CN108411901A - A kind of non-concrete fills pile and pile-driving method - Google Patents

A kind of non-concrete fills pile and pile-driving method Download PDF

Info

Publication number
CN108411901A
CN108411901A CN201810219624.0A CN201810219624A CN108411901A CN 108411901 A CN108411901 A CN 108411901A CN 201810219624 A CN201810219624 A CN 201810219624A CN 108411901 A CN108411901 A CN 108411901A
Authority
CN
China
Prior art keywords
pile
hollow cylinder
concrete
supporting course
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810219624.0A
Other languages
Chinese (zh)
Inventor
刘牧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNMING SHUIXIAO TECHNOLOGY Co Ltd
Original Assignee
KUNMING SHUIXIAO TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING SHUIXIAO TECHNOLOGY Co Ltd filed Critical KUNMING SHUIXIAO TECHNOLOGY Co Ltd
Priority to CN201810219624.0A priority Critical patent/CN108411901A/en
Publication of CN108411901A publication Critical patent/CN108411901A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of non-concrete to fill pile and pile-driving method, non-concrete bored concrete pile includes hollow cylinder, the top plate set on several equally distributed wing plates of hollow cylinder Basolateral and set on hollow cylinder top, wherein, wing plate triangle at an acute angle, and acute angle is down-set, hollow cylinder surface is marked with geology supporting course graticule, and supporting course graticule is less than the water surface at least 600mm so that supporting course at least 600mm is goed deep into hollow cylinder bottom end after non-perfusing stake in place.The present invention is especially suitable for the operations on interim or semipermanent construction of structures structural basis in river, lake, the library pool.Operating efficiency is obviously improved, the expenses such as construction personnel, machinery have not only been saved, construction period is saved, have avoided the danger of traditional infrastructure operation, it has abandoned armored concrete and has entered operating area water environment, had the characteristics that green, environmentally friendly, economical, safe efficient.

Description

A kind of non-concrete fills pile and pile-driving method
Technical field
The present invention relates to a kind of pile, especially a kind of non-concrete fills pile, further relates to pile-driving method.
Background technology
Currently, the piling for lake body trash-removal device platform is to use the filling column of concrete, however, filling with concrete Column carries out pile foundation operation, it is difficult to reach scheduled depth, to the more demanding of pile driving equipment, cylinder own wt is also larger, needs The cofferdam of foundation construction range is done in advance, pattern foundation pit supporting structure drains, concrete foundation casting operation, waste construction personnel, machinery Etc. expenses, construction period lengthen, meanwhile, there is also danger, armored concrete enters operating area water ring for traditional infrastructure operation Border is easy polluted-water, destroys ecology.
Therefore, we are badly in need of not using concrete in real work, avoid complicated working measure and conventional concrete base A kind of novel pile of plinth.
Invention content
In order to solve the above-mentioned technical problem, an object of the present disclosure is to provide a kind of non-concrete filling pile, the second mesh Be a kind of pile-driving method is provided.
The principle of the invention is as follows:
Those skilled in the art know that the closing of hollow tubular syringe one end keeps a certain amount of in tubular structure hollow part Gas simultaneously blocks syringe injection port, no matter being intended to extract at this time or promotion syringe piston is all highly difficult, basis at this time Pascal's principle:P=P0+Pgh 、PBy force=F*SArea
I.e.:Syringe is filled the area for gravity/syringe bottom that pressure=liquid that liquid is placed downward vertically to bottom generates P=ρgh(PLiquid=F/S=G/S=mg/s=ρLiquidhg);
Syringe ports are closed if it is air rubber stopper is sucked in syringe, then do not apply additional pressure or the feelings of draft Atmospheric pressure is equal inside and outside syringe under condition, but once presses the pressure or take out piston rod outward that syringe inside pushes, this Volume, the temperature factor that pressure in the external closed confined space of syringe is occupied with air are related, and formula prompts for:PV= Nrt, P indicate gas pressure intensity, V indicate volume of gas, n indicate molecular weight, R are constant contained by gas, T be gas temperature, when When temperature remains unchanged, the smaller pressure of gas volume of certain mass is bigger, and the bigger pressure of volume is smaller.Density at zero altitude For:ρ=1.225kg/m3
Thrust:P=PIt pushes away+Pgh
PV=nRT
At this point, size constants are constant.T temperature changes are little,(Practical lake and reservoir environment water temperature variation is little, can be ignored), so PV= N indicates molecular weight gas in nRT:PIt is empty=1.225Kg/m3*Xnm3* the mole coefficient of y air, Pv be variable i.e.:Volume is one In the case of fixed, being applied to pushing or pulling on syringe piston push rod, power is bigger, the pressure suffered by push rod and syringe volume space Qiang Yue great, it is reversed for once clogging injection orifice with rubber stopper forms confined space, in the case where temperature is certain, syringe with Injection ram forms a stable pneumatic structure system, and the power of the structure of the suffered bigger maintenance baric systerm of external force is more Greatly.
Around this principle, concrete scheme of the invention is as follows:
A kind of non-concrete filling pile, including hollow cylinder, several equally distributed wing plates set on hollow cylinder Basolateral With the top plate set on hollow cylinder top, wherein hollow cylinder bottom end open-ended, wing plate is triangular in shape, and acute angle is down-set, Hollow cylinder surface is marked with geology supporting course graticule.
Further, geology supporting course graticule is less than the water surface at least 600mm so that hollow cylinder bottom after non-perfusing stake in place Supporting course at least 600mm is goed deep at end.
Further, wing plate includes a right angle and one 30 ° of acute angle, and acute angle top is flat with hollow cylinder bottom end bottom Together, long right-angle side is set to by stiffened panel on hollow cylinder, and short right-angle side is to external radiation.
Further, wing plate is 4-16 blocks.
Further, hollow cylinder is cylinder, hexagonal or octagonal tubulose or square and rectangular pipe shape structure.
Further, top plate extends at least 10mm to hollow cylinder outside.
It is of the present invention to fill pile pile-driving method using above-mentioned non-concrete, include the following steps:
Step(1), in hollow cylinder bottom end wing plate is installed, carry out anti-corrosion, the stake top portion welding position soldering opening of inside and outside tube wall Work;
Step(2), find according to the geologic prospect data in construction operation plot non-concrete and fill pile and should reach the base of supporting course Native depth and non-concrete fill suffered various loads after the completion of pile, determine that pile body should enter the depth of base soil supporting course after calculating Degree, and according to the practical depth of water, mud layer depth, bearing stratum depth, be finally completed depth etc. and marked successively in pile body surface;
Step(3), non-concrete filled into pile be driven underground or lake library pool pile foundation point in strictly control position;
Step(4), non-concrete fill after pile reaches scheduled depth, check the errorless post package top plate of pile body verticality, it is hollow Cylinder welding surface beats mouth in advance, and live x-ray detection detection is carried out after the completion of various aspects welding ensures that any weld seam reaches level-one Weld chain, last butt welding chain carries out welding slag cleaning, corrosion prevention operation, after the welding of pile body top plate is completed inside pile pile by top plate to hollow The water surface is formed with the confined space of a certain amount of volume of air in pile body.In turn, non-concrete fills the position that pile is stable in piling, Water and mud are contained in lower part in pile body, and top is full of air so that pile body will not float, and be not easy to move.
Used pile pile and basic wing plate, the material of top plate, specification, thickness etc. must be in conjunction with the case where detailed programs by tying Structure engineer is calculated.
Further, top plate welding is welded simultaneously using thing or north-south.
Compared with prior art, beneficial effects of the present invention are as follows:
(1), the present invention structural mechanics and the mechanics of materials, metal pile foundation reinforcement of metallic tube-shaped structure system itself are utilized simultaneously Plate and each wing plate form the structural mechanics of the structural system of tree plate with base soil supporting course, and pile foundation completes stake content after top plate seal Gas pressure intensity power formed between object and pile body and top plate etc..Natural forms and device have fully been excavated on foundation construction objects system The principles of science of tool.Each soil layer in operation area is penetrated using the natural thickness of metallic walls and each wing plate, therefore pile crown forced area is non- It is often small, it is formed and forces strong increase decades of times with same equipment and force effect when pile body is suppressed downwards in sharp keen shear action, with Various other pile foundation operations compared to pile foundation part it is lighter reach predetermined depth.Therefore, with piling casing cooperation, piling is set Standby requirement substantially reduces, in this embodiment it is not even necessary to which professional piling machine operation is obviously improved with professional pile driving equipment operating efficiency.
(2), since pile body is hollow metal pile pile, pile body own wt is lighter.It is therefore particularly suitable for river, lake, Ku Tang In interim or semipermanent construction of structures structural basis operation.
(3), the present invention make full use of the mechanics of materials of material itself, structural mechanics and gas pressure force, river, lake, The cofferdam of foundation construction range need not be done when the environmental improvement operation of the library pool in advance, pattern foundation pit supporting structure drains, concrete foundation casting Operation.Therefore, the expenses such as construction personnel, machinery have not only been saved, construction period is saved, have avoided the danger of traditional infrastructure operation It is dangerous, it has abandoned armored concrete and has entered operating area water environment, had the characteristics that green, environmentally friendly, economical, safe efficient.
(4), as interim or semipermanent pile foundation engineering, torn open if the pile foundation completes mission needs in operating area It removes, it is only necessary to after the attachment of removal top and each stake are connected with each other works, remove seal top plate at the top of pile body first, destroy close The powerful pressure stability of envelope container is just very easy to release the structural stability of independent pile body lower part otherwise later, Completion building connection pile body itself that can be quickly is removed from environment without leaving any influence and ecological disruption.
Description of the drawings
Fig. 1 is that the non-concrete of the present invention fills the structural schematic diagram of pile;
Fig. 2 is the vertical view of the hollow cylinder with wing plate;
Fig. 3 is the structural schematic diagram of wing plate;
Fig. 4 is the structural schematic diagram that the non-concrete that piling is completed fills pile;
Fig. 5 is the vertical view of the hollow cylinder with wing plate of another embodiment;
Fig. 6 is the structural schematic diagram of the wing plate of another embodiment.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, is carried out clearly and completely to the technical solution in the present embodiment Description, it is clear that described embodiment is only rather than whole example to a part of example of the present invention.Based on the present invention In embodiment, the every other implementation that those of ordinary skill in the art are obtained under the premise of not making the creative labor Example, shall fall within the protection scope of the present invention.
Embodiment 1
As shown in Figure 1, the present embodiment non-concrete fill pile, including hollow cylinder 1, set on the 4 of 1 Basolateral of hollow cylinder A equally distributed wing plate 2 and top plate 3 set on hollow cylinder top, wherein 2 triangle at an acute angle of wing plate, and acute angle is downward Setting, surface is marked with geology supporting course graticule 5, hollow cylinder bottom end open-ended, as shown in figure 5, geology supporting course graticule is low In the water surface at least 600mm so that supporting course at least 600mm is goed deep into hollow cylinder bottom end after non-perfusing stake in place.Hollow cylinder 1 is Square and rectangular pipe shape structure.
As Figure 2-3, wing plate 2 includes a right angle and one 30 ° of acute angle, and acute angle top is flat with hollow cylinder bottom end Together, long right-angle side is set to by stiffened panel 4 on hollow cylinder, and short right-angle side is to external radiation.Top plate 3 prolongs to 1 outside of hollow cylinder Extend to few 10mm.Wing plate installation 300Acute angle is downward, and acute angle top is concordant with stake mouth, and the complete two-sided welding of long right-angle side is adding On gusset, short right-angle side is to external radiation, and each wing plate is uniformly distributed the mode of stress and arranges.
Common Q 235 or Q345 or other alloy pipe can be used in the present embodiment, after wall thickness, length etc. are formed by the stake The mechanics of materials of the loads change and metal itself that are subjected to, which calculates, to be determined.
The present embodiment fills the pile-driving method of pile and casing of driving piles using above-mentioned non-concrete, includes the following steps:
Step(1), in hollow cylinder bottom end wing plate is installed, carry out anti-corrosion, the stake top portion welding position soldering opening of inside and outside tube wall Work;
Step(2), find according to the geologic prospect data in construction operation plot non-concrete and fill pile and should reach the base of supporting course Native depth and non-concrete fill suffered various loads after the completion of pile, determine that pile body should enter the depth of base soil supporting course after calculating Degree, and according to the practical depth of water, mud layer depth, bearing stratum depth, be finally completed depth etc. and marked successively in pile body surface;
Step(3), using long-armed type piling machine waterborne non-concrete filling pile is driven underground or lake library pool pile foundation point, sternly Lattice control position;An entirety is formed with pile pile after wing plate installation, and is inserted into the painstaking layer of base soil and forms one completely Structural liptinite, the wing plate, such as expansion bolt, are firmly embedded in the painstaking layer of base soil, in structural system in vertical direction On form one and be both unfavorable for sinking through the painstaking layer of base soil, be also not easy to be shaken and pulled up around by wind load Stability structure system, in wing plate structural thickness plane, which ensures that pile body is once in place, and difficult generation itself or outer masterpiece The lodging of rotation and all directions under, it is whole as the root system set greatly is to the adhesive force and penetration of base soil supporting course.Such as Shown in Fig. 4, supporting course graticule is less than water surface 600mm so that supporting course 600mm is goed deep into 1 bottom end of hollow cylinder.The 2 long length of side of wing plate Degree is >=500mm, is determined with specific reference to calculating.
Step(4), non-concrete fill after pile reaches scheduled depth, encapsulate top plate, hollow cylinder welding surface is beaten in advance Mouthful, live x-ray detection detection is carried out after the completion of various aspects welding ensures that any weld seam reaches level-one weldering chain, last butt welding chain into The cleaning of row welding slag, corrosion prevention operation, the water after the welding of pile body top plate seal is completed in pipe will not evaporate, even if in water level decreasing pipe Water will not all decline, form a kind of packing state.The top plate that binds welding is using thing or north-south while welding preferably, really Protecting micro-strain influences the air-tightness of stake top top plate.
The welding of pile body top plate has the confined space of a certain amount of volumes of air inside pile pile after completing, base soil, surface dust in stake Lake and reservoir bottom mud mixture will form stable atmospheric pressure as the piston of syringe, at this time air pressure and surrounding in stake Atmospheric pressure is in a basic balance, and any external force is applied to pile body primarily vertically downward gravity laod or top connection structures Later wind load or live load, which forms upward pulling capacity, all can have stable air pressure pressure action inside pile pile due to surpass In stabilization.Between each pile body it is in place after through to be formed between each pile body meet top construction of structures framed bent pile body system again by other Structural system, which is connected after motive power transmits, mutually to be supported and offsets between pile foundation, and a stable pile foundation is collectively formed System.
Embodiment 2
As seen in figs. 5-6, Fig. 5 is the vertical view of the hollow cylinder with wing plate, and Fig. 6 is the structural representation of the hollow cylinder with wing plate Scheme, in the present embodiment, hollow cylinder 1 is cylinder, remaining is same as Example 1.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (8)

1. a kind of non-concrete fills pile, it is characterised in that:Including hollow cylinder, set on the several equal of hollow cylinder Basolateral The wing plate of even distribution and top plate set on hollow cylinder top, wherein hollow cylinder bottom end open-ended, wing plate is triangular in shape, and Acute angle is down-set, and hollow cylinder surface is marked with geology supporting course graticule.
2. non-concrete according to claim 1 fills pile, it is characterised in that:Geology supporting course graticule is at least less than the water surface 600mm so that supporting course at least 600mm is goed deep into hollow cylinder bottom end after non-perfusing stake in place.
3. non-concrete according to claim 1 fills pile, it is characterised in that:Wing plate includes a right angle and one 30 ° Acute angle, acute angle top is concordant with hollow cylinder bottom end, long right-angle side by stiffened panel be set to hollow cylinder on, short right-angle side to External radiation.
4. non-concrete according to claim 1 fills pile, it is characterised in that:Wing plate is 4-16 blocks.
5. non-concrete according to claim 1 fills pile, it is characterised in that:Hollow cylinder is cylinder, hexagonal or illiciumverum Shape tubulose or square and rectangular pipe shape structure.
6. non-concrete according to claim 1 fills pile, it is characterised in that:Top plate extends at least to hollow cylinder outside 10 mm。
7. a kind of non-concrete using one of claim 1-6 fills the pile-driving method of pile, it is characterised in that:Including walking as follows Suddenly:
Step(1), in hollow cylinder bottom end wing plate is installed, carry out anti-corrosion, the stake top portion welding position soldering opening of inside and outside tube wall Work;
Step(2), find according to the geologic prospect data in construction operation plot non-concrete and fill pile and should reach the base of supporting course Native depth and non-concrete fill suffered various loads after the completion of pile, determine that pile body should enter the depth of base soil supporting course after calculating Degree, and according to the practical depth of water, mud layer depth, bearing stratum depth, be finally completed depth etc. and marked successively in pile body surface;
Step(3), non-concrete filled into pile be driven underground or lake library pool pile foundation point in strictly control position;
Step(4), non-concrete fill after pile reaches scheduled depth, check the errorless post package top plate of pile body verticality, it is hollow Cylinder welding surface beats mouth in advance, and live x-ray detection detection is carried out after the completion of various aspects welding ensures that any weld seam reaches level-one Weld chain, last butt welding chain carries out welding slag cleaning, corrosion prevention operation, after the welding of pile body top plate is completed inside pile pile by top plate to hollow The water surface is formed with the confined space of a certain amount of volume of air in pile body.
8. pile-driving method according to claim 7, it is characterised in that:Top plate welding is welded simultaneously using thing or north-south It connects.
CN201810219624.0A 2018-03-16 2018-03-16 A kind of non-concrete fills pile and pile-driving method Pending CN108411901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810219624.0A CN108411901A (en) 2018-03-16 2018-03-16 A kind of non-concrete fills pile and pile-driving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810219624.0A CN108411901A (en) 2018-03-16 2018-03-16 A kind of non-concrete fills pile and pile-driving method

Publications (1)

Publication Number Publication Date
CN108411901A true CN108411901A (en) 2018-08-17

Family

ID=63131905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810219624.0A Pending CN108411901A (en) 2018-03-16 2018-03-16 A kind of non-concrete fills pile and pile-driving method

Country Status (1)

Country Link
CN (1) CN108411901A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040052779A (en) * 2004-03-20 2004-06-23 윤 용 송 Pile with an Extended Head and working method of the same
CN2729398Y (en) * 2004-09-20 2005-09-28 朱均琦 Pile mail
CN101397800A (en) * 2008-09-17 2009-04-01 中冶集团武汉勘察研究院有限公司 Deep pile survey mark burying method
CN101684650A (en) * 2008-09-27 2010-03-31 陈东曙 Cast-in-place concrete thin-walled tooth-shaped tubular pile with large diameter, pile forming device and method for forming pile
CN204608772U (en) * 2015-04-17 2015-09-02 上海三凯建设管理咨询有限公司 A kind of have the piling strtucture keeping off native function
CN205884383U (en) * 2016-08-15 2017-01-18 郭伟锋 Pile pole

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040052779A (en) * 2004-03-20 2004-06-23 윤 용 송 Pile with an Extended Head and working method of the same
CN2729398Y (en) * 2004-09-20 2005-09-28 朱均琦 Pile mail
CN101397800A (en) * 2008-09-17 2009-04-01 中冶集团武汉勘察研究院有限公司 Deep pile survey mark burying method
CN101684650A (en) * 2008-09-27 2010-03-31 陈东曙 Cast-in-place concrete thin-walled tooth-shaped tubular pile with large diameter, pile forming device and method for forming pile
CN204608772U (en) * 2015-04-17 2015-09-02 上海三凯建设管理咨询有限公司 A kind of have the piling strtucture keeping off native function
CN205884383U (en) * 2016-08-15 2017-01-18 郭伟锋 Pile pole

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李子厚 刘连成: "浅谈超流态压灌桩土施工", 《民营科技》 *

Similar Documents

Publication Publication Date Title
JP6166264B2 (en) How to build a retaining wall
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
US20140026518A1 (en) Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN103321260B (en) Interval boring cuts stake inclination correction method
CN105178319A (en) Pore pressure counterforce steel tube pile pulling method and device and soil removing device
CN105040692B (en) A kind of construction method of precast concrete pile body carrier pile
CN106192999A (en) The construction method of uplift pile
CN106522191A (en) Transformer substation foundation treatment method and application thereof
KR101141526B1 (en) Pressure Grouting Method
CN107142959A (en) A kind of geotechnical grid reinforcement foam concrete retaining wall fills structure and its method
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN103938641A (en) Foundation construction technology of large-scale photovoltaic power station in desert
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN107119675A (en) A kind of steel tube concrete pile combined support column and its construction method
CN108411901A (en) A kind of non-concrete fills pile and pile-driving method
CN106120790A (en) The special equipment of the compacted guncreting pile of high frequency and method
CN204252120U (en) The construction equipment of concrete pile
WO2023131936A2 (en) Bioinspired skirted footing and its method of installation
CN214245784U (en) Double-row steel sheet pile diaphragm wall cofferdam
CN108487226A (en) Multisection type composite bushing punching press sandy pile construction engineering method
CN211036960U (en) Electroosmosis gravel grouting pile
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill
CN109098205B (en) Civil air defense underground passage and construction method thereof
CN104153356B (en) The constructing device of concrete-pile and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180817