CN108412171A - The levelling metope of minusing whitewashes layer device - Google Patents

The levelling metope of minusing whitewashes layer device Download PDF

Info

Publication number
CN108412171A
CN108412171A CN201810383505.9A CN201810383505A CN108412171A CN 108412171 A CN108412171 A CN 108412171A CN 201810383505 A CN201810383505 A CN 201810383505A CN 108412171 A CN108412171 A CN 108412171A
Authority
CN
China
Prior art keywords
guide rail
wall
metope
crossbeam
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810383505.9A
Other languages
Chinese (zh)
Inventor
吴奉军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810383505.9A priority Critical patent/CN108412171A/en
Publication of CN108412171A publication Critical patent/CN108412171A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/04Patterns or templates; Jointing rulers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/16Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/16Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels
    • E04F21/161Trowels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The levelling metope of minusing disclosed by the invention whitewashes layer device, is related to a kind of Facilities.The levelling metope of minusing is whitewashed layer device and is made of positioning device, guider, leveling unit.Guider is fixed by positioning device on wall, and leveling unit slides levelling powdering layer by track of guider.The distance between guider and wall are more than the distance between leveling unit and wall, and layer is whitewashed using the levelling metope of the range difference of the two.The present invention has the characteristics that quick for installation, construction is accurate.

Description

The levelling metope of minusing whitewashes layer device
Technical field
The present invention relates to a kind of Facilities, and in particular to a kind of levelling metope powdering layer device of minusing.
Background technology
Traditional wall plastering construction, technique is cumbersome, high to the professional skill requirement of construction personnel.It is existing to use hard template The improved method for substituting floating screed, need to limit template thickness cannot be more than plastering layer thickness.Disclosed in patent 201120126301.0 A kind of plastering rib-punching template, claim clearly propose that template thickness is 10 millimeters.If the plastering of plastering construction technological requirement is thick 20 millimeters of average out to is spent, a part for wall has the error of 19 millimeters of protrusion.Wall plastering demand of technical standard plastering thickness Degree is no less than 7 millimeters, and the template of 10 millimeters thicks does not obviously meet construction requirement, and solution is two kinds:First, taking a lot of work, shovel Except wall projection portion;Second is that waste material, Integral upset plastering layer thickness.Using thinner template, template is also easy to produce deformation effect Construction accuracy.The method that template replaces floating screed only simply improves the levelling process in plastering construction.The plastering construction later stage It rubs the crucial process such as reality, cover, press polish with the hands, still needs to have the construction personnel of high professional skill to complete.
Invention content
To solve the above-mentioned problems, the levelling metope of minusing provided by the invention whitewashes layer device, has working specification, applies The true feature of working drawing disclosure satisfy that the requirement of primary construction personnel.
To achieve the goals above, the technical solution adopted in the present invention is as follows:The levelling metope of minusing whitewashes the dress of layer It sets, by positioning device, guider, leveling unit is constituted;Guider is fixed by positioning device on wall, leveling unit Levelling powdering layer is slided by track of guider;
Positioning device is made of multiple threaded rods, and wall is fixed in one end of every threaded rod by the hole made in advance on wall On body, exposed threaded rod is equipped with location nut and clamping piece on wall;On conplane wall, the positioning spiral shell of threaded rod Mother is in same vertical plane;
Guider is made of at least two guide rails;Every guide rail is at least provided with two planes, respectively reference plane and nearly metope; The nearly metope of guide rail is contacted with the location nut of threaded rod;The distance between the reference plane of every guide rail and nearly metope D is identical;It leads Rail is equipped with longitudinal logical heart slot hole;The threaded rod that every guide rail passes through logical heart slot hole by least two, passes through location nut and folder Firmware is fixed on wall;On conplane wall, the reference plane of guide rail is in same vertical plane.
Leveling unit is by an at least crossbeam, connector, construction board group at;Crossbeam is connected by connector with construction plate;Construction Plate is equipped with outer end face and working face;The length a of crossbeam is not less than the distance between two adjacent rails in same plane;Crossbeam Length a is respectively greater than the length b of the length d and connector for plate of constructing;Crossbeam is slided against the reference plane of guide rail, passes through plate of constructing Working face contacted with mortar strike off and smooth out whitewash layer;
The distance between the reference plane of guide rail and wall A are more than the distance between crossbeam and construction plate working face B, the difference of the two To whitewash the thickness C of layer.
Described in above-mentioned technical proposal, the thickness C for whitewashing layer, crossbeam and construction plate working face are can determine according to construction requirement The distance between B be known fixed, B add C's and value equal to guide rail reference plane and the distance between wall A;Because of guide rail Nearly metope is contacted with the location nut of threaded rod, by B plus C's and value subtract the distance between guide rail reference plane and nearly metope D, It can determine the distance between location nut and wall of threaded rod and the position on threaded rod, determined successively using level meter The position of all location nuts on conplane wall, so that it is determined that on same plane wall all guide rail reference planes position It sets.
Described in above-mentioned technical proposal, preferably:The length b of leveling unit connector is respectively smaller than length a and the construction of crossbeam The length d of plate;The distance between crossbeam and the outer end face of construction plate e are more than the distance between the reference plane of guide rail and nearly metope D; Construct the plate part f longer than connector, can carry out constructing operation in the gap between the nearly metope and wall of guide rail.
Described in above-mentioned technical proposal, preferably:The connector and construction plate of leveling unit, synchronous horizontal can slide on crossbeam It is dynamic.
Described in above-mentioned technical proposal, still more preferably:The leveling unit of two crossbeams is set, at parallel two crossbeams In same level;Two crossbeams are equal with the distance between construction plate working face respectively;The both ends of two crossbeams are respectively equipped with Vertical beam constitutes a fixed rectangular frame;The handle being connected with connector is equipped in rectangular frame, it is tight by handle operation crossbeam The reference plane sliding for pasting guide rail, by handle operation connector and construction plate, the synchronous horizontal on crossbeam slides;Plate construct than connecting The part f of fitting length can carry out constructing operation in the gap between the nearly metope and wall of guide rail.
Described in above-mentioned technical proposal, preferably:Leveling unit outfit shape of working surface is different and what can be replaced mutually applies Work plate;It is divided into strike-off stick and wiping tablet according to function is used.
Described in above-mentioned technical proposal, preferably:Threaded rod is cusp-shaped in part within the walls;The hole made in advance on wall It inside jumps a queue soft tube expansion;Threaded rod is equipped with the locating part contacted with hole hole, and the cross section of locating part is more than hole hole.
Described in above-mentioned technical proposal, preferably:The cross section of guide rail is L-type;Between the reference plane of guide rail and nearly metope away from It is not less than 20 millimeters from D.
Described in above-mentioned technical proposal, still more preferably:The cross section of guide rail is L-type, the reference plane of guide rail and nearly metope The distance between D when being not less than 20 millimeters, the length of leakage threaded rod is not more than A on wall, subtracts D more than A.
Above-mentioned technical proposal is taken, the invention has the advantages that:Using both guider and leveling unit with The levelling powdering layer of the distance between wall difference is not required to limit rail thicknesses, need to only meet A and be more than B.Rail thicknesses, which increase, to be conducive to lead The stabilization of rail shape improves construction accuracy.
The location nut of threaded rod replaces the effect of ash cake in traditional plastering construction, has job specfication, adjustment fast and accurately Feature.Part of the threaded rod in wall is the purpose of design of soft tube expansion of jumping a queue in cusp-shaped and hole:It Fast Installation and tears open Except threaded rod.
Guide rail is fixed by threaded rod, has the characteristics that quick for installation, recycling.Guide rail is equipped with longitudinal logical heart slot hole, energy Enough deviations of the generation of reduction punch position.The L-shaped guide rail of advantageous cross sections reduces the transverse width of guide rail reference plane, reduction The deviation generated by the error of perpendicularity of single location nut.Set the purpose for the screw thread pole length that leaks outside on wall:Prevent screw thread Bar stops sliding of the crossbeam in guide rail reference plane, meets threaded rod location nut and clamping piece fixes the required distance of guide rail.
The length of leveling unit each section sets purpose:It can construct in the narrow space between the nearly metope of guide rail and wall Operation is not required to repeat to dismount guide rail.The design of double crossbeams makes leveling unit more exactly in sliding is constructed.It slides laterally Construction tablet increases boundary of works area.Alternatively construction plate design ensures that plastering construction connects under a codes and standards always Continuous operation.
Description of the drawings
Fig. 1 is the front view that the levelling metope of minusing whitewashes layer device.
Fig. 2 is the side, sectional Local map that the levelling metope of minusing whitewashes layer device.
Fig. 3 is the vertical view Local map that the levelling metope of minusing whitewashes layer device.
Fig. 4 is the distance mark definition graph that the levelling metope of minusing whitewashes layer device.
Fig. 5 is the length indication definition graph for the leveling unit that the levelling metope of minusing whitewashes layer device.
Symbolic indication in figure:1 is threaded rod, and 101 be location nut, and 102 be clamping piece, and 103 be locating part;2 be guide rail, 201 be logical heart slot hole, and 202 be reference plane, and 203 be nearly metope;3 be leveling unit, and 301 be crossbeam, and 302 be connector, and 303 are Handle, 304 be vertical beam, and 305 be outer end face, and 306 be working face, and 4 be the hole made in advance;5 be to whitewash layer, and 6 be wall, 7 It is soft tube expansion;
A indicates the distance between reference plane and wall of guide rail;B indicates the distance between crossbeam and construction plate working face;C is indicated Whitewash the thickness of layer;D indicates the distance between guide rail reference plane and nearly metope;
A indicates the length of crossbeam;B indicates the length of connecting component;D indicates the length of construction plate;E indicates crossbeam and plate of constructing The distance between outer end face;F indicates the construction plate part longer than connector;
In figureIndicate connector and glide direction of the plate on crossbeam of constructing.
Specific implementation mode
Below in conjunction with the accompanying drawings 1,2,3 and example be described in further detail:It is by positioning that the levelling metope of minusing, which whitewashes the device of layer, Device, guider, leveling unit 3 are constituted.Guider is fixed by positioning device on wall 6, and leveling unit 3 is to be oriented to Device is that track slides levelling powdering layer 5.
Positioning device is made of multiple threaded rods 1.Each 1 one end of threaded rod is cusp-shaped, by making and jumping a queue soft in advance The hole 4 of tube expansion 7 is fixed on wall 6.Exposed threaded rod 1 is equipped with location nut 101, clamping piece 102, limit on wall 6 Position part 103.Length of the threaded rod 1 in wall 6 is controlled by locating part 103.On conplane wall, threaded rod 1 is determined Position nut 101 is in same vertical plane.
Guider is made of at least two guide rails 2.Advantageous cross sections are L-shaped guide rail 2, are led for adjacent two in same plane The distance between rail is 1.5 meters or so.Every guide rail 2 is reference plane 202 and nearly metope 203 respectively at least provided with two planes. The nearly metope 203 of guide rail is contacted with the location nut 101 of threaded rod.Between the reference plane 202 of every guide rail 2 and nearly metope 203 Distance D it is identical.Guide rail 2 is equipped with longitudinal logical heart slot hole 201.Every guide rail 2 passes through logical heart vast sky by least two threaded rods 1 201, it is fixed on wall 6 by location nut 101 and clamping piece 102.On conplane wall, the reference plane 202 of guide rail 2 In same vertical plane.
Leveling unit 3 is by an at least crossbeam 301, connector 302, construction board group at.Crossbeam 301 by connector 302 with apply Work plate is connected.The distance between two guide rails 2 adjacent not less than in same plane the length a of crossbeam 301.The length of crossbeam 301 Spend the length b that a is respectively greater than the length d and connector 302 of plate of constructing.Connector 302 and construction plate, can be on crossbeam 301 According toDirection synchronous horizontal sliding.Plate of constructing is equipped with outer end face 305 and working face 306.Crossbeam 301 abuts the benchmark of guide rail 2 Face 202 is slided, and is contacted to strike off and smooth out with mortar by the working face 306 for plate of constructing and is whitewashed layer 5.Leveling unit 3 is equipped with work Face 306 shape is different and the construction plate that can be replaced mutually.Construction plate is according to using function difference to be divided into strike-off stick and floating Plate.
It is preferably provided with the leveling unit 3 of two crossbeams 301.Two parallel crossbeams 301 are in same level, two crossbeams 301 is equal with the distance between construction plate respectively.Crossbeam 301 constitutes a fixation by the way that the connection of vertical beam 304 at both ends is arranged Rectangular frame.The handle 303 being connected with connector 302 is equipped in rectangular frame.By handle 303, operation crossbeam 301 is close to lead The reference plane 202 of rail 2 is slided.By handle, operation connector 302 and plate of constructing it is synchronous on crossbeam 2 according toDirection is lateral Sliding.Construct the plate part f longer than connector 302, can be applied in the gap between the nearly metope 203 and wall 6 of guide rail 2 Work operates.
It is further illustrated in conjunction with attached drawing 4 and example:The distance between the reference plane 202 of guide rail and wall 6 A crossbeams dry greatly The distance between 301 and construction plate working face 306 B, the difference of the two are to whitewash the thickness C of layer 5.
It can determine that the thickness C for whitewashing layer, the distance between crossbeam 301 and looking for flat working face 306 B are according to construction requirement Know fixed value, C add B's and value be equal to the distance between reference plane 202 and the wall 6 of guide rail A.Because guide rail 2 nearly metope 203 with The location nut 101 of threaded rod 1 contacts, by B plus C's and value subtract between 2 reference plane 202 of guide rail and closely metope 203 away from From D, the distance between location nut 101 and wall 6 of threaded rod 1 and the position on threaded rod 1 can determine.Utilize laser Level meter determines the position of location nut 101 all on conplane wall 6 successively, so that it is determined that same plane wall 6 Upper all 202 positions of guide rail reference plane.
It is further illustrated in conjunction with attached drawing 5 and example:The length b of the connector 302 of leveling unit 3 is respectively smaller than crossbeam 301 Length a and construction plate length d.The distance between crossbeam 301 and the outer end face 305 of looking for flat e are more than the reference plane of guide rail 2 The distance between 202 and nearly metope 203 D.Construct the plate part f longer than connector 302, can guide rail 2 nearly metope 203 with Narrow space between wall 6 carries out constructing operation.
Advantageous cross sections are L-shaped guide rail, and it is the resistance of threaded rod 1 in order to prevent that the length of restriction leakage threaded rod 1, which is not more than A, Sliding of the crossbeam 301 in reference plane 202 is kept off, it is to meet location nut 101 and press from both sides to limit screw thread pole length to be more than A to subtract D Firmware 102 fixes the required distance of guide rail 2.Preferably 40 millimeters of D values.
The levelling metope of minusing whitewashes the operate with method of layer device:It is long according to the setting interval of guide rail 2 and the logical heart Empty position, several holes 4 are made on wall 6, and --- soft tube expansion 7 of jumping a queue hammers into threaded rod 1 --- determines positioning spiral shell Female 101 positions --- wall plastering reaches certain thickness --- install guide rail 2, are fixed by clamping piece 102 --- and operation is levelling Device 3 is struck off by the strike-off stick for plate of constructing and whitewashes layer 5 --- filling up mortar --- operation leveling unit 3, passes through plate of constructing Wiping tablet compacting, which smoothes out, whitewashes layer 5 --- reach construction reference, remove fastener 102, guide rail 2, threaded rod 1 successively --- repairing Powdering layer 5 at hole 4 --- complete operational procedure.
It can be dentation, tabular, eight that the levelling metope of minusing, which whitewashes the construction plate working face of the leveling unit of layer device, The various shapes such as shape, concavo-convex, ellipticity.
The leveling unit that the levelling metope of minusing whitewashes layer device can be by steel wire rope and Spring balancer or with reconnection It connects, has the function that reduce labor intensity.

Claims (9)

1. the levelling metope of minusing whitewashes layer device, by positioning device, guider, leveling unit is constituted, it is characterised in that:It leads It is fixed by positioning device to device on wall, leveling unit slides levelling powdering layer by track of guider;
The positioning device is made of multiple threaded rods, and one end of every threaded rod is solid by the hole made in advance on wall It is equipped with location nut and clamping piece due to the threaded rod on wall, to leak outside on wall;On conplane wall, threaded rod Location nut is in same vertical plane;
The guider is made of at least two guide rails;Every guide rail at least provided with two planes, respectively reference plane and Nearly metope;The nearly metope of guide rail is contacted with the location nut of threaded rod;The distance between the reference plane of every guide rail and nearly metope (D) identical;Guide rail is equipped with longitudinal logical heart slot hole;The threaded rod that every guide rail passes through logical heart slot hole by least two, by fixed Position nut and clamping piece are fixed on wall;On conplane wall, the reference plane of guide rail is in same vertical plane.
The leveling unit is by an at least crossbeam, connector, construction board group at;Crossbeam passes through connector and construction plate phase Even;Plate of constructing is equipped with outer end face and working face;The length (a) of crossbeam not less than between two adjacent rails in same plane away from From;The length (a) of crossbeam is respectively greater than the length (b) of the length (d) and connector for plate of constructing;Crossbeam is close to the reference plane of guide rail Sliding contacts to strike off and smooth out and whitewashes layer by the working face for plate of constructing with mortar;
The distance between the reference plane of guide rail and wall (A) are more than the distance between crossbeam and construction plate working face (B), the two Difference is to whitewash the thickness (C) of layer.
2. the levelling metope of minusing according to claim 1 whitewashes layer device, it is characterised in that:It can according to construction requirement Determine that the thickness (C) for whitewashing layer, the distance between crossbeam and construction plate working face (B) are known fixed, the sum of (B) plus (C) Value is equal to the distance between the reference plane of guide rail and wall (A);Because the nearly metope of guide rail is contacted with the location nut of threaded rod, lead to Cross (B) plus (C) and value subtract the distance between guide rail reference plane and nearly metope (D), can determine the location nut of threaded rod The distance between wall and the position on threaded rod determine all positioning on conplane wall using level meter successively The position of nut, so that it is determined that on same plane wall all guide rail reference planes position.
3. the levelling metope of minusing according to claim 1 whitewashes layer device, it is characterised in that:The connector of leveling unit Length (b) be respectively smaller than crossbeam length (a) and construction plate length (d);Crossbeam and construct plate outer end face between away from It is more than the distance between the reference plane of guide rail and nearly metope (D) from (e);The construction plate part (f) longer than connector, can lead Gap between the nearly metope and wall of rail carries out constructing operation.
4. the levelling metope of minusing according to claim 1 whitewashes layer device, it is characterised in that:The connector of leveling unit With construction plate, synchronous horizontal can be slided on crossbeam.
5. the levelling metope of minusing according to claim 1 or 3 or 4 whitewashes layer device, it is characterised in that:Two cross are set The leveling unit of beam, parallel two crossbeams are in same level;Two crossbeams respectively construction plate working face between away from From equal;The both ends of two crossbeams are respectively equipped with vertical beam, constitute a fixed rectangular frame;It is equipped in rectangular frame and connector Connected handle, the reference plane that guide rail is close to by handle operation crossbeam are slided, and are existed by handle operation connector and construction plate Synchronous horizontal slides on crossbeam;The construction plate part (f) longer than connector, can be in the sky between the nearly metope and wall of guide rail Gap carries out constructing operation.
6. the levelling metope of minusing according to claim 1 whitewashes layer device, it is characterised in that:Leveling unit is equipped with work Face shape is different and the construction plate that can be replaced mutually;Construction plate is according to using function difference to be divided into strike-off stick and wiping tablet.
7. the levelling metope of minusing according to claim 1 whitewashes layer device, it is characterised in that:Threaded rod is in portion within the walls It is divided into cusp-shaped;It jumps a queue in the hole made in advance on wall soft tube expansion;Threaded rod is equipped with the limit contacted with hole hole The cross section of position part, locating part is more than hole hole.
8. the levelling metope of minusing according to claim 1 whitewashes layer device, it is characterised in that:The cross section of guide rail is L Type;The distance between guide rail reference plane and nearly metope (D) are not less than 20 millimeters.
9. the levelling metope of minusing according to claim 1 or 8 whitewashes layer device, it is characterised in that:Threaded rod on wall The length of leakage part is not more than (A), subtracts (D) more than (A).
CN201810383505.9A 2018-04-16 2018-04-16 The levelling metope of minusing whitewashes layer device Pending CN108412171A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810383505.9A CN108412171A (en) 2018-04-16 2018-04-16 The levelling metope of minusing whitewashes layer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810383505.9A CN108412171A (en) 2018-04-16 2018-04-16 The levelling metope of minusing whitewashes layer device

Publications (1)

Publication Number Publication Date
CN108412171A true CN108412171A (en) 2018-08-17

Family

ID=63136722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810383505.9A Pending CN108412171A (en) 2018-04-16 2018-04-16 The levelling metope of minusing whitewashes layer device

Country Status (1)

Country Link
CN (1) CN108412171A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260847A (en) * 2019-08-02 2019-09-20 安徽理工大学 A kind of laser leveler
CN110424687A (en) * 2019-08-08 2019-11-08 中冶天工集团有限公司 A kind of disposable floating screed leveling unit of composite exterior wall and construction method
WO2022191684A1 (en) 2021-03-09 2022-09-15 Valters Artis A device, a system and a method for levelling a wall or similar vertical surface

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260847A (en) * 2019-08-02 2019-09-20 安徽理工大学 A kind of laser leveler
CN110260847B (en) * 2019-08-02 2023-11-24 安徽理工大学 Laser level meter
CN110424687A (en) * 2019-08-08 2019-11-08 中冶天工集团有限公司 A kind of disposable floating screed leveling unit of composite exterior wall and construction method
WO2022191684A1 (en) 2021-03-09 2022-09-15 Valters Artis A device, a system and a method for levelling a wall or similar vertical surface
LV15671A (en) * 2021-03-09 2022-09-20 Valters Artis A device, a system and a method for levelling a wall or similar vertical

Similar Documents

Publication Publication Date Title
CN108412171A (en) The levelling metope of minusing whitewashes layer device
CN103586310A (en) Straightener calibration method
CN109737847A (en) A kind of rail variable cross-section dimensional measurement ruler
CN208518288U (en) The levelling metope of minusing whitewashes layer device
CN209206462U (en) A kind of double scraper power spreading devices of increasing material manufacturing equipment with unilateral leveling structure
CN206905682U (en) A kind of glass bend curvature measurement apparatus
CN206208177U (en) A kind of fixture of subsidiary raceway profile
CN210825044U (en) Be used for installing elevator sill elevator positioning auxiliary device
CN109579661A (en) A kind of test specimen producing device accurately controlling CFRP/ steel interface bondline thickness
CN210887985U (en) Ground leveling auxiliary device for building construction
CN204359278U (en) A kind of side expansion optical measuring system
CN207936873U (en) A kind of measuring scale
CN109047380A (en) A kind of bend pipe is quickly detected with origin reference location mechanism
CN204255250U (en) A kind of bracing frame span measures tool
CN212870976U (en) Accurate measuring device for building engineering technology
CN210981124U (en) Corner angle measuring device is used in production of aluminum alloy window frame
CN210704415U (en) Mounting and positioning tool for sealing slide way of sintering machine
CN209310719U (en) Building decoration detection device
CN108435837A (en) A kind of bender
CN104963510B (en) Device and method for positioning center line of wing plate of arc-shaped structure
CN216926822U (en) Plaster coating rate detection device plasters
CN206496712U (en) A kind of scale of control ash cake thickness
CN214352395U (en) Tool for rapidly drawing center line of binding surface of civil air defense door frame and door leaf
RU210977U1 (en) Device for plastering flat surfaces
CN206220496U (en) Modularization stair aluminum alloy pattern plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180817

WD01 Invention patent application deemed withdrawn after publication