CN108428195A - A kind of lifting sequence setting method and system - Google Patents
A kind of lifting sequence setting method and system Download PDFInfo
- Publication number
- CN108428195A CN108428195A CN201710688266.3A CN201710688266A CN108428195A CN 108428195 A CN108428195 A CN 108428195A CN 201710688266 A CN201710688266 A CN 201710688266A CN 108428195 A CN108428195 A CN 108428195A
- Authority
- CN
- China
- Prior art keywords
- lifting sequence
- lifting
- sequence
- component
- target member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 230000004048 modification Effects 0.000 claims abstract description 37
- 238000012986 modification Methods 0.000 claims abstract description 37
- 238000005516 engineering process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- Business, Economics & Management (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Health & Medical Sciences (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Computational Mathematics (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Automatic Assembly (AREA)
Abstract
This application discloses a kind of lifting sequence setting method and systems, are applied to assembled architecture field, including:Receive pre-set lifting sequence;Generate number of each component correspondingly according to lifting sequence sequence, wherein the reserved establishment space of addition son number is reserved between the number of each component;Generate the lifting sequence preserved according to number sorting, and the lifting sequence file detached with IFC files.The application receives pre-set lifting sequence, generate number of each component correspondingly according to lifting sequence sequence, and the reserved establishment space of addition son number is reserved between the number of each component, so as to not interfere with the number of other components after newly the lifting sequence of component being added to be added to original lifting sequence file, reduce the modification to lifting sequence file, lifting sequence file is individual file simultaneously, is no longer influenced each other with IFC files, and the efficiency of lifting work is improved.
Description
Technical field
The present invention relates to building engineering field, more particularly to a kind of lifting sequence setting method and system.
Background technology
The urbanization process with the development of society, country expands energetically, a large amount of architectural engineering generate, promote and build therewith
Build the development of engineering field, wherein the advantages of assembled architecture field is quickly built by it is developed rapidly, and assembles
Formula is built in component, is needed largely lift work and could will be built construction and finish, for this purpose, lifting sequence file is set
It sets particularly important.
In the prior art, the setting method of lifting sequence, there are the following problems:1, original IFC (Industry
Foundation Classes) it will lift as an attribute imparting, but IFC includes attribute much unrelated with lifting again,
Attribute setting step sequence is more, inefficiency;It is difficult to change when 2, malfunctioning, when design document changes, due to needing to make again
Make design document, original attribute all cancels, former achievement of allocation failure;Cause, efficiency is low when using lifting sequence file, shadow
Ring lifting working efficiency;Therefore, it is necessary to a kind of efficient lifting sequence setting methods.
Invention content
In view of this, the purpose of the present invention is to provide a kind of lifting sequence setting method and systems, to improve slinger
Make efficiency.Its concrete scheme is as follows:
A kind of lifting sequence setting method is applied to assembled architecture field, including:
Receive pre-set lifting sequence;
Generate the number that each component sorts according to the lifting sequence correspondingly, wherein the number of each component
Between be reserved with addition son number reserved establishment space;
Generate the lifting sequence preserved according to number sorting, and the lifting sequence file detached with IFC files.
Optionally, after generating lifting sequence file, further include:
Using modification information input by user, the lifting sequence file is changed.
Optionally, described to utilize modification information input by user, the process of the lifting sequence file is changed, including:
Using the lifting sequence of target member in the modification information, the target member is added to and its lifting sequence
Between adjacent component, and the son number for the previous component of lifting sequence for generating the target member.
Optionally, described to utilize modification information input by user, the process of the lifting sequence file is changed, including:
Using the attribute information of target member in the modification information, the target is searched in the lifting sequence file
The target member is set as lifting sequence starting point by the lifting sequence of component.
The invention also discloses a kind of lifting sequences, and system is arranged, and is applied to assembled architecture field, including:
Receiving module, for receiving pre-set lifting sequence;
Number generation module, the number to sort correspondingly according to the lifting sequence for generating each component,
In, the reserved establishment space of addition son number is reserved between the number of each component;
File generating module for generating the lifting sequence preserved according to number sorting, and is hung with what IFC files detached
Fill sequential file.
Optionally, further include:
Modified module changes the lifting sequence file for utilizing modification information input by user.
Optionally, the modified module, including:
Adding device adds the target member for the lifting sequence using target member in the modification information
To between the component adjacent with its lifting sequence, and the son number for the previous component of lifting sequence for generating the target member.
Optionally, the modified module, including:
Starting point changes unit, suitable in the lifting for the attribute information using target member in the modification information
The target member is set as lifting sequence starting point by the lifting sequence that the target member is searched in preface part.
In the present invention, lifting sequence setting method is applied to assembled architecture field, including:Receive pre-set hang
Dress sequence;Generate number of each component correspondingly according to lifting sequence sequence, wherein pre- between the number of each component
There are the reserved establishment spaces of addition son number;The lifting sequence preserved according to number sorting is generated, and is detached with IFC files
Lifting sequence file.The present invention receives pre-set lifting sequence, and it is suitable according to lifting correspondingly to generate each component
The number that sequence sorts, and the reserved establishment space of addition son number is reserved between the number of each component, so as to newly add component
Lifting sequence be added to the number that other components are not interfered with after original lifting sequence file, reduce to lifting sequence file
Modification, while lifting sequence file be individual file, no longer influence each other with IFC files, improve lifting work effect
Rate.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis
The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of lifting sequence setting method flow diagram disclosed by the embodiments of the present invention;
Fig. 2 is that system structure diagram is arranged in a kind of lifting sequence disclosed by the embodiments of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
It is shown in Figure 1 the embodiment of the invention discloses a kind of lifting sequence setting method, it is applied to assembled architecture and leads
Domain, this method include:
Step S11:Receive pre-set lifting sequence.
Specifically, user pre-sets the lifting sequence of each component, to obtain the lifting sequence of entire hoisting process,
Lifting sequence input by user is received to generate lifting sequence file.
Step S12:Generate number of each component correspondingly according to lifting sequence sequence.
Specifically, after receiving pre-set lifting sequence, the lifting of each component according to lifting sequence record is suitable
Sequence generates the number uniquely to sort according to lifting sequence for each component, and number sorting mode can be according to from small to large
Sequence sorts, and in the prior art, the number between component is continuous, causes lifting sequence to change once being inserted into new structural member,
The lifting sequence of all components after change of location is required to change, for this purpose, being reserved with addition between the number of each component
The reserved establishment space of son number;When generating the number to sort correspondingly according to lifting sequence for each component, each
The reserved establishment space of addition son number is reserved between the number of component, that is, between the adjacent component of two lifting sequences
Add lifting component sequence, it will be endowed new son number, from the lifting sequence not influenced between front member is realized, realize new
The lifting sequence of component is added to add, for example, generating the number according to lifting sequence sequence correspondingly for 5 components, respectively
11,21,31,41 and 51, new component is added between 11 and 21, then the number of new structural member is the sub- number 12 of number 11, real
Now number be 11 component complete lifting after, sequentially lifting number be 12 new structural member, then sequentially lifting subsequent number be 21,
31,41 and 51 component reduces the modification to lifting sequence file, and same without changing the number of subsequent members
The number of each component will not repeat in lifting sequence file so that each number can accurately correspond to each component and its phase
The lifting sequence answered can show the lifting sequence of component using number.
Step S13:The lifting sequence text for generating the lifting sequence preserved according to number sorting, and being detached with IFC files
Part.
Specifically, using the number of each component, by component sequential, and by the lifting sequence of each component, number
A lifting sequence file is saved as with component information, obtains a lifting sequence text for indicating lifting sequence with number order
Part can pass through the corresponding lifting of each component of lifting sequence file acquisition when needing to obtain the lifting sequence of component
Sequentially, and with IFC files it detaches, opening speed faster, is modified to IFC files or repaiied to lifting sequence file
Change, two files will be interfered with each other no longer.
As it can be seen that the embodiment of the present invention receives pre-set lifting sequence, generating each component, foundation is hung correspondingly
The number of dress sequence sequence, and the reserved establishment space of addition son number is each reserved between the number of component, so that new add
The lifting sequence of component is added to the number that other components are not interfered with after original lifting sequence file, reduces to lifting sequence
The modification of file, while lifting sequence file is individual file, no longer influences each other with IFC files, improves lifting work
Efficiency.
It is understood that lifting sequence file, after Preliminary design obtains, user may need in actual use
The lifting sequence of component is modified, to meet current lifting work requirements, for this purpose, can also be defeated including the use of user
The modification information entered changes lifting sequence file, using the lifting sequence in modification information, changes hanging in lifting sequence file
Dress sequence, obtains new lifting sequence file, specific amendment step may include step S14 and step S15;Wherein,
Step S14:Using the lifting sequence of target member in modification information, target member is added to and its lifting sequence
Between adjacent component, and the son number for the previous component of lifting sequence for generating target member.
It needs to add the lifting sequence of target member into lifting sequence file specifically, working as user, then sharp modification information
In target member information and target member lifting sequence, for example, the number of current lifting sequence is 11,21,31,41 and
51, totally five steps lift step, user need into lifting sequence file add a door lifting sequence, using in modification information
The title of door, the lifting sequence of door are the 5th step, then the number for generating door is 42, the number of new lifting sequence is 11,21,31,
41,42 and 51;When user needs to change the lifting sequence of original component into lifting sequence file, then utilize in modification information
The modified sequence of target member, for example, user needs to be the 8th step, number to a lifting sequence in lifting sequence file
Lifting sequence for 81 window is modified, and the new lifting sequence using the window described in modification information is the 5th step, then will
The number of the window is changed to 42, and the equal subsequent numbers of the number 91 and 101 after the window original number 81 can change, become automatically
81 and 91, to keep the continuity of number.
Step S15:Using the attribute information of target member in modification information, target member is searched in lifting sequence file
Lifting sequence, target member is set as lifting sequence starting point.
In practical applications, lifting work possibly can not once be finished, therefore, the lifting step in lifting sequence file
Suddenly a part may have been only carried out, and another part is also not carried out, if directly initiating lifting work at this time, loads lifting sequence
File can then cause the lifting step executed that will be performed, and cause repetition lifting, therefore, can utilize modification
Information searches target member in lifting sequence file, and the lifting step of target member is set as lifting sequence starting point, when with
Family needs to change the starting point of lifting sequence, and the lifting step by inputting target member in modification information is used as starting point,
Modification information is then utilized, target member is searched in lifting sequence file, and the lifting step of target member is set as lifting suitable
Sequence starting point executes to realize lifting work from any position in lifting sequence file, does not have to again to lifting sequence file
Cumbersome modification is carried out, the efficiency of lifting work is improved.
The embodiment of the invention also discloses a kind of lifting sequences, and system is arranged, shown in Figure 2, is applied to assembled architecture
Field, the system include:
Receiving module 11, for receiving pre-set lifting sequence;
Number generation module 12, for generating number of each component correspondingly according to lifting sequence sequence, wherein
The reserved establishment space of addition son number is reserved between the number of each component;
File generating module 13, for generating the lifting sequence preserved according to number sorting, and detached with IFC files
Lifting sequence file.
As it can be seen that the embodiment of the present invention receives pre-set lifting sequence, generating each component, foundation is hung correspondingly
The number of dress sequence sequence, and the reserved establishment space of addition son number is each reserved between the number of component, so that new add
The lifting sequence of component is added to the number that other components are not interfered with after original lifting sequence file, reduces to lifting sequence
The modification of file, while lifting sequence file is individual file, no longer influences each other with IFC files, improves lifting work
Efficiency.
Can also include modified module in the embodiment of the present invention;Wherein,
Modified module changes lifting sequence file for utilizing modification information input by user.
Wherein, above-mentioned modified module may include adding device and starting point modification unit;Wherein,
Target member is added to and is hung with it for the lifting sequence using target member in modification information by adding device
Between the adjacent component of dress sequence, and the son number for the previous component of lifting sequence for generating target member.
Starting point changes unit, for the attribute information using target member in modification information, in lifting sequence file
The lifting sequence for searching target member, lifting sequence starting point is set as by target member.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by
One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning
Covering non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only that
A little elements, but also include other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged
Except there is also other identical elements in the process, method, article or apparatus that includes the element.
A kind of lifting sequence setting method provided by the present invention and system are described in detail above, answered herein
With specific case, principle and implementation of the present invention are described, and the explanation of above example is only intended to help to manage
Solve the method and its core concept of the present invention;Meanwhile for those of ordinary skill in the art, according to the thought of the present invention,
There will be changes in specific implementation mode and application range, in conclusion the content of the present specification should not be construed as to this hair
Bright limitation.
Claims (8)
1. a kind of lifting sequence setting method, which is characterized in that it is applied to assembled architecture field, including:
Receive pre-set lifting sequence;
Generate the number that each component sorts according to the lifting sequence correspondingly, wherein between the number of each component
It is reserved with the reserved establishment space of addition son number;
Generate the lifting sequence preserved according to number sorting, and the lifting sequence file detached with IFC files.
2. lifting sequence setting method according to claim 1, which is characterized in that after generating lifting sequence file, also wrap
It includes:
Using modification information input by user, the lifting sequence file is changed.
3. lifting sequence setting method according to claim 2, which is characterized in that described to be believed using modification input by user
Breath, changes the process of the lifting sequence file, including:
Using the lifting sequence of target member in the modification information, the target member is added to adjacent with its lifting sequence
Component between, and the previous component of lifting sequence for generating the target member son number.
4. lifting sequence setting method according to claim 2, which is characterized in that described to be believed using modification input by user
Breath, changes the process of the lifting sequence file, including:
Using the attribute information of target member in the modification information, the target member is searched in the lifting sequence file
Lifting sequence, the target member is set as lifting sequence starting point.
5. system is arranged in a kind of lifting sequence, which is characterized in that it is applied to assembled architecture field, including:
Receiving module, for receiving pre-set lifting sequence;
Number generation module, the number to sort correspondingly according to the lifting sequence for generating each component, wherein every
The reserved establishment space of addition son number is reserved between the number of a component;
File generating module, for generating the lifting sequence preserved according to number sorting, and the lifting detached with IFC files is suitable
Preface part.
6. lifting sequence setting method according to claim 5, which is characterized in that further include:
Modified module changes the lifting sequence file for utilizing modification information input by user.
7. lifting sequence setting method according to claim 6, which is characterized in that the modified module, including:
Adding device, for the lifting sequence using target member in the modification information, by the target member be added to
Between the adjacent component of its lifting sequence, and the son number for the previous component of lifting sequence for generating the target member.
8. lifting sequence setting method according to claim 6, which is characterized in that the modified module, including:
Starting point changes unit, for the attribute information using target member in the modification information, in lifting sequence text
The target member is set as lifting sequence starting point by the lifting sequence that the target member is searched in part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710688266.3A CN108428195B (en) | 2017-08-12 | 2017-08-12 | Hoisting sequence setting method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710688266.3A CN108428195B (en) | 2017-08-12 | 2017-08-12 | Hoisting sequence setting method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108428195A true CN108428195A (en) | 2018-08-21 |
CN108428195B CN108428195B (en) | 2021-09-28 |
Family
ID=63155578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710688266.3A Active CN108428195B (en) | 2017-08-12 | 2017-08-12 | Hoisting sequence setting method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108428195B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111573258A (en) * | 2020-05-20 | 2020-08-25 | 欧拓飞科技(珠海)有限公司 | Manipulator feeding and discharging alignment system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011051639A1 (en) * | 2009-10-30 | 2011-05-05 | Centre Scientifique Et Technique Du Batiment (Cstb) | Configuration of construction products for a digital building model |
CN103246951A (en) * | 2012-12-11 | 2013-08-14 | 中建三局第一建设工程有限责任公司 | Intelligent electromechanical equipment management system and method based on BIM (building information modeling) |
WO2014079477A1 (en) * | 2012-11-20 | 2014-05-30 | Siemens Aktiengesellschaft | Method for the automatic creation of two- or three-dimensional building models |
CN105668418A (en) * | 2016-04-08 | 2016-06-15 | 湖南中铁五新重工有限公司 | Automatic hoisting device and method |
CN106777680A (en) * | 2016-12-14 | 2017-05-31 | 华中科技大学 | A kind of existing bridge fast B IM modelings and method |
-
2017
- 2017-08-12 CN CN201710688266.3A patent/CN108428195B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011051639A1 (en) * | 2009-10-30 | 2011-05-05 | Centre Scientifique Et Technique Du Batiment (Cstb) | Configuration of construction products for a digital building model |
WO2014079477A1 (en) * | 2012-11-20 | 2014-05-30 | Siemens Aktiengesellschaft | Method for the automatic creation of two- or three-dimensional building models |
CN103246951A (en) * | 2012-12-11 | 2013-08-14 | 中建三局第一建设工程有限责任公司 | Intelligent electromechanical equipment management system and method based on BIM (building information modeling) |
CN105668418A (en) * | 2016-04-08 | 2016-06-15 | 湖南中铁五新重工有限公司 | Automatic hoisting device and method |
CN106777680A (en) * | 2016-12-14 | 2017-05-31 | 华中科技大学 | A kind of existing bridge fast B IM modelings and method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111573258A (en) * | 2020-05-20 | 2020-08-25 | 欧拓飞科技(珠海)有限公司 | Manipulator feeding and discharging alignment system and method |
Also Published As
Publication number | Publication date |
---|---|
CN108428195B (en) | 2021-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105260354B (en) | A kind of Chinese AC automatic machines working method based on keyword dictionary tree construction | |
CN103307940B (en) | Electronic detonator initiating net control and initiation control method thereof | |
CN105095491A (en) | Process model repair method based on Petri net basic structures | |
CN103247068B (en) | A kind of rendering intent and device | |
CN104410293B (en) | Multiple-pulse thyristor trigger control method based on compensation of delay | |
CN105893482A (en) | Engine test data fully-automatic extracting and Word report generating method | |
CN103185490B (en) | A kind of programmable electronic detonator and the method and device of networking detection of detonating | |
CN108428195A (en) | A kind of lifting sequence setting method and system | |
CN104617830A (en) | Counter electromotive force zero-cross detection method and method of brushless DC motor, and phase-changing signal output method and circuit | |
CN109492115A (en) | A kind of Automobile Service knowledge physical network construction method, device and equipment | |
CN105447072A (en) | Configurable interface framework as well as searching method and system utilizing framework | |
CN101674205A (en) | Method and device for generating network communication protocol test sequence based on finite-state machine | |
CN103971189B (en) | A kind of method and apparatus of multimode management | |
CN105447003A (en) | Parameter set generation method and device | |
CN103064825A (en) | Indistinct sound establishing and setting method, input method and device and system thereof | |
CN105389335A (en) | Data mining analysis method and device based on automatic exercise | |
Rhaly Jr | A superclass of the posinormal operators | |
CN107992995A (en) | A kind of method and system for creating technological process title | |
CN105185297B (en) | A kind of the pulse width modulation conduction method and system of LED displays driving | |
CN104239314A (en) | Search word expanding method and system | |
CN203605833U (en) | Electronic detonator detonation control network | |
CN103077284B (en) | Generic text template is utilized automatically to generate the method and system of auxiliary code file | |
CN105447216A (en) | Method and device for increasing circuit simulation accuracy | |
CN104902091A (en) | Sorting method for address book and terminal | |
CN110008383A (en) | It is a kind of based on the black and white lists search method more indexed and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000 Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd Address before: 410205 room 3005, complex building, Changsha Jin Xia bonded logistics center, 30 Xingang Road, Kaifu District, Changsha, Hunan. Patentee before: Zhongmin Zhuyou Technology Investment Co.,Ltd. |
|
CP03 | Change of name, title or address |