically, the three phase sine Wave voltage forms phase current I1 through the first D/A conversion circuits, third power amplifier and the first up-flow circuit successively respectively;It passes through successively 2nd D/A conversion circuits, the 4th power amplifier and the second up-flow circuit form phase current I2;Successively through the 3rd D/A conversion circuits, 5th power amplifier and third up-flow circuit form phase current I3;Three-phase current I1, I2 and the I3 generated in the present embodiment is in 2A Within, frequency 50HZ, synchronous with the single-phase voltage of input, initial phase angle is adjustable.
The voltage-phase translation circuit and three-phase current generation module are arranged in a babinet, and Fig. 7 is before the babinet Panel schematic diagram is provided with keyboard on the babinet, and the keyboard is connected to the commutation circuit, for adjusting the commutation electricity Road carries out two-phase output voltage phase sequence and exchanges;The keyboard is additionally coupled to AVR single chip, for setting the AVR single chip ginseng Number adjusts three-phase current phase sequence and three-phase current and voltage angle;Specifically, the portable electric meter wiring of an embodiment is imitative Program chart is arranged as shown in figure 8, the keyboard includes at least in the keyboard of true instrument:First button U, for be arranged voltage just, Negative-phase sequence;Second button 1, third button 2 and the 4th button 3 press sequence decision three-phase output current sequence for passing through, and By repeating to press 180 ° of the corresponding anti-phase of button for adjusting and pressing;5th button+and the 6th button-are for adjusting three-phase The plus-minus of current phase adjusts three-phase current and voltage angle, since the mutual deviation angle of three-phase current is to have certain rule , so only needing one phase of setting.It should be appreciated that the portable electric meter wiring emulating instrument of the present invention can provide three relatively Claiming, the arbitrary voltage and current of phase angle, the acting characteristic for examining idle compensating control will such as test single-phase compensation characteristic, Device internal program only need to be changed, every phase current phase is made to individually adjust, the modification of such conventional program also should be the guarantor of the present invention Within the scope of shield.Further, display unit is additionally provided on the babinet, the display unit is connect with AVR single chip, is used In the phase sequence and phase of the voltage phase sequence and three-phase current for showing the keyboard setting;The display unit is LCD liquid crystal displays Screen, of low cost, intuitive display.
When using portable electric meter wiring emulating instrument of the invention, the wiring diagram with three-phase four-wire system electric energy meter is as schemed 9, since the circuits such as the display of meter, metering need the working power of certain power, and the two-phase voltage internal resistance that emulating instrument generates Higher, to make operating circuit normal operation in four line electric energy meter of electronic three-phase, therefore three-phase four-wire system electric energy meter meter supplies The phase voltage of electricity must use system voltage, i.e., as marked the voltage terminal for 1 " in emulating instrument in Fig. 8.Connect emulating instrument and electricity After voltage, current terminal line between energy table, you can device for opening power supply carries out the output of simulation three-phase voltage, electric current:It presses Lower first button U, is arranged the positive and negative phase sequence of voltage, presses the second button 1,3 key of third button 2 and the 4th button, and electric current phase sequence is arranged And direction, by the phase angle between the 5th button+and six buttons-setting electric current and voltage;After setting, you can allow student in electricity Energy table side volt-ampere phase meter, measures three-phase voltage phase sequence, each current phase angle etc., draws phasor diagram, carries out false wiring shape Formula judges, writes out general power expression formula under the wiring state, calculates a series of training such as more positive coefficient.
The portable electric meter wiring emulating instrument of the present invention is based on capacitance-resistance phase shift and generates three-phase voltage, is synchronized based on microcontroller Triggering generate three-phase current, complete by single phase poaer supply generate three-phase can Phase Sequence-changeable, phase voltage and current, be used for three-phase and four-line The teaching that false wiring of electric energy meter processed judges, and three-phase simulation voltage and current is provided for adjusting in the place of only single phase poaer supply Trial work is made, and to only have the place to operate schools of single phase poaer supply, provides study and practice judges three-phase and four-line false wiring of electric energy meter Solution;And the portable electric meter wiring emulating instrument of the present invention is small and exquisite portable, and manufacturing cost is low, easy to use, reaches The function of professional work platform.

Claims (10)

1. a kind of portable electric meter wiring emulating instrument, which is characterized in that including:
Voltage-phase translation circuit includes at least sequentially connected first reduction voltage circuit, the first phase-shift circuit, the first reverse phase electricity Road, the first power amplifier and the first booster circuit and sequentially connected second phase-shift circuit, the second negative circuit, the second work( Discharge road and the second booster circuit;The input terminal of second phase-shift circuit also connects with the output end of first negative circuit It connects;First phase-shift circuit is used for the first 0-90 ° of phase voltage U1 phase shifts after first reduction voltage circuit decompression;It should The voltage of 0-90 ° of phase shift obtains the voltage of 180-270 ° of phase shift through the first negative circuit reverse phase, through the first power amplifier and First booster circuit obtains the second phase voltage U2;The voltage of 180-270 ° of simultaneous phase shifting is arrived through the second phase-shift circuit phase shift 270-360 °, then the voltage of 90-180 ° of phase shift is obtained through the second negative circuit, by the second power amplifier and the second booster circuit Obtain third phase voltage U3;
Three-phase current generation module includes at least sequentially connected second reduction voltage circuit, shaping circuit and microcontroller;Single-phase voltage Sine voltage is formed through the second reduction voltage circuit and shaping circuit;The microcontroller is by setting three different delays, by this Sine voltage is converted to three-phase sine wave voltage and is exported;The three-phase sine wave voltage is converted through a D/A successively respectively Circuit, a power amplifier and a up-flow circuit form three-phase current.
2. portable electric meter wiring emulating instrument as described in claim 1, which is characterized in that the three-phase sine wave voltage point Phase current I1 is not formed through the first D/A conversion circuits, third power amplifier and the first up-flow circuit successively;Successively through the 2nd D/A Conversion circuit, the 4th power amplifier and the second up-flow circuit form phase current I2;Successively through the 3rd D/A conversion circuits, the 5th work( Discharge road and third up-flow circuit formation phase current I3.
3. portable electric meter wiring emulating instrument as described in claim 1, which is characterized in that the voltage-phase transformation electricity Road further includes the first follower being connected between the first negative circuit and the first power amplifier, and is connected to the second reverse phase The second follower between circuit and the second power amplifier;First follower and the second follower are used for impedance matching, every Ionization voltage influencing each other between reverse phase and power amplifier.
4. portable electric meter wiring emulating instrument as claimed in claim 3, which is characterized in that the voltage-phase transformation electricity Road further includes the commutation electricity between the first follower and the first power amplifier and between the second follower and the second power amplifier Road;The commutation circuit for changing output voltage phase sequence.
5. portable electric meter wiring emulating instrument as described in claim 1, which is characterized in that the microcontroller is prolonged by setting When three different delayed times between 0~0.02 second output loop, which is converted into 50Hz three-phase sine-waves Voltage.
6. portable electric meter wiring emulating instrument as described in claim 1, which is characterized in that the voltage-phase translation circuit It is arranged in a babinet with three-phase current generation module.
7. portable electric meter wiring emulating instrument as claimed in claim 6, which is characterized in that be provided with key on the babinet Disk, the keyboard are connected to the commutation circuit, and the exchange of two-phase output voltage phase sequence is carried out for adjusting the commutation circuit;Institute It states keyboard and is additionally coupled to AVR single chip, for setting the AVR single chip parameter regulation three-phase current phase sequence and three-phase current With voltage angle.
8. portable electric meter wiring emulating instrument as claimed in claim 7, which is characterized in that the keyboard includes at least:
First button, the positive and negative phase sequence for voltage to be arranged;
Second button, third button and the 4th button press sequence decision three-phase output current sequence for passing through, and pass through weight 180 ° of the corresponding anti-phase of button for adjusting and pressing is pressed again;
5th button and the 6th button, the plus-minus for adjusting three-phase current phase.
9. portable electric meter wiring emulating instrument as claimed in claim 7, which is characterized in that be additionally provided on the babinet aobvious Show that unit, the display unit are connect with microcontroller, the phase of voltage phase sequence and three-phase current for showing the keyboard setting Sequence and phase.
10. portable electric meter wiring emulating instrument as claimed in claim 9, which is characterized in that the display unit is LCD liquid Crystal display screen.
CN201810276470.9A 2018-03-30 2018-03-30 Portable electric meter wiring emulating instrument Active CN108492658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810276470.9A CN108492658B (en) 2018-03-30 2018-03-30 Portable electric meter wiring emulating instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810276470.9A CN108492658B (en) 2018-03-30 2018-03-30 Portable electric meter wiring emulating instrument

Publications (2)

Publication Number Publication Date
CN108492658A true CN108492658A (en) 2018-09-04
CN108492658B CN108492658B (en) 2019-09-17

Family

ID=63317734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810276470.9A Active CN108492658B (en) 2018-03-30 2018-03-30 Portable electric meter wiring emulating instrument

Country Status (1)

Country Link
CN (1) CN108492658B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109270315A (en) * 2018-10-31 2019-01-25 国网四川省电力公司广元供电公司 Two-phase inlet-outlet line polarity does not have a power failure commutation circuit
CN113077676A (en) * 2021-03-29 2021-07-06 广东电网有限责任公司 Electric energy metering cabinet signal input control system and electric energy metering cabinet wiring teaching device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87201768U (en) * 1987-02-05 1987-12-26 牡丹江市测试仪器厂 Portable test unit for ac/dc electric meters
JPH0816632A (en) * 1994-07-05 1996-01-19 Mitsubishi Electric Corp Radiation noise simulation tool
CN1435697A (en) * 2002-01-30 2003-08-13 湖南省电力试验研究所 Fictitious load source for in-situ checking electric energy meter
CN101710461A (en) * 2009-12-11 2010-05-19 德州学院 Three-phase circuit tester
CN201765728U (en) * 2009-12-30 2011-03-16 德州学院 Power source for three-phase alternating current experiment
CN201812423U (en) * 2010-12-07 2011-04-27 北京北研兴电力仪表有限责任公司 Program-controlled analog device for false wiring of electric energy meter
CN106990384A (en) * 2017-04-27 2017-07-28 广西网冠电气有限公司 A kind of three-phase electric energy meter false wiring detection means and detection method
CN206696420U (en) * 2017-04-27 2017-12-01 广西网冠电气有限公司 A kind of test supply unit of three-phase electric energy meter false wiring

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87201768U (en) * 1987-02-05 1987-12-26 牡丹江市测试仪器厂 Portable test unit for ac/dc electric meters
JPH0816632A (en) * 1994-07-05 1996-01-19 Mitsubishi Electric Corp Radiation noise simulation tool
CN1435697A (en) * 2002-01-30 2003-08-13 湖南省电力试验研究所 Fictitious load source for in-situ checking electric energy meter
CN101710461A (en) * 2009-12-11 2010-05-19 德州学院 Three-phase circuit tester
CN201765728U (en) * 2009-12-30 2011-03-16 德州学院 Power source for three-phase alternating current experiment
CN201812423U (en) * 2010-12-07 2011-04-27 北京北研兴电力仪表有限责任公司 Program-controlled analog device for false wiring of electric energy meter
CN106990384A (en) * 2017-04-27 2017-07-28 广西网冠电气有限公司 A kind of three-phase electric energy meter false wiring detection means and detection method
CN206696420U (en) * 2017-04-27 2017-12-01 广西网冠电气有限公司 A kind of test supply unit of three-phase electric energy meter false wiring

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
佚名: "JYM-A电能计量装置接线模拟试验台", 《HTTPS://WENKU.BAIDU.COM/VIEW/E77C34360B4C2E3F57276366.HTML?FROM=SEARCH》 *
居思学: "从单相交流电源取得三相电流的讨论", 《潍坊教育学院学报(综合版)》 *
胡海龙 等: "电能表错误接线模拟装置设计与应用", 《电器设备》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109270315A (en) * 2018-10-31 2019-01-25 国网四川省电力公司广元供电公司 Two-phase inlet-outlet line polarity does not have a power failure commutation circuit
CN113077676A (en) * 2021-03-29 2021-07-06 广东电网有限责任公司 Electric energy metering cabinet signal input control system and electric energy metering cabinet wiring teaching device

Also Published As

Publication number Publication date
CN108492658B (en) 2019-09-17

Similar Documents

Publication Publication Date Title
CN103792508B (en) The error testing system of the digitized measurement device and method of testing
CN103792854B (en) Flexible DC power transmission semi-matter simulating system based on modularization multi-level converter
CN106226723B (en) Electric energy metering simulation analysis system and method for complex nonlinear load environment
CN107202971B (en) Unconventional low voltage electric network electric energy measuring equipment operation characteristic simulation testing device
CN108492658B (en) Portable electric meter wiring emulating instrument
CN203101619U (en) Multi-parameter electrical testing equipment calibration system
CN104852616A (en) Power grid simulator with line impedance simulation function, and control method
CN206248776U (en) Universal multichannel flexible circuit board FPC comprehensive function test devices
CN204065240U (en) A kind of dry reactor performance test circuit and device
Turner Design and development of a smart grid laboratory for an energy and power engineering technology program
CN106093842A (en) three phase harmonic standard electric energy meter
CN102707117A (en) Relaying multifunctional tester
CN102866378A (en) Voltage or current transformer on-line test device and voltage or current transformer on-line test method
Tenti et al. Accountability and revenue metering in smart micro-grids
Bucci et al. Development of a low cost power meter based on a digital signal controller
CN201035130Y (en) Synthetic tester for mutual inductor electric energy meter
CN202285032U (en) Electronic transformer harmonic influence testing device
CN102495384B (en) Transition resistance simulation device of on-load tap-changer of transformer
CN211318674U (en) Running-in test device of gas insulated metal enclosed switch
CN203733339U (en) Anti-electricity stealing program controlled simulation apparatus
CN207440239U (en) The general switching device of Insulation Test
CN203376440U (en) Three-phase distribution induction withstand voltage test instrument
CN201600440U (en) Comprehensive energy efficiency quality test device
CN207148206U (en) The current sampling system and battery simulator of a kind of battery simulator
Goulart et al. Automated system for measuring electrical three-phase power components

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant