CN108446132A - A method of remotely updating electric power acquisition terminal software based on TFTP - Google Patents

A method of remotely updating electric power acquisition terminal software based on TFTP Download PDF

Info

Publication number
CN108446132A
CN108446132A CN201810261227.XA CN201810261227A CN108446132A CN 108446132 A CN108446132 A CN 108446132A CN 201810261227 A CN201810261227 A CN 201810261227A CN 108446132 A CN108446132 A CN 108446132A
Authority
CN
China
Prior art keywords
electric power
acquisition terminal
power acquisition
upgrade file
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810261227.XA
Other languages
Chinese (zh)
Inventor
黄孟孟
刘宁
刘绪胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Sanxing Medical and Electric Co Ltd
Original Assignee
Ningbo Sanxing Medical and Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sanxing Medical and Electric Co Ltd filed Critical Ningbo Sanxing Medical and Electric Co Ltd
Priority to CN201810261227.XA priority Critical patent/CN108446132A/en
Publication of CN108446132A publication Critical patent/CN108446132A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/06Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/2866Architectures; Arrangements
    • H04L67/30Profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Stored Programmes (AREA)
  • Information Transfer Between Computers (AREA)

Abstract

The present invention relates to a kind of methods remotely updating electric power acquisition terminal software using TFTP, and the method includes a) upgrading the binary file and upgrade status information package that source code generates by local PC ending tools, generate upgrade file;B) IAP host computers are built and select the electric power acquisition terminal that need to be accessed, the upgrade file is remotely sent to by TFTP agreements by selected electric power acquisition terminal;C) upgrade file is resolved after the reception of above-mentioned electric power acquisition terminal, and the information according to parsing carries out the software upgrading operation of electric power acquisition terminal.Compared with the existing technology, method of the invention can improve the upgrading efficiency of electric power acquisition terminal, reduce time cost, and operation strategies are wide.

Description

A method of remotely updating electric power acquisition terminal software based on TFTP
Technical field
A kind of updating the present invention relates to smart machine field more particularly to remotely electric power acquisition terminal software based on TFTP Method.
Background technology
Currently, measuring terminal is more commonly there are two types of upgrading modes:1, USB local upgrades;2, using message mode into Row upgrading.
But there is certain limitation in both methods:The former only supports 1 pair of 1 upgrading, and upgrading efficiency is low and must be manually The USB flash disk for carrying upgrade file is inserted into the USB flash disk mouth of electric power acquisition terminal, upgrading efficiency is low;Though high-volume may be implemented in the latter Terminal upgrades simultaneously, but upgrades the spent time by upper main website and the co-determination of electric power acquisition terminal, and can send many reports The redundant data of literary business causes update time longer.
Invention content
In view of the above problems, the purpose of the present invention is to provide a kind of electric power acquisition terminal software is remotely updated using TFTP Method, this method can support high-volume terminal while upgrade, and rapidly and efficiently, and terminal can be supported to carry out the liter other than application layer Grade operation.
To achieve the goals above, the technical solution adopted by the present invention is:It is a kind of remotely to update electric power acquisition using TFTP The method of terminal software, it is characterised in that:The method includes,
A) binary file and upgrade status information package that source code generates will be upgraded by local PC ending tools, generates and rises Grade file;
B) IAP host computers are built and select the electric power acquisition terminal that need to be accessed, by TFTP agreements by the upgrade file It is long-range to be sent to selected electric power acquisition terminal;
C) upgrade file is resolved after the reception of above-mentioned electric power acquisition terminal, and the information according to parsing carries out electric power and adopts Collect the software upgrading operation of terminal.
In order to which unrestricted choice needs the electric power acquisition terminal upgraded, the electric power acquisition terminal and local on host computer PC machine is located at the same network segment, and the master ip address of the electric power acquisition terminal is the IP address of local PC machine.
Further, it is described a) in by local PC machine ending tool will upgrade source code generate binary source file with rise Grade status information is packaged, and is generated upgrade file, is specifically included:
Local PC machine calculate upgrading source code generate binary file MD5 values and header CRC check, and with configuration File type, filename and destination address in file form upgrade status information, by the upgrade status information and binary system File is packaged into upgrade file with reference to 1K byte-aligned modes.
Further, it is described b) in build IAP host computers and select electric power acquisition terminal to be upgraded, assisted by TFTP The upgrade file is remotely sent to selected electric power acquisition terminal by view, including:
The ports IP and the address of the electric power acquisition terminal that need to be accessed are inputted by IAP host computers;
IAP host computers create UDP clients, and the UDP clients are built according to the selected ports IP with electric power acquisition terminal Vertical UDP connections, and upgrade file is handed down to by electric power acquisition terminal by TFTP agreements, you can realize electric power acquisition terminal upgrade The remote transmission of file, it is convenient and efficient.
Further, it is described b) in the upgrade file is remotely sent to by TFTP agreements by selected electric power acquisition Terminal, including:
The ports IP and upgrade file and TFTP, UDP message header are packaged under TFTP agreements by UDP clients Hair.
Further, it is described b) in the upgrade file is remotely sent to by TFTP agreements by selected electric power acquisition Terminal further includes:
When UDP clients issue TFTP agreements, sends writing system to selected electric power acquisition terminal and ask WRQ, and sentence Whether selected electric power acquisition terminal of breaking has response, if there is response, continues to judge whether have TID information in response, if so, then Carry out the transmission of upgrade file.
Further, the transmission for carrying out upgrade file includes selected electric power acquisition terminal replies acknowledgement frame and association After the good TID of quotient, upgrade file is cut into the data packet of 512 bytes and increases corresponding packet serial number and sent by UDP clients, It is sent if non-512 byte of data field is determined as last bag data.
Further, the method further includes before the step c),
Selected electric power acquisition terminal constantly monitors derived data, WRQ requests is judged whether there is, if so, then judging in WRQ Whether the destination address and address of carrying are legal, if legal, the TID for replying acknowledgement frame and consulting, and receive transmission The data to come over.
Further, it is described c) in the upgrade file through above-mentioned electric power acquisition terminal reception after be resolved, according to solution The information of analysis carries out the software upgrading operation of electric power acquisition terminal, including:
Parsing after the upgrade file has been received by selected electric power acquisition terminal, and carry out upgrade status information CRC16 is verified, the MD5 values of upgrade file verify and the verification of the size of upgrade file, after verifying qualification, to upgrade file class Type is judged, carries out updating operation to the corresponding portion of selected electric power acquisition terminal accordingly.
Further, described that upgrade file type is judged, accordingly to the corresponding portion of selected electric power acquisition terminal Progress updating operation is divided to specifically include:
If upgrade file type is application layer software update, selected electric power acquisition terminal is by the complete upgrade file of reception It is transported to startup guiding file and application layer document upgrading exchange area, calling system is resetted executes upgrading by starting guiding file;
If the basic parameter that upgrade file type is electric power acquisition terminal updates, former storage parameter is removed The FTL layers of nandflash, typing new parameter and resetting system makes new parameter come into force;
If the font file that upgrade file type is electric power acquisition terminal upgrades, former storage character library content is removed The physical address block of nandflash, reset system simultaneously upgrade font file;
If upgrade file type is the routing module upgrading belonging to electric power acquisition terminal, selected electric power acquisition terminal passes through Upgrade file subpackage is sent to affiliated routing module by serial ports, and upgrading is executed by routing module.
Compared with the prior art, the advantages of the present invention are as follows:By TFTP agreements required upgrading is sent to by software is upgraded Electric power acquisition terminal, one-to-many upgrade service is realized, compared to previous one-to-one USB flash disk upgrade service and message mode Upgrade service, while supporting high-volume terminal upgrade, updating speed is fast, and irredundant data, overcoming operating personnel needs hand The trouble of continuous plug USB flash disk is moved, and electric power acquisition terminal can be supported to carry out other than application layer simultaneously, such as character library, parameter, carrier wave The upgrading of transparent transmission upgrading etc., operation strategies are wide.
Description of the drawings
Fig. 1 is that the electric power acquisition terminal of an embodiment of the present invention is based on TFTP remotely newer system flow charts.
Fig. 2 is that the local PC ending tools of an embodiment of the present invention are packaged upgrade file flow chart.
Fig. 3 is that the local ends the PC IAP host computers of an embodiment of the present invention send the stream of upgrade file by TFTP agreements Cheng Tu.
Fig. 4 is the updating operation flow chart of the electric power acquisition terminal of an embodiment of the present invention.
Specific implementation mode
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining the present invention, and is not considered as limiting the invention.
A kind of corresponding system of method remotely updating electric power acquisition terminal software using TFTP of the present invention includes local PC machine end and electric power acquisition terminal are equipped with the local PC ending tools that upgrading source code can be packaged into upgrade file at local PC machine end And the IAP host computers built, referring to Fig. 1, this method includes the concrete operations flow which is upgraded,
A) binary file and upgrade status information package that source code generates will be upgraded by local PC ending tools, generates and rises Grade file;
B) IAP host computers are built and select the electric power acquisition terminal that need to be accessed, by TFTP agreements by the upgrade file It is long-range to be sent to selected electric power acquisition terminal;
C) upgrade file is resolved after the reception of above-mentioned electric power acquisition terminal, and the information according to parsing carries out electric power and adopts Collect the software upgrading operation of terminal.In order to which unrestricted choice needs the electric power acquisition terminal upgraded, the electric power on host computer Acquisition terminal and local PC machine be located at the same network segment, and the master ip address of the electric power acquisition terminal is the IP of local PC machine Location.
Wherein, it is described a) in by local PC machine ending tool will upgrade source code generate binary source file with upgrading shape State information package generates upgrade file, specifically includes:
Local PC machine calculate upgrading source code generate binary file MD5 values and header CRC check, and with configuration File type, filename and destination address in file form upgrade status information, by the upgrade status information and binary system File is packaged into upgrade file with reference to 1K byte-aligned modes.Concrete operations flow is referring to Fig. 2.
Referring to Fig. 3, it is described b) in build IAP host computers and select electric power acquisition terminal to be upgraded, assisted by TFTP The upgrade file is remotely sent to selected electric power acquisition terminal by view, including:
The ports IP and the address of the electric power acquisition terminal that need to be accessed are inputted by IAP host computers;
IAP host computers create UDP clients, and the UDP clients are built according to the selected ports IP with electric power acquisition terminal Vertical UDP connections, and upgrade file is handed down to by electric power acquisition terminal by TFTP agreements.Electric power acquisition terminal can be realized in this way The remote transmission of upgrade file, it is convenient and efficient.
Specifically, it is described b) in the upgrade file is remotely sent to by TFTP agreements by selected electric power acquisition Terminal, including:
The ports IP and upgrade file and TFTP, UDP message header are packaged under TFTP agreements by UDP clients Hair, and when UDP clients issue TFTP agreements, UDP clients can send writing system to selected electric power acquisition terminal and ask WRQ is sought, and constantly whether monitoring other side has response, if there is response, judges whether there is TID information in response, if so, then UDP Upgrade file can be cut into the data packet of 512 bytes and increase corresponding packet serial number and sent by client, if data field non-512 Byte is determined as last bag data and is sent.
As shown in figure 4, selected electric power acquisition terminal has also carried out following operation before receiving upgrade file:
Selected electric power acquisition terminal constantly monitors derived data, WRQ requests is judged whether there is, if so, then judging in WRQ Whether the destination address and address of carrying are legal, if legal, the TID for replying acknowledgement frame and consulting, and receive transmission The data to come over.
After having received to wear the upgrade file brought, it can be parsed, and in upgrade status information The size of CRC16, the MD5 values of upgrade file and upgrade file are verified, if verification is qualified, can further judge to rise Grade file type, to carry out updating operation to the corresponding portion of electric power acquisition terminal according to the type.
It is specifically, if described judge upgrade file type, accordingly to selected electric power acquisition terminal Corresponding portion carries out updating operation and specifically includes:
If upgrade file type is application layer software update, selected electric power acquisition terminal is by the complete upgrade file of reception It is transported to startup guiding file and application layer document upgrading exchange area, calling system is resetted executes upgrading by starting guiding file;
If the basic parameter that upgrade file type is electric power acquisition terminal updates, former storage parameter is removed The FTL layers of nandflash, typing new parameter and resetting system makes new parameter come into force;
If the font file that upgrade file type is electric power acquisition terminal upgrades, former storage character library content is removed The physical address block of nandflash, reset system simultaneously upgrade font file;
If upgrade file type is the routing module upgrading belonging to electric power acquisition terminal, selected electric power acquisition terminal passes through Upgrade file subpackage is sent to affiliated routing module by serial ports, and upgrading is executed by routing module.
In this way, will upgrade software by TFTP agreements is sent to the required electric power acquisition terminal upgraded, a pair is both realized More terminal upgrade services, it is ensured that updating speed, and irredundant data generate, and upgrade clothes compared to previous one-to-one USB flash disk Business and message mode upgrade service, it is time saving and energy saving, while this method can support other position liters other than terminal applies layer simultaneously Grade, such as the upgrading of character library, parameter, carrier wave transparent transmission upgrading, operation strategies are wide.
Certainly, a kind of specific embodiment that above are only the present invention, other than above-mentioned improvement, other are similar to change Into being also contained in the improvement threshold of the present invention, just do not repeating herein.While there has been shown and described that implementation of the invention Example, it will be appreciated by those skilled in the art that:It without departing from the principle and spirit of the present invention can be to these embodiments A variety of variations are carried out, modification, replaces and deforms, the scope of the present invention is limited by claim and its equivalent.

Claims (10)

1. a kind of method remotely updating electric power acquisition terminal software using TFTP, it is characterised in that:The method includes,
A) binary file and upgrade status information package that source code generates will be upgraded by local PC ending tools, generates upgrading text Part;
B) IAP host computers are built and select the electric power acquisition terminal that need to be accessed, it is by TFTP agreements that the upgrade file is long-range It is sent to selected electric power acquisition terminal;
C) upgrade file is resolved after the reception of above-mentioned electric power acquisition terminal, and it is whole that the information according to parsing carries out electric power acquisition The software upgrading at end operates.
2. according to the method described in claim 1, it is characterized in that:
The electric power acquisition terminal is located at the same network segment with local PC machine, and the master ip address of the electric power acquisition terminal is local The IP address of PC machine.
3. according to the method described in claim 2, it is characterized in that:
It is described a) in beaten by local PC machine ending tool by binary source file and upgrade status information that source code generates is upgraded Packet generates upgrade file, specifically includes,
MD5 values and the header CRC check of the binary file that upgrading source code generates, and and configuration file are calculated in local PC machine In file type, filename and destination address form upgrade status information, by the upgrade status information and binary file It is packaged into upgrade file with reference to 1K byte-aligned modes.
4. according to the method described in claim 3, it is characterized in that:
It is described b) in build IAP host computers and select electric power acquisition terminal to be upgraded, by TFTP agreements by the upgrading File is remotely sent to selected electric power acquisition terminal, including,
The ports IP and the address of the electric power acquisition terminal that need to be accessed are inputted by IAP host computers;
IAP host computers create UDP clients, and the UDP clients establish UDP according to the selected ports IP and electric power acquisition terminal Connection, and upgrade file is handed down to by electric power acquisition terminal by TFTP agreements, you can realize electric power acquisition terminal upgrade file Remote transmission, it is convenient and efficient.
5. according to the method described in claim 4, it is characterized in that:It is described b) in by TFTP agreements by the upgrade file It is remotely sent to selected electric power acquisition terminal, including:
The ports IP and upgrade file and TFTP, UDP message header are packaged into TFTP agreements and issued by UDP clients.
6. according to the method described in claim 5, it is characterized in that:
It is described b) in the upgrade file is remotely sent to by TFTP agreements by selected electric power acquisition terminal, further include,
When UDP clients issue TFTP agreements, sends writing system to selected electric power acquisition terminal and ask WRQ, and judge institute Whether the electric power acquisition terminal of choosing has response, if there is response, continues to judge whether have TID information in response, if so, then carrying out The transmission of upgrade file.
7. according to the method described in claim 6, it is characterized in that:
The transmission for carrying out upgrade file includes, after selected electric power acquisition terminal replies acknowledgement frame and the TID consulted, Upgrade file is cut into the data packet of 512 bytes and increases corresponding packet serial number and sent by UDP clients, if data field is non- 512 bytes are determined as last bag data and are sent.
8. according to the method described in claim 6, it is characterized in that:The method further includes before the step c),
Selected electric power acquisition terminal constantly monitors derived data, WRQ requests is judged whether there is, if so, then judging to carry in WRQ Destination address and address it is whether legal, if legal, the TID for replying acknowledgement frame and consulting, and receive send Data.
9. according to the method described in claim 8, it is characterized in that:
It is described c) in the upgrade file through above-mentioned electric power acquisition terminal reception after be resolved, according to parsing information carry out electricity The software upgrading of power acquisition terminal operates, including,
Parsing after the upgrade file has been received by selected electric power acquisition terminal, and carry out the schools CRC16 of upgrade status information It tests, the verification of the MD5 values of upgrade file and the size verification of upgrade file carry out upgrade file type after verifying qualification Judge, updating operation is carried out to the corresponding portion of selected electric power acquisition terminal accordingly.
10. according to the method described in claim 9, it is characterized in that:
It is described that upgrade file type is judged, updating operation is carried out to the corresponding portion of selected electric power acquisition terminal accordingly It specifically includes,
If upgrade file type updates for application layer software, selected electric power acquisition terminal carries the complete upgrade file of reception To guiding file and application layer document upgrading exchange area is started, calling system is resetted executes upgrading by starting guiding file;
If the basic parameter that upgrade file type is electric power acquisition terminal updates, remove the nandflash's of former storage parameter FTL layers, typing new parameter and resetting system makes new parameter come into force;
If the font file that upgrade file type is electric power acquisition terminal upgrades, the nandflash of former storage character library content is removed Physical address block, reset system simultaneously upgrades font file;
If upgrade file type is the routing module upgrading belonging to electric power acquisition terminal, selected electric power acquisition terminal passes through serial ports Upgrade file subpackage is sent to affiliated routing module, upgrading is executed by routing module.
CN201810261227.XA 2018-03-27 2018-03-27 A method of remotely updating electric power acquisition terminal software based on TFTP Pending CN108446132A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810261227.XA CN108446132A (en) 2018-03-27 2018-03-27 A method of remotely updating electric power acquisition terminal software based on TFTP

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810261227.XA CN108446132A (en) 2018-03-27 2018-03-27 A method of remotely updating electric power acquisition terminal software based on TFTP

Publications (1)

Publication Number Publication Date
CN108446132A true CN108446132A (en) 2018-08-24

Family

ID=63197509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810261227.XA Pending CN108446132A (en) 2018-03-27 2018-03-27 A method of remotely updating electric power acquisition terminal software based on TFTP

Country Status (1)

Country Link
CN (1) CN108446132A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109857433A (en) * 2019-01-15 2019-06-07 四川虹美智能科技有限公司 A kind of scm software upgrading tool and method
CN111049932A (en) * 2019-12-27 2020-04-21 宁波安信数控技术有限公司 DTU-based manipulator system file remote upgrading method and system
CN112083940A (en) * 2020-07-29 2020-12-15 宁波三星医疗电气股份有限公司 Power acquisition terminal remote upgrading method based on state cryptographic algorithm
CN112099839A (en) * 2020-05-29 2020-12-18 宁波三星医疗电气股份有限公司 Method for software generalization of electric power acquisition terminal
CN113489794A (en) * 2021-07-07 2021-10-08 智洋创新科技股份有限公司 Communication interaction method for intelligent identification master station and intelligent station end equipment of transformer substation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030016740A (en) * 2001-08-21 2003-03-03 엘지전자 주식회사 Tftp file transmission system and a automatic software upgrade method thereof
CN101119226A (en) * 2006-07-31 2008-02-06 中兴通讯股份有限公司 Method and system for updating terminal equipment database configuration
CN101594613A (en) * 2009-06-22 2009-12-02 中兴通讯股份有限公司 The method of terminal equipment and upgrading thereof, system
CN106412064A (en) * 2016-09-29 2017-02-15 国家电网公司 Remote upgrade method of power utilization information acquisition terminal

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030016740A (en) * 2001-08-21 2003-03-03 엘지전자 주식회사 Tftp file transmission system and a automatic software upgrade method thereof
CN101119226A (en) * 2006-07-31 2008-02-06 中兴通讯股份有限公司 Method and system for updating terminal equipment database configuration
CN101594613A (en) * 2009-06-22 2009-12-02 中兴通讯股份有限公司 The method of terminal equipment and upgrading thereof, system
CN106412064A (en) * 2016-09-29 2017-02-15 国家电网公司 Remote upgrade method of power utilization information acquisition terminal

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
严小红等: "《计算机网络安全实践教程》", 31 July 2017, 电子科技大学出版社 *
刘海成: "《AVR单片机原理及测控工程应用》", 30 June 2015, 北京航空航天大学出版社 *
王黎明等: "《ARM9嵌入式***开发与实践》", 31 October 2008, 北京航空航天大学出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109857433A (en) * 2019-01-15 2019-06-07 四川虹美智能科技有限公司 A kind of scm software upgrading tool and method
CN109857433B (en) * 2019-01-15 2022-08-19 四川虹美智能科技有限公司 Single chip microcomputer software upgrading tool and method
CN111049932A (en) * 2019-12-27 2020-04-21 宁波安信数控技术有限公司 DTU-based manipulator system file remote upgrading method and system
CN112099839A (en) * 2020-05-29 2020-12-18 宁波三星医疗电气股份有限公司 Method for software generalization of electric power acquisition terminal
CN112083940A (en) * 2020-07-29 2020-12-15 宁波三星医疗电气股份有限公司 Power acquisition terminal remote upgrading method based on state cryptographic algorithm
CN112083940B (en) * 2020-07-29 2023-03-03 宁波三星医疗电气股份有限公司 Power acquisition terminal remote upgrading method based on cryptographic algorithm
CN113489794A (en) * 2021-07-07 2021-10-08 智洋创新科技股份有限公司 Communication interaction method for intelligent identification master station and intelligent station end equipment of transformer substation

Similar Documents

Publication Publication Date Title
CN108446132A (en) A method of remotely updating electric power acquisition terminal software based on TFTP
CN105262627B (en) Firmware upgrading method, device and system
CN105590051B (en) Trusted application for credible performing environment generates and installation method
CN111083161A (en) Data transmission processing method and device and Internet of things equipment
CN113364512B (en) Encapsulation analysis method and device for Beidou short message
CN106227572A (en) A kind of frequency converter control system programme upgrade method
CN106411619A (en) Wireless equipment upgrading method based on low-power-consumption wide area network
CN107450869A (en) The online print system and method for a kind of PDF electronic invoices layout files
CN105082540A (en) Method for controlling 3D printer through 3D slicing device
CN108512898B (en) File pushing method and device, computer equipment and storage medium
CN101593119A (en) A kind of aerial firmware upgrade method of flash memory unit equipment and device monopolized
CN112286565B (en) Embedded system differential upgrading method based on storage container
CN106569789B (en) Task submission method and device
CN110007941A (en) A kind of the MCU firmware and upgrade method of Intelligent refuse classification recovery system
CN107018189A (en) Migrate application data and receive the method and device of application data
CN106534342A (en) Connection control method and system, and hosts
CN101409636A (en) Safety on-line upgrade method for networking equipment firmware
CN202404574U (en) Electric energy collecting terminal with remote upgrade function
WO2024108940A1 (en) Performance supervision method, apparatus and system, and device and medium
CN106936630A (en) A kind of whole bag upgrade method of many card insert type equipment and upgrade-system
CN112579141A (en) Firmware updating method, device, equipment and storage medium of embedded system
CN113220481A (en) Request processing and feedback method and device, computer equipment and readable storage medium
CN104079450A (en) Method and device for generating characteristic pattern set
CN103685552B (en) A kind of method for upgrading software of small memory device
CN109981342A (en) A kind of method and system of batch processing network device operation order

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180824

RJ01 Rejection of invention patent application after publication