CN108422559A - A kind of architectural engineering Concrete sand blanking equipment in batches - Google Patents

A kind of architectural engineering Concrete sand blanking equipment in batches Download PDF

Info

Publication number
CN108422559A
CN108422559A CN201810132481.XA CN201810132481A CN108422559A CN 108422559 A CN108422559 A CN 108422559A CN 201810132481 A CN201810132481 A CN 201810132481A CN 108422559 A CN108422559 A CN 108422559A
Authority
CN
China
Prior art keywords
plate
strut
mounting plate
guide
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810132481.XA
Other languages
Chinese (zh)
Other versions
CN108422559B (en
Inventor
刘梅生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Aochuan Hydraulic Equipment Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810132481.XA priority Critical patent/CN108422559B/en
Publication of CN108422559A publication Critical patent/CN108422559A/en
Application granted granted Critical
Publication of CN108422559B publication Critical patent/CN108422559B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/06Supplying the solid ingredients, e.g. by means of endless conveyors or jigging conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/0007Pretreatment of the ingredients, e.g. by heating, sorting, grading, drying, disintegrating; Preventing generation of dust

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Toys (AREA)

Abstract

The present invention relates to a kind of blanking equipment more particularly to a kind of architectural engineering Concrete sand blanking equipments in batches.It can will not be lumpd after blanking, sand are accumulated for a long time in batches and the technical problem to be solved in the present invention is to provide a kind of convenient for screening the architectural engineering Concrete sand of tiny sand blanking equipment in batches.The present invention provides such a architectural engineering Concrete sand blanking equipments in batches, include the first mounting plate, the first strut, driven wheel, transmission belt, L-type strut, the second mounting plate, driving wheel, sector gear etc.;Left and right is arranged with the first strut at the top of first mounting plate.The present invention passes through stir plate bilateral reciprocation, it avoids the sand in lower material frame from luming due to accumulating for a long time, ensure that the normal whereabouts of sand, improve the stable of the present invention, and the wall plaster more demanding to construction material is used it for, achieve the effect that improve equipment practicability.

Description

A kind of architectural engineering Concrete sand blanking equipment in batches
Technical field
The present invention relates to a kind of blanking equipment more particularly to a kind of sand blankings in batches of architectural engineering Concrete Equipment.
Background technology
Architectural engineering, refer to by construction to all kinds of building constructions and its affiliated facility and the circuit mating with it, pipeline, The installation activity of equipment is formed by engineering entity, wherein " building construction ", which refers to, head cover, beam column, wall, basis and can Inner space is formed, meets people's production, lives, learns, the engineering that public activity needs.
Needed in architectural engineering use a large amount of sand, and sand generally directly stack on-site, due to building site in addition to It is also stacked with other construction materials except sand, causes sand to be very easy to the upper substances such as cement or lime of contamination, influences sand The normal use of son, therefore sand can be placed in blanking equipment by part building site, however most of existing blanking equipment is deposited The shortcomings that can not be easy caking after blanking, sand are accumulated for a long time in batches and be difficult to screen tiny sand.
To sum up, research and development one kind is needed blanking, sand will not can to lump after accumulating for a long time in batches and be convenient for sieving at present The architectural engineering Concrete sand of tiny sand blanking equipment in batches is selected, it in the prior art can not be in batches to overcome Blanking, sand are easy caking and are difficult to screen tiny sand after accumulating for a long time the shortcomings that.
Invention content
(1)Technical problems to be solved
The present invention can not be easy to lump and be difficult to screen after blanking, sand are accumulated for a long time in batches in the prior art in order to overcome The shortcomings that tiny sand, the technical problem to be solved in the present invention is to provide one kind blanking, sand to accumulate for a long time in batches It will not lump afterwards and convenient for screening the architectural engineering Concrete sand of tiny sand blanking equipment in batches.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a architectural engineering Concrete with sand in batches under Expect equipment, includes the first mounting plate, the first strut, driven wheel, transmission belt, L-type strut, the second mounting plate, driving wheel, sector Gear, transmission gear, reel, the first belt pulley, the second belt pulley, flat belt, third mounting plate, third strut, lower material frame, Guide plate, the first spring and bracing wire, the first mounting plate top left and right are arranged with the first strut, and rotary type connects at the top of the first strut There is driven wheel, transmission belt is wound on the driven wheel of two sides of left and right, the first mounting plate top left side is equipped with L-type strut, and L-type strut is right End is equipped with the second mounting plate, and left is equipped with driving wheel on front side of the second mounting plate, and output shaft is connected with sector gear on front side of driving wheel, Right rotary type is connected with transmission gear on front side of second mounting plate, and transmission gear is engaged with sector gear right part, before transmission gear Side is equipped with reel, and the first belt pulley is equipped on front side of sector gear, the second belt pulley, the second belt are equipped on front side of the driven wheel of left side Flat belt is wound between wheel and the first belt pulley, the first mounting plate top right side is equipped with third mounting plate, third mounting plate left side Symmetrical above and below to be equipped with third strut, the third strut left end of both up and down is equipped with lower material frame, and two wall lower part of lower material frame or so is opened There is a guide hole, guide hole inner sliding type is connected with guide plate, and guide plate right part is provided with blanking hole, is connected with the first spring on the right side of guide plate, and first Spring right end is connect with third mounting plate left side central portion, is connected with bracing wire on the left of guide plate, end of pulling is connect with reel.
Preferably, further include have cam, the first guide sleeve, first connecting rod, push plate, second spring, second connecting rod, the 4th Bar, the second guide sleeve, third connecting rod and stir plate, right side driven wheel front side are equipped with cam, and third mounting plate lower part is led equipped with first Set, the first guide sleeve inner sliding type are connected with first connecting rod, and first connecting rod left end is equipped with push plate, and push plate right side central is connected with second It is connect on the left of spring, second spring right end and the first guide sleeve, first connecting rod left part is located in second spring, and first connecting rod right end connects It is connected to second connecting rod, the 4th strut is equipped at the top of lower material frame right wall, the 4th strut top is equipped with the second guide sleeve, is slided in the second guide sleeve Dynamic formula is connected with third connecting rod, and third connecting rod bottom right is connect with second connecting rod top, and third connecting rod bottom left is equipped with and stirs Movable plate, stir plate are located in lower material frame.
Preferably, further include having guide plate, third guide sleeve, guide rod, scraping wings, knob and third spring, first, left side Bar left side central portion is connected with guide plate with the inclination of the first mounting plate top left side, and L-type strut lower part is equipped with third guide sleeve, and third is led Set inner sliding type is connected with guide rod, and guide rod bottom right is equipped with scraping wings, and guide rod left end is equipped with knob, and knob right side is connected with the It is connect on the left of three springs, third spring right end and third guide sleeve, guide rod left part is located in third spring.
Preferably, further include having baffle, the first mounting plate is arranged with baffle, transmission belt and thereon device position before and after top Between the baffle of front and rear sides.
Preferably, further include having web plate and placement plate, L-type strut lower part is equipped with web plate, is equipped with and puts on the left of the first mounting plate Set plate.
Operation principle:The sand that vehicle ships can in advance be poured into lower material frame, steadily be stored by lower material frame Sand avoids clean sand from being infected with the upper building sites such as cement or lime materials, to influence the normal use of sand, when worker needs When taking sand, control driving wheel rotates counterclockwise, and driving wheel output shaft drives sector gear to rotate counterclockwise, and then drives First belt pulley rotates counterclockwise, and the first belt pulley drives the second belt pulley to rotate counterclockwise by flat belt, to drive a left side Side driven wheel rotates counterclockwise so that transmission belt rotates counterclockwise, and when sector gear rotates counterclockwise, sector gear, which drives, to be passed Moving gear rotates clockwise, and then reel is driven to rotate clockwise, and by bracing wire around rising, reel is pulled reel by bracing wire Guide plate moves downward, and the first spring is stretched, and when the blanking hole on guide plate is located in lower material frame, the sand in lower material frame passes through Blanking hole is fallen in transmission belt top right side, and when sector gear is detached with transmission gear, the first spring restores to the original state, and pulls guide plate Reset is moved downward, guide plate pulls out reel around the bracing wire risen, and the blanking hole on guide plate leaves in lower material frame at this time, by leading Plate blocks the sand in lower material frame, and sand is just no longer fallen in transmission belt top right side, since transmission belt rotates counterclockwise, in turn The sand of transmission belt top right side is sent to transmission belt top left side in batch, and is finally fallen in the first mounting plate top left Side, worker can take sand in batches, both meet use demand of the worker to sand, in turn avoid disposably pouring out Excessive sand can not be finished and cause sand defaced, and when worker need not take sand, master is controlled after guide plate resets Driving wheel stops operating.
Because further including having cam, the first guide sleeve, first connecting rod, push plate, second spring, second connecting rod, the 4th strut, Two guide sleeves, third connecting rod and stir plate, right side driven wheel front side are equipped with cam, and third mounting plate lower part is equipped with the first guide sleeve, the One guide sleeve inner sliding type is connected with first connecting rod, and first connecting rod left end is equipped with push plate, and push plate right side central is connected with second spring, It is connect on the left of second spring right end and the first guide sleeve, first connecting rod left part is located in second spring, and first connecting rod right end is connected with Second connecting rod, lower material frame right wall top are equipped with the 4th strut, and the 4th strut top is equipped with the second guide sleeve, the second guide sleeve inner sliding type It is connected with third connecting rod, third connecting rod bottom right is connect with second connecting rod top, and third connecting rod bottom left is equipped with stir plate, Stir plate is located in lower material frame, so when right side driven wheel rotates, driven wheel band moving cam in right side rotates, and works as cam protrusion When promotion push plate being divided to move right, push plate drives first connecting rod to move right, and then second connecting rod is driven to move right, to band Dynamic third connecting rod moves right so that stir plate moves right, and second spring is compressed, on the left of cam protrusion and push plate When separation, second spring restores to the original state, and pushes push plate and device moves downward reset thereon so that stir plate moves downward multiple Position, by stir plate bilateral reciprocation, avoids the sand in lower material frame from luming due to accumulating for a long time, ensure that sand Normal whereabouts, improve the present invention it is stable, when right side, driven wheel stops operating, stir plate also therewith stop left and right It moves back and forth.
Because further including having guide plate, third guide sleeve, guide rod, scraping wings, knob and third spring, the first strut of left side is left Middle side part and the inclination of the first mounting plate top left side are connected with guide plate, and L-type strut lower part is equipped with third guide sleeve, in third guide sleeve Slidingtype is connected with guide rod, and guide rod bottom right is equipped with scraping wings, and guide rod left end is equipped with knob, and knob right side is connected with third bullet It is connect on the left of spring, third spring right end and third guide sleeve, guide rod left part is located in third spring, so when sand is fallen in the first peace When loading board top left side, if worker does not take sand in time, it will cause sand to be gradually accumulated and influence the present invention's Stable operation pulls knob, third spring to be stretched to the left, and knob pulls scraping wings to move downward by guide rod, passes through pusher The sand of accumulation is pull towards left side by plate, then unclamps knob, and third spring restores to the original state, and pulls knob and device is transported to the right thereon Dynamic to reset, repeatedly this is operated, and can effectively shift the sand of accumulation, ensures equipment stable operation to reach Effect.
Because further including having baffle, at the top of the first mounting plate before and after be arranged with baffle, transmission belt and device is located at thereon Between the baffle of front and rear sides, so by baffle, when sand is dropped out out of lower material frame to transmission belt, avoid between the two Interaction force cause part sand to fall in the first mounting plate top right side, it is a large amount of without expending to be effectively guaranteed worker Time collects sand, improves work task efficiency.
Because further including having web plate and placement plate, L-type strut lower part is equipped with web plate, is equipped with and places on the left of the first mounting plate Plate can further filter out more tiny sand so by the cooperation of web plate and scraping wings, and use it for building The higher wall plaster of material requirements has achieved the effect that improve equipment practicability.
(3)Advantageous effect
The present invention avoids the sand in lower material frame from luming due to accumulating for a long time by stir plate bilateral reciprocation, protects The normal whereabouts for having demonstrate,proved sand improves the stable of the present invention, by baffle, when sand is dropped out out of lower material frame to transmission When band top, avoids interaction force between the two that part sand is caused to fall in the first mounting plate top right side, effectively protect Worker has been demonstrate,proved without taking a substantial amount of time collection sand, has improved work task efficiency, has passed through matching for web plate and scraping wings It closes, can further filter out more tiny sand, and use it for the wall plaster more demanding to construction material, reach Improve the effect of equipment practicability.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the part main structure diagram of the present invention.
Label in attached drawing be:The first mounting plates of 1-, the first struts of 2-, 3- driven wheels, 4- transmission belts, 5-L type struts, 6- Second mounting plate, 7- driving wheels, 8- sector gears, 9- transmission gears, 10- reels, the first belt pulleys of 11-, the second belts of 12- It takes turns, 13- flat belts, 14- third mounting plates, 15- third struts, material frame under 16-, 17- guide holes, 18- guide plates, 19- blanking holes, The first springs of 20-, 21- bracing wires, 22- cams, the first guide sleeves of 23-, 24- first connecting rods, 25- push plates, 26- second springs, 27- Two connecting rods, the 4th struts of 28-, the second guide sleeves of 29-, 30- third connecting rods, 31- stir plates, 32- guide plates, 33- third guide sleeves, 34- guide rods, 35- scraping wings, 36- knobs, 37- third springs, 38- baffles, 39- web plates, 40- placement plates.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of architectural engineering Concrete sand blanking equipment in batches, as shown in Figs. 1-3, include the first mounting plate 1, First strut 2, driven wheel 3, transmission belt 4, L-type strut 5, the second mounting plate 6, driving wheel 7, sector gear 8, transmission gear 9, around Line wheel 10, the second belt pulley 12, flat belt 13, third mounting plate 14, third strut 15, lower material frame 16, is led at first belt pulley 11 Plate 18, the first spring 20 and bracing wire 21,1 top left and right of the first mounting plate are arranged with the first strut 2, and 2 top of the first strut turns Dynamic formula is connected with driven wheel 3, and transmission belt 4 is wound on the driven wheel 3 of two sides of left and right, and 1 top left side of the first mounting plate is equipped with L-type branch Bar 5,5 right end of L-type strut are equipped with the second mounting plate 6, and 6 front side left of the second mounting plate is equipped with driving wheel 7, and 7 front side of driving wheel is defeated Shaft is connected with sector gear 8, and 6 front side right rotary type of the second mounting plate is connected with transmission gear 9, transmission gear 9 and sector 8 right part of gear engages, and the front side of transmission gear 9 is equipped with reel 10, and 8 front side of sector gear is equipped with the first belt pulley 11, left side from 3 front side of driving wheel is equipped with the second belt pulley 12, and flat belt 13, the first installation are wound between the second belt pulley 12 and the first belt pulley 11 1 top right side of plate is equipped with third mounting plate 14, and 14 left side of third mounting plate is symmetrical above and below to be equipped with third strut 15, both up and down 15 left end of third strut is equipped with lower material frame 16, and 16 or so two wall lower part of lower material frame is provided with guide hole 17, and 17 inner sliding type of guide hole connects Be connected to guide plate 18,18 right part of guide plate is provided with blanking hole 19, and 18 right side of guide plate is connected with the first spring 20,20 right end of the first spring with 14 left side central portion of third mounting plate connects, and 18 left side of guide plate is connected with bracing wire 21, and 21 end of bracing wire is connect with reel 10.
Embodiment 2
A kind of architectural engineering Concrete sand blanking equipment in batches, as shown in Figs. 1-3, include the first mounting plate 1, First strut 2, driven wheel 3, transmission belt 4, L-type strut 5, the second mounting plate 6, driving wheel 7, sector gear 8, transmission gear 9, around Line wheel 10, the second belt pulley 12, flat belt 13, third mounting plate 14, third strut 15, lower material frame 16, is led at first belt pulley 11 Plate 18, the first spring 20 and bracing wire 21,1 top left and right of the first mounting plate are arranged with the first strut 2, and 2 top of the first strut turns Dynamic formula is connected with driven wheel 3, and transmission belt 4 is wound on the driven wheel 3 of two sides of left and right, and 1 top left side of the first mounting plate is equipped with L-type branch Bar 5,5 right end of L-type strut are equipped with the second mounting plate 6, and 6 front side left of the second mounting plate is equipped with driving wheel 7, and 7 front side of driving wheel is defeated Shaft is connected with sector gear 8, and 6 front side right rotary type of the second mounting plate is connected with transmission gear 9, transmission gear 9 and sector 8 right part of gear engages, and the front side of transmission gear 9 is equipped with reel 10, and 8 front side of sector gear is equipped with the first belt pulley 11, left side from 3 front side of driving wheel is equipped with the second belt pulley 12, and flat belt 13, the first installation are wound between the second belt pulley 12 and the first belt pulley 11 1 top right side of plate is equipped with third mounting plate 14, and 14 left side of third mounting plate is symmetrical above and below to be equipped with third strut 15, both up and down 15 left end of third strut is equipped with lower material frame 16, and 16 or so two wall lower part of lower material frame is provided with guide hole 17, and 17 inner sliding type of guide hole connects Be connected to guide plate 18,18 right part of guide plate is provided with blanking hole 19, and 18 right side of guide plate is connected with the first spring 20,20 right end of the first spring with 14 left side central portion of third mounting plate connects, and 18 left side of guide plate is connected with bracing wire 21, and 21 end of bracing wire is connect with reel 10.
Further include having cam 22, the first guide sleeve 23, first connecting rod 24, push plate 25, second spring 26, second connecting rod 27, Four struts 28, the second guide sleeve 29, third connecting rod 30 and stir plate 31,3 front side of right side driven wheel are equipped with cam 22, third mounting plate 14 lower parts are equipped with the first guide sleeve 23, and 23 inner sliding type of the first guide sleeve is connected with first connecting rod 24, and 24 left end of first connecting rod is equipped with and pushes away Plate 25,25 right side central of push plate are connected with second spring 26, and 26 right end of second spring is connect with 23 left side of the first guide sleeve, and first connects 24 left part of bar is located in second spring 26, and 24 right end of first connecting rod is connected with second connecting rod 27, is equipped at the top of lower 16 right wall of material frame 4th strut 28,28 top of the 4th strut are equipped with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with third connecting rod 30, the 30 bottom right of three-link is connect with 27 top of second connecting rod, and 30 bottom left of third connecting rod is equipped with stir plate 31, stir plate 31 In lower material frame 16.
Embodiment 3
A kind of architectural engineering Concrete sand blanking equipment in batches, as shown in Figs. 1-3, include the first mounting plate 1, First strut 2, driven wheel 3, transmission belt 4, L-type strut 5, the second mounting plate 6, driving wheel 7, sector gear 8, transmission gear 9, around Line wheel 10, the second belt pulley 12, flat belt 13, third mounting plate 14, third strut 15, lower material frame 16, is led at first belt pulley 11 Plate 18, the first spring 20 and bracing wire 21,1 top left and right of the first mounting plate are arranged with the first strut 2, and 2 top of the first strut turns Dynamic formula is connected with driven wheel 3, and transmission belt 4 is wound on the driven wheel 3 of two sides of left and right, and 1 top left side of the first mounting plate is equipped with L-type branch Bar 5,5 right end of L-type strut are equipped with the second mounting plate 6, and 6 front side left of the second mounting plate is equipped with driving wheel 7, and 7 front side of driving wheel is defeated Shaft is connected with sector gear 8, and 6 front side right rotary type of the second mounting plate is connected with transmission gear 9, transmission gear 9 and sector 8 right part of gear engages, and the front side of transmission gear 9 is equipped with reel 10, and 8 front side of sector gear is equipped with the first belt pulley 11, left side from 3 front side of driving wheel is equipped with the second belt pulley 12, and flat belt 13, the first installation are wound between the second belt pulley 12 and the first belt pulley 11 1 top right side of plate is equipped with third mounting plate 14, and 14 left side of third mounting plate is symmetrical above and below to be equipped with third strut 15, both up and down 15 left end of third strut is equipped with lower material frame 16, and 16 or so two wall lower part of lower material frame is provided with guide hole 17, and 17 inner sliding type of guide hole connects Be connected to guide plate 18,18 right part of guide plate is provided with blanking hole 19, and 18 right side of guide plate is connected with the first spring 20,20 right end of the first spring with 14 left side central portion of third mounting plate connects, and 18 left side of guide plate is connected with bracing wire 21, and 21 end of bracing wire is connect with reel 10.
Further include having cam 22, the first guide sleeve 23, first connecting rod 24, push plate 25, second spring 26, second connecting rod 27, Four struts 28, the second guide sleeve 29, third connecting rod 30 and stir plate 31,3 front side of right side driven wheel are equipped with cam 22, third mounting plate 14 lower parts are equipped with the first guide sleeve 23, and 23 inner sliding type of the first guide sleeve is connected with first connecting rod 24, and 24 left end of first connecting rod is equipped with and pushes away Plate 25,25 right side central of push plate are connected with second spring 26, and 26 right end of second spring is connect with 23 left side of the first guide sleeve, and first connects 24 left part of bar is located in second spring 26, and 24 right end of first connecting rod is connected with second connecting rod 27, is equipped at the top of lower 16 right wall of material frame 4th strut 28,28 top of the 4th strut are equipped with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with third connecting rod 30, the 30 bottom right of three-link is connect with 27 top of second connecting rod, and 30 bottom left of third connecting rod is equipped with stir plate 31, stir plate 31 In lower material frame 16.
Further include having guide plate 32, third guide sleeve 33, guide rod 34, scraping wings 35, knob 36 and third spring 37, left side the One strut, 2 left side central portion is connected with guide plate 32 with the inclination of 1 top left side of the first mounting plate, and 5 lower part of L-type strut is led equipped with third Set 33,33 inner sliding type of third guide sleeve are connected with guide rod 34, and 34 bottom right of guide rod is equipped with scraping wings 35, and 34 left end of guide rod is equipped with Knob 36,36 right side of knob are connected with third spring 37, and 37 right end of third spring is connect with 33 left side of third guide sleeve, and guide rod 34 is left Portion is located in third spring 37.
Embodiment 4
A kind of architectural engineering Concrete sand blanking equipment in batches, as shown in Figs. 1-3, include the first mounting plate 1, First strut 2, driven wheel 3, transmission belt 4, L-type strut 5, the second mounting plate 6, driving wheel 7, sector gear 8, transmission gear 9, around Line wheel 10, the second belt pulley 12, flat belt 13, third mounting plate 14, third strut 15, lower material frame 16, is led at first belt pulley 11 Plate 18, the first spring 20 and bracing wire 21,1 top left and right of the first mounting plate are arranged with the first strut 2, and 2 top of the first strut turns Dynamic formula is connected with driven wheel 3, and transmission belt 4 is wound on the driven wheel 3 of two sides of left and right, and 1 top left side of the first mounting plate is equipped with L-type branch Bar 5,5 right end of L-type strut are equipped with the second mounting plate 6, and 6 front side left of the second mounting plate is equipped with driving wheel 7, and 7 front side of driving wheel is defeated Shaft is connected with sector gear 8, and 6 front side right rotary type of the second mounting plate is connected with transmission gear 9, transmission gear 9 and sector 8 right part of gear engages, and the front side of transmission gear 9 is equipped with reel 10, and 8 front side of sector gear is equipped with the first belt pulley 11, left side from 3 front side of driving wheel is equipped with the second belt pulley 12, and flat belt 13, the first installation are wound between the second belt pulley 12 and the first belt pulley 11 1 top right side of plate is equipped with third mounting plate 14, and 14 left side of third mounting plate is symmetrical above and below to be equipped with third strut 15, both up and down 15 left end of third strut is equipped with lower material frame 16, and 16 or so two wall lower part of lower material frame is provided with guide hole 17, and 17 inner sliding type of guide hole connects Be connected to guide plate 18,18 right part of guide plate is provided with blanking hole 19, and 18 right side of guide plate is connected with the first spring 20,20 right end of the first spring with 14 left side central portion of third mounting plate connects, and 18 left side of guide plate is connected with bracing wire 21, and 21 end of bracing wire is connect with reel 10.
Further include having cam 22, the first guide sleeve 23, first connecting rod 24, push plate 25, second spring 26, second connecting rod 27, Four struts 28, the second guide sleeve 29, third connecting rod 30 and stir plate 31,3 front side of right side driven wheel are equipped with cam 22, third mounting plate 14 lower parts are equipped with the first guide sleeve 23, and 23 inner sliding type of the first guide sleeve is connected with first connecting rod 24, and 24 left end of first connecting rod is equipped with and pushes away Plate 25,25 right side central of push plate are connected with second spring 26, and 26 right end of second spring is connect with 23 left side of the first guide sleeve, and first connects 24 left part of bar is located in second spring 26, and 24 right end of first connecting rod is connected with second connecting rod 27, is equipped at the top of lower 16 right wall of material frame 4th strut 28,28 top of the 4th strut are equipped with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with third connecting rod 30, the 30 bottom right of three-link is connect with 27 top of second connecting rod, and 30 bottom left of third connecting rod is equipped with stir plate 31, stir plate 31 In lower material frame 16.
Further include having guide plate 32, third guide sleeve 33, guide rod 34, scraping wings 35, knob 36 and third spring 37, left side the One strut, 2 left side central portion is connected with guide plate 32 with the inclination of 1 top left side of the first mounting plate, and 5 lower part of L-type strut is led equipped with third Set 33,33 inner sliding type of third guide sleeve are connected with guide rod 34, and 34 bottom right of guide rod is equipped with scraping wings 35, and 34 left end of guide rod is equipped with Knob 36,36 right side of knob are connected with third spring 37, and 37 right end of third spring is connect with 33 left side of third guide sleeve, and guide rod 34 is left Portion is located in third spring 37.
Further include having baffle 38, the first mounting plate is arranged with baffle 38, transmission belt 4 and thereon device position before and after 1 top Between front and rear sides baffle 38.
Further include having web plate 39 and placement plate 40,5 lower part of L-type strut is equipped with web plate 39, and 1 left side of the first mounting plate, which is equipped with, puts Set plate 40.
Operation principle:The sand that vehicle ships can be in advance poured into lower material frame 16, steadily by lower material frame 16 Sand is stored, avoids clean sand from being infected with the upper building sites such as cement or lime materials and works as work to influence the normal use of sand When people needs to take sand, control driving wheel 7 rotates counterclockwise, and 7 output shaft of driving wheel drives sector gear 8 to rotate counterclockwise, And then the first belt pulley 11 is driven to rotate counterclockwise, the first belt pulley 11 drives the second belt pulley 12 counterclockwise by flat belt 13 Rotation, to drive left side driven wheel 3 to rotate counterclockwise so that transmission belt 4 rotates counterclockwise, when sector gear 8 turns counterclockwise When dynamic, sector gear 8 is rotated clockwise with nutating gear 9, and then reel 10 is driven to rotate clockwise, and reel 10 will be drawn Line 21 is around rising, and reel 10 pulls guide plate 18 to move downward by bracing wire 21, and the first spring 20 is stretched, under on guide plate 18 When material hole 19 is located in lower material frame 16, the sand in lower material frame 16 is fallen by blanking hole 19 in 4 top right side of transmission belt, and sector is worked as When gear 8 is detached with transmission gear 9, the first spring 20 restores to the original state, and guide plate 18 is pulled to move downward reset, and guide plate 18 is by coiling Wheel 10 is pulled out around the bracing wire 21 risen, and the blanking hole 19 on guide plate 18 leaves in lower material frame 16 at this time, by guide plate 18 by lower material frame Sand in 16 blocks, and sand is just no longer fallen in 4 top right side of transmission belt, since transmission belt 4 rotates counterclockwise, and then transmission belt The sand of 4 top right sides is sent to 4 top left side of transmission belt in batch, and is finally fallen in 1 top left side of the first mounting plate, Worker can take sand in batches, both meet use demand of the worker to sand, in turn avoid disposably pouring out More sands can not be finished and cause sand defaced, and when worker need not take sand, master is controlled after guide plate 18 resets Driving wheel 7 stops operating.
Because further including having cam 22, the first guide sleeve 23, first connecting rod 24, push plate 25, second spring 26, second connecting rod 27, the 4th strut 28, the second guide sleeve 29, third connecting rod 30 and stir plate 31,3 front side of right side driven wheel are equipped with cam 22, third 14 lower part of mounting plate is equipped with the first guide sleeve 23, and 23 inner sliding type of the first guide sleeve is connected with first connecting rod 24,24 left end of first connecting rod Equipped with push plate 25,25 right side central of push plate is connected with second spring 26, and 26 right end of second spring is connect with 23 left side of the first guide sleeve, 24 left part of first connecting rod is located in second spring 26, and 24 right end of first connecting rod is connected with second connecting rod 27,16 right wall top of lower material frame Portion is equipped with the 4th strut 28, and 28 top of the 4th strut is equipped with the second guide sleeve 29, and 29 inner sliding type of the second guide sleeve is connected with third company Bar 30,30 bottom right of third connecting rod are connect with 27 top of second connecting rod, and 30 bottom left of third connecting rod is equipped with stir plate 31, stirs Movable plate 31 is located in lower material frame 16, so when right side driven wheel 3 rotates, right side driven wheel 3 is rotated with moving cam 22, works as cam When 22 protrusions push push plate 25 to move right, push plate 25 drives first connecting rod 24 to move right, and then drives second connecting rod 27 move right, to drive third connecting rod 30 to move right so that and stir plate 31 moves right, and second spring 26 is compressed, When 22 protrusion of cam and the left side of push plate 25 detach, second spring 26 restores to the original state, push push plate 25 and thereon device to Left movement resets so that stir plate 31 moves downward reset, by 31 bilateral reciprocation of stir plate, avoids in lower material frame 16 Sand lumps due to accumulating for a long time, ensure that the normal whereabouts of sand, improves the stable of the present invention, works as right side When driven wheel 3 stops operating, stir plate 31 also stops bilateral reciprocation therewith.
It is left because further including having guide plate 32, third guide sleeve 33, guide rod 34, scraping wings 35, knob 36 and third spring 37 The inclination of 2 left side central portion of the first strut of side and 1 top left side of the first mounting plate is connected with guide plate 32, and 5 lower part of L-type strut is equipped with the Three guide sleeves 33,33 inner sliding type of third guide sleeve are connected with guide rod 34, and 34 bottom right of guide rod is equipped with scraping wings 35,34 left end of guide rod Equipped with knob 36,36 right side of knob is connected with third spring 37, and 37 right end of third spring is connect with 33 left side of third guide sleeve, guide rod 34 left parts are located in third spring 37, so when sand is fallen in the first 1 top left side of mounting plate, if worker is without in time Take sand, it will cause sand to be gradually accumulated and influence stable operation of the invention, pull knob 36, third spring 37 to the left It being stretched, knob 36 pulls scraping wings 35 to move downward by guide rod 34, and the sand of accumulation is pull towards left side by scraping wings 35, Then unclamp knob 36, third spring 37 restores to the original state, and pulls knob 36 and device moves right reset thereon, repeatedly this Operation, can effectively shift the sand of accumulation, to achieve the effect that ensure equipment stable operation.
Because further including having baffle 38, it is arranged with baffle 38 before and after the top of the first mounting plate 1, transmission belt 4 and fills thereon Setting between front and rear sides baffle 38, so by baffle 38, when sand is dropped out out of lower material frame 16 to 4 top of transmission belt When, it avoids interaction force between the two that part sand is caused to fall in 1 top right side of the first mounting plate, is effectively guaranteed work People improves work task efficiency without taking a substantial amount of time collection sand.
Because further including having web plate 39 and placement plate 40,5 lower part of L-type strut is equipped with web plate 39, and 1 left side of the first mounting plate is set There is placement plate 40, so by the cooperation of web plate 39 and scraping wings 35, can further filter out more tiny sand, and will It is used for the wall plaster more demanding to construction material, has achieved the effect that improve equipment practicability.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. a kind of architectural engineering Concrete sand blanking equipment in batches, which is characterized in that include the first mounting plate (1), the first strut(2), driven wheel(3), transmission belt(4), L-type strut(5), the second mounting plate(6), driving wheel(7), sector Wheel(8), transmission gear(9), reel(10), the first belt pulley(11), the second belt pulley(12), flat belt(13), third peace Loading board(14), third strut(15), lower material frame(16), guide plate(18), the first spring(20)And bracing wire(21), the first mounting plate (1)Top or so is arranged with the first strut(2), the first strut(2)Top rotary type is connected with driven wheel(3), two sides of left and right Driven wheel(3)On be wound with transmission belt(4), the first mounting plate(1)Top left side is equipped with L-type strut(5), L-type strut(5)Right end Equipped with the second mounting plate(6), the second mounting plate(6)Front side left is equipped with driving wheel(7), driving wheel(7)Front side exports axis connection There is sector gear(8), the second mounting plate(6)Front side right rotary type is connected with transmission gear(9), transmission gear(9)With sector Gear(8)Right part engages, transmission gear(9)Front side is equipped with reel(10), sector gear(8)Front side is equipped with the first belt pulley (11), left side driven wheel(3)Front side is equipped with the second belt pulley(12), the second belt pulley(12)With the first belt pulley(11)Spaced winding There is flat belt(13), the first mounting plate(1)Top right side is equipped with third mounting plate(14), third mounting plate(14)It is right above and below left side Claim to be equipped with third strut(15), the third strut of both up and down(15)Left end is equipped with lower material frame(16), lower material frame(16)Left and right two Wall lower part is provided with guide hole(17), guide hole(17)Inner sliding type is connected with guide plate(18), guide plate(18)Right part is provided with blanking hole (19), guide plate(18)Right side is connected with the first spring(20), the first spring(20)Right end and third mounting plate(14)Left side central portion Connection, guide plate(18)Left side is connected with bracing wire(21), bracing wire(21)End and reel(10)Connection.
2. a kind of architectural engineering Concrete according to claim 1 is with sand, blanking equipment, feature exist in batches In further including having cam(22), the first guide sleeve(23), first connecting rod(24), push plate(25), second spring(26), second connecting rod (27), the 4th strut(28), the second guide sleeve(29), third connecting rod(30)And stir plate(31), right side driven wheel(3)Front side is equipped with Cam(22), third mounting plate(14)Lower part is equipped with the first guide sleeve(23), the first guide sleeve(23)Inner sliding type is connected with the first company Bar(24), first connecting rod(24)Left end is equipped with push plate(25), push plate(25)Right side central is connected with second spring(26), the second bullet Spring(26)Right end and the first guide sleeve(23)Left side connects, first connecting rod(24)Left part is located at second spring(26)It is interior, first connecting rod (24)Right end is connected with second connecting rod(27), lower material frame(16)The 4th strut is equipped at the top of right wall(28), the 4th strut(28)Top End is equipped with the second guide sleeve(29), the second guide sleeve(29)Inner sliding type is connected with third connecting rod(30), third connecting rod(30)Bottom, right Side and second connecting rod(27)Top connects, third connecting rod(30)Bottom left is equipped with stir plate(31), stir plate(31)Under being located at Material frame(16)It is interior.
3. a kind of architectural engineering Concrete according to claim 2 is with sand, blanking equipment, feature exist in batches In further including having guide plate(32), third guide sleeve(33), guide rod(34), scraping wings(35), knob(36)With third spring (37), the first strut of left side(2)Left side central portion and the first mounting plate(1)Top left side inclination is connected with guide plate(32), L-type branch Bar(5)Lower part is equipped with third guide sleeve(33), third guide sleeve(33)Inner sliding type is connected with guide rod(34), guide rod(34)Bottom right Equipped with scraping wings(35), guide rod(34)Left end is equipped with knob(36), knob(36)Right side is connected with third spring(37), third bullet Spring(37)Right end and third guide sleeve(33)Left side connects, guide rod(34)Left part is located at third spring(37)It is interior.
4. a kind of architectural engineering Concrete according to claim 3 is with sand, blanking equipment, feature exist in batches In further including having baffle(38), the first mounting plate(1)Baffle is arranged with before and after top(38), transmission belt(4)And device thereon Positioned at front and rear sides baffle(38)Between.
5. a kind of architectural engineering Concrete according to claim 4 is with sand, blanking equipment, feature exist in batches In further including having web plate(39)And placement plate(40), L-type strut(5)Lower part is equipped with web plate(39), the first mounting plate(1)Left side Equipped with placement plate(40).
CN201810132481.XA 2018-02-09 2018-02-09 A kind of architectural engineering Concrete sand blanking equipment in batches Active CN108422559B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810132481.XA CN108422559B (en) 2018-02-09 2018-02-09 A kind of architectural engineering Concrete sand blanking equipment in batches

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810132481.XA CN108422559B (en) 2018-02-09 2018-02-09 A kind of architectural engineering Concrete sand blanking equipment in batches

Publications (2)

Publication Number Publication Date
CN108422559A true CN108422559A (en) 2018-08-21
CN108422559B CN108422559B (en) 2019-11-15

Family

ID=63156679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810132481.XA Active CN108422559B (en) 2018-02-09 2018-02-09 A kind of architectural engineering Concrete sand blanking equipment in batches

Country Status (1)

Country Link
CN (1) CN108422559B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110436151A (en) * 2019-08-22 2019-11-12 唐家调 A kind of quantitative transloading equipment of sawdust collection
CN110743844A (en) * 2019-10-21 2020-02-04 周发丁 Rapeseed component cleaning machine
CN110952756A (en) * 2019-11-14 2020-04-03 谢富琨 Automatic cement smearing machine for outdoor tile adhesion
CN112295707A (en) * 2020-11-17 2021-02-02 韩小玉 Equipment for crushing non-metallic cable material
CN112570280A (en) * 2020-11-20 2021-03-30 王云娥 Building screening sand machine
CN112808544A (en) * 2020-12-11 2021-05-18 魏辉 Device for uniformly brushing modified starch on surface of cloth

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201684729U (en) * 2010-05-06 2010-12-29 葛洲坝集团第五工程有限公司 Air lock device of weighing bin at outlet of powder concentrator
CN203557537U (en) * 2013-10-25 2014-04-23 洛阳至圣科技有限公司 Concrete mixing and sand-stone batch feeding device
CN104909178A (en) * 2015-06-10 2015-09-16 长兴新源机械设备科技有限公司 Automatic quantitative lead slag conveyor
CN205588477U (en) * 2016-05-12 2016-09-21 江西应用技术职业学院 Fly ash multistage agitation device
CN206502421U (en) * 2017-02-23 2017-09-19 温立萍 A kind of medical discarded medicine bottle quantitative Treatment device
CN206537979U (en) * 2017-02-02 2017-10-03 谭支强 A kind of medical quantitative discharging device
CN107499956A (en) * 2017-09-18 2017-12-22 成都融创智谷科技有限公司 A kind of Intelligent fixed time blanking dry powder and mortar storage tank equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201684729U (en) * 2010-05-06 2010-12-29 葛洲坝集团第五工程有限公司 Air lock device of weighing bin at outlet of powder concentrator
CN203557537U (en) * 2013-10-25 2014-04-23 洛阳至圣科技有限公司 Concrete mixing and sand-stone batch feeding device
CN104909178A (en) * 2015-06-10 2015-09-16 长兴新源机械设备科技有限公司 Automatic quantitative lead slag conveyor
CN205588477U (en) * 2016-05-12 2016-09-21 江西应用技术职业学院 Fly ash multistage agitation device
CN206537979U (en) * 2017-02-02 2017-10-03 谭支强 A kind of medical quantitative discharging device
CN206502421U (en) * 2017-02-23 2017-09-19 温立萍 A kind of medical discarded medicine bottle quantitative Treatment device
CN107499956A (en) * 2017-09-18 2017-12-22 成都融创智谷科技有限公司 A kind of Intelligent fixed time blanking dry powder and mortar storage tank equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110436151A (en) * 2019-08-22 2019-11-12 唐家调 A kind of quantitative transloading equipment of sawdust collection
CN110436151B (en) * 2019-08-22 2021-04-02 萧县木伟信息科技有限公司 Quantitative transfer equipment is collected to saw-dust
CN110743844A (en) * 2019-10-21 2020-02-04 周发丁 Rapeseed component cleaning machine
CN110952756A (en) * 2019-11-14 2020-04-03 谢富琨 Automatic cement smearing machine for outdoor tile adhesion
CN112295707A (en) * 2020-11-17 2021-02-02 韩小玉 Equipment for crushing non-metallic cable material
CN112570280A (en) * 2020-11-20 2021-03-30 王云娥 Building screening sand machine
CN112808544A (en) * 2020-12-11 2021-05-18 魏辉 Device for uniformly brushing modified starch on surface of cloth

Also Published As

Publication number Publication date
CN108422559B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN108422559A (en) A kind of architectural engineering Concrete sand blanking equipment in batches
CN100484636C (en) Full automatic technique of graded deferrization, and equipment
CN112473956A (en) Tombarthite waste material is rubble separator for recovery
CN108686945A (en) The producing device of High Strength Concrete Structures part
CN210876227U (en) Gravel and sand sieving mechanism that building site used
CN108114883A (en) A kind of sieve sand vehicle for building for being convenient to clean and transporting
CN209093149U (en) A kind of RE oxide powder agitating device
CN217172996U (en) Building electrical construction erection equipment
CN208991225U (en) Intelligent building anti-block apparatus
CN210820208U (en) High-efficient agitating unit of cement for building
CN209393514U (en) A kind of concrete for making former material screening separator
CN211341838U (en) Automatic masonry device
CN210562190U (en) Concrete distributing device with cleaning function
CN108405177A (en) A kind of strong magnetic and weak magnetic rare earth ore separation equipment
CN205815257U (en) A kind of defecator of carpet adhesive specially
CN201751399U (en) Silica sand equalization warehouse
CN206501272U (en) Concrete batch plant
CN218610265U (en) Sand screening device capable of avoiding screen blockage
CN217830706U (en) Concrete screening device
CN110076033A (en) A kind of preparation facilities and preparation method on the floor LVT
CN219745472U (en) New forms of energy transformer preparation is with powder screening equipment
CN218314342U (en) Building mortar stirrer
CN206083096U (en) A screening sand machine for building engineering
CN219187688U (en) Raw material particle screening device for thermal insulation mortar
CN115369810B (en) A portable stone device of throwing for flood prevention is speedily carried out rescue work

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right

Effective date of registration: 20191025

Address after: 317604 Taizhou City, Zhejiang Province, Yuhuan City, barley Lantau Street

Applicant after: Zhejiang Aochuan Hydraulic Equipment Co., Ltd.

Address before: 518054 Nanshan District, Guangdong Province, Shenzhen, Guangdong, Guangdong Province, New High Street South China Science and Technology Development Institute, incubation room 415

Applicant before: Liu Meisheng

TA01 Transfer of patent application right