CN108425375A - A kind of basis prefabricated post and its connection structure and its construction method - Google Patents

A kind of basis prefabricated post and its connection structure and its construction method Download PDF

Info

Publication number
CN108425375A
CN108425375A CN201810381333.1A CN201810381333A CN108425375A CN 108425375 A CN108425375 A CN 108425375A CN 201810381333 A CN201810381333 A CN 201810381333A CN 108425375 A CN108425375 A CN 108425375A
Authority
CN
China
Prior art keywords
cylinder
foundation
ground beam
prefabricated
prefabricated post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810381333.1A
Other languages
Chinese (zh)
Inventor
李藏住
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810381333.1A priority Critical patent/CN108425375A/en
Publication of CN108425375A publication Critical patent/CN108425375A/en
Priority to PCT/CN2019/084136 priority patent/WO2019206192A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of basic prefabricated posts, its drip irrigation device includes cylinder and foundation bolt, the foundation bolt is poured vertically in cylinder, the foundation bolt include bar portion and perpendicular to bar portion and with the integrally formed stabilizer blade of the bar portion, cylinder is partly stretched out in the bar portion and is placed in above cylinder;The invention also discloses a kind of installation methods of basic prefabricated post, and drip irrigation device includes following installation steps:Step a, foundation pit is dug, bottom of foundation ditch pours concrete bed course and arranges bar-mat reinforcement on bed course;Step b, basic prefabricated post is vertically placed in foundation pit;Step c, basic prefabricated post position is adjusted, the bar portion of foundation bolt is made to keep vertical;Step d, bottom of foundation ditch casting concrete makes concrete cladding lower body part point;Step e, foundation pit backfill is carried out after bottom of foundation ditch concrete setting;Achieve the purpose that avoid foundation bolt position in basic casting process deviation occur.

Description

A kind of basis prefabricated post and its connection structure and its construction method
Technical field
The present invention relates to a kind of building foundation, more particularly to a kind of basic prefabricated post and its connection structure and its construction party Method.
Background technology
Basis is the structure element being transmitted to the various effects that structure is born on ground.When basis top and steel When structural column connects, the pre-embedded anchoring bolts in basis are needed.During common foundation construction, need first that foundation bolt is solid vertically It is scheduled in foundation pit, then binds reinforcement foundation, installation form finally carries out concreting.When due to concreting, lower margin Bolt is easy to shift and tilt under by External force interference, and the position deviation so as to cause the exposed screw rod in top has exceeded Code requirement causes steel structure column difficult to install, and seriously affects the quality of connection with steel structure column.Even if the later stage is adjusted It is whole, it is bothersome laborious when being also unable to reach intrinsic requirement for bearing capacity, and adjusting, it can also influence the duration.
Invention content
The object of the present invention is to provide a kind of basic prefabricated posts, can reduce foundation bolt position in basic casting process and go out Existing deviation.
The present invention above-mentioned technical purpose technical scheme is that:A kind of basis prefabricated post, including Cylinder and foundation bolt, the foundation bolt are poured vertically in cylinder, and the foundation bolt includes bar portion and perpendicular to bar portion Stabilizer blade, cylinder is partly stretched out in the bar portion and is placed in above cylinder.
Second object of the present invention is to provide a kind of connection structure of basic prefabricated post, the foundation bolt position of the structure More accurate, installation quality is high.
The present invention above-mentioned technical purpose technical scheme is that:A kind of basis prefabricated post, including Cylinder and foundation bolt, the foundation bolt are poured vertically in cylinder, and the foundation bolt includes bar portion and perpendicular to bar portion Stabilizer blade, cylinder is partly stretched out in the bar portion and is placed in above cylinder, cylinder bottom is embedded in cast-in-place base concrete.
By using above-mentioned technical proposal, foundation bolt is made not shift and tilt in concreting process, It avoids causing to generate deviation.
Third object of the present invention is to provide a kind of construction methods of foundation structure, and this method installation steps are simple, apply Work is efficient.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of installation method of basis prefabricated post, including following installation steps:
Step a, foundation pit is dug, bottom of foundation ditch pours concrete bed course;
Step b, basic prefabricated post is vertically placed in foundation pit;
Step c, basic prefabricated post position is adjusted, the bar portion of foundation bolt is made to keep vertical;
Step d, bottom of foundation ditch casting concrete makes concrete cladding lower body part point;
Step e, foundation pit backfill is carried out after bottom of foundation ditch concrete setting.
By using above-mentioned technical proposal, foundation bolt is made not shift and tilt in concreting process, It avoids causing to generate deviation, and is not required to installation side form, construction is rapidly and efficiently.
In conclusion the present invention has the following technical effects:
1. foundation bolt is poured in advance in basic prefabricated post, when carrying out infrastructure, basic prefabricated post is placed on base vertically In hole and in bottom of foundation ditch casting concrete, since foundation bolt is fixed in cylinder, can keep away when lower concrete pours Exempt from that foundation bolt shifts and deviation occurs in inclination, while the construction for carrying out by basic prefabricated post basis is easy to construct, it can Save the duration;
2. foundation bolt lower part is poured in can meet the needs of foundation bolt stress in cylinder, while can reduce foundation bolt Dosage, it is cost-effective;Cylinder bottom setting spacer bar can be used as the support of pillar, be convenient for adjusting, while in foundation pit Casting concrete rear support reinforcing bar can play the role of reinforcement basic stress ability and be adopted simultaneously as foundation bolt cost is higher Foundation bolt dosage can be saved with such method, it is cost-effective;
3. the foundation structure connect with prefabricated ground beam/precast concrete column it is integral, have better stress, anti-seismic performance;
4. using this method, do not need installation form, construction rapidly and efficiently, save the duration.
Description of the drawings
Fig. 1 is basic prefabricated post structural schematic diagram;
Fig. 2 is basic prefabricated post scheme of installation;
Fig. 3 is basic prefabricated post schematic cross-section;
Fig. 4 is that basic prefabricated post foundation bolt stabilizer blade is located at structural schematic diagram in cylinder;
Fig. 5 is provided with the basic prefabricated post schematic diagram of internal reinforcing bar;
Fig. 6 is the basic prefabricated post schematic diagram that stabilizer blade is located at outside cylinder;
Fig. 7 is provided with the basic prefabricated post scheme of installation of location hole;
Fig. 8 is provided with the basic prefabricated post structural schematic diagram of location hole;
Fig. 9 is the basic prefabricated post structural schematic diagram that location hole is through-hole;
Figure 10 is the structural schematic diagram of first time casting concrete in through-hole;
Figure 11 is second of casting concrete and the structural schematic diagram for wrapping up bolt in through-hole;
Figure 12 is the basic prefabricated post structural schematic diagram of side setting cylinder dowel;
Figure 13 is the basic prefabricated post of side setting cylinder dowel and prefabricated ground beam connection diagram;
Figure 14 is the prefabricated post structural schematic diagram of cylinder dowel setting enlarged footing;
Figure 15 is the cylinder dowel that enlarged footing is arranged and prefabricated ground beam sleeve connection schematic diagram;
Figure 16 is the prefabricated foundation rod structure schematic diagram of side setting jack hole;
Figure 17 is that perforation muscle passes through the structural schematic diagram for connecting both sides ground beam after jack hole;
Figure 18 is the structural schematic diagram that sleeve connection is used after perforating muscle setting enlarged footing;
Figure 19 is that the ground beam dowel of enlarged footing is arranged directly with the structural schematic diagram of sleeve connection;
Figure 20 is that the high prefabricated ground beam in both sides is connected with each other structural schematic diagram;
Figure 21 is that the high prefabricated ground beam in both sides is connected with each other construction procedure one;
Figure 22 is that the high prefabricated ground beam in both sides is connected with each other construction procedure two;
Figure 23 is that the high prefabricated ground beam in both sides is connected with each other construction procedure three;
Figure 24 is that the high prefabricated ground beam in both sides is connected with each other construction procedure four;
Figure 25 is the prefabricated foundation rod structure schematic diagram for becoming enlarged footing after bar portion screw thread nutting;
Figure 26 is that nut enlarged footing connects muscle sleeve connection structure schematic diagram with precast concrete column bottom;
Figure 27 is the prefabricated foundation rod structure schematic diagram of bar portion end setting enlarged footing;
Figure 28 is that enlarged footing connects muscle sleeve connection structure schematic diagram with precast concrete column bottom;
Figure 29 is the prefabricated foundation rod structure schematic diagram that setting is affixed with foundation bottom;
Figure 30 is prefabricated foundation column and precast concrete column sleeve connection structure schematic diagram;
Figure 31 is the structural schematic diagram of installation vertical reinforcement in prefabricated foundation column through-hole;
Figure 32 is prefabricated foundation column and hollowcore precast concrete column attachment structure schematic diagram;
Figure 33 is prefabricated foundation column and hollowcore precast concrete column and prefabricated ground beam attachment structure schematic diagram;
Figure 34 is the structural schematic diagram of closed-entry reinforcing steel bar connecting sleeve tube middle cylinder body;
Figure 35 is the end view of necking;
Figure 36 is the cooperation schematic diagram of sleeve and connection reinforcing bar;
Figure 37 is the connection relationship diagram of closed-entry reinforcing steel bar connecting sleeve tube and prefabricated post;
Figure 38 is the structural schematic diagram of split type cylinder;
Figure 39 is the connection relationship diagram of split type cylinder and prefabricated post;
Figure 40 is the structural schematic diagram that sleeve is connected with two reinforcing bars of vertical state;
Figure 41 is the structural schematic diagram for stretching into fastening piece type sleeve outside;
Figure 42 is to stretch into fastening piece type sleeve and the assembling schematic diagram for connecting reinforcing bar outside.
Reference numeral:1, cylinder;11, cylinder dowel;12, jack hole;13, perforation muscle;14, filling tape is poured after;2, Foot bolt;21, bar portion;22, stabilizer blade;3, spacer bar;4, location hole;41, stiffener;42, through-hole;5, foundation pit;51, concrete pad Layer;52, the first pouring area;53, the second pouring area;6, cylinder;61, necking;611, transition circular conical surface;62, injected hole;63, even Fishplate bar;631, connecting hole;64, barrier element;65, clamping block;651, blocked hole;66, shrapnel;7, H profile steel;71, steel plate;72、 Shear pile;8, prefabricated ground beam;81, ground beam dowel;9, precast concrete column;91, bottom connects muscle;92, hollow;101, sleeve; 102, reinforcing bar is connected;103, enlarged footing.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.The identical reference numeral of wherein identical parts It indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper", "lower", " bottom surface " and " top surface " refers to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from geometric center of specific component Direction.
When being built to building foundation, it is necessary first to fix foundation bolt 2 vertically in foundation pit 5, then be propped up Mould and concrete perfusion basis of formation, in concrete perfusion, foundation bolt 2, which is easily shifted and tilted, leads to foundation bolt 2 Deviation occurs for position, cannot be satisfied building requirements, and the later stage adjusts time-consuming and laborious and easily causes foundation bolt 2 and fix unstable feelings Condition designs a kind of basic prefabricated post of 2 run-off the straight of avoidable foundation bolt and offset, concrete structure in order to solve the above problem It is as follows:
Embodiment one:
A kind of basis prefabricated post, as shown in Figure 1, including cylinder 1 and foundation bolt 2, foundation bolt 2 is cast in inside cylinder 1, is wrapped The bar portion 21 being vertically arranged and the stabilizer blade 22 perpendicular to bar portion 21 are included, bar portion 21 is an integral molding structure with stabilizer blade 22, bar portion 21 Upper end stretches out cylinder 1 and is placed in 1 top of cylinder, and the tip portion of bar portion 21 can be bolt head.The bar portion 21 of foundation bolt 2 to The lower bottom surface for stretching out cylinder 1, stabilizer blade 22 are located at outside cylinder 1.
As shown in Fig. 2, when installation, pours bed course in 5 bottom of foundation pit and arrange bar-mat reinforcement, then lift basic prefabricated post To foundation pit 5, after adjusting position and height, stabilizer blade 22 is connected and fixed with bar-mat reinforcement, finally carries out 5 lower concrete of foundation pit and pour It builds, makes the bottom of the concrete poured cladding cylinder 1, foundation pit 5 is backfilled after concrete setting can complete the construction on basis.
Since foundation bolt 2 is embedded in advance inside cylinder 1, the relative position of bar portion 21 and bolt head when prefabricated It is fixed, it is bound compared to scene by foundation bolt 2 is single, position precision higher.And after basic prefabricated post installation is fixed, Stabilized structure, the external force in casting process is difficult to be impacted to its position, so after the completion of entire foundation construction, foundation bolt 2 position offset is well controlled, and precision is high, to improve the construction quality on basis.
In addition, in original base work progress, installation form ability casting concrete is needed, and due to the shape on basis Structure is that lower part is big, and top is small, so template installation is complicated time-consuming.And this method is used, installation form is not needed, as long as will mix Solidifying soil pours into 5 bottom of foundation pit, it is made to wrap up the bottom of cylinder 1.Also have in this way construction rapidly and efficiently, work can be saved The advantages of phase.
As shown in figure 3, the forms such as prism or cylinder, the circumference centered on 1 axis of cylinder of foundation bolt 2 can be used in cylinder 1 Array has multiple.
When the height of foundation of design is larger, the height of cylinder 1 is needed accordingly to increase, but due to 2 material of foundation bolt High compared to regular reinforcement price, stabilizer blade 22 is located at the waste that the setting outside cylinder 1 can cause material.So as shown in figure 4, The lower part and stabilizer blade 22 of bar portion 21 may be contained within inside cylinder 1.Preferably, stabilizer blade 22 is arranged for varus.1 lower end of cylinder is fixed Several spacer bars 3 are provided with, spacer bar 3 is vertically arranged, and the upper end is poured in cylinder 1, and 3 lower end of each spacer bar is protected It holds and flushes.Spacer bar 3 can be straight muscle, can also be as shown in Figure 4, and the bottom of spacer bar 3 is turned up or varus, with convenient Support is fixed.
Spacer bar 3 can also be as the inside vertical applied force reinforcing bar of cylinder 1.As shown in figure 5, cylinder 1 is reinforced concrete Soil structure, inside setting vertical applied force reinforcing bar and stirrup, stirrup it may be said that there are two types of, it is a kind of (to be by vertical applied force reinforcing bar Spacer bar 3) hoop is enclosed, it is a kind of that foundation bolt 2 is enclosed into hoop.
As shown in fig. 6, when the stabilizer blade 22 of foundation bolt 2 is located at the outside of cylinder 1, foundation bolt 2 can be served as column The vertical applied force reinforcing bar of body 1 arranges stirrup in the surrounding of foundation bolt 2.
When the stabilizer blade 22 of foundation bolt 2 is located at 1 outside of cylinder, can be turn up or varus setting.Turn up setting when, by Power structure is more preferable, and the processing and transport of more convenient basic prefabricated post is arranged in varus.
Embodiment two:
Fig. 2 is reviewed, basis top is threadedly coupled with the steel plate 71 for being fixed on 7 bottom of H profile steel to reach to H by foundation bolt 2 7 fixed purpose of shaped steel.Due to foundation bolt 2 in the case where bearing larger shear stress easily there is a situation where fractureing, because This with 7 fixed steel plate of H profile steel, 71 lower end as shown in fig. 7, be welded with shear pile 72, which sets perpendicular to steel plate 71 It sets.In the prior art, it is corresponding with shear pile 72 to pour out mold to be placed in upper end center position when basis is poured Location hole 4 stretches into shear pile 72 in location hole 4 when installing H profile steel 7, finally in gap and fixed between steel plate 71 and basis Casting concrete in the hole 4 of position, to achieve the purpose that bear shear stress.
As shown in Figure 8 and Figure 9, for ease of coordinating with shear pile 72, the 1 upper end center position of cylinder in the present invention is preset with 42 two kinds of forms of counterbore and through-hole can be arranged in location hole 4, the location hole 4, and wherein counterbore can be directly used for carrying out with shear pile 72 Cooperation, through-hole 42 also act as the when of being poured to 5 bottom of foundation pit in addition to it can be coordinated with shear pile 72 and topple over concrete.
As shown in Figure 10, it in through-hole 42 after casting concrete, is connect with base foundation concrete integral, strengthens basis The connection of prefabricated post and bottom cast-in-place concrete structure enhances the stress performance on basis.It can also be arranged in through-hole 42 vertical Stiffener 41.In addition it should be pointed out that concrete is divided into two-step pouring in through-hole 42, when pouring for the first time, reserve The part coordinated with shear pile 72;After the installation of H profile steel 7, then filling tape 14 is poured after being arranged between 1 top of steel plate 71 and cylinder Carry out secondary pour.
As shown in figure 11, when secondary casting concrete, steel plate 71 and fixing bolt can be wrapped up into concrete, is prevented It gets rusty.
Embodiment three:
Further include the prefabricated ground beam 8 for being set to 1 side of cylinder, in advance with embodiment one except that as shown in Figure 12 and Figure 13 Ground beam 8 processed connects adjacent two basic prefabricated posts.8 horizontal direction of prefabricated ground beam is embedded with ground beam dowel 81, and ground beam connects Muscle 81 is connect to connect with basic prefabricated post.Basic post-cast strip is set between the end and cylinder 1 of prefabricated ground beam 8, after concreting, By prefabricated ground beam 8 with basis connect it is integral.
Binding connection, welding, the connection of straight screw sleeve 101 etc. may be used often with cylinder dowel 11 in ground beam dowel 81 Rule are fixedly connected with mode.
As shown in figure 14,81 end of ground beam dowel of prefabricated ground beam 8 is arranged to enlarged footing 103, as shown in figure 15, cylinder 11 end of dowel is enlarged footing 103, and ground beam dowel 81 is connect with the sleeve 101 of cylinder dowel 11(101 structure of sleeve and Its connection type is described in last paragraph).
Example IV:
As shown in figure 16, described to wear with embodiment three except that offer several jack holes 12 in 1 upper portion side wall of cylinder It is horizontally disposed through-hole or blind hole to connect hole 12.As shown in figure 17, foundation structure further includes the perforation muscle 13 across jack hole 12, The both ends of perforation muscle 13 are affixed with the ground beam dowel 81 positioned at its both sides respectively.
When prefabricated ground beam 8 is T-shaped setting, the jack hole 12 of one side can be blind hole.
Not only facilitate the transport and installation of basic prefabricated post by the way that jack hole 12 is arranged, but also convenient for the connection of ground beam, together When also make the connection of ground beam more flexible, facilitate adjustment.
As shown in figure 17,13 both ends of perforation muscle are set as enlarged footing 103, and as shown in figure 18,81 end of ground beam dowel is Enlarged footing 103, perforation muscle 13 are connect with the sleeve 101 of ground beam dowel 81.
Embodiment five:
With embodiment three except that as shown in figure 19, filling tape 14, phase are poured after being arranged between 1 top of steel plate 71 and cylinder The ground beam dowel 81 of adjacent two prefabricated ground beams 8 pours after to be connected inside filling tape 14.After pour 14 casting concrete of filling tape after, Prefabricated ground beam 8 and basis connection is integral.
Further, 81 both ends of ground beam dowel of prefabricated ground beam 8 are set as enlarged footing 103, two neighboring prefabricated ground beam 8 Ground beam dowel 81 with sleeve 101 connect.
The foundation structure need not do any improvement to the side of basic prefabricated post cylinder 1, and equally may be implemented will be prefabricated Ground beam 8 connect integral with basis.
Embodiment six:
With embodiment five except that as shown in figure 20, the height of prefabricated ground beam 8 is more than the height of cylinder 1,1 bottom of cylinder Concrete is divided into two-step pouring, and what it is positioned at bottom is the first pouring area 52, and what it is positioned at top is the second pouring area 53;It is two neighboring The part ground beam dowel 81 of prefabricated ground beam 8 is attached in the second pouring area 53.
Steps are as follows when construction:
As shown in figure 21, first basic prefabricated post is mounted on 5 inner cushion layer of foundation pit, and assembling reinforcement, basic prefabricated post is fixed;
As shown in figure 22,52 concrete of the first pouring area is poured;
As shown in figure 23, after 52 concrete setting of the first pouring area, prefabricated ground beam 8 is mounted on 52 concrete of the first pouring area Top, and the ground beam dowel 81 that two neighboring prefabricated ground beam 8 is located to 1 upper and lower part of cylinder carries out welding or sleeve 101 Connection;
In conjunction with Figure 24 and Figure 20, the concrete between 53 concrete of the second pouring area and two neighboring prefabricated ground beam 8, coagulation are poured Native top surface pours to stopping when 72 bottom of shear pile and pours;
Finally, as shown in figure 20, H profile steel 7 is installed, and the concrete for pouring by after filling tape 14 pours.
Embodiment seven:
The difference is that, as shown in figure 25, the part that the bar portion 21 exposes to 1 upper surface of cylinder offers with embodiment one Screw thread, nut is screwed into after screw thread becomes enlarged footing 103 by 21 end of bar portion.As shown in figure 26, foundation structure further includes prefabricated mixed Solidifying earth pillar 9,9 bottom of precast concrete column are embedded with the bottom extended downwardly and connect muscle 91, and the lower end that bottom connects muscle 91 is set as expanding Major part 103;Bottom connects muscle 91 and is connect with the sleeve 101 of enlarged footing 103 of foundation bolt 2;9 bottom surface of precast concrete column and basis Post-cast strip is arranged between top surface in prefabricated post.
As shown in figure 27, the bar portion 21 of foundation bolt 2 exposes to the end of 1 upper surface of cylinder and is set as enlarged footing 103.Such as Shown in Figure 28,9 bottom of precast concrete column connects muscle 91 and is connect with the sleeve 101 of enlarged footing 103 of foundation bolt 2.
Embodiment eight:
The difference is that, as shown in figure 29, the stabilizer blade 22 of basic prefabricated post is located inside cylinder 1 with embodiment one, and basis is pre- Column bottom surface processed is affixed with 5 bottom of foundation pit.The basic prefabricated post being arranged herein has bigger compared to basic prefabricated post above Sectional dimension, 1 bottom of cylinder is not required in the concrete poured after embedment, but is directly placed in foundation pit 5, its own gravity is utilized It is used based on advantage.
As shown in figure 30, the top of basic prefabricated post is connect with the sleeve 101 of precast concrete column 9.
Further, in conjunction with Figure 31 and 32, precast concrete column 9 is provided with upper and lower perforative hollow 92;It is filled in hollow 92 Note concrete is simultaneously connect with post-cast strip concrete;Perforative through-hole 42 up and down is arranged in cylinder 1, in through-hole 42 concrete perfusion and with Post-cast strip concrete connection.
Preferably, the vertical reinforcement that hollow 92 interior settings of through-hole 42 and precast concrete column 9 are elongated, and it is vertical by more Reinforcing bar is connected with stirrup.To further strengthen the connection between basic prefabricated post and precast concrete column 9.
As shown in figure 33, foundation structure can also include prefabricated ground beam 8, and the ground beam dowel 81 of prefabricated ground beam 8 uses sleeve 101 connections.
Embodiment nine,
A kind of construction method of foundation structure, including following installation steps:
Step a, Fig. 2 is reviewed, foundation pit 5 is dug, 5 bottom of foundation pit pours concrete bed course 51 and arranges bar-mat reinforcement on bed course;
Step b, basic prefabricated post is sling and is vertically placed in foundation pit 5;
Step c, basic prefabricated post position is adjusted, so that the bar portion 21 of foundation bolt 2 is kept vertical, passes through spacer bar 3 or lower margin Bolt 2 is supported, and interim positioning can be arranged when necessary;
Step d, 5 bottom casting concrete of foundation pit makes concrete coat 1 lower part of cylinder, can be into when foundation pit 5 is in irregular shape Row formwork pours, and directly can inject concrete by limit hole when limit hole is upper and lower through-hole form is poured;
Step e, the ground beam dowel 81 of prefabricated ground beam 8 is connected with each other, or by the ground beam dowel 81 and cylinder of prefabricated ground beam 8 Dowel 11 connects, or the ground beam dowel 81 of prefabricated ground beam 8 is connect with perforation muscle 13, and pours two neighboring prefabricated ground beam Post-cast strip between 8;
Step f, foundation pit 5 is carried out after the solidification of 5 lower concrete of foundation pit to backfill.
Embodiment ten,
A kind of construction method of foundation structure, as shown in Figure 29-Figure 33, including following installation steps:
Step a, foundation pit 5 is dug, basic prefabricated post is vertically placed in foundation pit 5;
Step b, vertical reinforcement in the through-hole 42 of basic prefabricated post is installed, stirrup is bound;
Precast concrete column 9 is installed step c, above basic prefabricated post, vertical reinforcement is penetrated in hollow 92;Precast concrete Column 9 can carry out temporary support with supporting blocks such as I-steel;
Step d, by the sleeve 101 of enlarged footing 103 of enlarged footing 103 and 9 lower part of precast concrete column at the top of basic prefabricated post Connection;
Step e, the prefabricated ground beam 8 in both sides is installed, the sleeve 101 of ground beam dowel 81 of prefabricated ground beam 8 is connected;
Step f, by the post-cast strip casting concrete between at the top of basic prefabricated post and 9 bottom of precast concrete column.
Tube-in-tube structure and attaching method thereof is introduced:
Sleeve 101 may be used closed-entry reinforced bar sleeve and stretch into fastening piece type sleeve outside.
(Due to the company of the bar portion 21 and prefabricated ground beam 8 of ground beam dowel 11, perforation muscle 13, foundation bolt 2 above The bottom for connecing reinforcing bar 81 and precast concrete column 9 connects muscle 91 and is both provided with enlarged footing 103, so connection reinforcing bar hereinafter 102, which represent all of above reinforcing bar, illustrates.The component of 101 both sides of sleeve is illustrated by taking prefabricated ground beam 8 as an example)
Closed-entry reinforced bar sleeve:
As shown in figure 34, closed-entry reinforced bar sleeve includes cylinder 6 and is integrally connected to the necking 61 at 6 both ends of cylinder, is opened on cylinder 6 Equipped with several equally distributed injected holes 62, flowed into inside cylinder 6 convenient for cement mortar;In conjunction with Figure 35, necking 61 is round mouth, contracting Mouthful 61 inner walls are conical surface-shaped, and the larger one end of circular conical surface is towards the inside of cylinder 6;In conjunction with Figure 36, closed-entry reinforced bar sleeve Connection structure is made of connection reinforcing bar 102 and cylinder 6, and 102 one end of connection reinforcing bar is pre-buried to be fixedly connected on inside prefabricated ground beam 8, The other end is exposed at 8 outside of prefabricated ground beam and is connected with enlarged footing 103, enlarged footing in one end end far from prefabricated ground beam 8 103 outer wall radial dimension is more than the outer wall radial dimension of connection reinforcing bar 102 and the inner wall radial dimension less than necking 61, expands First 103 can stretch into from necking 61 inside cylinder 6.
As shown in figure 37, cement mortar is after injected hole 62 flows into the inside of cylinder 6 and solidifies and form concrete, enlarged footing 103 can be fixed on inside cylinder 6, and the connection reinforcing bar 102 that can limit 6 both ends of cylinder is pulled out towards the direction movement being located remotely from each other Go out cylinder 6, to the prefabricated ground beam 8 to both ends(Rectangular block shape structure of the reinforcing bar 102 far from 6 one end of cylinder is connected in Figure 37 is The schematic diagram of prefabricated ground beam 8)It is attached, improves the bonding strength between two prefabricated ground beams 8.Enlarged footing 103 is close to connection One end of reinforcing bar 102 is round platform planar, and enlarged footing 103 is less than the other end close to one end of prefabricated ground beam 8;For ease of narration, contracting The circular conical surface of mouth 61 is defined as transition circular conical surface 611, and necking 61 and cylinder are integrally connected between 6 end by transition circular conical surface 611 It connects, after connection reinforcing bar 102 is by the active force for extracting cylinder 6 direction, round table surface squeezes concrete, and concrete is by squeezing action Power(Such as the schematic diagram that the direction of F arrows meaning in Figure 37 is force direction)Pass to transition circular conical surface 611, transition circular conical surface 611 reaction forces generated have component radially to enlarged footing 103, radially compress enlarged footing 103, therefore, transition circle The conical surface 611 can make the load of cylinder 6 and internal concrete carrying bigger, improve connection reinforcing bar 102 and enlarged footing 103 with Bonding strength between cylinder 6.
Compared with existing grout sleeve, which does not need individual grouting operation, but in casting concrete, coagulation Soil paste liquid enters the connection that cylinder 6 completes connection reinforcing bar 102, and operation is more convenient and does not need special grouting material, It is cost-effective.It transmits further, since the program is depended on pressure, is stung by cohering between grouting material and reinforcing bar compared to grout sleeve It closes, connection is relatively reliable.
The shape of necking 61 can be round, can also be the various shapes such as rectangular, strip and ellipse, enlarged footing 103 section is adapted with the shape of necking 61.It is effectively transferred to cylinder 6 in order to make the pressure of enlarged footing 103 pass through concrete On, the size big 1 ~ 5mm, preferably 2 ~ 3mm of the size ratio enlarged footing 103 of necking 61.
As shown in Figure 38 and Figure 39, cylinder 6 has separate structure, can be split as two halves in an axial direction.Two halves cylinder 6 is mutual Close one end outer surface has been fixedly connected with connecting plate 63, and connecting hole 631, two halves cylinder 6 are offered on connecting plate 63 After being mutually butted split, the connecting hole 631 on connecting plate 63 can be mutually aligned, can by will sell or the pin members such as bolt simultaneously insert Enter in two connecting holes being mutually aligned 631, pin joints are carried out to two connecting plates 63, limitation two halves cylinder 6 is towards being located remotely from each other Direction is separated from each other.
When the distance between two prefabricated ground beams 8 are smaller, 102 phase of connection reinforcing bar that is embedded in inside prefabricated ground beam 8 Mutually the distance between close end face of one end is also smaller, can cylinder 6 be split as two halves, first will wherein half cylinder 6 It is nested on one of connection reinforcing bar 102, then the other half cylinder 6 is socketed on connection reinforcing bar 102, finally by two halves cylinder Body 6 is slided along the axial direction for connecting reinforcing bar 102 and towards direction close to each other, and the connecting hole 631 on connecting plate 63 is made to be mutually aligned, Being inserted into connecting hole 631 by pin member keeps two halves cylinder 6 stitched together.
As shown in figure 40, when connection be two reinforcing bars of vertical state when, in order to by sleeve 101 before casting concrete It can be more easily temporarily fixed at the docking location of two connection reinforcing bars 102, be unlikely to slide.So in the middle part of 6 inner wall of cylinder Position is connected with the barrier element 64 for preventing enlarged footing 103 from running through sleeve 101.Barrier element 64 can be located among cylinder 6 Disk plate.Further, in order to allow cement mortar to be flowed freely in cylinder 6, barrier element 64 is arranged to hollow annulus Shape, internal radius are less than the diameter of enlarged footing 103.Alternatively, barrier element 64 can also be one be radially arranged piece along cylinder 6 Rod piece.
Stretch into fastening piece type sleeve outside:
As shown in Figure 41 and Figure 42, it includes cylinder 6, clamping block 65, shrapnel 66 to stretch into fastening piece type sleeve outside, and the both ends of cylinder 6 are equal The blocked hole 651 for 65 grafting of clamping block is offered, injected hole 62 is offered on cylinder 6.The outside of shrapnel 66 one end and cylinder 6 Face is mutually fixedly connected, and one end that the other end and the clamping block 65 of shrapnel 66 are located on the outside of cylinder 6 is mutually fixedly connected.
102 one end of connection reinforcing bar is fixedly connected with enlarged footing 103, and the radial dimension of enlarged footing 103 is more than connection reinforcing bar 102 Radial dimension, enlarged footing 103 can from the port of cylinder 6 be inserted into cylinder 6 inside.In insertion process, enlarged footing 103 pushes clamping Flexible deformation occurs for band spring plate 66 when block 65 is moved towards the direction far from 6 central axis of cylinder, and clamping is crossed in enlarged footing 103 After block 65, shrapnel 66 gradually restores deformation and is inserted into the reset of cylinder 6, and limitation enlarged footing 103 extracts cylinder 6.
When post-cast strip casting concrete around cylinder 6, cement mortar can be flowed into from the two-port and injected hole 62 of cylinder 6 Inside cylinder 6, solid concrete is formed after cement slurry sets, so that connection reinforcing bar 102 is fixed on inside cylinder 6, to realize The connection of two connection reinforcing bars 102.
In addition it should be pointed out that 4 sleeve correlations that the applicant submitted on April 8th, 2018 may be used in sleeve Patent of invention, application number is respectively 201810306670.4,201810307419.X, 201810307420.2 and 201810307967.2。
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.

Claims (39)

1. a kind of basis prefabricated post, which is characterized in that including cylinder(1)And foundation bolt(2), the foundation bolt(2)Vertically It pours in cylinder(1)It is interior, the foundation bolt(2)Including bar portion(21)With perpendicular to bar portion(21)Stabilizer blade(22), the bar Portion(21)Cylinder is stretched out in upper part(1)It is placed in cylinder(1)Top.
2. basis prefabricated post according to claim 1, which is characterized in that the foundation bolt(2)Bar portion(21)Downwards Stretch out cylinder(1)Bottom surface, stabilizer blade(22)Positioned at cylinder(1)It is external.
3. basis prefabricated post according to claim 1, which is characterized in that the foundation bolt(2)Stabilizer blade(22)It is located at Cylinder(1)Inside, the cylinder(1)Bottom is provided with several vertical spacer bars(3), the spacer bar(3)It pours upper end It builds in the cylinder(1)It is internal.
4. basis prefabricated post according to claim 1, which is characterized in that cylinder(1)For reinforced concrete structure, inside is set It is equipped with reinforcing bar.
5. basis prefabricated post according to claim 1, which is characterized in that the stabilizer blade(22)Towards cylinder(1)Outside Or inside.
6. basis prefabricated post according to claim 1, which is characterized in that the cylinder(1)Upper end center position offers Location hole(4).
7. basis prefabricated post according to claim 6, which is characterized in that the location hole(4)For the counterbore of upper end opening Structure.
8. basis prefabricated post according to claim 6, which is characterized in that the location hole(4)To run through cylinder(1)It is logical Pore structure.
9. basis prefabricated post according to claim 8, which is characterized in that be provided with vertical stiffener in through-hole (41)。
10. basis prefabricated post according to claim 1, which is characterized in that the cylinder(1)Upper side horizontal direction is pre- It is embedded with cylinder dowel(11).
11. basis prefabricated post according to claim 10, which is characterized in that the cylinder dowel(11)Exposed end It is set as enlarged footing(103).
12. basis prefabricated post according to claim 1, which is characterized in that the cylinder(1)If being offered in upper portion side wall Dry jack hole(12), the jack hole(12)For horizontally disposed through-hole or blind hole.
13. basis prefabricated post according to claim 1, which is characterized in that the bar portion(21)Expose to cylinder(1)Upper table The part in face offers screw thread, and nut is screwed into after screw thread becomes enlarged footing by bar portion end(103).
14. basis prefabricated post according to claim 1, which is characterized in that the bar portion(21)Expose to cylinder(1)Upper table The end in face is set as enlarged footing(103).
15. a kind of foundation structure, which is characterized in that include the basic prefabricated post as described in any one of claim 1-14, Cylinder(1)Bottom is embedded in cast-in-place base concrete.
16. foundation structure according to claim 15, which is characterized in that cylinder(1)Top is connect with steel column.
17. foundation structure according to claim 16, which is characterized in that steel column bottom surface is equipped with junction steel plate(71), steel plate (71)With cylinder(1)Top bolt connects.
18. foundation structure according to claim 17, which is characterized in that steel plate(71)Plane perpendicular is connected with shear pile (72), shear pile(72)Stretch into location hole(4)In.
19. foundation structure according to claim 18, which is characterized in that steel plate(71)With cylinder(1)It is arranged between top After pour filling tape (14).
20. foundation structure according to claim 19, which is characterized in that steel plate(71)And coagulation is poured around fixing bolt Soil wraps up connecting portion, prevents from getting rusty.
21. foundation structure according to claim 15, which is characterized in that location hole(4)In vertically arranged stiffener And casting concrete (41),.
22. foundation structure according to claim 15, which is characterized in that further include being set to cylinder(1)Side it is prefabricated Ground beam (8), prefabricated ground beam (8) connect adjacent two basic prefabricated posts.
23. foundation structure according to claim 22, which is characterized in that prefabricated ground beam(8)Horizontal direction is embedded with ground beam Dowel(81), ground beam dowel(81)(81) it is connect with basis prefabricated post.
24. foundation structure according to claim 23, which is characterized in that ground beam dowel(81)It is solid with cylinder dowel It connects.
25. foundation structure according to claim 24, which is characterized in that cylinder dowel end is enlarged footing(103), ground Beam dowel(81)Enlarged footing is arranged in end(103), ground beam dowel(81)With cylinder dowel sleeve(101)Connection.
26. foundation structure according to claim 23, which is characterized in that further include the perforation muscle across jack hole(13), Perforation muscle (13) and ground beam dowel(81)It is affixed.
27. foundation structure according to claim 26, which is characterized in that the perforation muscle(13)Both ends are set as enlarged footing (103), ground beam dowel(81)End is enlarged footing(103), muscle of perforating(13)With ground beam dowel(81)Use sleeve(101)Even It connects.
28. foundation structure according to claim 27, which is characterized in that further include precast concrete column (9), concrete Earth pillar bottom surface setting bottom connects muscle (91), and end is enlarged footing(103), the enlarged footing of precast concrete column(103)With cylinder(1) The enlarged footing at top(103)Use sleeve(101)Connection.
29. foundation structure according to claim 23, which is characterized in that poured after being arranged between 1 top of steel plate 71 and cylinder Filling tape(14), two neighboring prefabricated ground beam(8)Ground beam dowel(81)Filling tape is poured after(14)Inside connection.
30. foundation structure according to claim 29, which is characterized in that prefabricated ground beam(8)Ground beam dowel(81)Two End is set as enlarged footing(103), two neighboring prefabricated ground beam(8)Ground beam dowel(81)Use sleeve(101)Connection.
31. foundation structure according to claim 23, which is characterized in that prefabricated ground beam(8)Height be more than cylinder(1)'s Highly, cylinder(1)Lower concrete is divided into two-step pouring, and what it is positioned at bottom is the first pouring area (52), and what it is positioned at top is Two pouring areas (53);Two neighboring prefabricated ground beam(8)Part ground beam dowel(81)Connected in the second pouring area (63) It connects.
32. a kind of foundation structure, which is characterized in that include the basic prefabricated post as described in any one of claim 13-14, It further include precast concrete column(9), precast concrete column(9)Bottom is embedded with the bottom extended downwardly and connects muscle(91), bottom connects Muscle(91)Lower end be set as enlarged footing(103);Bottom connects muscle(91)With foundation bolt(2)Enlarged footing(103)Use sleeve (101)Connection;Precast concrete column(9)Post-cast strip is set between bottom surface and basic prefabricated post top surface.
33. a kind of foundation structure, which is characterized in that include the basic prefabricated post as described in any one of claim 13-14, It is characterized in that, stabilizer blade(22)Positioned at cylinder(1)Inside, basic prefabricated post bottom surface are affixed with bottom of foundation ditch.
34. foundation structure according to claim 33, which is characterized in that precast concrete column(9)It is provided with and runs through up and down Hollow (92);Hollow (92) interior concrete perfusion is simultaneously connect with post-cast strip concrete.
35. foundation structure according to claim 34, which is characterized in that cylinder(1)Perforative through-hole (42) above and below setting, The interior concrete perfusion of through-hole (42) is simultaneously connect with post-cast strip concrete.
36. foundation structure according to claim 35, which is characterized in that cylinder(1)Through-hole (42) and precast concrete Column(9)Hollow (92) in the elongated vertical reinforcement of setting.
37. a kind of construction method of foundation structure, it is characterised in that:Including following installation steps:
Step a, foundation pit is dug(5), foundation pit(5)Bottom pours concrete bed course(51);
Step b, basic prefabricated post is vertically placed on foundation pit(5)It is interior;
Step c, it adjusts basic prefabricated post position and reinforces, make foundation bolt(2)Bar portion(21)Keep vertical;
Step d, foundation pit(5)Bottom casting concrete makes concrete coat cylinder(1)Lower part;
Step e, foundation pit(5)Foundation pit is carried out after lower concrete solidification(5)Backfill.
38. according to a kind of construction method of foundation structure described in claim 37, which is characterized in that further include step d-1, incite somebody to action Prefabricated ground beam(8)Ground beam dowel(81)It is connected with each other, or by prefabricated ground beam(8)Ground beam dowel(81)With prefabricated ground beam (8)The connection of cylinder dowel, or by prefabricated ground beam(8)Ground beam dowel(81)With perforation muscle(13)Connection, and pour phase Adjacent two prefabricated ground beams(8)Between post-cast strip.
39. a kind of construction method of foundation structure, it is characterised in that:Including following installation steps:
Step a, foundation pit is dug(5), basic prefabricated post is vertically placed on foundation pit(5)It is interior;
Step b, precast concrete column is installed above basic prefabricated post(9);
Step c, by the enlarged footing at the top of basic prefabricated post(103)With precast concrete column(9)The enlarged footing of lower part(103)With set Cylinder(101)Connection;
Step d, by basic prefabricated post top and precast concrete column(9)Post-cast strip casting concrete between bottom.
CN201810381333.1A 2018-04-25 2018-04-25 A kind of basis prefabricated post and its connection structure and its construction method Pending CN108425375A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810381333.1A CN108425375A (en) 2018-04-25 2018-04-25 A kind of basis prefabricated post and its connection structure and its construction method
PCT/CN2019/084136 WO2019206192A1 (en) 2018-04-25 2019-04-24 Prefabricated column/beam and connection structure thereof and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810381333.1A CN108425375A (en) 2018-04-25 2018-04-25 A kind of basis prefabricated post and its connection structure and its construction method

Publications (1)

Publication Number Publication Date
CN108425375A true CN108425375A (en) 2018-08-21

Family

ID=63161765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810381333.1A Pending CN108425375A (en) 2018-04-25 2018-04-25 A kind of basis prefabricated post and its connection structure and its construction method

Country Status (1)

Country Link
CN (1) CN108425375A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258602A (en) * 2019-06-27 2019-09-20 中铁第四勘察设计院集团有限公司 Prefabricated water-blocking bank segment, the construction method from wall discharge structure and from wall ditch
WO2019206192A1 (en) * 2018-04-25 2019-10-31 Li Cangzhu Prefabricated column/beam and connection structure thereof and construction method thereof
CN110820952A (en) * 2019-10-17 2020-02-21 九州职业技术学院 Steel structure column installation rapid positioning device and construction method
CN110965572A (en) * 2019-12-31 2020-04-07 中国电建集团贵州电力设计研究院有限公司 Street lamp foundation prefabricated structure and construction method
CN113719032A (en) * 2021-10-13 2021-11-30 中建科工集团有限公司 Construction method for column base joint of multi-limb column
CN113863672A (en) * 2021-11-25 2021-12-31 中国十九冶集团有限公司 Method for quickly constructing cylinder box concrete structure
CN113914682A (en) * 2021-09-26 2022-01-11 广州地铁设计研究院股份有限公司 Prefabricated cavity column assembly type column type maintenance pit and construction method thereof
CN113957996A (en) * 2021-11-17 2022-01-21 甘肃天水绿色装配式建筑产业发展有限公司 High-toughness prestress fabricated concrete building structure
CN113969676A (en) * 2021-09-26 2022-01-25 广州地铁设计研究院股份有限公司 Prefabricated assembled column type maintenance pit and construction method thereof
US11293183B2 (en) * 2017-06-02 2022-04-05 China State Construction Engineering Corporation Limited Precast column base joint and construction method therefor
CN115613761A (en) * 2022-10-31 2023-01-17 中国十九冶集团有限公司 Steel reinforcement cage expansion assembly and construction method for installing box steel column in steel reinforcement cage

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073381A (en) * 1998-08-27 2000-03-07 Sugimoto Kenchiku Kenkyusho:Kk Exposed type fixed column base in steel steel-structured building, installation structure thereof, and its construction method
JP2002138492A (en) * 2000-10-30 2002-05-14 Shimizu Corp Foundation execution method of building
CN203639932U (en) * 2013-12-20 2014-06-11 中铁第一勘察设计院集团有限公司 Pre-embedded foundation structure used for installation of machine column of high-column signal machine of railway
CN203835020U (en) * 2014-05-07 2014-09-17 湖北邮电规划设计有限公司 Fast-construction prefabricated base for communication single-pipe tower
CN205171535U (en) * 2015-07-02 2016-04-20 国家电网公司 Prefabricated assembled foundation of transmission line
CN206512590U (en) * 2016-11-24 2017-09-22 重庆市中科大业建筑科技有限公司 A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN107447858A (en) * 2017-09-29 2017-12-08 成都城电电力工程设计有限公司 PC fabricated construction dry type column foot connecting structures
JP2018021445A (en) * 2016-07-20 2018-02-08 大成建設株式会社 Method for constructing precast concrete foundation and precast concrete-made foundation
CN209162874U (en) * 2018-04-25 2019-07-26 李藏柱 A kind of basis prefabricated post and foundation structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073381A (en) * 1998-08-27 2000-03-07 Sugimoto Kenchiku Kenkyusho:Kk Exposed type fixed column base in steel steel-structured building, installation structure thereof, and its construction method
JP2002138492A (en) * 2000-10-30 2002-05-14 Shimizu Corp Foundation execution method of building
CN203639932U (en) * 2013-12-20 2014-06-11 中铁第一勘察设计院集团有限公司 Pre-embedded foundation structure used for installation of machine column of high-column signal machine of railway
CN203835020U (en) * 2014-05-07 2014-09-17 湖北邮电规划设计有限公司 Fast-construction prefabricated base for communication single-pipe tower
CN205171535U (en) * 2015-07-02 2016-04-20 国家电网公司 Prefabricated assembled foundation of transmission line
JP2018021445A (en) * 2016-07-20 2018-02-08 大成建設株式会社 Method for constructing precast concrete foundation and precast concrete-made foundation
CN206512590U (en) * 2016-11-24 2017-09-22 重庆市中科大业建筑科技有限公司 A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN107447858A (en) * 2017-09-29 2017-12-08 成都城电电力工程设计有限公司 PC fabricated construction dry type column foot connecting structures
CN209162874U (en) * 2018-04-25 2019-07-26 李藏柱 A kind of basis prefabricated post and foundation structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘自明: "《桥梁深水基础》", 30 April 2003, 人民交通出版社, pages: 215 *
汪黎明: "《华东工程质量监督理论与实践 2008 安徽》", 31 May 2008, 合肥工业大学出版社, pages: 373 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11293183B2 (en) * 2017-06-02 2022-04-05 China State Construction Engineering Corporation Limited Precast column base joint and construction method therefor
WO2019206192A1 (en) * 2018-04-25 2019-10-31 Li Cangzhu Prefabricated column/beam and connection structure thereof and construction method thereof
CN110258602A (en) * 2019-06-27 2019-09-20 中铁第四勘察设计院集团有限公司 Prefabricated water-blocking bank segment, the construction method from wall discharge structure and from wall ditch
CN110820952A (en) * 2019-10-17 2020-02-21 九州职业技术学院 Steel structure column installation rapid positioning device and construction method
CN110965572A (en) * 2019-12-31 2020-04-07 中国电建集团贵州电力设计研究院有限公司 Street lamp foundation prefabricated structure and construction method
CN113914682A (en) * 2021-09-26 2022-01-11 广州地铁设计研究院股份有限公司 Prefabricated cavity column assembly type column type maintenance pit and construction method thereof
CN113969676A (en) * 2021-09-26 2022-01-25 广州地铁设计研究院股份有限公司 Prefabricated assembled column type maintenance pit and construction method thereof
CN113719032A (en) * 2021-10-13 2021-11-30 中建科工集团有限公司 Construction method for column base joint of multi-limb column
CN113957996A (en) * 2021-11-17 2022-01-21 甘肃天水绿色装配式建筑产业发展有限公司 High-toughness prestress fabricated concrete building structure
CN113863672A (en) * 2021-11-25 2021-12-31 中国十九冶集团有限公司 Method for quickly constructing cylinder box concrete structure
CN115613761A (en) * 2022-10-31 2023-01-17 中国十九冶集团有限公司 Steel reinforcement cage expansion assembly and construction method for installing box steel column in steel reinforcement cage
CN115613761B (en) * 2022-10-31 2024-06-07 中国十九冶集团有限公司 Reinforcement cage expansion assembly and construction method for installing box-type steel column in reinforcement cage

Similar Documents

Publication Publication Date Title
CN108425375A (en) A kind of basis prefabricated post and its connection structure and its construction method
WO2020001156A1 (en) Bridge and bridge pier thereof
CN110205918B (en) Assembled bridge pile splicing structure and connecting method thereof
JP2002256573A (en) Foundation for existing foundation reinforcing steel tower and construction method for it
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN106836463A (en) The constructing device and construction method of cushion cap and ground girder construction
CN111364352A (en) Prefabricated pipe pier and cast-in-place pile connecting structure and construction method
CN110106780A (en) A kind of connection structure, the construction method of Precast Pier Columns and pile foundation
JP2001098514A (en) Method for constructing arch rib of concrete arch bridge
JP2004204563A (en) Pile head joint part structure and cylindrical body for fitting on the pile head
CN113738023B (en) Semi-prefabricated semi-cast-in-situ constructional column, and assembly structure and construction method thereof
CN209162874U (en) A kind of basis prefabricated post and foundation structure
CN206529778U (en) Customized type prestress anchorage cable reaction beam mounting structure
KR100382877B1 (en) Pier revolution apparatus and T-type pier construction method using the same
JPH0412111Y2 (en)
CN117052045A (en) Semi-embedded end-bearing column foot of steel tube concrete column and steel tube and column foot construction method thereof
JP6624797B2 (en) Construction method of pile foundation structure and pile foundation structure
WO2002016701A1 (en) Reinforcement structure for a foundation pile
JPH0610344A (en) Confirmation and increase method for support force of cast-in-place pile
CN213571600U (en) Bridge underpins bearing structure
CN210507509U (en) Prefabricated cushion cap and pier
CN113175237A (en) Building outer wall reinforcing structure and reinforcing method
CN112921960B (en) Supporting pile, foundation pit retaining wall, pile splicing structure, guide frame and construction method of guide frame
JPH02164930A (en) Foundation structure for building
CN212714493U (en) Prefabricated pier of assembling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Cangzhu

Inventor before: Li Cangzhu

CB03 Change of inventor or designer information