CN108460541A - Harbour intelligence maintenance system and method - Google Patents
Harbour intelligence maintenance system and method Download PDFInfo
- Publication number
- CN108460541A CN108460541A CN201810252341.6A CN201810252341A CN108460541A CN 108460541 A CN108460541 A CN 108460541A CN 201810252341 A CN201810252341 A CN 201810252341A CN 108460541 A CN108460541 A CN 108460541A
- Authority
- CN
- China
- Prior art keywords
- data
- layer
- maintenance
- kpi
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 75
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000007405 data analysis Methods 0.000 claims abstract description 27
- 238000013480 data collection Methods 0.000 claims abstract description 23
- 238000013500 data storage Methods 0.000 claims abstract description 16
- 238000004891 communication Methods 0.000 claims abstract description 12
- 238000007726 management method Methods 0.000 claims description 68
- 238000005265 energy consumption Methods 0.000 claims description 35
- 230000008439 repair process Effects 0.000 claims description 11
- 238000004458 analytical method Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 238000007792 addition Methods 0.000 claims description 5
- 238000012217 deletion Methods 0.000 claims description 5
- 230000037430 deletion Effects 0.000 claims description 5
- 230000007246 mechanism Effects 0.000 claims description 5
- 230000008859 change Effects 0.000 description 5
- 238000011161 development Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 230000002618 waking effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of harbour intelligence maintenance system and method, which includes:Operation layer, including emergency maintenance module, maintaining module, part warehouse, KPI Key Performance Indicator module, basic information module, temporary duty module;Data active layer, including the sensing data of crane, operation data, device data and third party system data;Data collection layer is acquired data source different in data active layer using corresponding communications protocol or tool;Data storage layer carries out tree structure storage with relevant database to the data of operation layer, data active layer and data collection layer, and is docked with data analysis layer;Data analysis layer uses maintaining module and lines up algorithm automatically;Presentation layer is accessed by browser or mobile terminal, and the result of data analysis layer is presented.The present invention can improve maintenance efficiency and science, reduce the unnecessary machine stop times of equipment and time, reduce complicated daily maintenance plan scheduling time, increase scheduling accuracy.
Description
Technical field
The present invention relates to a kind of intelligence system and its method, more specifically to a kind of harbour intelligence maintenance system and
Method.
Background technology
During dock operation, in addition to equipment accurately and efficiently operates, the maintaining of mechanical equipment, equipment are run
The analysis of data, the management of maintenance staff also take up highly important status.With the continuous improvement of harbor automatic degree,
Intelligent maintenance systematic difference is the trend of automatic dock development and the important symbol that automatization level is promoted.It is original
Maintenance manages the demand that system gradually can not meet user under line, in order to meet the needs of automatic dock development, is preferably
Offering customers service, there is an urgent need to a kind of intelligent maintenance systems that can be directed to pier facilities, can make the Business Stream of entire harbour
Journey digitlization, standardization, automation.
Current most of harbour enterprises using planned maintenance also by the way of being maintained, regularly to crane facility and component
Regularly Check and Maintenance is carried out, the actual use situation of equipment and its true health status is not accounted for, also results in
The waste of time and manpower and materials.
Invention content
For the above-mentioned problems in the prior art, the object of the present invention is to provide a kind of harbour intelligence maintenance system and
Method.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of harbour intelligence maintenance system, including:Operation layer, including emergency maintenance module, maintaining module, spare part
Library, KPI Key Performance Indicator module, basic information module, temporary duty module;Data active layer includes the sensor number of crane
According to, operation data, device data and third party system data;Data collection layer uses data source different in data active layer
Corresponding communications protocol or tool are acquired;Data storage layer, to the data of operation layer, data active layer and data collection layer
Tree structure storage is carried out with relevant database, and is docked with data analysis layer;Data analysis layer, to maintaining module
Using lining up algorithm automatically;Presentation layer is accessed by browser or mobile terminal, and the result of data analysis layer is presented.
Further, data collection layer supports driving and communications protocol using OPC UA, and OPC UA are acquiring bottom
Data and support Kafka data and file are sent to data storage layer by message mechanism.
Further, emergency maintenance module includes troublshooting unit, sends work administrative unit, completion administrative unit, completion
Check and accept unit and comprehensive inquiry unit;Automatic arrangement program unit provides automatic arrangement program algorithm, including daily planning, week according to actual conditions
Plan, monthly plan, yearly plan, and automatically generate maintenance work order;Basic information unit puies forward maintenance item, period, content, work order
Date progress additions and deletions of waking up, which change, looks into, and determines the basic information of automatic arrangement program algorithm;Work administrative unit is sent to receive automatic arrangement program maintenance
Work order retracts to work order or work is sent to handle, and working hour is sent to preset maintenance time, and it is appropriate automatically to be chosen by personnel's shift report
Maintenance personal;Completion administrative unit receives work order and is confirmed, after completing repair, completion work order is automatically generated, to record
Repair consumed people when, energy information;Completion acceptance unit by complete work order compared with actual conditions, to work order carry out rollback or
Examination is handled;Different work order states, including maintenance progress, consumption information are checked in the offer of comprehensive inquiry unit.
Further, KPI Key Performance Indicator module includes energy consumption KPI units, personnel KPI units, machine KPI units, synthesis
KPI units;Energy consumption KPI units provide each mechanical equipment total energy consumption comparison, single device energy consumption statistic, the amount of money of equipment energy consumption
Statistics and the corresponding purposes work order of each equipment energy consumption;Each link participant's of the intelligent maintenance system of personnel's KPI units statistics
Working hour consumes when the consumed people of distinct device, different work type and when people corresponding work order;Machine KPI units are for difference
Workload in its certain time of device statistics, disorderly closedown amount, operation specifying information;Comprehensive KPI unit comprehensives statistics energy consumption, people
Member's performance, machine efficiency, analysis show all time-consuming, relationships between consumptive material, man efficiency, mechanical equipment efficiency.
Further, basic information module includes machinery equipment information management unit, personal management unit, rights management list
Member;Machinery equipment information management unit provides the management of all machinery equipment information;Personal management unit provides personal information and looks into
It askes;Rights management unit offer include menu management, menu button management, Role Management, role-security management, division management,
User management, user role management.
To achieve the above object, the present invention also adopts the following technical scheme that:
A kind of harbour intelligence maintenance method, including:Build operation layer, operation layer emergency maintenance module, maintaining module,
Part warehouse, KPI Key Performance Indicator module, basic information module, temporary duty module;Data active layer is built, data active layer includes
Sensing data, operation data, device data and the third party system data of heavy-duty machine;Build data collection layer, data collection layer
Data source different in data active layer is acquired using corresponding communications protocol or tool;Build data storage layer, number
Tree structure storage is carried out with relevant database to the data of operation layer, data active layer and data collection layer according to accumulation layer, and
And it is docked with data analysis layer;Data analysis layer is built, data analysis layer uses maintaining module and lines up algorithm automatically;Structure
Presentation layer is built, presentation layer is accessed by browser or mobile terminal, and the result of data analysis layer is presented.
Further, in data collection layer, driving and communications protocol are supported using OPC UA, OPC UA are acquiring
Bottom data and support Kafka data and file are sent to data storage layer by message mechanism.
Further, built in emergency maintenance module troublshooting unit, send work administrative unit, the administrative unit that completes,
Completion acceptance unit and comprehensive inquiry unit;Automatic arrangement program unit provides automatic arrangement program algorithm, including day meter according to actual conditions
Draw, all plans, monthly plan, yearly plan, and automatically generate maintenance work order;Basic information unit to maintenance item, the period, content,
The progress additions and deletions of work order prompt date, which change, looks into, and determines the basic information of automatic arrangement program algorithm;Work administrative unit is sent to receive automatic row
Cheng Weibao work orders, retract to work order or work are sent to handle, and working hour is sent to preset maintenance time, can automatically be selected by personnel's shift report
Take appropriate maintenance personal;Completion administrative unit receives work order and is confirmed, after completing repair, automatically generates completion work order, uses
With record repair consumed people when, energy information;Completion acceptance unit is compared by the work order that completes with actual conditions, is carried out to work order
It retracts or examination is handled;Different work order states, including maintenance progress, consumption information are checked in the offer of comprehensive inquiry unit.
Further, built in KPI Key Performance Indicator module energy consumption KPI units, personnel KPI units, machine KPI units,
Comprehensive KPI units;Energy consumption KPI units provide each mechanical equipment total energy consumption and compare, single device energy consumption statistic, equipment energy consumption
The amount of money counts and the corresponding purposes work order of each equipment energy consumption;Each link participant of the intelligent maintenance system of personnel's KPI units statistics
The working hour of member consumes when the consumed people of distinct device, different work type and when people corresponding work order;Machine KPI units are directed to
Distinct device counts workload in its certain time, disorderly closedown amount, operation specifying information;Comprehensive KPI unit comprehensives count energy
Consumption, personnel performance, machine efficiency, analysis show all time-consuming, relationships between consumptive material, man efficiency, mechanical equipment efficiency.
Further, machinery equipment information management unit, personal management unit, permission pipe are built in basic information module
Manage unit;Machinery equipment information management unit provides the management of all machinery equipment information;Personal management unit provides personnel's letter
Breath inquiry;The offer of rights management unit includes menu management, menu button management, Role Management, role-security management, department's pipe
Reason, user management, user role management.
In the above-mentioned technical solutions, harbour intelligence maintenance system and method for the invention can improve maintenance efficiency and science
Property, the unnecessary machine stop times of equipment and time are reduced, complicated daily maintenance plan scheduling time is reduced, it is accurate to increase scheduling
Property.Work flow under script line is applied to webpage and mobile client by the present invention using B/S frameworks, realizes that harbour automates journey
The promotion of degree promotes user experience, improves efficiency, meets equipment and arbitrary resolution in operating system (iOS, Android)
Under application.
Description of the drawings
Fig. 1 is the structural schematic diagram of harbour intelligence maintenance system of the present invention.
Specific implementation mode
The technical solution further illustrated the present invention with reference to the accompanying drawings and examples.
Referring to Fig.1, the present invention discloses a kind of harbour intelligence maintenance system first, main functional modules include presentation layer,
Operation layer, data analysis layer, data storage layer, data collection layer, data active layer.
Specifically, as shown in Figure 1, operation layer includes emergency maintenance module, maintaining module, part warehouse, crucial achievement
Imitate Index module, basic information module, temporary duty module.
Emergency maintenance module includes troublshooting unit, send work administrative unit, completion administrative unit, completion acceptance unit and
Comprehensive inquiry unit.Wherein, automatic arrangement program unit according to actual conditions provide automatic arrangement program algorithm, including daily planning, week plan,
Monthly plan, yearly plan, and automatically generate maintenance work order.Basic information unit reminds day to maintenance item, period, content, work order
Phase progress additions and deletions, which change, looks into, and determines the basic information of automatic arrangement program algorithm.Work administrative unit is sent to receive automatic arrangement program maintenance work order,
It is retracted to work order or work is sent to handle, working hour is sent to preset maintenance time, appropriate repair can be chosen automatically by personnel's shift report
Personnel.Completion administrative unit receives work order and is confirmed, after completing repair, automatically generates completion work order, to record repair
When consumed people, energy information.Completion acceptance unit is compared by the work order that completes with actual conditions, is retracted or is checked and accepted to work order
Processing.Different work order states, including maintenance progress, consumption information are checked in the offer of comprehensive inquiry unit.
KPI Key Performance Indicator module includes energy consumption KPI units, personnel KPI units, machine KPI units, comprehensive KPI units.
Energy consumption KPI units provide each mechanical equipment total energy consumption comparison, and the amount of money of single device energy consumption statistic, equipment energy consumption counts, with
And the corresponding purposes work order of each equipment energy consumption.The working hour of each link participant of the intelligent maintenance system of personnel's KPI units statistics, no
Consume when the consumed people of same equipment, different work type and when people corresponding work order.Machine KPI units are united for distinct device
Count workload in its certain time, disorderly closedown amount, operation specifying information.Comprehensive KPI unit comprehensives statistics energy consumption, Ren Yuanji
Effect, machine efficiency, analysis show all time-consuming, relationships between consumptive material, man efficiency, mechanical equipment efficiency.
Basic information module includes machinery equipment information management unit, personal management unit, rights management unit.Machine is set
Standby information management unit provides the management of all machinery equipment information.Personal management unit provides personal information inquiry.Permission pipe
Reason unit offer include menu management, menu button management, Role Management, role-security management, division management, user management,
User role management.
With continued reference to Fig. 1, data active layer includes sensing data, operation data, device data and the third party of crane
System data.
Data collection layer is acquired data source different in data active layer using corresponding communications protocol or tool.
Data collection layer using OPC UA come support driving and communications protocol, OPC UA to acquire bottom data and support Kafka will
Data and file are sent to data storage layer by message mechanism.
Data storage layer carries out tree-like knot to the data of operation layer, data active layer and data collection layer with relevant database
Structure stores, and is docked with data analysis layer.Mechanical equipment information that data storage layer is related to whole system, spare part product letter
Breath, personal information, maintaining information carries out tree structure storage using relevant database and last time data analysis layer is right
It connects, high performance data access service is provided.
Data analysis layer uses maintaining module and lines up algorithm automatically.For maintaining module, using automatic row
Journey algorithm, science scheduling reduce artificial scheduling workload and wrong scheduling.For the fault points Alarm, it is associated with using science, from
Dynamic association repair work order.
Presentation layer is accessed by browser or mobile terminal, present data analysis layer as a result, end user passes through browser
Or mobile terminal accesses intelligent maintenance system, makes a report on online, checks repair maintenance progress, and by Various types of data analysis result to scheme
The forms such as table, report are presented.
On the other hand, correspond to above-mentioned harbour intelligence maintenance system, invention additionally discloses a kind of harbour intelligence maintenance method,
It mainly includes the following steps:
Build operation layer, operation layer emergency maintenance module, maintaining module, part warehouse, KPI Key Performance Indicator module, base
Plinth information module, temporary duty module;
Data active layer is built, data active layer includes sensing data, operation data, device data and the third party of crane
System data;
Build data collection layer, data collection layer to data source different in data active layer using corresponding communications protocol or
Person's tool is acquired;
Build data storage layer, data relationship type of the data storage layer to operation layer, data active layer and data collection layer
Database carries out tree structure storage, and is docked with data analysis layer;
Data analysis layer is built, data analysis layer uses maintaining module and lines up algorithm automatically;
Presentation layer is built, presentation layer is accessed by browser or mobile terminal, and the result of data analysis layer is presented.
Those of ordinary skill in the art it should be appreciated that more than embodiment be intended merely to illustrate the present invention,
And be not used as limitation of the invention, as long as in the spirit of the present invention, the change to embodiment described above
Change, modification will all be fallen within the scope of claims of the present invention.
Claims (10)
1. a kind of harbour intelligence maintenance system, which is characterized in that including:
Operation layer, including emergency maintenance module, maintaining module, part warehouse, KPI Key Performance Indicator module, basic information mould
Block, temporary duty module;
Data active layer, including the sensing data of crane, operation data, device data and third party system data;
Data collection layer is acquired data source different in data active layer using corresponding communications protocol or tool;
Data storage layer carries out tree structure to the data of operation layer, data active layer and data collection layer with relevant database
Storage, and docked with data analysis layer;
Data analysis layer uses maintaining module and lines up algorithm automatically;
Presentation layer is accessed by browser or mobile terminal, and the result of data analysis layer is presented.
2. harbour intelligence maintenance system as described in claim 1, it is characterised in that:
The data collection layer using OPC UA come support driving and communications protocol, the OPC UA to acquire bottom data and
Support Kafka that data and file are sent to data storage layer by message mechanism.
3. harbour intelligence maintenance system as described in claim 1, it is characterised in that:
The emergency maintenance module includes troublshooting unit, send work administrative unit, completion administrative unit, completion acceptance unit and
Comprehensive inquiry unit;
The automatic arrangement program unit provides automatic arrangement program algorithm, including daily planning, all plans, monthly plan, year according to actual conditions
Plan, and automatically generate maintenance work order;
The basic information unit, which changes maintenance item, period, content, the progress additions and deletions of work order prompt date, to be looked into, and determines automatic row
The basic information of journey algorithm;
It is described that work administrative unit is sent to receive automatic arrangement program maintenance work order, it is retracted to work order or work is sent to handle, send working hour pre-
If maintenance time, appropriate maintenance personal can be chosen automatically by personnel's shift report;
The completion administrative unit receives work order and is confirmed, after completing repair, automatically generates completion work order, to record dimension
When repairing consumed people, energy information;
The completion acceptance unit is compared by the work order that completes with actual conditions, to work order retract or examination is handled;
Different work order states, including maintenance progress, consumption information are checked in the comprehensive inquiry unit offer.
4. harbour intelligence maintenance system as described in claim 1, it is characterised in that:
The KPI Key Performance Indicator module includes energy consumption KPI units, personnel KPI units, machine KPI units, comprehensive KPI units;
The energy consumption KPI units provide each mechanical equipment total energy consumption comparison, single device energy consumption statistic, the amount of money of equipment energy consumption
Statistics and the corresponding purposes work order of each equipment energy consumption;
The working hour of each link participant of the intelligent maintenance system of the personnel KPI units statistics, distinct device, different work type
Corresponding work order is consumed when consumed people and when people;
The machine KPI units count workload in its certain time, disorderly closedown amount for distinct device, and operation is specifically believed
Breath;
The comprehensive KPI unit comprehensives statistics energy consumption, personnel performance, machine efficiency, analysis show all time-consuming, consumptive materials, people
Relationship between work efficiency rate, mechanical equipment efficiency.
5. harbour intelligence maintenance system as described in claim 1, it is characterised in that:
The basic information module includes machinery equipment information management unit, personal management unit, rights management unit;
The machinery equipment information management unit provides the management of all machinery equipment information;
The personal management unit provides personal information inquiry;
The rights management unit offer includes menu management, menu button management, Role Management, role-security management, department
Management, user management, user role management.
6. a kind of harbour intelligence maintenance method, which is characterized in that including:
Build operation layer, the operation layer emergency maintenance module, maintaining module, part warehouse, KPI Key Performance Indicator module, base
Plinth information module, temporary duty module;
Data active layer is built, the data active layer includes sensing data, operation data, device data and the third party of crane
System data;
Build data collection layer, the data collection layer to data source different in data active layer using corresponding communications protocol or
Person's tool is acquired;
Build data storage layer, data relationship type of the data storage layer to operation layer, data active layer and data collection layer
Database carries out tree structure storage, and is docked with data analysis layer;
Data analysis layer is built, the data analysis layer uses maintaining module and lines up algorithm automatically;
Presentation layer is built, the presentation layer is accessed by browser or mobile terminal, and the result of data analysis layer is presented.
7. harbour intelligence maintenance method as claimed in claim 6, it is characterised in that:
In data collection layer, driving and communications protocol are supported using OPC UA, the OPC UA are acquiring bottom data
And support Kafka that data and file are sent to data storage layer by message mechanism.
8. harbour intelligence maintenance method as claimed in claim 6, it is characterised in that:
Built in emergency maintenance module troublshooting unit, send work administrative unit, the administrative unit that completes, completion acceptance unit and
Comprehensive inquiry unit;
The automatic arrangement program unit provides automatic arrangement program algorithm, including daily planning, all plans, monthly plan, year according to actual conditions
Plan, and automatically generate maintenance work order;
The basic information unit, which changes maintenance item, period, content, the progress additions and deletions of work order prompt date, to be looked into, and determines automatic row
The basic information of journey algorithm;
It is described that work administrative unit is sent to receive automatic arrangement program maintenance work order, it is retracted to work order or work is sent to handle, send working hour pre-
If maintenance time, appropriate maintenance personal can be chosen automatically by personnel's shift report;
The completion administrative unit receives work order and is confirmed, after completing repair, automatically generates completion work order, to record dimension
When repairing consumed people, energy information;
The completion acceptance unit is compared by the work order that completes with actual conditions, to work order retract or examination is handled;
Different work order states, including maintenance progress, consumption information are checked in the comprehensive inquiry unit offer.
9. harbour intelligence maintenance method as claimed in claim 6, it is characterised in that:
Energy consumption KPI units, personnel KPI units, machine KPI units, comprehensive KPI units are built in KPI Key Performance Indicator module;
The energy consumption KPI units provide each mechanical equipment total energy consumption comparison, single device energy consumption statistic, the amount of money of equipment energy consumption
Statistics and the corresponding purposes work order of each equipment energy consumption;
The working hour of each link participant of the intelligent maintenance system of the personnel KPI units statistics, distinct device, different work type
Corresponding work order is consumed when consumed people and when people;
The machine KPI units count workload in its certain time, disorderly closedown amount for distinct device, and operation is specifically believed
Breath;
The comprehensive KPI unit comprehensives statistics energy consumption, personnel performance, machine efficiency, analysis show all time-consuming, consumptive materials, people
Relationship between work efficiency rate, mechanical equipment efficiency.
10. harbour intelligence maintenance method as claimed in claim 6, it is characterised in that:
Machinery equipment information management unit, personal management unit, rights management unit are built in basic information module;
The machinery equipment information management unit provides the management of all machinery equipment information;
The personal management unit provides personal information inquiry;
The rights management unit offer includes menu management, menu button management, Role Management, role-security management, department
Management, user management, user role management.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810252341.6A CN108460541A (en) | 2018-03-26 | 2018-03-26 | Harbour intelligence maintenance system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810252341.6A CN108460541A (en) | 2018-03-26 | 2018-03-26 | Harbour intelligence maintenance system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108460541A true CN108460541A (en) | 2018-08-28 |
Family
ID=63238039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810252341.6A Withdrawn CN108460541A (en) | 2018-03-26 | 2018-03-26 | Harbour intelligence maintenance system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108460541A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109886434A (en) * | 2019-02-21 | 2019-06-14 | 上海智辉自动化科技有限公司 | A kind of intelligent drilling platform maintenance maintenance system and method |
CN112039977A (en) * | 2020-08-27 | 2020-12-04 | 上海振华重工(集团)股份有限公司 | Cloud-native industrial data collection and fault alarm system and operation method |
CN113298477A (en) * | 2021-07-28 | 2021-08-24 | 深圳市冠宏物流有限公司 | Container logistics cloud management system based on internet |
CN113996953A (en) * | 2020-07-28 | 2022-02-01 | 宝山钢铁股份有限公司 | Comprehensive state data acquisition and analysis system of laser welding machine |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101123545A (en) * | 2006-08-08 | 2008-02-13 | 上海沪东集装箱码头有限公司 | Device maintenance management system for container wharf |
CN202848951U (en) * | 2012-11-09 | 2013-04-03 | 大连宝信起重技术有限公司 | Automatic monitoring and controlling device of mooring vehicles |
CN104680315A (en) * | 2015-02-12 | 2015-06-03 | 上海交通大学 | Constraint-theory-based intelligent preventive maintenance system and method for port loading and unloading equipment |
CN104760892A (en) * | 2014-01-06 | 2015-07-08 | 中国特种设备检测研究院 | Harbor crane health monitoring and forecasting visualization system |
-
2018
- 2018-03-26 CN CN201810252341.6A patent/CN108460541A/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101123545A (en) * | 2006-08-08 | 2008-02-13 | 上海沪东集装箱码头有限公司 | Device maintenance management system for container wharf |
CN202848951U (en) * | 2012-11-09 | 2013-04-03 | 大连宝信起重技术有限公司 | Automatic monitoring and controlling device of mooring vehicles |
CN104760892A (en) * | 2014-01-06 | 2015-07-08 | 中国特种设备检测研究院 | Harbor crane health monitoring and forecasting visualization system |
CN104680315A (en) * | 2015-02-12 | 2015-06-03 | 上海交通大学 | Constraint-theory-based intelligent preventive maintenance system and method for port loading and unloading equipment |
Non-Patent Citations (1)
Title |
---|
韦燚 等: "基于B/S架构的港口机械设备智能维保***", 《新型工业化》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109886434A (en) * | 2019-02-21 | 2019-06-14 | 上海智辉自动化科技有限公司 | A kind of intelligent drilling platform maintenance maintenance system and method |
CN113996953A (en) * | 2020-07-28 | 2022-02-01 | 宝山钢铁股份有限公司 | Comprehensive state data acquisition and analysis system of laser welding machine |
CN113996953B (en) * | 2020-07-28 | 2023-08-11 | 宝山钢铁股份有限公司 | State data comprehensive acquisition and analysis system of laser welder |
CN112039977A (en) * | 2020-08-27 | 2020-12-04 | 上海振华重工(集团)股份有限公司 | Cloud-native industrial data collection and fault alarm system and operation method |
CN112039977B (en) * | 2020-08-27 | 2022-11-08 | 上海振华重工(集团)股份有限公司 | Cloud-native industrial data collection and fault alarm system and operation method |
CN113298477A (en) * | 2021-07-28 | 2021-08-24 | 深圳市冠宏物流有限公司 | Container logistics cloud management system based on internet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108320069B (en) | Production and manufacturing execution system | |
CN108460541A (en) | Harbour intelligence maintenance system and method | |
CN108038626B (en) | Full life cycle monitoring system and monitoring method for cigarette equipment | |
CN109190944A (en) | Medicine enterprise manufactures execution system | |
CN111210108B (en) | Performance management and control model of electric power material supply chain | |
CN104123590A (en) | 95598 customer service center operation monitoring system and method | |
CN106779096B (en) | Power distribution network reports situation active forewarning system for repairment | |
CN103093320A (en) | Management method of equipment in metro operation network | |
CN103489062A (en) | Scheduled outage method and device based on CIM model | |
CN104318393B (en) | A kind of radiopharmacy management system | |
CN106651643A (en) | Power security management and control method for whole process based on distribution and adjustment | |
CN110600111A (en) | Warehouse management system | |
CN107798484A (en) | A kind of long supervisory service system in river | |
CN108319638B (en) | Dangerous goods production and manufacturing execution system applying handheld inspection equipment | |
CN102467705A (en) | Early warning mechanism for controlling operational risk of container terminal and method for implementing early warning mechanism | |
CN112633807A (en) | Supply chain optimization method and system based on intelligent reminding | |
CN117350492A (en) | MES operation management system capable of intelligently controlling comparison historical data | |
CN115063065A (en) | RFID technology-based automatic generation method for purchase plan report form of overhaul material | |
CN112418548B (en) | Intelligent workshop management method and system based on artificial intelligence technology | |
KR100584903B1 (en) | System for real time controlling driving data of power plant | |
CN201838034U (en) | Enterprise comprehensive management system | |
CN116739208A (en) | Unified management system for power supply service | |
CN202795451U (en) | Asset entire life-cycle management process control application system based on topic base | |
CN115860418A (en) | Method and device for dispatching power generation cars, electronic equipment and storage medium | |
CN115545560A (en) | Wisdom energy visual management platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180828 |
|
WW01 | Invention patent application withdrawn after publication |