CN108457654A - A kind of production practice of Pb-Zn deposits - Google Patents

A kind of production practice of Pb-Zn deposits Download PDF

Info

Publication number
CN108457654A
CN108457654A CN201810138235.5A CN201810138235A CN108457654A CN 108457654 A CN108457654 A CN 108457654A CN 201810138235 A CN201810138235 A CN 201810138235A CN 108457654 A CN108457654 A CN 108457654A
Authority
CN
China
Prior art keywords
ore
mine
production
mining
annular solid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810138235.5A
Other languages
Chinese (zh)
Inventor
李文康
张宸宇
欧西江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Huayang Mineral Source Material Co Ltd
Original Assignee
Guangxi Huayang Mineral Source Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Huayang Mineral Source Material Co Ltd filed Critical Guangxi Huayang Mineral Source Material Co Ltd
Priority to CN201810138235.5A priority Critical patent/CN108457654A/en
Publication of CN108457654A publication Critical patent/CN108457654A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of production practice of Pb-Zn deposits, is related to exploitation of mineral resources technical field, includes the following steps:(1) minery setting, (2) mine locating, (3) mining, (4) back production;The production practice of the present invention is high to the controlling extent of ore body, ore recovery ratio when mining can be effectively improved, ore loss ratio and ore dilution rate is reduced, improves the utilization rate of mineral resources, resource guarantee is provided for Sustainable Development of Mine, there is good use value and application prospect.

Description

A kind of production practice of Pb-Zn deposits
【Technical field】
The present invention relates to exploitation of mineral resources technical fields, and in particular to a kind of production practice of Pb-Zn deposits.
【Background technology】
Pb-Zn deposits are the mineral products rich in metallic element lead and zinc, and lead zinc is widely used, with electrical industry, mechanical industry, army The fields such as thing industry, metallurgical industry, chemical industry, light industry and pharmaceutical sector.In addition, lead metal is in nuclear industry, petroleum industry etc. Also there is more purposes in department.
The development of human society depends on substance, and mineral resources are then one of these important substance bases.Currently, 95% The above energy, 80% or more the capital goods in the agricultural sector of the raw material of industry and 70% or more both be from mineral resources.Mineral resources Come from mine mostly, and have an opencast mining of a part of the building stone type mine as all kinds of mines in China, with regard to mine number Speech can account for total mine 60% or so, therefore the degree that its comprehensive utilization of resources is realized, be comprehensively utilized to China's mine resources Very important effect is played in overall development, and mine resources how are comprehensively utilized in building mine field, protects mine environment, Green Mine is built, green mining is promoted to do more and benefits our pursuits, promotion exploitation of mineral resources comprehensive utilization and ecological environment Continuing health coordinated development has important directive significance.
【Invention content】
In view of this, the purpose of the present invention is to provide a kind of production practice of Pb-Zn deposits, production practice pair of the invention The controlling extent of ore body is high, can effectively improve ore recovery ratio when mining, reduces ore loss ratio and ore dilution rate, improves The utilization rate of mineral resources, for Sustainable Development of Mine provides resource guarantee.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
A kind of production practice of Pb-Zn deposits, includes the following steps:
(1) it prospects:Perpendicular to the exploration row of the direction arrangement interval certain distance of ore body principal length on predetermined absolute altitude Line tunnels prospecting drift, until puncturing entire ore body along exploration line;
(2) it digs up mine:It is dug up mine by the way of big cross section driving, while mining, vacant mining area will have been exploited Four walls are built into the annular solid in four faces up and down with reinforced concrete structure, and one section of annular is just constructed per exploiting one section forward Body, adjacent two annular solid are built into integral structure, and the vertical beam of build support is spaced between the inner wall up and down of annular solid, right The internal face of annular solid carries out Anti-steam-leakage, leakproof water process, and the mine hole of production or life is formed after the completion of coal mining;
(3) back production:On predetermined absolute altitude described in step (1), ore body is divided into two ore beds and carries out back production respectively, along mine Phosphor bodies trend caunches to ore body main body using shallow hole shrinkage method.
In the present invention, further, the back production in the step (3) is to carry out back production respectively to two ore bed of ore body, is first adopted Upper layer Hou Cai lower layers, back production lower layer ore bed after after upper layer mine balkstone avalanche and stablizing.
In the present invention, further, the interlayer between two kinds of mining methods stope of the upper and lower layer should ensure that 4-6m's Thickness.
In the present invention, further, Anti-steam-leakage, leakproof water process are carried out to the internal face of annular solid in the step (2) Concrete mode be:The internal face of annular solid is handled by way of injection or slip casting or surface plastic spraying.
In the present invention, further, the outside in minery is provided with the logical of fresh air conveying to minery Wind facility.
It is further, described that gas boring and surveying and warning device are provided in minery in the present invention.
In conclusion by adopting the above-described technical solution, the beneficial effects of the invention are as follows:
1. the production practice of the Pb-Zn deposits of the present invention is on predetermined absolute altitude perpendicular to the direction mine locating lane of ore body principal length Road is until the entire ore body of breakdown adopts cutting under the situation that mine locating wears that arteries and veins discloses ore body and country rock distribution by being carried out to ore body Make, back production of caunching is carried out to ore body main body using shallow hole shrinkage method, it is high to the controlling extent of ore body, when can effectively improve mining Ore recovery ratio reduces ore loss ratio and ore dilution rate, improves the utilization rate of mineral resources, carried for Sustainable Development of Mine For resource guarantee.The present invention makees the cutting of adopting that ore body carries out, and stability is good, safe and reliable, can effectively improve mining efficiency.
2. the present invention greatly reduces the danger coefficient of cutter's operation, and the overall cost dug up mine is low, is suitble to various The exploitation of mineral.
3. the present invention carries out back production of caunching using shallow hole shrinkage method to ore body main body, simple in structure, management facilitates, adopts quasi- work Journey amount is small, has good use value and application prospect.
【Specific implementation mode】
The following examples can help those skilled in the art that the present invention is more fully understood, but cannot be with any Mode limits the present invention.
Embodiment 1
A kind of production practice for Pb-Zn deposits that the present embodiment is provided includes the following steps:
(1) minery is arranged:The outside in minery is provided with the ventilation equipment of fresh air conveying to minery;It is adopting Gas boring and surveying and warning device are provided in mining area;
(2) it prospects:Perpendicular to the exploration row of the direction arrangement interval certain distance of ore body principal length on predetermined absolute altitude Line tunnels prospecting drift, until puncturing entire ore body along exploration line;
(3) it digs up mine:It is dug up mine by the way of big cross section driving, while mining, vacant mining area will have been exploited Four walls are built into the annular solid in four faces up and down with reinforced concrete structure, and one section of annular is just constructed per exploiting one section forward Body, adjacent two annular solid are built into integral structure, and the vertical beam of build support is spaced between the inner wall up and down of annular solid, right The internal face of annular solid carries out Anti-steam-leakage, leakproof water process, and the mine hole of production or life is formed after the completion of coal mining;Its In, Anti-steam-leakage is carried out to the internal face of annular solid, the concrete mode of leakproof water process is:Pass through injection or slip casting or surface plastic spraying Mode the internal face of annular solid is handled.
(4) back production:On predetermined absolute altitude described in step (2), ore body is divided into two ore beds and carries out back production respectively, is first adopted Ceng Houcai lower layers, the interlayer between two kinds of mining methods stope of upper and lower layer should ensure that the thickness of 4m, waited in ability exploitation process Layer mine balkstone avalanche and back production lower layer ore bed after stablizing, along ore body main body trend using shallow hole shrinkage method to ore body main body It caunches.
Embodiment 2
A kind of production practice for Pb-Zn deposits that the present embodiment is provided includes the following steps:
(1) minery is arranged:The outside in minery is provided with the ventilation equipment of fresh air conveying to minery;It is adopting Gas boring and surveying and warning device are provided in mining area;
(2) it prospects:Perpendicular to the exploration row of the direction arrangement interval certain distance of ore body principal length on predetermined absolute altitude Line tunnels prospecting drift, until puncturing entire ore body along exploration line;
(3) it digs up mine:It is dug up mine by the way of big cross section driving, while mining, vacant mining area will have been exploited Four walls are built into the annular solid in four faces up and down with reinforced concrete structure, and one section of annular is just constructed per exploiting one section forward Body, adjacent two annular solid are built into integral structure, and the vertical beam of build support is spaced between the inner wall up and down of annular solid, right The internal face of annular solid carries out Anti-steam-leakage, leakproof water process, and the mine hole of production or life is formed after the completion of coal mining;Its In, Anti-steam-leakage is carried out to the internal face of annular solid, the concrete mode of leakproof water process is:Pass through injection or slip casting or surface plastic spraying Mode the internal face of annular solid is handled.
(4) back production:On predetermined absolute altitude described in step (2), ore body is divided into two ore beds and carries out back production respectively, is first adopted Ceng Houcai lower layers, the interlayer between two kinds of mining methods stope of upper and lower layer should ensure that the thickness of 5m, waited in ability exploitation process Layer mine balkstone avalanche and back production lower layer ore bed after stablizing, along ore body main body trend using shallow hole shrinkage method to ore body main body It caunches.
Embodiment 3
A kind of production practice for Pb-Zn deposits that the present embodiment is provided includes the following steps:
(1) minery is arranged:The outside in minery is provided with the ventilation equipment of fresh air conveying to minery;It is adopting Gas boring and surveying and warning device are provided in mining area;
(2) it prospects:Perpendicular to the exploration row of the direction arrangement interval certain distance of ore body principal length on predetermined absolute altitude Line tunnels prospecting drift, until puncturing entire ore body along exploration line;
(3) it digs up mine:It is dug up mine by the way of big cross section driving, while mining, vacant mining area will have been exploited Four walls are built into the annular solid in four faces up and down with reinforced concrete structure, and one section of annular is just constructed per exploiting one section forward Body, adjacent two annular solid are built into integral structure, and the vertical beam of build support is spaced between the inner wall up and down of annular solid, right The internal face of annular solid carries out Anti-steam-leakage, leakproof water process, and the mine hole of production or life is formed after the completion of coal mining;Its In, Anti-steam-leakage is carried out to the internal face of annular solid, the concrete mode of leakproof water process is:Pass through injection or slip casting or surface plastic spraying Mode the internal face of annular solid is handled.
(4) back production:On predetermined absolute altitude described in step (2), ore body is divided into two ore beds and carries out back production respectively, is first adopted Ceng Houcai lower layers, the interlayer between two kinds of mining methods stope of upper and lower layer should ensure that the thickness of 6m, waited in ability exploitation process Layer mine balkstone avalanche and back production lower layer ore bed after stablizing, along ore body main body trend using shallow hole shrinkage method to ore body main body It caunches.
Although above the present invention is described in detail with a general description of the specific embodiments, On the basis of the present invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Cause This, these modifications or improvements, belong to the scope of protection of present invention without departing from theon the basis of the spirit of the present invention.

Claims (6)

1. a kind of production practice of Pb-Zn deposits, which is characterized in that include the following steps:
(1) it prospects:Perpendicular to the exploration line of the direction arrangement interval certain distance of ore body principal length, edge on predetermined absolute altitude It explores line and tunnels prospecting drift, until puncturing entire ore body;
(2) it digs up mine:It is dug up mine by the way of big cross section driving, while mining, four walls in vacant mining area will have been exploited It is built into the annular solid in four faces up and down with reinforced concrete structure, one section of annular solid is just constructed per exploiting one section forward, Adjacent two annular solid is built into integral structure, the vertical beam of build support is spaced between the inner wall up and down of annular solid, to ring The internal face of body carries out Anti-steam-leakage, leakproof water process, and the mine hole of production or life is formed after the completion of coal mining;
(3) back production:On predetermined absolute altitude described in step (1), ore body is divided into two ore beds and carries out back production respectively, along ore body master Body trend caunches to ore body main body using shallow hole shrinkage method.
2. a kind of production practice of Pb-Zn deposits according to claim 1, which is characterized in that the back production in the step (3) It is that back production is carried out respectively to two ore bed of ore body, first adopts upper layer Hou Cai lower layers, back production after after upper layer mine balkstone avalanche and stablizing Lower layer's ore bed.
3. a kind of production practice of Pb-Zn deposits according to claim 2, which is characterized in that two kinds of mining of the upper and lower layer Interlayer between method stope should ensure that the thickness of 4-6m.
4. a kind of production practice of Pb-Zn deposits according to claim 1, which is characterized in that annular in the step (2) The internal face of body carries out Anti-steam-leakage, the concrete mode of leakproof water process is:Injection or slip casting or surface plastic spraying by way of pair The internal face of annular solid is handled.
5. a kind of production practice of Pb-Zn deposits according to claim 1, which is characterized in that the outside in minery is set It is equipped with the ventilation equipment of fresh air conveying to minery.
6. a kind of production practice of Pb-Zn deposits according to claim 1, which is characterized in that described to be provided in minery Gas boring and surveying and warning device.
CN201810138235.5A 2018-02-10 2018-02-10 A kind of production practice of Pb-Zn deposits Pending CN108457654A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810138235.5A CN108457654A (en) 2018-02-10 2018-02-10 A kind of production practice of Pb-Zn deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810138235.5A CN108457654A (en) 2018-02-10 2018-02-10 A kind of production practice of Pb-Zn deposits

Publications (1)

Publication Number Publication Date
CN108457654A true CN108457654A (en) 2018-08-28

Family

ID=63240016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810138235.5A Pending CN108457654A (en) 2018-02-10 2018-02-10 A kind of production practice of Pb-Zn deposits

Country Status (1)

Country Link
CN (1) CN108457654A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113663806A (en) * 2021-07-20 2021-11-19 上海光合竹能源科技有限公司 In-situ lead-zinc oxide ore disposal beneficiation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090315388A1 (en) * 2008-06-20 2009-12-24 Solvay Chemicals, Inc. Mining method for co-extraction of non-combustible ore and mine methane
CN102434159A (en) * 2011-11-28 2012-05-02 浙江永昌仪表有限公司 Mining method for ore bed
CN102619514A (en) * 2012-04-26 2012-08-01 鞍钢集团矿业公司 Top-filled pillarless cornice end-wall sublevel caving method extraction technique
CN103615251A (en) * 2013-12-10 2014-03-05 中国新型建材设计研究院 Strip-type mining method for thin ore body
CN104179505A (en) * 2014-02-12 2014-12-03 云南磷化集团有限公司 Phosphorus ore underground mining method
CN104314567A (en) * 2014-09-25 2015-01-28 白银有色集团股份有限公司 Medium-thick ore body mining method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090315388A1 (en) * 2008-06-20 2009-12-24 Solvay Chemicals, Inc. Mining method for co-extraction of non-combustible ore and mine methane
CN102434159A (en) * 2011-11-28 2012-05-02 浙江永昌仪表有限公司 Mining method for ore bed
CN102619514A (en) * 2012-04-26 2012-08-01 鞍钢集团矿业公司 Top-filled pillarless cornice end-wall sublevel caving method extraction technique
CN103615251A (en) * 2013-12-10 2014-03-05 中国新型建材设计研究院 Strip-type mining method for thin ore body
CN104179505A (en) * 2014-02-12 2014-12-03 云南磷化集团有限公司 Phosphorus ore underground mining method
CN104314567A (en) * 2014-09-25 2015-01-28 白银有色集团股份有限公司 Medium-thick ore body mining method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113663806A (en) * 2021-07-20 2021-11-19 上海光合竹能源科技有限公司 In-situ lead-zinc oxide ore disposal beneficiation method
CN113663806B (en) * 2021-07-20 2023-10-20 常海鹏 Lead zinc oxide ore in-situ treatment beneficiation method

Similar Documents

Publication Publication Date Title
CN103147761B (en) Filling mining method of gently inclined thin mineral deposit with soft roof
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
CN100554642C (en) A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CA2986062C (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN103306720A (en) Inclined layered solid filling coal mining method for ultra-thick coal seam
CN103902780A (en) Method for predicting deformation of solid-filled coal mining surfaces
CN103883304B (en) A kind of gasifying underground coal method building gasification furnace passage
CN103924975A (en) Water retaining method for coal mining process
CN103899348A (en) Method for fast extracting gas on coalface
CN110656939B (en) Large-stage efficient mining method for steeply inclined medium-thickness ore body meeting water argillization surrounding rock
CN104929643A (en) Top-bottom space reconstruction upward type cut-and-filling stoping method after high layering medium-length hole ore dropping
CN103437803A (en) Structure and method for gas drainage of drill holes of high-drainage drill field of coal mine
CN203822359U (en) Distribution structure for gas extraction holes of coal face
CN105736009A (en) Shrinkage heap leaching subsequent filling mining method used for steeply-inclined thin orebody
CN109898992A (en) It is a kind of that disaster-ridden source ore bed safe working method is administered using surface orientation drilling in advance
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN104453900A (en) Filling mining method of near-horizontal ore body
CN109098711A (en) It is a kind of to block the heavily stressed method in ore body top using pressure relief groove
CN108457654A (en) A kind of production practice of Pb-Zn deposits
CN104481571B (en) Mine flyash grouting fire extinguishing method
CN104179505A (en) Phosphorus ore underground mining method
CN108425673A (en) A kind of production practice of copper mine
CN102434159B (en) Mining method for ore bed
CN109026140B (en) A method of with band and the artificial water proof stratum of solid-filling coal-mining technique

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180828

RJ01 Rejection of invention patent application after publication