CN108411873A - A kind of river sewage blocking device for water conservancy - Google Patents

A kind of river sewage blocking device for water conservancy Download PDF

Info

Publication number
CN108411873A
CN108411873A CN201810203600.6A CN201810203600A CN108411873A CN 108411873 A CN108411873 A CN 108411873A CN 201810203600 A CN201810203600 A CN 201810203600A CN 108411873 A CN108411873 A CN 108411873A
Authority
CN
China
Prior art keywords
bearing
babinet
bevel gear
long
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810203600.6A
Other languages
Chinese (zh)
Other versions
CN108411873B (en
Inventor
魏海勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huasheng Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810203600.6A priority Critical patent/CN108411873B/en
Publication of CN108411873A publication Critical patent/CN108411873A/en
Application granted granted Critical
Publication of CN108411873B publication Critical patent/CN108411873B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/06Barriers therefor construed for applying processing agents or for collecting pollutants, e.g. absorbent

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Filtration Of Liquid (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of sewage blocking device for water conservancy more particularly to a kind of river sewage blocking devices for water conservancy.The technical problem to be solved in the present invention is to provide a kind of flexible structure, lift adjustment can be carried out, have a wide range of application, block that dirty effect is good, is conveniently used for the river sewage blocking device of water conservancy to the pollutant cleaning intercepted.The present invention provides such a river sewage blocking devices for water conservancy, include first base, the first babinet, first bearing, lead screw, nut, second bearing, first rotating wheel etc.;First base is provided with perforative first large through-hole up and down, and the first babinet is connected at the top of first base, and the first babinet and the first large through-hole are the formula setting that is staggered.A kind of river sewage blocking device for water conservancy provided by the present invention, flexible structure can easily carry out lift adjustment, have a wide range of application, block that dirty effect is good, easily the pollutant intercepted can be cleared up, be conducive to the production and life of people, performance safety is reliable.

Description

A kind of river sewage blocking device for water conservancy
Technical field
The present invention relates to a kind of sewage blocking device for water conservancy more particularly to a kind of river sewage blocking devices for water conservancy.
Background technology
Tellurian water is abundant, but fresh water amount only accounts for 2.5%, and participates in the dynamic water of global water cycle Only the 1.6% of fresh water amount, about 577 tcms, wherein drop to land using runoff as the water of principal mode, it is more Annual is 47 tcms, this part water circular regeneration year by year, is the main object that human development utilizes, however this portion In point water there are about three/second is that occurring in the form of heavy rain and flood, be not only difficult to largely utilize, and often bring serious water Calamity, China are located at east Asia, and topography Xi Gaodong is low, and monsoon climate is apparent, and rainy season is concentrated, and Annual variations are very big, area Be unevenly distributed, southeastern coastal areas annual rainfall about 1800mm, Northwest inland not as good as 200mm, water resource essentially from Atmospheric precipitation, Annual total amount is 28100 billion cubic meters, occupies the 6th, the world, the weather conditions of Chinese rain hotsync and the plentiful water money of rivers Source and the vast alluvial plain of rivers middle and lower reaches all bring advantage to the procreation of Chinese nation development, but water and soil provides The exploitation in source is also along with the struggle with bloods and droughts, and the growth of population increases the pressure developed to water and soil resources again, to 20 The eighties in century, because populous, per capita water resources quantity be only a quarter that the world is worth per capita, especially water resource with The distribution of land resource is not in tune, southern water it is more and plough it is few, northern water it is few and plough it is more, such as the Changjiang river and its areas to the south, Rivers run-off accounts for the 83% of the whole nation, but arable land only accounts for 33%, and North of Yangtze River area arable land accounts for the 67% of the whole nation, but rivers run-off 17% is only accounted for, these all become the restraining factors of Future Development.
The existing fixed structure traditional for the river sewage blocking device generally use of water conservancy, can not carry out lift adjustment, Application range is narrow, blocks that dirty effect is poor, the pollutant cleaning trouble intercepted, is unfavorable for the production and life of people, therefore there is an urgent need for A kind of flexible structure is researched and developed, lift adjustment can be carried out, had a wide range of application, block that dirty effect is good, clears up the pollutant intercepted It is conveniently used for the river sewage blocking device of water conservancy.
Invention content
(1)Technical problems to be solved
The present invention can not carry out to overcome the existing fixed structure traditional for the river sewage blocking device generally use of water conservancy Lift adjustment, application range is narrow, blocks that dirty effect is poor, the disadvantage of the pollutant cleaning trouble intercepted, the invention solves skill Art problem is to provide a kind of flexible structure, can carry out lift adjustment, have a wide range of application, blocking that dirty effect is good, dirt to being intercepted Dye object cleaning is conveniently used for the river sewage blocking device of water conservancy.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a river sewage blocking devices for water conservancy, include One pedestal, the first babinet, first bearing, lead screw, nut, second bearing, the first rotating wheel, the first connecting shaft, 3rd bearing, square Shape frame, filter screen, notch plate, the second connecting shaft, the second babinet, second base, fourth bearing, long rotary shaft, casing, first Bevel gear, 5th bearing, L shaped plate, 6th bearing, second bevel gear, pin rod, 7th bearing and the second rotating wheel, first base It is provided with perforative first large through-hole up and down, is connected with the first babinet at the top of first base, the first babinet is with the first large through-hole The formula that is staggered is arranged, and the interior bottom of the first babinet is embedded with first bearing, and the lower end of lead screw is connect with first bearing interference, and nut is set It sets on lead screw, nut is matched with lead screw, and second bearing is embedded at the top of the first babinet, and second bearing connects with lead screw interference It connects, the first rotating wheel is arranged on lead screw, and the first rotating wheel is located at the top of the first babinet, and the right side wall of the first babinet is provided with the The right side wall of three long sliding slots, nut is connected with the first connecting shaft, and the first connecting shaft slidingtype is located in the long sliding slot of third, and first connects The right end of spindle is connect with 3rd bearing interference, and 3rd bearing is embedded in the left side wall of rectangular frame, and rectangular frame is located at the The right side of one babinet, filter screen are located in rectangular frame, and filter screen matches with rectangular frame, and filter screen is connected with rectangular frame It connects, the lower part of rectangular frame front side wall is connected with notch plate, and the right side wall of rectangular frame is connected with the second connecting shaft, the second babinet Positioned at the right side of rectangular frame, the left side wall of the second babinet is provided with the first long sliding slot, and the second connecting shaft slidingtype is located at the first length In sliding slot, the bottom of the second babinet is connected with second base, and second base is provided with perforative second large through-hole up and down, second largest logical Hole is the formula setting that is staggered with the second babinet, and the interior bottom of the second babinet is embedded with fourth bearing, the lower end of long rotary shaft and the 4th Bearing interference connects, and the side wall of long rotary shaft is provided with axial slide, and sleeve sliding type is sleeved in long rotary shaft, and first bevel gear is solid Surely it is sleeved on the lower part of casing, the top of casing is connect with 5th bearing interference, and 5th bearing is embedded the upper right quarter in L shaped plate, the Six bearings are embedded the lower left quarter in L shaped plate, and the second connecting shaft is connect with 6th bearing interference, and the right end of the second connecting shaft is connected with Second bevel gear, second bevel gear are located at the lower left of first bevel gear, and second bevel gear is meshed with first bevel gear, pin rod It is arranged on the right side wall of casing, pin rod is located at the top of L shaped plate, and one end slidingtype of pin rod is located in axial slide, and second 7th bearing is embedded at the top of babinet, 7th bearing is connect with long rotary shaft interference, and the upper end of long rotary shaft is connected with second The right inner side wall of rotating wheel, the second babinet is provided with the second long sliding slot, and the right side wall slidingtype of L shaped plate is located in the second long sliding slot.
Preferably, further include have briquetting, the first long bolt, the first fixed plate, curved splint, guide rod, the second fixed plate, First spring and the second long bolt, briquetting are located at the left side of long rotary shaft, and the first long bolt, the first length are connected on the left of briquetting Screw rod is set as being threadedly coupled with the first fixed plate, is connected at the top of the bottom of the first fixed plate and the second babinet, arc folder Plate is located at the right side of long rotary shaft, and the lower part of curved splint right side wall is connected with guide rod, and the lower part of the second fixed plate is provided with a left side Right perforative pilot hole, guide rod slidingtype are located in pilot hole, and the bottom of the second fixed plate is connected with the top of the second babinet It connects, on the guide bar, the first spring is located at the right side of the second fixed plate to the first spring pocket, and the top of the second fixed plate is threadedly coupled There are the second long bolt, the second long bolt to be located at the right side of curved splint, the second long bolt is in contact with curved splint.
Preferably, further include having head rod, the second connecting rod, tup, gong body, third connecting rod, small rack, the 4th Connecting rod, striking rod, drum body and second spring, the upper end of lead screw are connected with head rod, head rod left side wall it is upper End is connected with the second connecting rod, and the left end of the second connecting rod is connected with tup, and gong body is in contact with tup, and gong body is connect with third The bottom of bar is set as being articulated and connected, and small rack is located at the left side of gong body, and the top of small rack is connected with third connecting rod, small It is connected at the top of the bottom of holder and the first babinet, the top of head rod right side wall is connected with the 4th connecting rod, and the 4th Connecting rod is located at the lower right of the second connecting rod, and the right end of the 4th connecting rod bottom is connected with striking rod, drum body and striking rod phase The upper end of contact, second spring is connected with drum body, is connected at the top of the lower end of second spring and the first babinet.
Preferably, further include thering is third hand tap gear, the 4th bevel gear and the first electric rotating machine, third hand tap gear fixing sleeve to exist On lead screw, for third hand tap gear between the first babinet and the first rotating wheel, the 4th bevel gear is located at the top of third hand tap gear, 4th bevel gear is meshed with third hand tap gear, and the right end of the first electric rotating machine output shaft is connected with the 4th bevel gear, and first It is connected at the top of the bottom of electric rotating machine and the first babinet.
Preferably, further include having the 5th bevel gear, the 6th bevel gear and the second electric rotating machine, connect at the top of the second rotating wheel It is connected to the 5th bevel gear, the 6th bevel gear is located at the top of the 5th bevel gear, and the 6th bevel gear is meshed with the 5th bevel gear, the The right end of two electric rotating machine output shafts is connected with the 6th bevel gear, the top of the bottom of the second electric rotating machine and the first fixed plate It is connected.
Operation principle:Because the present invention includes first base, the first babinet, first bearing, lead screw, nut, the second axis Hold, the first rotating wheel, the first connecting shaft, 3rd bearing, rectangular frame, filter screen, notch plate, the second connecting shaft, the second babinet, Second base, fourth bearing, long rotary shaft, casing, first bevel gear, 5th bearing, L shaped plate, 6th bearing, the second cone tooth Wheel, pin rod, 7th bearing and the second rotating wheel, so in the present invention, rectangular frame, filter screen and notch plate are usually placed in river High altitude location above road will not pass through to the vessel in river and cause to hinder, and first base and second base are and river The bottom in road is bolted by multiple, and multiple bolts are located in the first large through-hole and the second large through-hole, when needing to river When road carries out blocking dirt, the first rotating wheel can be rotated, the first rotating wheel drives lead screw to be rotated, and lead screw drives nut It is moved downwards, nut drives the first connecting shaft and 3rd bearing to be moved downwards, and 3rd bearing drives rectangular frame, mistake Strainer and notch plate are moved downwards, and rectangular frame drives the second connecting shaft, 6th bearing, L shaped plate and 5th bearing downward It is moved, 5th bearing drives casing, first bevel gear, second bevel gear and pin rod to be moved downwards, the upper right of L shaped plate End is slided in the second long sliding slot, and pin rod can only be slided in axial slide, and filter screen is driven downwards and arrives river Setting position in road, at this time staff the second rotating wheel is fixed by hand, you can by filter screen in water in river Pollutant be filtered interception, when needing current excessively high vessel, staff can rotate the second rotating wheel, Second rotating wheel drives long rotary shaft to be rotated, and long rotary shaft drives casing to be rotated by pin rod, and casing passes through first Bevel gear drives second bevel gear to be rotated, and second bevel gear drives rectangular frame to be rotated by the second connecting shaft, and Rectangular frame and filter screen are turned into horizontality, the passage of tall and big vessel will not be counteracted, filter screen intercepts Pollutant can be collected by notch plate.
Because further including having briquetting, the first long bolt, the first fixed plate, curved splint, guide rod, the second fixed plate, One spring and the second long bolt, briquetting are located at the left side of long rotary shaft, the first long bolt, the first long spiral shell are connected on the left of briquetting Bar is set as being threadedly coupled with the first fixed plate, is connected at the top of the bottom of the first fixed plate and the second babinet, so when needing When long rotary shaft being fixed, the first long bolt can be screwed, the first long bolt is to the pressure by briquetting tightly In long rotary shaft, but also the second long bolt can be screwed, the second long bolt pushes curved splint to the left, And curved splint is tightly pressed in long rotary shaft, by the cooperation of briquetting and curved splint, can firmly be rotated long Axis is fixed, and securely and reliably, guide rod and the second fixed plate provide guiding auxiliary for curved splint, and the first spring is curved splint It provides and resets auxiliary.
Because further including thering is head rod, the second connecting rod, tup, gong body, third connecting rod, small rack, the 4th to connect Extension bar, striking rod, drum body and second spring, so when the first rotating wheel of staff couple and lead screw rotate, lead screw energy Enough head rod is driven to be rotated, head rod drives the second connecting rod and the 4th connecting rod to be rotated simultaneously, the Two connecting rods are to drive tup to be rotated, and for tup to be tapped to gong body, gong body sends out caution sound, the 4th connecting rod To drive striking rod to be rotated, for striking rod to be struck to drum body, drum body sends out caution sound, passes through gong body and drum body The caution sound sent out can preferably remind the vessel in river, prevent from causing the accident, and second spring provides for drum body Reset auxiliary.
Because further including having third hand tap gear, the 4th bevel gear and the first electric rotating machine, third hand tap gear fixing sleeve is in silk On bar, for third hand tap gear between the first babinet and the first rotating wheel, the 4th bevel gear is located at the top of third hand tap gear, the Four bevel gears are meshed with third hand tap gear, and the right end of the first electric rotating machine output shaft is connected with the 4th bevel gear, the first rotation It is connected at the top of the bottom of rotating motor and the first babinet, so staff can start the first electric rotating machine and operate, First electric rotating machine drives third hand tap gear to be rotated by the 4th bevel gear, and third hand tap gear is to drive lead screw to be revolved Turn, manual hand manipulation is replaced using the first electric rotating machine, it is convenient and efficient, it is time saving and energy saving.
Because further including having the 5th bevel gear, the 6th bevel gear and the second electric rotating machine, the top of the second rotating wheel connects There are the 5th bevel gear, the 6th bevel gear to be located at the top of the 5th bevel gear, the 6th bevel gear is meshed with the 5th bevel gear, and second The right end of electric rotating machine output shaft is connected with the 6th bevel gear, the top phase of the bottom of the second electric rotating machine and the first fixed plate Connection, so staff can start the second electric rotating machine and operate, the second electric rotating machine is driven by the 6th bevel gear 5th bevel gear is rotated, and the 5th bevel gear is replaced to drive the second rotating wheel to be rotated using the second electric rotating machine Manual hand manipulation, it is convenient and efficient, it is time saving and energy saving.
(3)Advantageous effect
A kind of river sewage blocking device for water conservancy provided by the present invention, flexible structure can easily carry out lift adjustment, Have a wide range of application, block that dirty effect is good, easily the pollutant intercepted can be cleared up, be conducive to the production and life of people Living, performance safety is reliable, simple in structure, is easy to manufacture, repair easy to maintain, maintenance and repair is at low cost, easy to spread to answer With.
Description of the drawings
Fig. 1 is the main view schematic diagram of the present invention.
Fig. 2 is the main view schematic diagram of the second babinet of the present invention.
Fig. 3 is the front sectional view structural schematic diagram of the first babinet of the present invention.
Fig. 4 is the main view schematic diagram of the first electric rotating machine of the present invention.
Fig. 5 is the main view schematic diagram of the second electric rotating machine of the present invention.
Label in attached drawing be:1- first bases, the first babinets of 2-, 3- first bearings, 4- lead screws, 5- nuts, 6- second Bearing, the first rotating wheels of 7-, the first connecting shafts of 8-, 9- 3rd bearings, 10- rectangular frames, 11- filter screens, 12- notch plates, 13- Second connecting shaft, the second babinets of 14-, 15- second bases, 16- fourth bearings, 17- long rotary shafts, 18- casings, 19- first are bored Gear, 20- 5th bearings, 21-L shape plates, 22- 6th bearings, 23- second bevel gears, 24- pin rods, 25- 7th bearings, 26- Two rotating wheels, 31- briquettings, the first long bolts of 32-, the first fixed plates of 33-, 34- curved splints, 35- guide rods, 36- second are solid Fixed board, the first springs of 37-, the second long bolts of 38-, 41- head rods, the second connecting rods of 42-, 43- tups, 44- gong bodies, 45- third connecting rods, 46- small racks, the 4th connecting rods of 47-, 48- striking rods, 49- rouse body, 50- second springs, 51- thirds cone Gear, the 4th bevel gears of 52-, the first electric rotating machines of 53-, the 5th bevel gears of 61-, the 6th bevel gears of 62-, the second electric rotatings of 63- Machine, the first large through-holes of 101-, the first long sliding slots of 141-, the second long sliding slots of 142-, the second large through-holes of 151-, 171- axial slides, The long sliding slot of 201- thirds, 361- pilot holes.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of river sewage blocking device for water conservancy includes as shown in Figs. 1-5 first base 1, the first babinet 2, first bearing 3, lead screw 4, nut 5, second bearing 6, the first rotating wheel 7, the first connecting shaft 8,3rd bearing 9, rectangular frame 10, filter screen 11, notch plate 12, the second connecting shaft 13, the second babinet 14, second base 15, fourth bearing 16, long rotary shaft 17, casing 18, First bevel gear 19,5th bearing 20, L shaped plate 21,6th bearing 22, second bevel gear 23, pin rod 24,7th bearing 25 and Two rotating wheels 26, first base 1 are provided with perforative first large through-hole 101 up and down, and the top of first base 1 is connected with the first babinet 2, the first babinet 2 and the first large through-hole 101 are the formula setting that is staggered, and the interior bottom of the first babinet 2 is embedded with first bearing 3, lead screw 4 Lower end connect with 3 interference of first bearing, nut 5 be arranged on lead screw 4, nut 5 is matched with lead screw 4, the top of the first babinet 2 Portion is embedded with second bearing 6, and second bearing 6 is connect with 4 interference of lead screw, and the first rotating wheel 7 is arranged on lead screw 4, the first rotation Wheel 7 is located at the top of the first babinet 2, and the right side wall of the first babinet 2 is provided with the long sliding slot 201 of third, and the right side wall of nut 5 is connected with First connecting shaft 8,8 slidingtype of the first connecting shaft are located in the long sliding slot of third 201, right end and the 3rd bearing 9 of the first connecting shaft 8 Interference connects, and 3rd bearing 9 is embedded in the left side wall of rectangular frame 10, and rectangular frame 10 is located at the right side of the first babinet 2, mistake Strainer 11 is located in rectangular frame 10, and filter screen 11 matches with rectangular frame 10, and filter screen 11 is connected with rectangular frame 10, The lower part of 10 front side wall of rectangular frame is connected with notch plate 12, and the right side wall of rectangular frame 10 is connected with the second connecting shaft 13, the Two babinets 14 are located at the right side of rectangular frame 10, and the left side wall of the second babinet 14 is provided with the first long sliding slot 141, the second connecting shaft 13 Slidingtype is located in the first long sliding slot 141, and the bottom of the second babinet 14 is connected with second base 15, and second base 15 is provided with up and down Perforative second large through-hole 151, the second large through-hole 151 and the second babinet 14 are the formula setting that is staggered, the interior bottom of the second babinet 14 It is embedded with fourth bearing 16, the lower end of long rotary shaft 17 is connect with 16 interference of fourth bearing, and the side wall of long rotary shaft 17 is provided with axis To sliding slot 171,18 slidingtype of casing is sleeved in long rotary shaft 17, and 19 fixing sleeve of first bevel gear is in the lower part of casing 18, casing 18 top is connect with 20 interference of 5th bearing, and 5th bearing 20 is embedded the upper right quarter in L shaped plate 21, and 6th bearing 22 is embedded The lower left quarter of L shaped plate 21, the second connecting shaft 13 are connect with 22 interference of 6th bearing, and the right end of the second connecting shaft 13 is connected with second Bevel gear 23, second bevel gear 23 are located at the lower left of first bevel gear 19, and second bevel gear 23 is nibbled with 19 phase of first bevel gear It closes, pin rod 24 is arranged on the right side wall of casing 18, and pin rod 24 is located at the top of L shaped plate 21, one end slidingtype position of pin rod 24 In in axial slide 171, the top of the second babinet 14 is embedded with 7th bearing 25, and 7th bearing 25 connects with 17 interference of long rotary shaft It connects, the upper end of long rotary shaft 17 is connected with the second rotating wheel 26, and the right inner side wall of the second babinet 14 is provided with the second long sliding slot 142, L The right side wall slidingtype of shape plate 21 is located in the second long sliding slot 142.
Embodiment 2
A kind of river sewage blocking device for water conservancy includes as shown in Figs. 1-5 first base 1, the first babinet 2, first bearing 3, lead screw 4, nut 5, second bearing 6, the first rotating wheel 7, the first connecting shaft 8,3rd bearing 9, rectangular frame 10, filter screen 11, notch plate 12, the second connecting shaft 13, the second babinet 14, second base 15, fourth bearing 16, long rotary shaft 17, casing 18, First bevel gear 19,5th bearing 20, L shaped plate 21,6th bearing 22, second bevel gear 23, pin rod 24,7th bearing 25 and Two rotating wheels 26, first base 1 are provided with perforative first large through-hole 101 up and down, and the top of first base 1 is connected with the first babinet 2, the first babinet 2 and the first large through-hole 101 are the formula setting that is staggered, and the interior bottom of the first babinet 2 is embedded with first bearing 3, lead screw 4 Lower end connect with 3 interference of first bearing, nut 5 be arranged on lead screw 4, nut 5 is matched with lead screw 4, the top of the first babinet 2 Portion is embedded with second bearing 6, and second bearing 6 is connect with 4 interference of lead screw, and the first rotating wheel 7 is arranged on lead screw 4, the first rotation Wheel 7 is located at the top of the first babinet 2, and the right side wall of the first babinet 2 is provided with the long sliding slot 201 of third, and the right side wall of nut 5 is connected with First connecting shaft 8,8 slidingtype of the first connecting shaft are located in the long sliding slot of third 201, right end and the 3rd bearing 9 of the first connecting shaft 8 Interference connects, and 3rd bearing 9 is embedded in the left side wall of rectangular frame 10, and rectangular frame 10 is located at the right side of the first babinet 2, mistake Strainer 11 is located in rectangular frame 10, and filter screen 11 matches with rectangular frame 10, and filter screen 11 is connected with rectangular frame 10, The lower part of 10 front side wall of rectangular frame is connected with notch plate 12, and the right side wall of rectangular frame 10 is connected with the second connecting shaft 13, the Two babinets 14 are located at the right side of rectangular frame 10, and the left side wall of the second babinet 14 is provided with the first long sliding slot 141, the second connecting shaft 13 Slidingtype is located in the first long sliding slot 141, and the bottom of the second babinet 14 is connected with second base 15, and second base 15 is provided with up and down Perforative second large through-hole 151, the second large through-hole 151 and the second babinet 14 are the formula setting that is staggered, the interior bottom of the second babinet 14 It is embedded with fourth bearing 16, the lower end of long rotary shaft 17 is connect with 16 interference of fourth bearing, and the side wall of long rotary shaft 17 is provided with axis To sliding slot 171,18 slidingtype of casing is sleeved in long rotary shaft 17, and 19 fixing sleeve of first bevel gear is in the lower part of casing 18, casing 18 top is connect with 20 interference of 5th bearing, and 5th bearing 20 is embedded the upper right quarter in L shaped plate 21, and 6th bearing 22 is embedded The lower left quarter of L shaped plate 21, the second connecting shaft 13 are connect with 22 interference of 6th bearing, and the right end of the second connecting shaft 13 is connected with second Bevel gear 23, second bevel gear 23 are located at the lower left of first bevel gear 19, and second bevel gear 23 is nibbled with 19 phase of first bevel gear It closes, pin rod 24 is arranged on the right side wall of casing 18, and pin rod 24 is located at the top of L shaped plate 21, one end slidingtype position of pin rod 24 In in axial slide 171, the top of the second babinet 14 is embedded with 7th bearing 25, and 7th bearing 25 connects with 17 interference of long rotary shaft It connects, the upper end of long rotary shaft 17 is connected with the second rotating wheel 26, and the right inner side wall of the second babinet 14 is provided with the second long sliding slot 142, L The right side wall slidingtype of shape plate 21 is located in the second long sliding slot 142.
Further include thering is briquetting 31, the first long bolt 32, the first fixed plate 33, curved splint 34, guide rod 35, second to fix Plate 36, the first spring 37 and the second long bolt 38, briquetting 31 are located at the left side of long rotary shaft 17, and the left side of briquetting 31 is connected with One long bolt 32, the first long bolt 32 are set as being threadedly coupled with the first fixed plate 33, the bottom and second of the first fixed plate 33 The top of babinet 14 is connected, and curved splint 34 is located at the right side of long rotary shaft 17, the lower part connection of 34 right side wall of curved splint There are guide rod 35, the lower part of the second fixed plate 36 to be provided with the perforative pilot hole 361 in left and right, 35 slidingtype of guide rod is located at pilot hole In 361, the bottom of the second fixed plate 36 is connected with the top of the second babinet 14, and the first spring 37 is sleeved on guide rod 35, the One spring 37 is located at the right side of the second fixed plate 36, and the top of the second fixed plate 36 is threaded with the second long bolt 38, and second Long bolt 38 is located at the right side of curved splint 34, and the second long bolt 38 is in contact with curved splint 34.
Embodiment 3
A kind of river sewage blocking device for water conservancy includes as shown in Figs. 1-5 first base 1, the first babinet 2, first bearing 3, lead screw 4, nut 5, second bearing 6, the first rotating wheel 7, the first connecting shaft 8,3rd bearing 9, rectangular frame 10, filter screen 11, notch plate 12, the second connecting shaft 13, the second babinet 14, second base 15, fourth bearing 16, long rotary shaft 17, casing 18, First bevel gear 19,5th bearing 20, L shaped plate 21,6th bearing 22, second bevel gear 23, pin rod 24,7th bearing 25 and Two rotating wheels 26, first base 1 are provided with perforative first large through-hole 101 up and down, and the top of first base 1 is connected with the first babinet 2, the first babinet 2 and the first large through-hole 101 are the formula setting that is staggered, and the interior bottom of the first babinet 2 is embedded with first bearing 3, lead screw 4 Lower end connect with 3 interference of first bearing, nut 5 be arranged on lead screw 4, nut 5 is matched with lead screw 4, the top of the first babinet 2 Portion is embedded with second bearing 6, and second bearing 6 is connect with 4 interference of lead screw, and the first rotating wheel 7 is arranged on lead screw 4, the first rotation Wheel 7 is located at the top of the first babinet 2, and the right side wall of the first babinet 2 is provided with the long sliding slot 201 of third, and the right side wall of nut 5 is connected with First connecting shaft 8,8 slidingtype of the first connecting shaft are located in the long sliding slot of third 201, right end and the 3rd bearing 9 of the first connecting shaft 8 Interference connects, and 3rd bearing 9 is embedded in the left side wall of rectangular frame 10, and rectangular frame 10 is located at the right side of the first babinet 2, mistake Strainer 11 is located in rectangular frame 10, and filter screen 11 matches with rectangular frame 10, and filter screen 11 is connected with rectangular frame 10, The lower part of 10 front side wall of rectangular frame is connected with notch plate 12, and the right side wall of rectangular frame 10 is connected with the second connecting shaft 13, the Two babinets 14 are located at the right side of rectangular frame 10, and the left side wall of the second babinet 14 is provided with the first long sliding slot 141, the second connecting shaft 13 Slidingtype is located in the first long sliding slot 141, and the bottom of the second babinet 14 is connected with second base 15, and second base 15 is provided with up and down Perforative second large through-hole 151, the second large through-hole 151 and the second babinet 14 are the formula setting that is staggered, the interior bottom of the second babinet 14 It is embedded with fourth bearing 16, the lower end of long rotary shaft 17 is connect with 16 interference of fourth bearing, and the side wall of long rotary shaft 17 is provided with axis To sliding slot 171,18 slidingtype of casing is sleeved in long rotary shaft 17, and 19 fixing sleeve of first bevel gear is in the lower part of casing 18, casing 18 top is connect with 20 interference of 5th bearing, and 5th bearing 20 is embedded the upper right quarter in L shaped plate 21, and 6th bearing 22 is embedded The lower left quarter of L shaped plate 21, the second connecting shaft 13 are connect with 22 interference of 6th bearing, and the right end of the second connecting shaft 13 is connected with second Bevel gear 23, second bevel gear 23 are located at the lower left of first bevel gear 19, and second bevel gear 23 is nibbled with 19 phase of first bevel gear It closes, pin rod 24 is arranged on the right side wall of casing 18, and pin rod 24 is located at the top of L shaped plate 21, one end slidingtype position of pin rod 24 In in axial slide 171, the top of the second babinet 14 is embedded with 7th bearing 25, and 7th bearing 25 connects with 17 interference of long rotary shaft It connects, the upper end of long rotary shaft 17 is connected with the second rotating wheel 26, and the right inner side wall of the second babinet 14 is provided with the second long sliding slot 142, L The right side wall slidingtype of shape plate 21 is located in the second long sliding slot 142.
Further include thering is briquetting 31, the first long bolt 32, the first fixed plate 33, curved splint 34, guide rod 35, second to fix Plate 36, the first spring 37 and the second long bolt 38, briquetting 31 are located at the left side of long rotary shaft 17, and the left side of briquetting 31 is connected with One long bolt 32, the first long bolt 32 are set as being threadedly coupled with the first fixed plate 33, the bottom and second of the first fixed plate 33 The top of babinet 14 is connected, and curved splint 34 is located at the right side of long rotary shaft 17, the lower part connection of 34 right side wall of curved splint There are guide rod 35, the lower part of the second fixed plate 36 to be provided with the perforative pilot hole 361 in left and right, 35 slidingtype of guide rod is located at pilot hole In 361, the bottom of the second fixed plate 36 is connected with the top of the second babinet 14, and the first spring 37 is sleeved on guide rod 35, the One spring 37 is located at the right side of the second fixed plate 36, and the top of the second fixed plate 36 is threaded with the second long bolt 38, and second Long bolt 38 is located at the right side of curved splint 34, and the second long bolt 38 is in contact with curved splint 34.
Further include having head rod 41, the second connecting rod 42, tup 43, gong body 44, third connecting rod 45, small rack 46, the 4th connecting rod 47, striking rod 48, drum body 49 and second spring 50, the upper end of lead screw 4 are connected with head rod 41, the The upper end of one connecting rod, 41 left side wall is connected with the second connecting rod 42, and the left end of the second connecting rod 42 is connected with tup 43, gong body 44 are in contact with tup 43, and the bottom of gong body 44 and third connecting rod 45 is set as being articulated and connected, and small rack 46 is located at gong body 44 Left side, the top of small rack 46 is connected with third connecting rod 45, and the bottom of small rack 46 is connected with the top of the first babinet 2 It connects, the top of 41 right side wall of head rod is connected with the 4th connecting rod 47, and the 4th connecting rod 47 is located at the second connecting rod 42 The right end of lower right, 47 bottom of the 4th connecting rod is connected with striking rod 48, and drum body 49 is in contact with striking rod 48, second spring 50 Upper end 49 be connected with drum body, the lower end of second spring 50 is connected with the top of the first babinet 2.
Embodiment 4
A kind of river sewage blocking device for water conservancy includes as shown in Figs. 1-5 first base 1, the first babinet 2, first bearing 3, lead screw 4, nut 5, second bearing 6, the first rotating wheel 7, the first connecting shaft 8,3rd bearing 9, rectangular frame 10, filter screen 11, notch plate 12, the second connecting shaft 13, the second babinet 14, second base 15, fourth bearing 16, long rotary shaft 17, casing 18, First bevel gear 19,5th bearing 20, L shaped plate 21,6th bearing 22, second bevel gear 23, pin rod 24,7th bearing 25 and Two rotating wheels 26, first base 1 are provided with perforative first large through-hole 101 up and down, and the top of first base 1 is connected with the first babinet 2, the first babinet 2 and the first large through-hole 101 are the formula setting that is staggered, and the interior bottom of the first babinet 2 is embedded with first bearing 3, lead screw 4 Lower end connect with 3 interference of first bearing, nut 5 be arranged on lead screw 4, nut 5 is matched with lead screw 4, the top of the first babinet 2 Portion is embedded with second bearing 6, and second bearing 6 is connect with 4 interference of lead screw, and the first rotating wheel 7 is arranged on lead screw 4, the first rotation Wheel 7 is located at the top of the first babinet 2, and the right side wall of the first babinet 2 is provided with the long sliding slot 201 of third, and the right side wall of nut 5 is connected with First connecting shaft 8,8 slidingtype of the first connecting shaft are located in the long sliding slot of third 201, right end and the 3rd bearing 9 of the first connecting shaft 8 Interference connects, and 3rd bearing 9 is embedded in the left side wall of rectangular frame 10, and rectangular frame 10 is located at the right side of the first babinet 2, mistake Strainer 11 is located in rectangular frame 10, and filter screen 11 matches with rectangular frame 10, and filter screen 11 is connected with rectangular frame 10, The lower part of 10 front side wall of rectangular frame is connected with notch plate 12, and the right side wall of rectangular frame 10 is connected with the second connecting shaft 13, the Two babinets 14 are located at the right side of rectangular frame 10, and the left side wall of the second babinet 14 is provided with the first long sliding slot 141, the second connecting shaft 13 Slidingtype is located in the first long sliding slot 141, and the bottom of the second babinet 14 is connected with second base 15, and second base 15 is provided with up and down Perforative second large through-hole 151, the second large through-hole 151 and the second babinet 14 are the formula setting that is staggered, the interior bottom of the second babinet 14 It is embedded with fourth bearing 16, the lower end of long rotary shaft 17 is connect with 16 interference of fourth bearing, and the side wall of long rotary shaft 17 is provided with axis To sliding slot 171,18 slidingtype of casing is sleeved in long rotary shaft 17, and 19 fixing sleeve of first bevel gear is in the lower part of casing 18, casing 18 top is connect with 20 interference of 5th bearing, and 5th bearing 20 is embedded the upper right quarter in L shaped plate 21, and 6th bearing 22 is embedded The lower left quarter of L shaped plate 21, the second connecting shaft 13 are connect with 22 interference of 6th bearing, and the right end of the second connecting shaft 13 is connected with second Bevel gear 23, second bevel gear 23 are located at the lower left of first bevel gear 19, and second bevel gear 23 is nibbled with 19 phase of first bevel gear It closes, pin rod 24 is arranged on the right side wall of casing 18, and pin rod 24 is located at the top of L shaped plate 21, one end slidingtype position of pin rod 24 In in axial slide 171, the top of the second babinet 14 is embedded with 7th bearing 25, and 7th bearing 25 connects with 17 interference of long rotary shaft It connects, the upper end of long rotary shaft 17 is connected with the second rotating wheel 26, and the right inner side wall of the second babinet 14 is provided with the second long sliding slot 142, L The right side wall slidingtype of shape plate 21 is located in the second long sliding slot 142.
Further include thering is briquetting 31, the first long bolt 32, the first fixed plate 33, curved splint 34, guide rod 35, second to fix Plate 36, the first spring 37 and the second long bolt 38, briquetting 31 are located at the left side of long rotary shaft 17, and the left side of briquetting 31 is connected with One long bolt 32, the first long bolt 32 are set as being threadedly coupled with the first fixed plate 33, the bottom and second of the first fixed plate 33 The top of babinet 14 is connected, and curved splint 34 is located at the right side of long rotary shaft 17, the lower part connection of 34 right side wall of curved splint There are guide rod 35, the lower part of the second fixed plate 36 to be provided with the perforative pilot hole 361 in left and right, 35 slidingtype of guide rod is located at pilot hole In 361, the bottom of the second fixed plate 36 is connected with the top of the second babinet 14, and the first spring 37 is sleeved on guide rod 35, the One spring 37 is located at the right side of the second fixed plate 36, and the top of the second fixed plate 36 is threaded with the second long bolt 38, and second Long bolt 38 is located at the right side of curved splint 34, and the second long bolt 38 is in contact with curved splint 34.
Further include having head rod 41, the second connecting rod 42, tup 43, gong body 44, third connecting rod 45, small rack 46, the 4th connecting rod 47, striking rod 48, drum body 49 and second spring 50, the upper end of lead screw 4 are connected with head rod 41, the The upper end of one connecting rod, 41 left side wall is connected with the second connecting rod 42, and the left end of the second connecting rod 42 is connected with tup 43, gong body 44 are in contact with tup 43, and the bottom of gong body 44 and third connecting rod 45 is set as being articulated and connected, and small rack 46 is located at gong body 44 Left side, the top of small rack 46 is connected with third connecting rod 45, and the bottom of small rack 46 is connected with the top of the first babinet 2 It connects, the top of 41 right side wall of head rod is connected with the 4th connecting rod 47, and the 4th connecting rod 47 is located at the second connecting rod 42 The right end of lower right, 47 bottom of the 4th connecting rod is connected with striking rod 48, and drum body 49 is in contact with striking rod 48, second spring 50 Upper end 49 be connected with drum body, the lower end of second spring 50 is connected with the top of the first babinet 2.
Further include having third hand tap gear 51, the 4th bevel gear 52 and the first electric rotating machine 53,51 fixing sleeve of third hand tap gear On lead screw 4, for third hand tap gear 51 between the first babinet 2 and the first rotating wheel 7, the 4th bevel gear 52 is located at triconodont The top of wheel 51, the 4th bevel gear 52 are meshed with third hand tap gear 51, the right end and the 4th of 53 output shaft of the first electric rotating machine Bevel gear 52 is connected, and the bottom of the first electric rotating machine 53 is connected with the top of the first babinet 2.
Further include having the 5th bevel gear 61, the 6th bevel gear 62 and the second electric rotating machine 63, the top of the second rotating wheel 26 It is connected with the 5th bevel gear 61, the 6th bevel gear 62 is located at the top of the 5th bevel gear 61, and the 6th bevel gear 62 and the 5th bores tooth Wheel 61 is meshed, and the right end of 63 output shaft of the second electric rotating machine is connected with the 6th bevel gear 62, the bottom of the second electric rotating machine 63 Portion is connected with the top of the first fixed plate 33.
Operation principle:Because the present invention includes first base 1, the first babinet 2, first bearing 3, lead screw 4, nut 5, Two bearings 6, the first rotating wheel 7, the first connecting shaft 8,3rd bearing 9, rectangular frame 10, filter screen 11, notch plate 12, second connect Spindle 13, the second babinet 14, second base 15, fourth bearing 16, long rotary shaft 17, casing 18, first bevel gear 19, the 5th axis 20, L shaped plate 21,6th bearing 22, second bevel gear 23, pin rod 24,7th bearing 25 and the second rotating wheel 26 are held, so at this In invention, rectangular frame 10, filter screen 11 and notch plate 12 are usually placed in the high altitude location above river, will not be in river Vessel passage causes to hinder, and first base 1 and second base 15 are bolted with the bottom in river by multiple, multiple Bolt is located in the first large through-hole 101 and the second large through-hole 151, can be to first when needing to carry out blocking dirt to river Rotating wheel 7 is rotated, and the first rotating wheel 7 drives lead screw 4 to be rotated, and lead screw 4 drives nut 5 to be moved downwards, nut 5 The first connecting shaft 8 and 3rd bearing 9 is driven to be moved downwards, 3rd bearing 9 drives rectangular frame 10, filter screen 11 and spill Plate 12 is moved downwards, rectangular frame 10 drive the second connecting shaft 13,6th bearing 22, L shaped plate 21 and 5th bearing 20 to Under moved, 5th bearing 20 drives casing 18, first bevel gear 19, second bevel gear 23 and pin rod 24 to be transported downwards Dynamic, the upper right side of L shaped plate 21 is slided in the second long sliding slot 142, and pin rod 24 can only be slided in axial slide 171 It is dynamic, and filter screen 11 is driven downwards to the setting position in river, staff is fixed by hand by the second rotating wheel 26 at this time Firmly, you can interception is filtered to the pollutant in water in river by filter screen 11, when needing current excessively high vessel, work The second rotating wheel 26 can be rotated by making personnel, and the second rotating wheel 26 drives long rotary shaft 17 to be rotated, long rotary shaft 17 drive casing 18 to be rotated by pin rod 24, and casing 18 drives 23 turns of second bevel gear by first bevel gear 19 Dynamic, second bevel gear 23 drives rectangular frame 10 to be rotated by the second connecting shaft 13, and by rectangular frame 10 and filter screen 11 turn to horizontality, will not be counteracted to the passage of tall and big vessel, and the pollutant that filter screen 11 intercepts can lead to Notch plate 12 is crossed to be collected.
Because further including having briquetting 31, the first long bolt 32, the first fixed plate 33, curved splint 34, guide rod 35, second Fixed plate 36, the first spring 37 and the second long bolt 38, briquetting 31 are located at the left side of long rotary shaft 17, the left side connection of briquetting 31 There is the first long bolt 32, the first long bolt 32 to be set as being threadedly coupled with the first fixed plate 33, the bottom of the first fixed plate 33 with The top of second babinet 14 is connected, thus when need long rotary shaft 17 is fixed when, can to the first long bolt 32 into Row screws, and the first long bolt 32, but also can be to the second long bolt to which briquetting 31 to be tightly pressed in long rotary shaft 17 38 are screwed, and the second long bolt 38 pushes curved splint 34 to the left, and curved splint 34 is tightly pressed at long rotation In shaft 17, by the cooperation of briquetting 31 and curved splint 34, firmly long rotary shaft 17 can be fixed, securely and reliably, Guide rod 35 and the second fixed plate 36 are that curved splint 34 provides guiding auxiliary, and the first spring 37 is that curved splint 34 provides reset Auxiliary.
Because further including having head rod 41, the second connecting rod 42, tup 43, gong body 44, third connecting rod 45, ramuscule Frame 46, the 4th connecting rod 47, striking rod 48, drum body 49 and second spring 50, so working as the first rotating wheel of staff couple 7 and silk When bar 4 is rotated, lead screw 4 can drive head rod 41 to be rotated, and head rod 41 drives the second connection simultaneously Bar 42 and the 4th connecting rod 47 are rotated, and the second connecting rod 42 is to drive tup 43 to be rotated, and tup 43 is to gong Body 44 is tapped, and gong body 44 sends out caution sound, the 4th connecting rod 47 to drive striking rod 48 to be rotated, striking rod 48 from And drum body 49 is struck, drum body 49 sends out caution sound, and the caution sound sent out by gong body 44 and drum body 49 can be better Vessel in river is reminded, prevents from causing the accident, second spring 50 is that drum body 49 provides reset auxiliary.
Because further including having third hand tap gear 51, the 4th bevel gear 52 and the first electric rotating machine 53, third hand tap gear 51 is solid Surely it is sleeved on lead screw 4, for third hand tap gear 51 between the first babinet 2 and the first rotating wheel 7, the 4th bevel gear 52 is located at third The top of bevel gear 51, the 4th bevel gear 52 are meshed with third hand tap gear 51, the right end of 53 output shaft of the first electric rotating machine with 4th bevel gear 52 is connected, and the bottom of the first electric rotating machine 53 is connected with the top of the first babinet 2, so staff can With start the first electric rotating machine 53 operated, the first electric rotating machine 53 by the 4th bevel gear 52 drive third hand tap gear 51 into Row rotation, third hand tap gear 51 replace manual hand manipulation to drive lead screw 4 to be rotated, using the first electric rotating machine 53, It is convenient and efficient, it is time saving and energy saving.
Because further including having the 5th bevel gear 61, the 6th bevel gear 62 and the second electric rotating machine 63, the second rotating wheel 26 Top is connected with the 5th bevel gear 61, and the 6th bevel gear 62 is located at the top of the 5th bevel gear 61, the 6th bevel gear 62 and the 5th Bevel gear 61 is meshed, and the right end of 63 output shaft of the second electric rotating machine is connected with the 6th bevel gear 62, the second electric rotating machine 63 Bottom be connected with the top of the first fixed plate 33, so staff can start the second electric rotating machine 63 and operate, Second electric rotating machine 63 drives the 5th bevel gear 61 to be rotated by the 6th bevel gear 62, and the 5th bevel gear 61 is to drive the Two rotating wheels 26 are rotated, and manual hand manipulation is replaced using the second electric rotating machine 63, convenient and efficient, time saving and energy saving.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. a kind of river sewage blocking device for water conservancy, which is characterized in that include first base(1), the first babinet(2), One bearing(3), lead screw(4), nut(5), second bearing(6), the first rotating wheel(7), the first connecting shaft(8), 3rd bearing (9), rectangular frame(10), filter screen(11), notch plate(12), the second connecting shaft(13), the second babinet(14), second base (15), fourth bearing(16), long rotary shaft(17), casing(18), first bevel gear(19), 5th bearing(20), L shaped plate (21), 6th bearing(22), second bevel gear(23), pin rod(24), 7th bearing(25)With the second rotating wheel(26), the first bottom Seat(1)It is provided with perforative first large through-hole up and down(101), first base(1)Top be connected with the first babinet(2), the first case Body(2)With the first large through-hole(101)For the formula setting that is staggered, the first babinet(2)Interior bottom be embedded with first bearing(3), lead screw (4)Lower end and first bearing(3)Interference connects, nut(5)It is arranged in lead screw(4)On, nut(5)With lead screw(4)It matches, First babinet(2)Top be embedded with second bearing(6), second bearing(6)With lead screw(4)Interference connects, the first rotating wheel(7) It is arranged in lead screw(4)On, the first rotating wheel(7)Positioned at the first babinet(2)Top, the first babinet(2)Right side wall be provided with Three long sliding slots(201), nut(5)Right side wall be connected with the first connecting shaft(8), the first connecting shaft(8)Slidingtype is located at third Long sliding slot(201)It is interior, the first connecting shaft(8)Right end and 3rd bearing(9)Interference connects, 3rd bearing(9)It is embedded in rectangle Frame(10)Left side wall in, rectangular frame(10)Positioned at the first babinet(2)Right side, filter screen(11)Positioned at rectangular frame (10)It is interior, filter screen(11)With rectangular frame(10)Match, filter screen(11)With rectangular frame(10)It is connected, rectangular frame (10)The lower part of front side wall is connected with notch plate(12), rectangular frame(10)Right side wall be connected with the second connecting shaft(13), the Two babinets(14)Positioned at rectangular frame(10)Right side, the second babinet(14)Left side wall be provided with the first long sliding slot(141), second Connecting shaft(13)Slidingtype is located at the first long sliding slot(141)It is interior, the second babinet(14)Bottom be connected with second base(15), the Two pedestals(15)It is provided with perforative second large through-hole up and down(151), the second large through-hole(151)With the second babinet(14)For the formula of being staggered Setting, the second babinet(14)Interior bottom be embedded with fourth bearing(16), long rotary shaft(17)Lower end and fourth bearing(16) Interference connects, long rotary shaft(17)Side wall be provided with axial slide(171), casing(18)Slidingtype is sleeved on long rotary shaft(17) On, first bevel gear(19)Fixing sleeve is in casing(18)Lower part, casing(18)Top and 5th bearing(20)Interference connects, 5th bearing(20)It is embedded in L shaped plate(21)Upper right quarter, 6th bearing(22)It is embedded in L shaped plate(21)Lower left quarter, second Connecting shaft(13)With 6th bearing(22)Interference connects, the second connecting shaft(13)Right end be connected with second bevel gear(23), the Two bevel gears(23)Positioned at first bevel gear(19)Lower left, second bevel gear(23)With first bevel gear(19)It is meshed, Pin rod(24)It is arranged in casing(18)Right side wall on, pin rod(24)Positioned at L shaped plate(21)Top, pin rod(24)One end slide Dynamic formula is located at axial slide(171)It is interior, the second babinet(14)Top be embedded with 7th bearing(25), 7th bearing(25)With length Rotary shaft(17)Interference connects, long rotary shaft(17)Upper end be connected with the second rotating wheel(26), the second babinet(14)The right side in Side wall is provided with the second long sliding slot(142), L shaped plate(21)Right side wall slidingtype be located at the second long sliding slot(142)It is interior.
2. a kind of river sewage blocking device for water conservancy according to claim 1, which is characterized in that further include having briquetting (31), the first long bolt(32), the first fixed plate(33), curved splint(34), guide rod(35), the second fixed plate(36), One spring(37)With the second long bolt(38), briquetting(31)Positioned at long rotary shaft(17)Left side, briquetting(31)Left side connection There is the first long bolt(32), the first long bolt(32)With the first fixed plate(33)It is set as being threadedly coupled, the first fixed plate(33) Bottom and the second babinet(14)Top be connected, curved splint(34)Positioned at long rotary shaft(17)Right side, curved splint (34)The lower part of right side wall is connected with guide rod(35), the second fixed plate(36)Lower part be provided with the perforative pilot hole in left and right (361), guide rod(35)Slidingtype is located at pilot hole(361)It is interior, the second fixed plate(36)Bottom and the second babinet(14)'s Top is connected, the first spring(37)It is sleeved on guide rod(35)On, the first spring(37)Positioned at the second fixed plate(36)Right side, Second fixed plate(36)Top be threaded with the second long bolt(38), the second long bolt(38)Positioned at curved splint(34)'s Right side, the second long bolt(38)With curved splint(34)It is in contact.
3. a kind of river sewage blocking device for water conservancy according to claim 2, which is characterized in that further include having the first company Extension bar(41), the second connecting rod(42), tup(43), gong body(44), third connecting rod(45), small rack(46), the 4th connection Bar(47), striking rod(48), drum body(49)And second spring(50), lead screw(4)Upper end be connected with head rod(41), the One connecting rod(41)The upper end of left side wall is connected with the second connecting rod(42), the second connecting rod(42)Left end be connected with tup (43), gong body(44)With tup(43)It is in contact, gong body(44)With third connecting rod(45)Bottom be set as being articulated and connected, it is small Holder(46)Positioned at gong body(44)Left side, small rack(46)Top and third connecting rod(45)It is connected, small rack(46) Bottom and the first babinet(2)Top be connected, head rod(41)The top of right side wall is connected with the 4th connecting rod (47), the 4th connecting rod(47)Positioned at the second connecting rod(42)Lower right, the 4th connecting rod(47)The right end of bottom is connected with Striking rod(48), drum body(49)With striking rod(48)It is in contact, second spring(50)Upper end with drum body(49)It is connected, second Spring(50)Lower end and the first babinet(2)Top be connected.
4. a kind of river sewage blocking device for water conservancy according to claim 3, which is characterized in that further include having third cone Gear(51), the 4th bevel gear(52)With the first electric rotating machine(53), third hand tap gear(51)Fixing sleeve is in lead screw(4)On, the Third hand tap gear(51)Positioned at the first babinet(2)With the first rotating wheel(7)Between, the 4th bevel gear(52)Positioned at third hand tap gear (51)Top, the 4th bevel gear(52)With third hand tap gear(51)It is meshed, the first electric rotating machine(53)The right end of output shaft With the 4th bevel gear(52)It is connected, the first electric rotating machine(53)Bottom and the first babinet(2)Top be connected.
5. a kind of river sewage blocking device for water conservancy according to claim 4, which is characterized in that further include having the 5th cone Gear(61), the 6th bevel gear(62)With the second electric rotating machine(63), the second rotating wheel(26)Top be connected with the 5th cone tooth Wheel(61), the 6th bevel gear(62)Positioned at the 5th bevel gear(61)Top, the 6th bevel gear(62)With the 5th bevel gear(61) It is meshed, the second electric rotating machine(63)The right end of output shaft and the 6th bevel gear(62)It is connected, the second electric rotating machine(63)'s Bottom and the first fixed plate(33)Top be connected.
CN201810203600.6A 2018-03-13 2018-03-13 A river course trash device for water conservancy Active CN108411873B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810203600.6A CN108411873B (en) 2018-03-13 2018-03-13 A river course trash device for water conservancy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810203600.6A CN108411873B (en) 2018-03-13 2018-03-13 A river course trash device for water conservancy

Publications (2)

Publication Number Publication Date
CN108411873A true CN108411873A (en) 2018-08-17
CN108411873B CN108411873B (en) 2020-02-14

Family

ID=63131220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810203600.6A Active CN108411873B (en) 2018-03-13 2018-03-13 A river course trash device for water conservancy

Country Status (1)

Country Link
CN (1) CN108411873B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109174528A (en) * 2018-10-12 2019-01-11 北海农瑞农业技术开发有限公司 A kind of shower support device convenient for adjusting
CN110260096A (en) * 2019-06-28 2019-09-20 武汉鼎业环保工程技术有限公司 A kind of online pipeline rehabilitation device
CN110314435A (en) * 2019-07-24 2019-10-11 浙江创韵环境科技有限公司 A kind of environment-friendly type river sewage processing unit
CN110872829A (en) * 2019-11-28 2020-03-10 陈君君 Fence for cleaning river
CN111877504A (en) * 2020-08-03 2020-11-03 黄仁燕 Sewage inlet pipe with blocking function for domestic wastewater pollution discharge
CN112663573A (en) * 2020-12-21 2021-04-16 山西瑞通路桥新技术有限公司 Based on water environment environmental protection is with blocking dirty device
CN113047246A (en) * 2021-02-06 2021-06-29 浙江水利水电学院 Construction method of antifouling net for ecological river channel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2221109C1 (en) * 2002-05-06 2004-01-10 Левагин Владимир Михайлович Boom barrier of variable buoyancy
CN201835270U (en) * 2010-10-26 2011-05-18 李典基 Double-rackbar open-close machine
CN205314068U (en) * 2015-11-20 2016-06-15 东北石油大学 Power station dam trash rack
CN205501963U (en) * 2016-04-07 2016-08-24 广州市水电建设工程有限公司 Be applied to trash rack of medium and small river waterfall water treatment engineering
CN206680971U (en) * 2017-04-11 2017-11-28 张萍 A kind of hydraulic engineering is removed contamination fence

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2221109C1 (en) * 2002-05-06 2004-01-10 Левагин Владимир Михайлович Boom barrier of variable buoyancy
CN201835270U (en) * 2010-10-26 2011-05-18 李典基 Double-rackbar open-close machine
CN205314068U (en) * 2015-11-20 2016-06-15 东北石油大学 Power station dam trash rack
CN205501963U (en) * 2016-04-07 2016-08-24 广州市水电建设工程有限公司 Be applied to trash rack of medium and small river waterfall water treatment engineering
CN206680971U (en) * 2017-04-11 2017-11-28 张萍 A kind of hydraulic engineering is removed contamination fence

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109174528A (en) * 2018-10-12 2019-01-11 北海农瑞农业技术开发有限公司 A kind of shower support device convenient for adjusting
CN110260096A (en) * 2019-06-28 2019-09-20 武汉鼎业环保工程技术有限公司 A kind of online pipeline rehabilitation device
CN110314435A (en) * 2019-07-24 2019-10-11 浙江创韵环境科技有限公司 A kind of environment-friendly type river sewage processing unit
CN110872829A (en) * 2019-11-28 2020-03-10 陈君君 Fence for cleaning river
CN111877504A (en) * 2020-08-03 2020-11-03 黄仁燕 Sewage inlet pipe with blocking function for domestic wastewater pollution discharge
CN112663573A (en) * 2020-12-21 2021-04-16 山西瑞通路桥新技术有限公司 Based on water environment environmental protection is with blocking dirty device
CN112663573B (en) * 2020-12-21 2022-04-22 山西瑞通路桥新技术有限公司 Based on water environment environmental protection is with blocking dirty device
CN113047246A (en) * 2021-02-06 2021-06-29 浙江水利水电学院 Construction method of antifouling net for ecological river channel
CN113047246B (en) * 2021-02-06 2022-06-17 浙江水利水电学院 Construction method of antifouling net for ecological river channel

Also Published As

Publication number Publication date
CN108411873B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
CN108411873A (en) A kind of river sewage blocking device for water conservancy
CN209014559U (en) A kind of surface water quality detection device
CN113818412B (en) Breed sea area and float garbage collection device
CN113756269B (en) Fixed surface of water floater cleaning device
CN205253218U (en) Construction garbage crushing device
CN214695857U (en) Rainwater collection device of green building
CN109211609A (en) A kind of remediation contaminated soil soil collecting device
CN109970129B (en) Floatable interface photo-thermal conversion solar seawater desalination device
CN211339004U (en) Automatic cap screwing machine for aerator
CN108554002A (en) A kind of filter device for water conservancy
CN112376528A (en) Garbage cleaning device for water pollution prevention and control engineering and cleaning method thereof
CN209043635U (en) Remediation contaminated soil soil collecting device
CN212026190U (en) A river course cleaning device for water conservancy water and electricity
CN218766192U (en) Municipal sewage analysis sampling equipment
CN213668191U (en) Sewage filtering and recycling equipment for sewage treatment process
CN108502319A (en) A kind of pipeline handling device of water conservancy
CN211523148U (en) Hydraulic engineering surface of water rubbish interception net
CN211133123U (en) Water pollution administers and uses filter equipment
CN210665183U (en) Collection system is held back to wetland sand blown by wind
CN211155238U (en) Faucet assembly of direct drinking machine
CN213388273U (en) Novel integrated glass fiber reinforced plastic septic tank
CN218813607U (en) Water conservancy river rubbish intercepting device
CN215327281U (en) Rainwater purification rainwater drainage port ecological purification equipment
CN220317165U (en) Bridge girder erection machine edge warning equipment
CN213516490U (en) Water sampling device for environmental monitoring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200108

Address after: 518000 Minle Hotel, Minle community, Minzhi street, Longhua District, Shenzhen City, Guangdong Province

Applicant after: Shenzhen Huasheng Construction Engineering Co., Ltd

Address before: 518108 506, building a, No.5, Chuangwei innovation Valley, Tangtou No.1 Road, Shiyan street, Bao'an District, Shenzhen City, Guangdong Province

Applicant before: Wei Haiyong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 Minzhi Street Minle community Minle Industrial Park Minle Hotel 5abgh, Longhua District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Huasheng Construction Group Co.,Ltd.

Address before: 518000 Minzhi Street Minle community Minle Industrial Park Minle Hotel 5abgh, Longhua District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Huasheng Construction Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder