CN108442391A - A kind of assembling frame beam cable bolting structure and its construction method - Google Patents

A kind of assembling frame beam cable bolting structure and its construction method Download PDF

Info

Publication number
CN108442391A
CN108442391A CN201810413733.6A CN201810413733A CN108442391A CN 108442391 A CN108442391 A CN 108442391A CN 201810413733 A CN201810413733 A CN 201810413733A CN 108442391 A CN108442391 A CN 108442391A
Authority
CN
China
Prior art keywords
prefabricated
cable
rood
assembling frame
rood beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810413733.6A
Other languages
Chinese (zh)
Inventor
贾金青
林青坤
高军程
杨国平
刘俊岩
王浩
刘春梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201810413733.6A priority Critical patent/CN108442391A/en
Publication of CN108442391A publication Critical patent/CN108442391A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention provides a kind of assembling frame beam cable bolting structure, including assembling frame beam, prestress anchorage cable and alien earth sparging face;Assembling frame beam is made of the prefabricated rood beam being connected with each other, and prefabricated rood beam is internally provided with elongated reinforcing bar, and the both ends of crossbeam and vertical beam are all embedded with suspension hook and fixed steel bars, and prefabricated rood beam center is equipped with anchor cable hole;Elongated splice between prefabricated rood beam is connected with each other by mechanical connecting joint, and the junction casting concrete between prefabricated rood beam forms entirety;Prestress anchorage cable is fixed on by anchorage on prefabricated rood beam by anchor cable hole, and the suspension hook on prefabricated rood beam is connected by hoist cable with soil nailing, the present invention is suitable for rock slope supporting, easy for construction, precast frame beam can directly be fixed on branch armour layer, save scaffold installation;Using assembling frame beam, element factory is prefabricated, reduces site operation difficulty, while Cast-in-Situ Segment template support can be directly anchored on prefabricated components, accelerates speed of application.

Description

A kind of assembling frame beam cable bolting structure and its construction method
Technical field
The invention belongs to geotechnical engineering fields, and in particular to a kind of assembling frame beam cable bolting structure and its construction party Method.
Background technology
Prestressed anchor cable frame support system is a kind of novel active flexible supporting knot that last century the nineties occur Structure, oneself be widely used in railway, highway slope diseases reparation and reinforcing engineering in.The structure is by reinforced concrete frame Beam and prestress anchorage cable combine, and a kind of novel reinforced system of formation passes through anchor cable, frame and slope ground body three Between interaction, the Rock And Soil sliding force generated when unstable Rock And Soil glides is born, to maintain slope ground body Stabilization.But in many cases since slope supported is steeper, the construction of Vierendeel girder is more difficult, and reinforcing bar binding and Template Location are non- It is often difficult, while severe construction environment, it is difficult to ensure that Vierendeel girder quality, construction period are relatively long.
Invention content
In order to solve the above technical problems, a kind of assembling frame beam cable bolting structure of present invention offer and its construction party Method.Suitable for rock side slope.It is difficult in the construction compared with gradient slope and complex slope to solve traditional prestressed anchor cable frame supporting The problem of degree improves construction quality, shortens construction period.
Technical scheme is as follows:A kind of assembling frame beam cable bolting structure, including it is assembling frame beam, pre- Stress anchor cable, the soil nailing for being evenly distributed on branch armour layer and alien earth sparging face;Assembling frame beam is connected with each other by several Prefabricated rood beam composition, the crossbeam and vertical beam of the prefabricated rood beam are internally provided with the elongated steel of the elongated reinforcing bar in all top and lower part The both ends of muscle, crossbeam and vertical beam are all embedded with suspension hook and fixed steel bars, and each prefabricated rood beam center is equipped with anchor cable hole;Prefabricated ten The elongated splice in top between word beam is connected with each other by mechanical connecting joint, and the elongated splice in lower part is connected by machinery Connector is connected with each other, and the junction between prefabricated rood beam has poured concrete and formed entirety;Prestress anchorage cable passes through anchor Suo Kong is fixed on by anchorage on prefabricated rood beam, and the suspension hook on the prefabricated rood beam is connected by hoist cable with soil nailing, temporarily Fixed steel nail is located at branch armour layer, and is set to crossbeam and vertical beam both sides;Fiber mesh cloth is placed between prefabricated rood beam, alien earth sparging Face is set on web.
The reinforced bar mechanical connector is used for the connection of elongated splice.The elongated reinforcing bar in the top and lower part are elongated Reinforcing bar is calculated according to different engineerings according to arrangement of reinforcement;The fixed steel bars by prefabricated rood beam for being fixed on side slope temporarily On, it is convenient that member position and verticality are adjusted.The prestress anchorage cable is made of free segment and anchoring section two parts, anchor Suo Caiyong steel strand wires or reinforcing bar, anchoring section are made of steel strand wires and mortar, and free segment is made of plastics outsourcing and grease.Prefabricated ten The crossbeam and vertical beam equal length of word beam.Web of the present invention can make soil moved in improve the original matrix rock surface formed one it is lasting whole Body plate.
It is fixed temporarily steel nail to connect with fixed steel bars by connecting reinforcing bar temporarily, temporarily fix prefabricated rood beam, anchor cable After being fixed by anchorage, interim connection reinforcing bar is blocked.
It is preferred that each prefabricated rood beam junction, it is banded with stirrup between the elongated reinforcing bar of the elongated reinforcing bar in top and lower part, is formed The spacing of compact zone, stirrup is 50mm or 100mm.
It is preferred that it is additionally provided with groove in each crosshead of prefabricated rood beam, it is viscous with cast-in-place concrete to increase precast concrete Knot, prevents joint face to be broken.
The piece-ups of same section mechanical connecting joint are no more than the 50% of the total radical of reinforcing bar, and the mistake of mechanical connecting joint The standard width of a room in an old-style house is away from not less than 1m.
In order to facilitate linked network, preferably prefabricated cross beam sides is linked up with equipped with web, and web links up with cloth by web It is placed between prefabricated rood beam.
It is preferred that soil nailing is evenly arranged between prefabricated rood beam, length 5-8m.
It is preferred that the raw material in alien earth sparging face includes peat, fertile soil, grass fiber, slow-release nutrient fertilizer, jet thickness is to set Count the 125% of thickness.
It is preferred that cable bolting structure further includes billet, bearing plate when billet is prestressed cable anchorage prevents office Portion's crushing of concrete.
The present invention also provides a kind of construction methods of assembling frame beam cable bolting structure, include the following steps:
A. slope surface is cleared up
B. soil nailing and construction prestressed cable
By the arrangement requirement of the anchor hole and soil nailing of design, the construction of soil nailing and anchor cable is carried out;
C. assembling frame beam is constructed
1) positioning is fixed temporarily steel nail position, and carries out steel nail and squeeze into construction, by prefabricated rood beam on branch armour layer, makes Anchor cable passes through prefabricated rood beam center to be equipped with anchor cable hole, and prefabricated rood beam is lifted on the soil nailing that construction is completed by hoist cable, Steel nail will be fixed temporarily by connecting reinforcing bar temporarily to connect with fixed steel bars, fixed prefabricated rood beam position;
2) after prefabricated rood beam installation is fixed, the elongated splice in top is connected with each other by mechanical connecting joint, under The elongated splice in portion is connected with each other;In prefabricated rood beam junction casting concrete;
D. anchorage cable stretching and locking
Tensioning is carried out after anchor cable slurry and assembling frame beam Cast-in-Situ Segment reach design strength and is locked;It will connect temporarily Reinforcing bar blocks;
E. sealing off and covering anchorage
F. alien earth sparging
1) fiber mesh cloth is placed between prefabricated rood beam;
2) alien earth sparging.
It is welded with fixed steel bars with steel nail welding, the other end is fixed temporarily described interim connection reinforcing bar one end.
Present invention advantageous effect outstanding is:
(1) present invention is suitable for rock slope supporting, and easy for construction, prefabricated frame, which is set a roof beam in place, can be directly anchored to branch armour layer, Save scaffold installation;
(2) present invention is combined support form using assembling frame beam, prestress anchorage cable with soil nailing between Vierendeel girder, ensures The stability of beam compartment fractured rock improves integrally-built safety, while rood beam when soil nailing can be used as construction is determined Position.
(3) present invention uses assembling frame beam, and element factory is prefabricated, reduces site operation difficulty, while Cast-in-Situ Segment mould Slab supporting can be directly anchored on prefabricated components, accelerate speed of application.
Description of the drawings
Fig. 1 is assembled grid beam component schematic diagram of the present invention;
Fig. 2 is assembled grid beam component left view of the present invention;
Fig. 3 is assembled grid beam temporary fixing structure schematic diagram of the present invention;
Fig. 4 is assembled grid beam Cast-in-Situ Segment bar connecting schematic diagram of the present invention;
Fig. 5 is beam compartment soil nailing relative position schematic diagram of the present invention;
Fig. 6 is the schematic diagram of rood beam of the present invention construction;
Fig. 7 is beam compartment web connection diagram of the present invention;
Fig. 8 is the overall structure diagram after assembled grid beam anchor cable construction of the present invention is complete.
Label and symbol description
1- matches formula Vierendeel girder;2- anchor cable holes position;3- suspension hooks;4- fixed steel bars;The elongated reinforcing bar in the tops 5-;The elongated steel in the lower parts 6- Muscle;7- grooves;8- mechanical connecting joints;9- stirrups;10- is fixed temporarily steel nail;11- connection reinforcing bars;12- soil nailings;13- hoist cables; 14- webs;15- concrete junction;16- alien earth spargings face layer;17- prestress anchorage cables;The top and the bottom 18- crossbeam.
Specific implementation mode
Embodiment 1
As shown in figures 1-8, a kind of assembling frame beam cable bolting structure, including assembling frame beam 1, prestress anchorage cable 17, soil nailing 12 and the alien earth sparging face 16 of branch armour layer are evenly distributed on;Assembling frame beam 1 is connected with each other pre- by several Rood beam composition processed, the crossbeam and vertical beam of the prefabricated rood beam are internally provided with the elongated reinforcing bar 5 in all top and the elongated reinforcing bar in lower part 6, the both ends of crossbeam and vertical beam are all embedded with suspension hook 3 and fixed steel bars 4, and each prefabricated rood beam center is equipped with anchor cable hole;It is prefabricated The elongated splice in top between rood beam is connected with each other by mechanical connecting joint 8, and the elongated splice in lower part passes through machine Tool jointing 8 is connected with each other, and the junction between prefabricated rood beam has poured concrete and formed entirety;Prestress anchorage cable 18 It by anchor cable hole, is fixed on prefabricated rood beam by anchorage, the suspension hook 3 on the prefabricated rood beam passes through hoist cable 13 and soil nailing 12 It is connected, is fixed temporarily steel nail 10 and is located at branch armour layer, and be set to crossbeam and vertical beam both sides;Web 14 is arranged in prefabricated cross Between beam, alien earth sparging face 16 is set on web 14.Each prefabricated rood beam junction, the elongated reinforcing bar 5 in top and lower part are elongated Stirrup 9 is banded between reinforcing bar 6, the spacing of stirrup 9 is 50mm or 100mm.It is additionally provided in each crosshead of prefabricated rood beam Groove 7.The piece-ups of same section mechanical connecting joint 8 are no more than the 50% of the total radical of reinforcing bar, and the mistake of mechanical connecting joint 8 The standard width of a room in an old-style house is away from not less than 1m.Prefabricated cross beam sides is linked up with equipped with web, and web 14 is by web hitch arrangements in prefabricated Between rood beam.The soil nailing 12 is evenly arranged between prefabricated rood beam, length 5-8m.The raw material packet in alien earth sparging face 16 Peat, fertile soil, grass fiber, slow-release nutrient fertilizer are included, jet thickness is the 125% of design thickness.
It is fixed temporarily steel nail to connect with fixed steel bars by connecting reinforcing bar temporarily, temporarily fix prefabricated rood beam, anchor cable After being fixed by anchorage, interim connection reinforcing bar is blocked.
A kind of construction method of assembling frame beam cable bolting structure, includes the following steps:
(1) slope surface is cleared up
Before anchor cable construction, manually slope is repaiied according to layering from top to down in time first and excavate level-one, protect level-one.It excavates When to anchor cable position, the half depth for excavating adjacent anchor cable spacing should be continued downwards, slope surface is cleaned out.
(2) soil nailing and anchor cable construction
The construction requirement anchor cable positioning of assembling frame beam anchor cable must be accurate, according to practical slope surface, first presses design arrangement It is required that by the accurate measuring in anchor hole position and soil nailing position in slope surface, red paint is used in combination, and construction part indicates that anchor cable is opened at the scene Hole site and nail Construction position.Anchor hole position deviation must not exceed ± 10mm.Carry out nail Construction between anchor cable and Vierendeel girder.
(3) construction of frame beam
1) after waiting for anchor cable construction, before rood beam installation, crossbeam and longeron based process are completed first, for out-of-flatness And unsound rock mass, 20cm can be excavated downwards and backfills C15 piece stone concretes formation good basis;
2) positioning is fixed temporarily 10 position of steel nail, and carries out steel nail and squeeze into construction, by prefabricated rood beam on branch armour layer, Make anchor cable that prefabricated rood beam center be passed through to be equipped with anchor cable hole, prefabricated rood beam is lifted on by the soil nailing that construction is completed by hoist cable 13 On 12, steel nail 10 will be fixed temporarily by connecting reinforcing bar 11 temporarily and connect with fixed steel bars 4, fixed prefabricated rood beam position;
3) after prefabricated rood beam installation is fixed, the elongated splice in top is connected with each other by mechanical connecting joint 8, under The elongated splice in portion is connected with each other;Bind stirrup, support template, in prefabricated rood beam junction casting concrete;(same section Face splice number must not exceed the 50% of the total radical of reinforcing bar, and connector is staggered spacing not less than 1m).
(4) anchorage cable stretching and locking
Tensioning is carried out after anchor cable slurry and concrete cast-in-situ section reach design strength.By live pulling test, determine Tensioning and locking technique.Anchorage cable stretching and lock hierarchy carry out, and are strictly executed by design requirement and operating instruction.In design tensioning After the completion, single compensation tensioning is carried out in due course, is then locked.After compensating tensioning, from anchorage amount, long 5~10cm is reserved Steel strand wires, rest part are clipped, and the interim reinforcing bar 11 that connects blocks.
(5) sealing off and covering anchorage
Anchor plate and anchor head each section gap are filled with cement paste, the concrete not less than C25 is finally used to anchor head Sealing off and covering anchorage is carried out, corrosion is prevented and takes into account beauty.
(6) beam compartment surface construction (alien earth sparging)
1) it removes work surface sundries and loosens sillar;
2) linked network.Web 14 is hung on web hook, is arranged between prefabricated rood beam;
3) alien earth sparging, watering moistening slope surface before alien earth sparging, by peat, fertile soil, grass fiber, slow-release nutrient fertilizer etc. Mixing material sow grass seeds by duster after the stirring of special-purpose machinery it is online in high-intensity fiber, thickness be deck-molding 2/3.Since water supply in media loses Mistake can cause stromal thickness inadequate, and it is the 125% of design thickness generally to require jet thickness.
It is welded with fixed steel bars 4 with the welding of steel nail 10, the other end is fixed temporarily interim connection 11 one end of reinforcing bar.
Web 14 can be high-intensity fiber geonet.

Claims (10)

1. a kind of assembling frame beam cable bolting structure, which is characterized in that including assembling frame beam (1), prestress anchorage cable (17), soil nailing (12) and alien earth sparging face (16) of branch armour layer are evenly distributed on;Assembling frame beam (1) is mutual by several The prefabricated rood beam composition of connection, the crossbeam and vertical beam of the prefabricated rood beam be internally provided with the elongated reinforcing bar in all top (5) and under The both ends of the elongated reinforcing bar in portion (6), crossbeam and vertical beam are all embedded with suspension hook (3) and fixed steel bars (4), each prefabricated rood beam center Equipped with anchor cable hole;The elongated splice in top between prefabricated rood beam is connected with each other by mechanical connecting joint (8), and lower part is logical Long splice is connected with each other by mechanical connecting joint (8), and the junction between prefabricated rood beam has poured concrete shape It is integral;Prestress anchorage cable (18) is fixed on by anchorage on prefabricated rood beam by anchor cable hole, hanging on the prefabricated rood beam Hook (3) by hoist cable (13) soil nailing (12) be connected;It is fixed temporarily steel nail (10) and is located at branch armour layer, and set on crossbeam and erect Beam both sides, web (14) are arranged between prefabricated rood beam, and alien earth sparging face (16) are set on web (14).
2. a kind of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that each prefabricated rood beam connects Meet place, be banded with stirrup (9) between the elongated reinforcing bar of the elongated reinforcing bar in top (5) and lower part (6), the spacing of stirrup (9) be 50mm or 100mm。
3. a kind of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that prefabricated rood beam it is every Groove (7) is additionally provided in a crosshead.
4. a kind of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that same section machinery connects The piece-ups of connector (8) are no more than the 50% of the total radical of reinforcing bar, and the spacing that is staggered of mechanical connecting joint (8) is not less than 1m.
5. a kind of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that prefabricated cross beam sides It is linked up with equipped with web, web (14) is by web hitch arrangements between prefabricated rood beam.
6. a kind of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that the soil nailing (12) exists It is evenly arranged between prefabricated rood beam, length 5-8m.
7. a kind of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that be fixed temporarily steel nail (10) it is connect with fixed steel bars (4) by connecting reinforcing bar (11) temporarily, temporarily fixes prefabricated rood beam, after anchor cable locking, cut Disconnected interim connection reinforcing bar (11).
8. a kind of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that alien earth sparging face (16) Raw material include peat, fertile soil, grass fiber, slow-release nutrient fertilizer, jet thickness is the 125% of design thickness.
9. a kind of a kind of construction method of assembling frame beam cable bolting structure as described in claim 1, which is characterized in that Include the following steps:
A. slope surface is cleared up
B. soil nailing and construction prestressed cable
By the arrangement requirement of the anchor hole and soil nailing (12) of design, the construction of soil nailing and anchor cable is carried out;
C. assembling frame beam is constructed
1) positioning is fixed temporarily steel nail (10) position, and carries out steel nail and squeeze into construction, by prefabricated rood beam on branch armour layer, makes Anchor cable passes through prefabricated rood beam center to be equipped with anchor cable hole, and prefabricated rood beam is lifted on the soil nailing that construction is completed by hoist cable (13) (12) on, steel nail (10) will be fixed temporarily by connecting reinforcing bar (11) temporarily and connect with fixed steel bars (4), fixed prefabricated rood beam Position;
2) after prefabricated rood beam installation is fixed, the elongated splice in top is connected with each other by mechanical connecting joint (8), lower part Elongated splice is connected with each other;In prefabricated rood beam junction casting concrete;
D. anchorage cable stretching and locking
Tensioning is carried out after anchor cable slurry and assembling frame beam Cast-in-Situ Segment reach design strength and is locked;Reinforcing bar will be connected temporarily (11) it blocks;
E. sealing off and covering anchorage
F. alien earth sparging
1) web (14) is arranged between prefabricated rood beam;
2) alien earth sparging.
10. a kind of construction method of assembling frame beam cable bolting structure as claimed in claim 9, which is characterized in that face When connection reinforcing bar (11) one end and be fixed temporarily steel nail (10) welding, the other end and fixed steel bars (4) are welded.
CN201810413733.6A 2018-05-03 2018-05-03 A kind of assembling frame beam cable bolting structure and its construction method Pending CN108442391A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810413733.6A CN108442391A (en) 2018-05-03 2018-05-03 A kind of assembling frame beam cable bolting structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810413733.6A CN108442391A (en) 2018-05-03 2018-05-03 A kind of assembling frame beam cable bolting structure and its construction method

Publications (1)

Publication Number Publication Date
CN108442391A true CN108442391A (en) 2018-08-24

Family

ID=63202637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810413733.6A Pending CN108442391A (en) 2018-05-03 2018-05-03 A kind of assembling frame beam cable bolting structure and its construction method

Country Status (1)

Country Link
CN (1) CN108442391A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024632A (en) * 2018-09-14 2018-12-18 南华大学 A kind of the precast lattice beam structure and assembly monolithic construction method of slope reinforcement
CN109356173A (en) * 2018-10-22 2019-02-19 中铁二院工程集团有限责任公司 A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN110055979A (en) * 2019-04-15 2019-07-26 北京铁科特种工程技术有限公司 For the precast prestressed concrete anchor pier of slope reinforcement and production and construction method
CN110080256A (en) * 2019-06-06 2019-08-02 福建工程学院 A kind of assembled cross anchor pier and its construction method
CN110130367A (en) * 2019-04-10 2019-08-16 北京铁科特种工程技术有限公司 It is a kind of for the precast lattice beam of slope reinforcement and its production and construction method
CN110565655A (en) * 2019-05-17 2019-12-13 中铁十七局集团第二工程有限公司 frame beam unit for slope reinforcement and assembled frame beam
CN111705795A (en) * 2020-06-22 2020-09-25 南华大学 Prefabricated anchor pier for slope reinforcement and post-cast lattice beam assembly integral construction method
CN112900431A (en) * 2020-12-16 2021-06-04 陕西建工第六建设集团有限公司 Material-saving high-water-pressure soil layer anchor cable construction method for loess area
US11030356B2 (en) * 2018-12-20 2021-06-08 Disney Enterprises, Inc. Automated system for design and fabrication of artificial rockwork structures
CN117005679A (en) * 2023-08-04 2023-11-07 泰昌建设有限公司 Broad-width special-shaped beam structure and combined template thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541495A (en) * 2013-09-22 2014-01-29 沈阳建筑大学 Connecting box assembled type concrete beam
CN105155683A (en) * 2015-08-12 2015-12-16 四川省建筑设计研究院 Prefabricated beam-column connection in prefabricated concrete buildings and construction method thereof
CN107964966A (en) * 2017-11-20 2018-04-27 中国电建集团成都勘测设计研究院有限公司 Slope reinforcement system for foundation construction engineering
CN208251121U (en) * 2018-05-03 2018-12-18 大连理工大学 A kind of assembling frame beam cable bolting structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541495A (en) * 2013-09-22 2014-01-29 沈阳建筑大学 Connecting box assembled type concrete beam
CN105155683A (en) * 2015-08-12 2015-12-16 四川省建筑设计研究院 Prefabricated beam-column connection in prefabricated concrete buildings and construction method thereof
CN107964966A (en) * 2017-11-20 2018-04-27 中国电建集团成都勘测设计研究院有限公司 Slope reinforcement system for foundation construction engineering
CN208251121U (en) * 2018-05-03 2018-12-18 大连理工大学 A kind of assembling frame beam cable bolting structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
傅海英, 中国建材工业出版社 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024632A (en) * 2018-09-14 2018-12-18 南华大学 A kind of the precast lattice beam structure and assembly monolithic construction method of slope reinforcement
CN109356173A (en) * 2018-10-22 2019-02-19 中铁二院工程集团有限责任公司 A kind of pin-connected panel anchor bolt frame girder construction and its construction method
US11030356B2 (en) * 2018-12-20 2021-06-08 Disney Enterprises, Inc. Automated system for design and fabrication of artificial rockwork structures
CN110130367A (en) * 2019-04-10 2019-08-16 北京铁科特种工程技术有限公司 It is a kind of for the precast lattice beam of slope reinforcement and its production and construction method
CN110055979A (en) * 2019-04-15 2019-07-26 北京铁科特种工程技术有限公司 For the precast prestressed concrete anchor pier of slope reinforcement and production and construction method
CN110565655A (en) * 2019-05-17 2019-12-13 中铁十七局集团第二工程有限公司 frame beam unit for slope reinforcement and assembled frame beam
CN110080256A (en) * 2019-06-06 2019-08-02 福建工程学院 A kind of assembled cross anchor pier and its construction method
CN110080256B (en) * 2019-06-06 2024-05-24 福建工程学院 Assembled cross anchor pier and construction method thereof
CN111705795A (en) * 2020-06-22 2020-09-25 南华大学 Prefabricated anchor pier for slope reinforcement and post-cast lattice beam assembly integral construction method
CN112900431A (en) * 2020-12-16 2021-06-04 陕西建工第六建设集团有限公司 Material-saving high-water-pressure soil layer anchor cable construction method for loess area
CN117005679A (en) * 2023-08-04 2023-11-07 泰昌建设有限公司 Broad-width special-shaped beam structure and combined template thereof
CN117005679B (en) * 2023-08-04 2024-06-18 泰昌建设有限公司 Broad-width special-shaped beam structure and combined template thereof

Similar Documents

Publication Publication Date Title
CN108442391A (en) A kind of assembling frame beam cable bolting structure and its construction method
CN107447765B (en) Side slope construction supported with framed anchor construction
CN103469939B (en) Masonry infilled wall and main body flexible connection anti-seismic structure and construction method thereof
CN106498950B (en) Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body
CN110241833B (en) Waterproof moisturizing fully-prefabricated lattice beam anchor cable support system, support and repair method
CN109797778A (en) Pipe-jacking working well applicable to desert anhydrous sand layer area and construction method
CN108824220A (en) A kind of cast-in-place support and construction method of the rigid structure of cantilever T-type
CN111502675A (en) Supporting method for construction of high-ground-stress weak broken surrounding rock large-section tunnel intersection
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN108266191A (en) A kind of multiple-arch tunnel optimized construction method
CN208251121U (en) A kind of assembling frame beam cable bolting structure
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN110397305A (en) A kind of concrete underpinning structure and the method using its progress decaying concrete displacement
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN108867690A (en) The reverse construction of peg board barricade of big foundation pit
CN209723033U (en) Pipe jacking working well applicable to desert waterless sand layer area
CN108643193A (en) A kind of pattern foundation pit supporting structure prestress anchorage cable Drilling draw out method
CN110344844A (en) A kind of track engineering section of track well construction method
CN113668576A (en) Assembled type flaky stone slope surface protection structure and construction method
CN109610665A (en) Oil depot assembled fire wall construction method
CN218508463U (en) Assembled side slope prestressed anchorage cable supporting frame structure
CN108729466B (en) Large formwork supporting method for constructing anchor-free concrete retaining wall
CN107100322A (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
JP5015125B2 (en) Slope-stabilized pseudo-pressure body installation method and pseudo-pressure body used in the installation method
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180824