CN108413032A CN201810421466.7A CN201810421466A CN108413032A CN 108413032 A CN108413032 A CN 108413032A CN 201810421466 A CN201810421466 A CN 201810421466A CN 108413032 A CN108413032 A CN 108413032A
Authority
CN
China
Prior art keywords
tank body
lower tank
microcontroller
pressure vessel
upper tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810421466.7A
Other languages
Chinese (zh)
Other versions
CN108413032B (en
Inventor
陈子育
傅贵轩
刘长征
刘云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUYANG ANGU BOILER PRESSURE VESSEL MANUFACTURING Co Ltd
Original Assignee
FUYANG ANGU BOILER PRESSURE VESSEL MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUYANG ANGU BOILER PRESSURE VESSEL MANUFACTURING Co Ltd filed Critical FUYANG ANGU BOILER PRESSURE VESSEL MANUFACTURING Co Ltd
Priority to CN201810421466.7A priority Critical patent/CN108413032B/en
Publication of CN108413032A publication Critical patent/CN108413032A/en
Application granted granted Critical
Publication of CN108413032B publication Critical patent/CN108413032B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J12/00Pressure vessels in general

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Vessels And Lids Thereof (AREA)

Abstract

The invention discloses a kind of tower pressure vessel and its working methods, including upper tank body, intermediate tank body and lower tank, the upper tank body, the junction of intermediate tank body and lower tank, which extends outwardly, is arranged convex edge, and upper tank body, the convex edge surface of intermediate tank body and lower tank is correspondingly arranged through-hole respectively, the upper tank body, intermediate tank body and the corresponding through-hole internal engagement installation connection bolt of lower tank, the upper tank body, the junction of intermediate tank body and lower tank is respectively provided with step groove, the step groove internal engagement installs sealing rubber ring, the sealing rubber ring is internally provided with tension ring, this tower pressure vessel and its working method are by the way of combined type installation, and junction installs sealing rubber ring additional, effectively adapt to big specification holds volume needs, and by the way of being filled after first pressure testing, ensure safe to use.

Description

A kind of tower pressure vessel and its working method
Technical field
The present invention relates to pressure vessel technology field, specially a kind of tower pressure vessel and its working method.
Background technology
Pressure vessel being widely used in production field is general, it is multiple industries such as chemical industry, oil refining, light industry and energy Necessary key equipment, but in the malicious event of pressure vessel, quite a few is since structure design is unreasonable Caused, structure design is unreasonable, rational structure design, require first its structure convenient for manufacture, advantageously ensure that quality and Manufacturing defect is avoided or reduced, some pressure vessels, it is difficult to complete one-time-concreting molding, need to be poured repeatedly because volume is larger, Or by the way of combined type installation, this just claims to the sealing performance of tank body, therefore, furthers investigate to adapt it to Various working conditions meet industrial production enlargement requirement and ensure that its safe and reliable operation has great importance.
Invention content
The technical problem to be solved by the present invention is to overcome the existing defects, provides a kind of tower pressure vessel and its work side Method, by the way of combined type installation, and junction installs sealing rubber ring additional, and effectively adapt to big specification holds volume needs, And by the way of being filled after first pressure testing, guarantee is safe to use, can effectively solve the problems in background technology.
To achieve the above object, the present invention provides the following technical solutions:A kind of tower pressure vessel, including upper tank body, in Between tank body and lower tank, the junction of the upper tank body, intermediate tank body and lower tank extends outwardly setting convex edge, and upper tank The convex edge surface of body, intermediate tank body and lower tank is correspondingly arranged through-hole respectively, and the upper tank body, intermediate tank body and lower tank correspond to Through-hole internal engagement installation connection bolt, the junction of the upper tank body, intermediate tank body and lower tank is respectively provided with step groove, institute Step groove internal engagement installation sealing rubber ring is stated, the sealing rubber ring is internally provided with tension ring, the side wall setting of the upper tank body Air admission hole and venthole, the air admission hole and venthole are connected to air inlet pipe and an air outlet pipe respectively, the lower tank bottom cooperation The end of mounting seat, the air inlet pipe and an air outlet pipe is respectively cooperating with installation check valve and solenoid valve, the input of the solenoid valve End is electrically connected with the output end of microcontroller, and the input terminal of the microcontroller is electrically connected with the output end of external power supply.
As a preferred technical solution of the present invention, it is all provided at the convex edge of the upper tank body, intermediate tank body and lower tank Set groove, the air inlet pipe and an air outlet pipe is fixedly mounted on the inside grooves of upper tank body, intermediate tank body and lower tank, it is described into The end of tracheae and escape pipe is respectively cooperating with installation force (forcing) pump and adjustable compression release valve, the adjustment axis of the adjustable compression release valve with The output axis connection of motor, the motor and the input terminal of force (forcing) pump and the output end of microcontroller are electrically connected.
As a preferred technical solution of the present invention, sewage draining exit, and the blowdown of lower tank is arranged in the lower tank bottom Cooperation installation dirt-discharging hook at mouthful, installs sealing ring additional, and air hole is arranged in the top of upper tank body between the dirt-discharging hook and sewage draining exit, Cooperation installation pressure limiting valve at the air hole.
As a preferred technical solution of the present invention, hydraulic pressure sensor is set, the hydraulic pressure passes inside the lower tank The output end of sensor is electrically connected with the input terminal of microcontroller, and the intermediate tank surface is arranged display screen, the display screen it is defeated Enter end to be electrically connected with the output end of microcontroller.
As a preferred technical solution of the present invention, the tension ring is the round and elastic ring with opening, and tensioner The opening of ring is threaded hole, and installation tension bolt is coordinated in the threaded hole.
The present invention also proposes that a kind of working method of tower pressure vessel, working method include the following steps:
Step 1:According to required container size, select appropriate number of intermediate tank body, by upper tank body, intermediate tank body and under Tank body carries out being assembled into tank body;
Step 2:Tank interior is inflated, the internal pressure variation shown by display screen is observed, judges the sealing of tank body Property;
Step 3:The air inlet of force (forcing) pump is connected to original matter container, pressurize pump work, and gas is passed through air inlet Pipe is filled into tank interior;
Step 4:Microcontroller controls solenoid valve and opens, and gas is discharged by escape pipe, and microcontroller controls motor work, right The effect of easing stress of adjustable compression release valve is adjusted;
Step 5:After the release completely of tank interior gas, dirt-discharging hook is opened, tank interior sediment is cleared up, After cleaning, dirt-discharging hook is correctly installed, after repeating step 2, then carries out gas filling.
Compared with prior art, the beneficial effects of the invention are as follows:By the way of this tower pressure vessel is installed using combined type, The intermediate tank body that can select different number as needed, is combined into the tank body of not co-content, meets various scenes and uses, and Hydraulic pressure sensor is added, calculating can be detected to internal liquid capacity, and show by display screen, and at air inlet pipe Force (forcing) pump is set, admission pressure can be promoted, ensures storage pressure, and adjustable compression release valve is set at gas outlet, is ensured defeated It is steady air flow to go out air-flow, and before carrying out gas filling, carries out pressure testing operation in advance, leakproofness deficiency is effectively avoided to cause Leakage problem.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is lower tank sectional view of the present invention;
Fig. 3 is the adjacent intermediate tank body junction schematic diagram of the present invention;
Fig. 4 is tension ring assembling schematic diagram of the present invention.
In figure:1 upper tank body, 2 intermediate tank bodies, 3 lower tanks, 4 pressure limiting valves, 5 air inlet pipe, 6 escape pipes, 7 pedestals, 8 hydraulic pressure pass Sensor, 9 dirt-discharging hooks, 10 microcontrollers, 11 check valves, 12 solenoid valves, 13 force (forcing) pumps, 14 adjustable compression release valves, 15 motors, 16 sealings Cushion rubber, 17 tension rings, 18 tension bolts, 19 display screens.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of tower pressure vessel, including upper tank body 1, centre Tank body 2 and lower tank 3, the junction of upper tank body 1, intermediate tank body 2 and lower tank 3, which extends outwardly, is arranged convex edge, and upper tank body 1, the convex edge surface of intermediate tank body 2 and lower tank 3 is correspondingly arranged through-hole respectively, and upper tank body 1, intermediate tank body 2 and lower tank 3 correspond to Through-hole internal engagement installation connection bolt, the junction of upper tank body 1, intermediate tank body 2 and lower tank 3 is respectively provided with step groove, platform Rank slot internal engagement installs sealing rubber ring 16, and sealing rubber ring 16 is internally provided with tension ring 17, and air admission hole is arranged in the side wall of upper tank body 1 And venthole, air admission hole and venthole are connected to air inlet pipe 5 and escape pipe 6 respectively, 3 bottom of lower tank coordinates mounting seat 7, into The end of tracheae 5 and escape pipe 6 is respectively cooperating with installation check valve 11 and solenoid valve 12, input terminal and the microcontroller 10 of solenoid valve 12 Output end electrical connection, the input terminal of microcontroller 10 be electrically connected with the output end of external power supply, upper tank body 1, centre tank body 2 and under Groove is respectively provided at the convex edge of tank body 3, air inlet pipe 5 and escape pipe 6 are fixedly mounted on upper tank body 1, intermediate tank body 2 and lower tank The end of 3 inside grooves, air inlet pipe 5 and escape pipe 6 is respectively cooperating with installation force (forcing) pump 13 and adjustable compression release valve 14, adjustable The output of the input terminal and microcontroller 10 of the adjustment axis of pressure reducing valve 14 and the output axis connection of motor 15, motor 15 and force (forcing) pump 13 Sewage draining exit, and cooperation installation dirt-discharging hook 9 at the sewage draining exit of lower tank 3, dirt-discharging hook 9 and row is arranged in end electrical connection, 3 bottom of lower tank Install sealing ring between dirty mouth additional, and air hole is arranged in the top of upper tank body 1, and installation pressure limiting valve 4, lower tank 3 are coordinated at air hole Inside setting hydraulic pressure sensor 8, the output end of hydraulic pressure sensor 8 are electrically connected with the input terminal of microcontroller 10,2 surface of intermediate tank body Display screen 19 is set, and the input terminal of display screen 19 is electrically connected with the output end of microcontroller 10, and tension ring 17 is the circle with opening Shape elastic ring, and the opening of tension ring 17 is threaded hole, and installation tension bolt 18 is coordinated in threaded hole.
A kind of working method of tower pressure vessel, working method include the following steps:
Step 1:According to required container size, appropriate number of intermediate tank body 2 is selected, by upper tank body 1,2 and of intermediate tank body Lower tank 3 carries out being assembled into tank body;
Step 2:Tank interior is inflated, the internal pressure variation shown by display screen 19 is observed, judges the sealing of tank body Property;
Step 3:The air inlet of force (forcing) pump 13 is connected to original matter container, force (forcing) pump 13 works, and gas is passed through Air inlet pipe 5 is filled into tank interior;
Step 4:Microcontroller 10 controls solenoid valve 12 and opens, and gas is discharged by escape pipe 6, and microcontroller 10 controls motor 15 work, are adjusted the effect of easing stress of adjustable compression release valve 14;
Step 5:After the release completely of tank interior gas, dirt-discharging hook 9 is opened, tank interior sediment is cleared up, It is correct that dirt-discharging hook 9 is installed after cleaning, after repeating step 2, then carry out gas filling.
When in use:According to required container size, appropriate number of intermediate tank body 2 is selected, then by upper tank body 1, centre Tank body 2 and lower tank 3 assemble, by upper tank body 1, the 17 inside tension bolt 18 of tension ring of intermediate tank body 2 and 3 junction of lower tank Rotation is to suitable position, after the completion, closes dirt-discharging hook 9, is inflated pressure testing, and progress substance is filling after pressure testing qualification, when filling, The entrance of force (forcing) pump 13 is connected to original matter container, microcontroller 10 controls force (forcing) pump 13 and works, and substance is passed through air inlet Pipe 5 injects tank interior, and hydraulic pressure sensor 8 is detected internal pressure, and transmits the result to microcontroller 10, microcontroller 10 Internal liquid capacity is calculated according to feedback result, and result is shown by display screen 19, when release, microcontroller 10 controls electricity Magnet valve 12 is opened, and gas is discharged by escape pipe 12, and microcontroller 10 controls motor 15 and works, to change adjustable compression release valve 14 Effect of easing stress, keep steady air flow output.
The present invention can be selected the intermediate tank body 2 of different number, be combined into as needed by the way of combined type installation The not tank body of co-content meets various scenes and uses, and hydraulic pressure sensor 8 is added, and can be examined to internal liquid capacity It surveys and calculates, and shown by display screen 19, and force (forcing) pump 13 is set at air inlet pipe 5, admission pressure can be promoted, ensure to deposit Pressure is stored up, and adjustable compression release valve 14 is set at gas outlet, guarantee output gas flow is steady air flow, and is added carrying out gas Before note, pressure testing operation is carried out in advance, effectively avoids leakage problem caused by leakproofness deficiency.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of tower pressure vessel, including upper tank body (1), intermediate tank body (2) and lower tank (3), it is characterised in that:On described The junction of tank body (1), intermediate tank body (2) and lower tank (3), which extends outwardly, is arranged convex edge, and upper tank body (1), intermediate tank body (2) and the convex edge surface of lower tank (3) is correspondingly arranged through-hole, the upper tank body (1), intermediate tank body (2) and lower tank (3) respectively Corresponding through-hole internal engagement installation connection bolt, the junction of the upper tank body (1), intermediate tank body (2) and lower tank (3) are equal Step groove, the step groove internal engagement installation sealing rubber ring (16) are set, and the sealing rubber ring (16) is internally provided with tension ring (17), the side wall setting air admission hole and venthole of the upper tank body (1), the air admission hole and venthole respectively with air inlet pipe (5) It is connected to escape pipe (6), lower tank (3) the bottom cooperation mounting seat (7), the end of the air inlet pipe (5) and escape pipe (6) Portion is respectively cooperating with installation check valve (11) and solenoid valve (12), the output of the input terminal and microcontroller (10) of the solenoid valve (12) End electrical connection, the input terminal of the microcontroller (10) are electrically connected with the output end of external power supply.
2. a kind of tower pressure vessel according to claim 1, it is characterised in that:The upper tank body (1), intermediate tank body (2) and at the convex edge of lower tank (3) it is respectively provided with groove, the air inlet pipe (5) and escape pipe (6) are fixedly mounted on upper tank body (1), the end of the inside grooves of intermediate tank body (2) and lower tank (3), the air inlet pipe (5) and escape pipe (6) is respectively cooperating with peace Fill force (forcing) pump (13) and adjustable compression release valve (14), the output shaft of the adjustment axis and motor (15) of the adjustable compression release valve (14) The input terminal of connection, the motor (15) and force (forcing) pump (13) is electrically connected with the output end of microcontroller (10).
3. a kind of tower pressure vessel according to claim 1, it is characterised in that:Lower tank (3) the bottom setting row Dirty mouth, and cooperation installation dirt-discharging hook (9) at the sewage draining exit of lower tank (3), the dirt-discharging hook (9) install sealing additional between sewage draining exit Circle, and air hole is arranged in the top of upper tank body (1), coordinates installation pressure limiting valve (4) at the air hole.
4. a kind of tower pressure vessel according to claim 1, it is characterised in that:Water is set inside the lower tank (3) The output end of pressure sensor (8), the hydraulic pressure sensor (8) is electrically connected with the input terminal of microcontroller (10), the intermediate tank body (2) surface setting display screen (19), the input terminal of the display screen (19) are electrically connected with the output end of microcontroller (10).
5. a kind of tower pressure vessel according to claim 1, it is characterised in that:The tension ring (17) is with opening Round and elastic ring, and the opening of tension ring (17) is threaded hole, cooperation installation tension bolt (18) in the threaded hole.
6. a kind of working method of tower pressure vessel, it is characterised in that:Working method includes the following steps:
Step 1:According to required container size, appropriate number of intermediate tank body (2) is selected, by upper tank body (1), intermediate tank body (2) It carries out being assembled into tank body with lower tank (3);
Step 2:Tank interior is inflated, the internal pressure variation shown by observation display screen (19) judges the sealing of tank body Property;
Step 3:The air inlet of force (forcing) pump (13) is connected to original matter container, force (forcing) pump (13) work passes through gas Air inlet pipe (5) is filled into tank interior;
Step 4:Microcontroller (10) controls solenoid valve (12) and opens, and gas is discharged by escape pipe (6), microcontroller (10) control Motor (15) works, and the effect of easing stress of adjustable compression release valve (14) is adjusted;
Step 5:After the release completely of tank interior gas, dirt-discharging hook (9) is opened, tank interior sediment is cleared up, clearly After reason, dirt-discharging hook (9) is correctly installed, after repeating step 2, then carries out gas filling.
CN201810421466.7A 2018-05-04 2018-05-04 Tower type pressure container and working method thereof Active CN108413032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810421466.7A CN108413032B (en) 2018-05-04 2018-05-04 Tower type pressure container and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810421466.7A CN108413032B (en) 2018-05-04 2018-05-04 Tower type pressure container and working method thereof

Publications (2)

Publication Number Publication Date
CN108413032A true CN108413032A (en) 2018-08-17
CN108413032B CN108413032B (en) 2023-10-27

Family

ID=63137870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810421466.7A Active CN108413032B (en) 2018-05-04 2018-05-04 Tower type pressure container and working method thereof

Country Status (1)

Country Link
CN (1) CN108413032B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109442207A (en) * 2018-11-29 2019-03-08 无锡诺贝特流体设备科技有限公司 A kind of assembled water bath carburetor
CN109654813A (en) * 2018-12-25 2019-04-19 临安派祺空气净化科技有限公司 A kind of refrigerant type dryer
CN113769698A (en) * 2021-10-29 2021-12-10 阜阳安固锅炉压力容器制造有限公司 Hydrogenation tower
CN115234834A (en) * 2021-04-22 2022-10-25 辛集市皓瑞封头制造有限公司 Pressure vessel convenient to restore

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5462445A (en) * 1977-10-28 1979-05-19 Hitachi Ltd Fitting seal equipment
CN201934650U (en) * 2011-01-21 2011-08-17 上海寰球石油化学工程有限公司 Combined spherical pressure container
CN107366826A (en) * 2017-08-01 2017-11-21 阜阳安固锅炉压力容器制造有限公司 A kind of pressure vessel and its method of work with pressure-regulating device
CN207287405U (en) * 2017-10-11 2018-05-01 大连东泰资源再生有限公司 A kind of PH adjusts tank
CN208203993U (en) * 2018-05-04 2018-12-07 阜阳安固锅炉压力容器制造有限公司 A kind of tower pressure vessel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5462445A (en) * 1977-10-28 1979-05-19 Hitachi Ltd Fitting seal equipment
CN201934650U (en) * 2011-01-21 2011-08-17 上海寰球石油化学工程有限公司 Combined spherical pressure container
CN107366826A (en) * 2017-08-01 2017-11-21 阜阳安固锅炉压力容器制造有限公司 A kind of pressure vessel and its method of work with pressure-regulating device
CN207287405U (en) * 2017-10-11 2018-05-01 大连东泰资源再生有限公司 A kind of PH adjusts tank
CN208203993U (en) * 2018-05-04 2018-12-07 阜阳安固锅炉压力容器制造有限公司 A kind of tower pressure vessel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109442207A (en) * 2018-11-29 2019-03-08 无锡诺贝特流体设备科技有限公司 A kind of assembled water bath carburetor
CN109654813A (en) * 2018-12-25 2019-04-19 临安派祺空气净化科技有限公司 A kind of refrigerant type dryer
CN115234834A (en) * 2021-04-22 2022-10-25 辛集市皓瑞封头制造有限公司 Pressure vessel convenient to restore
CN113769698A (en) * 2021-10-29 2021-12-10 阜阳安固锅炉压力容器制造有限公司 Hydrogenation tower

Also Published As

Publication number Publication date
CN108413032B (en) 2023-10-27

Similar Documents

Publication Publication Date Title
CN108413032A (en) A kind of tower pressure vessel and its working method
US20110174703A1 (en) Method and apparatus of submersible intake equipment
SU1498908A1 (en) Arrangement for collecting oil and gas from gryphons on sea bottom
CN107063649A (en) The underwater wellhead annular space sealing ground test device of pressurization can be loaded simultaneously
CN110411843B (en) Pressure container or pipeline air pressure test system and test method
CN102563358A (en) Self-closing type water drain apparatus for gas and service method of self-closing water drain apparatus
CN201297437Y (en) Differential pressure type drainage device used in containers
CN208203993U (en) A kind of tower pressure vessel
CN216079296U (en) Low-pressure hydrogen steady flow system of fuel cell automobile hydrogenation station
CN201013642Y (en) Piston type fluid-control valve used for self-sucking pump
CN211877329U (en) Safe check valve test system
CN214699313U (en) Novel intelligent integrated lubrication for cock valve of basement of coke oven
CN202925598U (en) Silence type pipeline non-negative pressure water supply device
CN209130369U (en) A kind of oil pipeline receiving ball tube automatic exhaust device
CN102537652A (en) Method for displacing impurities at bottom of water sealed tank of gas holder without shutdown as well as gas holder
CN109356782B (en) Buoyancy water lifting device and buoyancy water lifting method for hydraulic and hydroelectric engineering
CN206785787U (en) A kind of hydraulic system depassing unit
CN216687611U (en) Membrane frame structure of MBR membrane module
CN206347554U (en) A kind of boiler bottom blowdown apparatus
CN217654682U (en) Filter gas tightness detection test device
CN201606548U (en) Aerating and exhausting check valve device of a tank storing cyclopentane raw materials
CN217287249U (en) Oil-water separation dehydration tank reconstructed from underground oily sewage horizontal tank
CN202441639U (en) Pump front suction device
CN220354809U (en) Liquid pipeline gas catcher
CN216846775U (en) Ball valve hydraulic detection device with two detection stations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A tower pressure vessel and its working method

Granted publication date: 20231027

Pledgee: China Postal Savings Bank Limited by Share Ltd. Fuyang branch

Pledgor: FUYANG ANGU BOILER PRESSURE VESSEL MANUFACTURE Co.,Ltd.

Registration number: Y2024980017201