CN1084598A - Weir - Google Patents

Weir Download PDF

Info

Publication number
CN1084598A
CN1084598A CN 92110894 CN92110894A CN1084598A CN 1084598 A CN1084598 A CN 1084598A CN 92110894 CN92110894 CN 92110894 CN 92110894 A CN92110894 A CN 92110894A CN 1084598 A CN1084598 A CN 1084598A
Authority
CN
China
Prior art keywords
energy dissipating
weir
dissipating piece
row
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 92110894
Other languages
Chinese (zh)
Other versions
CN1030263C (en
Inventor
洪瑞明
洪国浩
洪国材
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 92110894 priority Critical patent/CN1030263C/en
Publication of CN1084598A publication Critical patent/CN1084598A/en
Application granted granted Critical
Publication of CN1030263C publication Critical patent/CN1030263C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A kind of Weir, in the energy dissipating piece that is arranged in rows, in length and breadth to linking Φ 25 reinforcing bars, concrete energy dissipating piece is 1~4 row to be arranged, and by water (flow) direction, the energy dissipating piece weir crest height from the upstream to the downstream is stepped.Front-seat and back row's ladder height differs 25~50cm.On the top of energy dissipating piece, laid dry stone or waste tire are set, form the form that semifixed weir combines with movable weir.It is simple and easy cheap to construct, and the practical value height has bigger overturning or slip resistance analysis and factor of safety against sliding in flood or in the river that The turbulent river crashes its way through.Help the rivers and canals diversion irrigation.

Description

Weir
The present invention relates to the devices for dissipation of energy of structure, the especially flood spillway on dam, river, a kind of hurdle or weir.
Head-work in the torrent is troubling and masty problem always.The turbulent river crashes its way through, when the stream condition is unstable, very easily cause the rivers and creeks to change its course when the river, even destroy by rush of water river weir or scour riverbed.In this case, tend to cause head to improve, the difficulty that causes water guide to irrigate can make diversion irrigation sink into to pause when serious.Wash in a pan dark water level in order to improve the riverbed because of washing away, the practice of custom is to throw toward the place of being washed away, riverbed to fill out " Gou " and flood reluctantly and obtain to draw filling.After another time flood arrived, all that has been achieved is spoiled, destroys nothing left but after a while.Difficulty of construction is also bigger, poor effect.The cost of materials of Gou and expenses of labour are also relatively more expensive.
Russian Patent SU889785 utilize to arrange and to be grid-like many energy dissipating pieces and to solve the problems referred to above, this energy dissipating piece flow path direction end opening that meets water, and side wall is erect at the back side, and the riverbed is wedged with pin in the bottom surface.This structure is owing to be that single energy dissipating piece is in the face of current, though see that from integral body a plurality of energy dissipating pieces are staggered, for weakening eddy current is effective, but in some rivers that The turbulent river crashes its way through, on the validity of using, still there are some queries, from the angle of construction, Wedged pin also has certain degree of difficulty to the bottom, riverbed.
The objective of the invention is to propose the water that Weir that a kind of movable weir combines with fixing river weir tackles in the river its guiding is entered irrigation canal.Waterflow stabilization when standing flood, river weir is stablized in good health, and flood is had enough opposing slippages and anti-turning over safety factor; And can stablize water intaking and irrigate the saving maintenance cost.
The present invention is achieved in that the husky lock 4 of row that comprises the energy dissipating piece 1 that is arranged in rows, is arranged at rivers and creeks section, concrete energy dissipating piece is 1~4 row and arranges, according to water (flow) direction, the weir crest height of every row's concrete energy dissipating piece 1 progressively successively decrease to the downstream from the upstream form stepped, connect to all establishing reinforcing bar 2 in length and breadth between each concrete energy dissipating piece 1, the husky lock 4 of the row of every row's energy dissipating piece all is located at same position.Last row's energy dissipating piece to the weir crest discrepancy in elevation of arranging the energy dissipating piece down is 25~50cm.The bar diameter 25mm that connects the energy dissipating piece.The front end that the head that is positioned at the upstream arranges energy dissipating piece 1 is provided with laid dry stone bank protection 6.Rectangle stone 3 or a plurality of waste tire are piled up in the top of each block concrete energy dissipating piece.
The present invention has following characteristics:
Weir construct simple and easy cheap, the practical value height.
2. connecting to the reinforcing bar that Φ 25 is all arranged in length and breadth of energy dissipating piece, form whole river weir structure, have flexing resistance again simultaneously, if wherein some energy dissipating piece turning overs can not influence another piece energy dissipating piece cracking destruction.
3. the frictional resistance of energy dissipating piece can transmit mutually, has increased factor of safety against sliding.
Between each energy dissipating piece because action of steel bars, floor space is increased, thereby has also increased the safety factor of opposing turning over.
5. staged energy dissipating block structure can prevent the scour phenomenon of river weir front end energy dissipating piece effectively.This is because leave the gap between the concrete energy dissipating piece, offsets energy because of the backflow effect of current is impacted water mutually, so can avoid the effect of washing the sand.
6. save operating expenses and maintenance cost.This is because if there is portion's hurt bad, can repair one by one at any time, also can record again in the former address when as if the surperficial for years of energy dissipating piece wearing and tearing being arranged.
Figure 1A is the rectangle pyramid Gou floor map of high 150cm.
B is a brachmorphy pyramid Gou side schematic view.
Fig. 2 A is cylindrical Gou side schematic view.
B is cylindrical Gou ground plan.
Fig. 3 is the fixed weir lateral view.
Fig. 4 is the Weir lateral view.
Fig. 5 be the buoyant foundation support pier formula weir force analysis figure.
Fig. 6 is basic flush type Weir force analysis figure.
Fig. 7 bears gravel impact analysis chart for the present invention.
Fig. 8 is a flat roof type Weir lateral view.
Fig. 9 is a staged Weir lateral view.
Figure 10 uses embodiment for Weir.
Now further narrate structure embodiment of the present invention and feasibility in conjunction with the accompanying drawings:
Referring to Fig. 1~4: adopt bamboo weaving or branch establishment Gou, shape has tetrahedral angle taper or cylindrical, interior rocking, throw and fill in the river course that is washed away, construction easily, impact resistance not.Fixed weir mostly is the coagulation earth bank generally by the requirement that intercepts water fully, the durability height, and dash is effective, but because this fixed weir is a rigid structures, and not enough or deal with improperly as foundation strength, Chang Yi causes danger, and local damage is difficult for repairing, and cost is also relatively more expensive.Also have a kind of movable weir, this structure types is applicable to the situation that the overflow depth of water is excessive or the riverbed mobile impurities is too much, adopts fixed weir to bury or when stopping up water inlet, adopts movable weir more.Weir of the present invention has the characteristics of fixed weir and movable weir simultaneously concurrently, with connecting with reinforcing bar between the energy dissipating piece, generally adopts horizontal three row's formulas or four row's formulas, and when running into flood, flood can wash out the thing of piling up of connecting reinforcement place or weir crest.
Referring to Fig. 6: the design formulas of Weir active force is as follows: concrete energy dissipating piece adopts 2m * 2m * 2m, and Weir is imbedded 1 meter in riverbed, is in saturation state.
If weir crest depth of water H 1=50cm
The unit weight W of water o=1000kg/m 3
Concrete density r=2.4T/m 3
Building stones unit weight r stone=2.6T/m 3
Water flow impact pressure F1=(W 0Q)/(g) V (V is that flow velocity, Q are flow) ... (1)
Hydrostatic pressure F2=1/2 W o(H 2 2-H 2 1) ... (2)
Soil pressure (pressing the Rankine formula)
P o=1/2(W1-W o)C oH o 2……(3)
In the formula: the unit weight=1.8T/m of W1-silt unit 3
W oUnit weight=the 1T/m of unit of-water 3
C o-coefficient of earth pressure=0.4~0.5
H o=silt height
Friction factor f=0.4(concrete and sand)
One. the buoyant foundation
Buoyancy pu=1/2W oH 2L ... (4)
Come-up frictional force pf=f(W o-Pu) ... (5)
Hydraulic impact F1=(W 0The QV=of)/(g) (HBW 0The V of)/(g) 2(6)
Hydrostatic pressure F2=1/2W o(H 2-H 1) ... (7)
Origin of force distance X=1/3 H (H 2+ 2H 1)/(H 2+ H 1) ... (8)
The slip safety factor
n= (f(W 0-Pu))/(F1+F2) = 6680/4836.7 =1.37 ……(9)
The turning over safety factor
K 0= (W 0)/(Pu×4/3+F3×0.78+F2×1) =2.41……(10)
Two. the flush type basis:
The slip safety factor
n= (f(W 0-Pu-P′u))/(F3+F2+F1-F4) = 5760/3492 =1.65
The turning over safety factor
K 0= (f(W 0×1+Pe×2/3+F2×0.22)/(F1×0.5+F4×0.31+Pu′×4/3+Pu′×2/3)
= 19994/6452.9 =3.09
Three. the suffered impact force of gravel
According to Newton's formula, act on the power of gravel
Figure 92110894X_IMG2
In the formula: C-empirical coefficient=0.53
The gravel area of A-Transverse to the flow direction
The unit unit weight of ω-water
V Stone-gravel volume
G-acceleration of gravity
Gravel is heavy in water
W Stone=(d-w o) V Stone(12)
In the formula: the proportion of d-gravel
The condition that gravel moves down in the riverbed
F ω+W StoneSin α>fW StoneCos α ... (13)
(Cw)/(2g) AV 2>(d-w o)V(fcosα-sinα)……(14)
The gravel major axis is a, and axis is b, and minor axis is c
V Stone=4/3 π (a+b+c)/8 A=π (ac)/4
A is the axle of parallel water (flow) direction, and c is the axle vertical with water (flow) direction
V = βb ( d - w 0 ) ( f cos a - sin a ) w 0 - - - ( 15 )
In the formula: V-water velocity, β-(4g)/(3c) (being constant)
If gravel diameter is 1 meter, V=4.87m/sec then is even also the water velocity that moves of the gravel of 1 meter of diameter is 4.87m/sec
If the volume of energy dissipating piece is 2m * 2m * 2m, the water velocity that then can carry above-mentioned energy dissipating piece is V=12m/sec.Thereby can be according to flow rate of water flow, and the opposing turning over, the size of the safe coefficient design energy dissipating piece of slippage.
Referring to Fig. 8~9: flat roof type whetstone Dun Yan is weaker than stairstepping whetstone Dun Yan to the energy dissipating effect of current, and its front end energy dissipating piece has the situation of washing the sand.Every row's discrepancy in elevation of staged energy dissipating piece differs 25~50cm, and Parallel to the flow direction progressively lowers.Stairstepping whetstone Dun Yan has the discrepancy in elevation at the weir crest place, and current form the many places eddy current, offsets the energy of water (flow) direction.This type can reduce the scour phenomenon of front end energy dissipating piece effectively.
Concrete energy dissipating piece 1 pours on the spot in the riverbed, can imbed certain depth under the riverbed.At concrete energy dissipating piece weir crest placed rockfill layer or waste tire being set is in order further to eliminate energy.If this placed rockfill layer or waste tire can not be resisted current scour, be washed away by the river immediately, but can not influence the basis on weir and this body structure of energy dissipating piece.Between energy dissipating piece 1, connect in length and breadth with Φ 25mm reinforcing bar 2.Need establish distributing bar around being embedded in the embedding place in the concrete energy dissipating piece.
Referring to Figure 10: by two row's energy dissipating pieces, sediment outflow lock 4 is formed staged whetstone Dun Yan, arranges the gate of husky lock and takes single lock formula can prevent the alluvial of foreign material such as earth more effectively.When the husky lock of the row of opening, be preferably in the moment that water level has just moved back.
If there is alluvial the upstream and the phenomenon of riverbed bed hedgehopping is occurred near 5 places of whetstone Dun Yan, only need dig out a water channel with excavator and can diversion go into canal and save the expense of increasing diversion dam at 5 places.

Claims (5)

1, a kind of Weir, comprise the energy dissipating piece 1 that is arranged in rows, be arranged at the husky lock 4 of row in rivers and creeks section, it is characterized in that: concrete energy dissipating piece is 1~4 row and arranges, according to water (flow) direction, the weir crest height of every row's concrete energy dissipating piece 1 progressively successively decrease to the downstream from the upstream form stepped, connect to all establishing reinforcing bar 2 in length and breadth between each concrete energy dissipating piece 1, the husky lock 4 of the row of every row's energy dissipating piece all is located at same position.
2,, it is characterized in that by the described Weir of claim 1: on to arrange energy dissipating piece to the weir crest discrepancy in elevation of row's energy dissipating piece down be 25~50cm.
3, by the described Weir of claim 1, it is characterized in that: the bar diameter 25mm that connects the energy dissipating piece.
4, by the described Weir of claim 1, it is characterized in that: the front end that the head that is positioned at the upstream arranges energy dissipating piece 1 is provided with laid dry stone bank protection 6.
5, by the described Weir of claim 1, it is characterized in that: the top of each block concrete energy dissipating piece, pile up rectangle stone 3 or a plurality of waste tire.
CN 92110894 1992-09-23 1992-09-23 Weir Expired - Fee Related CN1030263C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92110894 CN1030263C (en) 1992-09-23 1992-09-23 Weir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92110894 CN1030263C (en) 1992-09-23 1992-09-23 Weir

Publications (2)

Publication Number Publication Date
CN1084598A true CN1084598A (en) 1994-03-30
CN1030263C CN1030263C (en) 1995-11-15

Family

ID=4945020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92110894 Expired - Fee Related CN1030263C (en) 1992-09-23 1992-09-23 Weir

Country Status (1)

Country Link
CN (1) CN1030263C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012009966A1 (en) * 2010-07-22 2012-01-26 兰州金福乐生物工程有限公司 New use of triangular cylinder
CN103866742A (en) * 2014-02-26 2014-06-18 韦有学 Rolling dam
CN106759066A (en) * 2017-01-09 2017-05-31 宁波市交通规划设计研究院有限公司 A kind of method of mountain area side slope water conservancy diversion energy dissipating prevention and control geological disaster

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012009966A1 (en) * 2010-07-22 2012-01-26 兰州金福乐生物工程有限公司 New use of triangular cylinder
CN103866742A (en) * 2014-02-26 2014-06-18 韦有学 Rolling dam
CN106759066A (en) * 2017-01-09 2017-05-31 宁波市交通规划设计研究院有限公司 A kind of method of mountain area side slope water conservancy diversion energy dissipating prevention and control geological disaster
CN106759066B (en) * 2017-01-09 2019-08-02 宁波市交通规划设计研究院有限公司 A kind of method of mountain area side slope water conservancy diversion energy dissipating prevention and control geological disaster

Also Published As

Publication number Publication date
CN1030263C (en) 1995-11-15

Similar Documents

Publication Publication Date Title
CN1837512B (en) Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN106400744A (en) Comprehensive side-slope treatment structure for preventing river channel erosion and construction method thereof
CN213952260U (en) Cofferdam structure combining steel sheet pile and steel pipe pile
CN1030263C (en) Weir
RU2321701C2 (en) Weir construction method
CN105421305B (en) A kind of peg board plane is interlocked its supplementary devices for combining with facade
CN210368865U (en) Multistage dissipation of mud-rock flow structure of blocking
CN112627208A (en) Assembled cofferdam suitable for rock foundation and construction method thereof
CN106836115A (en) One kind broken end creek separate system
CN108411934B (en) Floating tubular pile, dam retaining structure and construction method thereof
CN208151956U (en) Breakwater suitable for soft soil foundation
CN109610407B (en) Ecological barricade of landslide prevention based on dead weight is balanced
CN114214975B (en) Repair method for bridge pier and protection structure of bridge pier
CN210887090U (en) Breakwater with energy dissipation function
CN216999263U (en) Protective structure of pier
CN215165198U (en) A banket structure that is used for regional embankment cofferdam of strong tidal bore
CN1587546A (en) Permeable soil keeping wall and its use
CN212223491U (en) Face river roadbed structure
CN210507492U (en) Cofferdam structure
CN207988083U (en) The orthogonal anti-structure of drainning off floodwaters of Gobi Region solar energy optical-thermal place
CN112575777A (en) Frame reinforcing system and method for high-speed railway pier foundation penetrating through under channel
CN112609640A (en) Concrete sluice gate pier structure and construction method thereof
CN206667185U (en) Approach channel shore protection repairs structure
CN206477302U (en) One kind broken end creek separate system
CN115538495B (en) Construction method of offshore wind power polygonal foundation anti-scouring system

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee