CN108405735A - Pre-buried channel flow rivet rod riveting set - Google Patents

Pre-buried channel flow rivet rod riveting set Download PDF

Info

Publication number
CN108405735A
CN108405735A CN201711442342.9A CN201711442342A CN108405735A CN 108405735 A CN108405735 A CN 108405735A CN 201711442342 A CN201711442342 A CN 201711442342A CN 108405735 A CN108405735 A CN 108405735A
Authority
CN
China
Prior art keywords
supporting plate
rivet rod
lower die
buried channel
channel flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711442342.9A
Other languages
Chinese (zh)
Inventor
殷林杰
柴国敏
焦改霞
安文新
梅志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dasen Mechanical And Electrical Co Ltd
Original Assignee
Henan Dasen Mechanical And Electrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dasen Mechanical And Electrical Co Ltd filed Critical Henan Dasen Mechanical And Electrical Co Ltd
Priority to CN201711442342.9A priority Critical patent/CN108405735A/en
Publication of CN108405735A publication Critical patent/CN108405735A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/10Die sets; Pillar guides
    • B21D37/12Particular guiding equipment, e.g. pliers; Special arrangements for interconnection or cooperation of dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D39/00Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/003Positioning devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Insertion Pins And Rivets (AREA)

Abstract

The invention discloses a kind of pre-buried channel flow rivet rod riveting set, including crimping structure, which includes upper die and lower die and pedestal, is equipped between upper mold and lower die and holds mechanism;The mechanism that holds includes supporting plate, and the centre of the supporting plate is equipped with lower die cavity, and supporting plate both sides are equipped with and hold mechanism;The lower end of the lower die is fixed on the base, and upper end is placed in the lower die cavity, and can be slided above and below relatively with lower die cavity;The pedestal is equipped with several pilot holes, and the lower face of the supporting plate, which is equipped with, to be packed into the matched several guide posts of pilot hole, the guide post in the pilot hole.When riveting rivet rod, it is only necessary to pre-buried channel flow is placed in lower die, the rivet rod after heating is placed in and is held in mechanism, by holding gear grips, moving down upper mold can rivet rivet rod on conduit, and easy to operate, riveting is efficient.

Description

Pre-buried channel flow rivet rod riveting set
Technical field
The invention patent relates to a kind of pre-buried channel flow riveting equipment, especially a kind of rivet rod riveting set.
Background technology
Pre-buried channel flow originates from Europe at first, is mainly used for nuclear power engineering, then gradually extends to civil engineering, such as subway Tunnel shield piece, underground pipe gallery, at present in developed country, the subway work overwhelming majority is all made of the skill of pre-buried channel flow Art scheme.In recent years, the arrangement and method for construction of pre-buried channel flow is also gradually promoted at home, especially in current subway work, The usage amount of pre-buried channel flow also gradually starts to increase, such as No. 9 lines of Shenzhen Metro, Line 2 Metro Lanzhou, Shijiazhuang subway Line 1 Deng.
Compared with traditional live bar planting, pre-buried channel flow embodies more advantage, can effectively reduce the labor of worker Fatigue resistance improves working efficiency, while the pollution condition of Noise Exposure and dust work is also not present in construction site.
The production of pre-buried channel flow at present mostly uses hot-rolled channel, back riveting or welding rivet rod, welds because of its processing efficiency It is low, require height to be gradually riveted replacement operation skill.Using the method for riveting at present there is also this more problem, speed Degree is slow, the problem of being loosened after riveting.
Invention content
The purpose of the present invention is to provide a kind of pre-buried channel flow rivet rod riveting sets, improve riveting efficiency, enhancing riveting jail Solidity.
To achieve the above object, the technical solution adopted by the present invention is:Pre-buried channel flow rivet rod riveting set, including crimping knot Structure, the crimping structure include upper die and lower die and pedestal, are equipped between upper mold and lower die and hold mechanism;Described holds mechanism Including supporting plate, the centre of the supporting plate is equipped with lower die cavity, and supporting plate both sides are equipped with and hold mechanism;The lower end of the lower die is fixed on bottom On seat, upper end is placed in the lower die cavity, and can be slided above and below relatively with lower die cavity;The pedestal is equipped with several lead The lower face of Xiang Kong, the supporting plate are equipped with and the matched several guide posts of pilot hole, guide post dress Enter in the pilot hole.
When riveting rivet rod, it is only necessary to pre-buried channel flow is placed in lower die, the rivet rod after heating is placed in and is held in mechanism, By holding gear grips, moving down upper mold can rivet rivet rod on conduit, and easy to operate, riveting is efficient.
Further, the middle part of the upper surface of the upper mold is equipped with die shank, and the middle part of lower face is equipped with briquetting;Upper mold Both ends are respectively equipped with inclined wedge, and notch is equipped in the middle part of the lower end of the inclined wedge;The mechanism that holds includes being arranged in supporting plate upper surface Both sides along the symmetrical sliding block of supporting plate median plane, two opposite inside bottoms of sliding block are respectively equipped with notch, the notch and half The shape of pre-buried channel flow is consistent;Be respectively equipped with baffle at the both ends of supporting plate, the baffle be equipped with mounting hole, the two of the sliding block Side is respectively equipped with pull rod, and the other end of the pull rod is installed with compression spring after mounting hole in the body of rod;The ruler of the notch The very little size more than the baffle.
Notch on the inside of two sliding blocks constitutes notch in opposite directions, and upper mold moves down, and inclined wedge squeezes sliding block and moves inward, and clamps Anchor pole so that rivet rod will not deform in riveting process, and after riveting, the spring on pull rod pulls sliding block to move outward, Convenient to install rivet rod next time, riveting speed is fast, and riveting effect is good.
Further, the described mechanism that holds further includes the inner slide being arranged on the inside of two sliding blocks, and the one of the inner slide Hold arc-shaped, the other end is installed with little spring, and spacer pin is equipped between inner slide and sliding block.
When two arcuate structures move inward, the circle consistent with rivet rod is constituted, anchor pole is fixed.
Further, the opposite medial surface of two sliding blocks is equipped with arcuate structure, the arcuate structure longitudinal side It is equipped with oblique angle with top.
The oblique angle facilitates the movement of rivet rod, improves the docking operation between rivet rod and conduit.
Further, the upper surface of the sliding block and the supporting plate is equipped with guide rail, and sliding block can be certainly in guide rail By sliding.
Guide rail structure can effectively reduce friction, improve operating efficiency, prolong the service life.
Further, the lower end inside of the inclined wedge is equipped with inner bevel, and the sliding block apical lateral is equipped with outer oblique angle, The inclined-plane of the inner bevel and the plane at outer oblique angle are mutually parallel.
When the oblique angle that inclined-plane is mutually parallel is convenient for riveting, the rapid-aligning of upper mold and lower die.
Further, the both sides of the pedestal are respectively equipped with barricade, and the barricade is equipped with hole, the pull rod The other end passes through barricade.
Further, the pedestal lower face is equipped with rubber pad, which is bolted on the bottom On seat.
Rubber pad functions as compression spring, and larger elastic force is provided for device recovery.
Description of the drawings
Fig. 1, pre-buried channel flow rivet rod riveting set die opening state longitudinal profile structure schematic;
Fig. 2, pre-buried channel flow rivet rod riveting set working condition longitudinal profile structure schematic;
Fig. 3, mechanism longitudinal profile structure chart is held;
Fig. 4, pre-buried channel flow rivet rod riveting set vertical view.
In figure:1, die shank, 2, upper mold, 3, inclined wedge, 4, briquetting, 5, spacer pin, 6, sliding block, 7, inner slide, 8, little spring, 9, barricade, 10, pedestal, 11, clamping plate, 12, rubber pad, 13, bushing, 14, guide post, 15, supporting plate, 16, compressed spring, 17, under Mould.
Specific implementation mode
As Figure 1-Figure 4, pre-buried channel flow rivet rod riveting set, including crimping structure, the crimping structure include upper mold 2, Lower die 17 and pedestal 10;It is equipped between upper mold 2 and lower die 17 and holds mechanism;The mechanism that holds includes supporting plate 15, the support The centre of plate 15 is equipped with lower die cavity, and supporting plate both sides are equipped with and hold mechanism;The lower end of the lower die 17 is fixed on pedestal 10, on End is placed in the lower die cavity, and can be slided above and below relatively with lower die cavity.The pedestal 10 is equipped with several pilot holes, The lower face of the supporting plate 15 is equipped with and the matched several guide posts 14 of pilot hole, the guide post 14 dress Enter in the pilot hole, bushing 13 is equipped in pilot hole.The mechanism that holds includes being arranged in the upper surface of supporting plate 15 Both sides are respectively equipped with along the symmetrical sliding block 6 of supporting plate median plane, and two opposite inside bottoms of sliding block 6 are respectively equipped with notch, this is lacked Mouth is consistent with the shape of half of pre-buried channel flow;It is respectively equipped with baffle 18 at the both ends of supporting plate, which is equipped with mounting hole, institute The both sides for the sliding block stated are respectively equipped with pull rod 19, and the other end of the pull rod 19 is installed with compression spring after mounting hole in the body of rod 16;The size of the notch is more than the size of the baffle.
The middle part of the upper surface of upper mold is equipped with die shank 1, and the middle part of lower face is equipped with briquetting 4;The both ends of upper mold are respectively equipped with The lower end middle part of inclined wedge 3, the inclined wedge 3 is equipped with notch.
When riveting rivet rod, it is only necessary to pre-buried channel flow is placed in lower die, the rivet rod after heating is placed in pre-buried channel flow In hole, by holding gear grips, moving down upper mold can rivet rivet rod on conduit, and easy to operate, riveting is efficient.
Notch on the inside of two sliding blocks constitutes notch in opposite directions, and lower die moves down, and inclined wedge squeezes sliding block and moves inward, and improves Clamping degree of the sliding block to anchor pole so that rivet rod will not deform in riveting process, and after riveting, the spring on pull rod, which pulls, to be slided Block moves outward, and convenient to install rivet rod next time, riveting speed is fast, and riveting effect is good.
The mechanism that holds further includes the inner slide 7 being arranged two 6 insides of sliding block, and one end of the inner slide 7 is in arc Shape, the other end are installed with little spring 8, and spacer pin 5 is equipped between inner slide and sliding block.
When two arcuate structures move inward, the circle consistent with rivet rod is constituted, while clamping anchor pole limit, Stress damage will not be caused to rivet rod.
The opposite medial surface of two sliding blocks is equipped with arcuate structure, and the arcuate structure longitudinal side and top are equipped with Oblique angle.The oblique angle facilitates the movement of rivet rod, improves the docking operation between rivet rod and conduit.
The upper surface of the sliding block and the supporting plate is equipped with guide rail, and sliding block can be free to slide in guide rail.It leads Rail structure can effectively reduce friction, improve operating efficiency, prolong the service life.
The lower end inside of the inclined wedge 3 is equipped with inner bevel, and the sliding block apical lateral is equipped with outer oblique angle, and described is interior The inclined-plane at oblique angle and the plane at outer oblique angle are mutually parallel.When the oblique angle that inclined-plane is mutually parallel is convenient for riveting, upper mold and lower die it is fast Speed contraposition.
During barricade is pushed for upper mold.Inclined wedge will not deform, and improve the compaction degree to sliding block.The pedestal lower end Face is equipped with rubber pad 12, which is fixed on by bolt and clamping plate 11 on the pedestal, and rubber pad 12 plays pressure bullet The effect of spring, the effect of barricade be prevent inclined wedge be bent outwardly deformation.
This hair designs a Special riveting mold, Special riveting mold be by hold mechanism and detent mechanism by conduit and Rivet rod is fixed as one, then whole to move down, and generates a pressure to rivet rod head, rivet rod head is made to generate deformation, complete riveting.
When work, upper mold moves downward, and inclined wedge squeezes sliding block and moves clamping conduit and rivet rod inwards, later upper mold and fixture block Continue to move downward as a whole, because lower die is to be rigidly fixed on lower template, during moving down, rivet rod by because Pressure generates deformation, is finally completed riveting.
The manufacturing process of the present invention is as follows:
(1) lower die 17 being made according to conduit opening width, rivet rod deflection, 17 width of lower die and channel width are adapted, The deflection that height generates after being riveted with rivet rod is consistent.
(2) supporting plate 15 is made, the notch to match with lower die 17 is provided among supporting plate 15, in order to which supporting plate 15 can be upper and lower It is mobile, as shown in Figure 1.
(3) pedestal 10 is made, corresponding round hole is provided among pedestal 10, circular hole is packed into bushing 13, and guide post 14 passes through Bushing 13,14 top of guide post are connected with supporting plate 15, and lower part is connected with clamping plate 11, and guide post 14 exceeds the height of pedestal 10 Deflection after being riveted more than rivet rod.
(4) thick rubber 12 is placed with below clamping plate, clamping plate 11, rubber 12 and pedestal 10 are connected by stay bolt to be connected in One.
(5) certain activity, the deflection that activity is generated with rivet rod match under.Barricade 9 is bolted On pedestal 10.The distance between two barricades 9 can just clamp two inclined wedges 3 in mold work, as shown in Figure 1.
(6) inner slide 7 is made, width is greater than rivet rod, one end tack, other end spill, spill and rivet rod diameter phase Matching, and along corner cut under female end, as shown in Figure 4.
(7) sliding block 6 is made, the outer upper of left and right sliding block 6 is made as inclined-plane, and 6 compressive plane appropriate location of sliding block is internally Digging, hole is inner small and outside big, constitutes inner slide hole, and specific size matches with inner slide 7.Also a size and limit are drawn in 6 top surface of sliding block The hole that position pin 5 matches, and the hole penetrates inner slide hole.And sliding block clamp side dig out it is consistent with conduit and the half side shape of rivet rod Space when two sliding blocks 6 clamp, just clamps conduit and rivet rod, as shown in Figure 3.
(8) little spring 8 is penetrated in inner slide hole, then inner slide 7 is put into inner slide, later wear spacer pin 5 Enter limit pin hole.Sliding block 6 is limited in using guide rail on supporting plate 15 after completion.Spring 16 passes through barricade 9 simultaneously, such as Fig. 3 institutes Show.
(9) die shank 1, upper mold 2, inclined wedge 3 and briquetting 4 are made.The lower inside surface of inclined wedge 3 has parallel to each other with sliding block 6 Inclined-plane, and inclined wedge lower part is provided with groove, convenient for avoiding spring 16 during it is moved down.Above-mentioned 4 parts are connected as one Body.
The present invention the course of work be:
When mold work, conduit enters along lower die 17 in mold, the head top to the upper surface of lower die 17 of rivet rod;Push riveting Bar, until inner slide 7 just blocks the position of rivet rod.
Upper mold is run down, and left and right sliding block 6 starts movement inwards and clamps conduit and rivet rod.Briquetting 4 is whole to moving down simultaneously Dynamic, when in left and right, sliding block 6 clamps, inclined wedge just wedges the gap between barricade 9 and sliding block 6 completely.
Then entire upper mold 2, sliding block 6 and supporting plate 15 continue integrally to move down, lower die 17 is to be rigidly fixed in lower bottom base 10 On, it is immovable, it will generate at this time and its Leading Edge Deformation is forced to rivet rod generation extruding force, and complete riveting.After completing primary riveting, weight Multiple abovementioned steps, carry out next working cycles.

Claims (8)

1. a kind of pre-buried channel flow rivet rod riveting set, including crimping structure, which is characterized in that the crimping structure include upper mold, under Mould and pedestal are equipped between upper mold and lower die and hold mechanism;The mechanism that holds includes supporting plate, and the centre of the supporting plate is equipped with Lower die cavity, supporting plate both sides are equipped with and hold mechanism;The lower end of the lower die is fixed on the base, and upper end is placed in the lower die cavity In, and can be slided above and below relatively with lower die cavity;The pedestal is equipped with several pilot holes, on the lower face of the supporting plate Equipped with the matched several guide posts of pilot hole, the guide post is packed into the pilot hole.
2. pre-buried channel flow rivet rod riveting set described in accordance with the claim 1, which is characterized in that the upper surface of the upper mold Middle part is equipped with die shank, and the middle part of lower face is equipped with briquetting;The both ends of upper mold are respectively equipped with inclined wedge, are equipped in the middle part of the lower end of the inclined wedge Notch;The mechanism that holds is set including setting the on both sides of the upper end in supporting plate along the symmetrical sliding block of supporting plate median plane, two sliding blocks Opposite inside bottom is respectively equipped with notch, and the notch is consistent with the shape of half of conduit;The both ends of supporting plate are respectively equipped with baffle, The baffle is equipped with mounting hole, and the both sides of the sliding block are respectively equipped with pull rod, the other end of the pull rod pass through after mounting hole The body of rod is installed with compression spring;The size of the notch is more than the size of the baffle.
3. pre-buried channel flow rivet rod riveting set according to claim 2, which is characterized in that the mechanism that holds includes setting The inner slide on the inside of two sliding blocks is set, one end of the inner slide is arc-shaped, and the other end is installed with little spring, inner slide and sliding block Between be equipped with spacer pin.
4. pre-buried channel flow rivet rod riveting set described in accordance with the claim 3, which is characterized in that two sliding blocks are opposite Medial surface is equipped with arcuate structure, and the arcuate structure longitudinal side and top are equipped with oblique angle.
5. according to claim 1-4 any one of them pre-buried channel flow rivet rod riveting sets, which is characterized in that the sliding block with The upper surface of the supporting plate is equipped with guide rail, and sliding block can be free to slide in guide rail.
6. pre-buried channel flow rivet rod riveting set according to claim 2, which is characterized in that the lower end inside of the inclined wedge Equipped with inner bevel, the sliding block apical lateral is equipped with outer oblique angle, and the inclined-plane of the inner bevel and the plane at outer oblique angle are mutual It is parallel.
7. pre-buried channel flow rivet rod riveting set according to claim 2, which is characterized in that distinguish the both sides of the pedestal Equipped with barricade, the barricade is equipped with hole, and the other end of the pull rod passes through barricade.
8. pre-buried channel flow rivet rod riveting set according to claim 2, which is characterized in that set on the pedestal lower face There is rubber pad, which is bolted on the pedestal.
CN201711442342.9A 2017-12-27 2017-12-27 Pre-buried channel flow rivet rod riveting set Pending CN108405735A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711442342.9A CN108405735A (en) 2017-12-27 2017-12-27 Pre-buried channel flow rivet rod riveting set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711442342.9A CN108405735A (en) 2017-12-27 2017-12-27 Pre-buried channel flow rivet rod riveting set

Publications (1)

Publication Number Publication Date
CN108405735A true CN108405735A (en) 2018-08-17

Family

ID=63125581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711442342.9A Pending CN108405735A (en) 2017-12-27 2017-12-27 Pre-buried channel flow rivet rod riveting set

Country Status (1)

Country Link
CN (1) CN108405735A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110270819A (en) * 2019-06-28 2019-09-24 苏州浪潮智能科技有限公司 The device and its application method of the lateral riveted of chassis cover hand the turn of the screw
CN111168406A (en) * 2020-01-09 2020-05-19 山东金博利达精密机械有限公司 Embedded channel welding production line, riveting production line and production system
CN111940556A (en) * 2020-09-11 2020-11-17 深圳市富诚达科技有限公司 Metal part thermal forming device
CN113089501A (en) * 2021-04-02 2021-07-09 浙江交工集团股份有限公司 Self-locking type profile steel support frame for large cantilever bent cap construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110270819A (en) * 2019-06-28 2019-09-24 苏州浪潮智能科技有限公司 The device and its application method of the lateral riveted of chassis cover hand the turn of the screw
CN110270819B (en) * 2019-06-28 2021-03-02 苏州浪潮智能科技有限公司 Device for laterally riveting upper cover of case by hand-screwed screws and use method thereof
CN111168406A (en) * 2020-01-09 2020-05-19 山东金博利达精密机械有限公司 Embedded channel welding production line, riveting production line and production system
CN111168406B (en) * 2020-01-09 2022-03-08 山东金博利达精密机械有限公司 Embedded channel welding production line, riveting production line and production system
CN111940556A (en) * 2020-09-11 2020-11-17 深圳市富诚达科技有限公司 Metal part thermal forming device
CN113089501A (en) * 2021-04-02 2021-07-09 浙江交工集团股份有限公司 Self-locking type profile steel support frame for large cantilever bent cap construction

Similar Documents

Publication Publication Date Title
CN108405735A (en) Pre-buried channel flow rivet rod riveting set
CN104275387B (en) Punching tool flattened by a kind of pipe fitting
CN202506684U (en) Steel pipe fixture for steel pipe production line
CN108044016A (en) Pre-buried channel flow rivet rod riveting system and clinching method
CN102962362B (en) Riveting equipment
CN208195546U (en) Pre-buried channel flow rivet rod riveting system
CN203265322U (en) Drill pipe straightening device
CN202037208U (en) Anchor pole straightener
CN219529013U (en) Quick mounting structure of shield constructs quick-witted cutter
CN104440302A (en) Cross drilling, tapping and face milling multistation clamp for compressor cylinders
CN103586386B (en) U-shaped section parts bi-directional synchronization riveting equipment
CN103065879A (en) Molded case circuit breaker moving contact mechanism spring assembling device
CN203566377U (en) Simple and quick clamping device
CN202943180U (en) Pushing type metal plate bending bracket
CN205914685U (en) Steel bar end socket is anchor clamps for upsetter machine
CN214939464U (en) Noise reduction and insulation device for construction site
CN211472504U (en) Concrete bored concrete pile pipe drill way fixing device
CN211991637U (en) A fixing tool that is used for robot welding pigsty fence
CN204339369U (en) Compressor casing cross drilling tapping milling face multi-station clamp
CN203055803U (en) Moving contact mechanism spring assembling device of molded case circuit breaker
CN110802358A (en) Pipeline baffle positioning mechanism
CN103394908A (en) O-shaped ring automatic installation equipment
CN204583922U (en) A kind of set cap top board die arrangement
CN201979164U (en) Fine-cutting device for steel
CN206536415U (en) A kind of portable lossless installing mechanism of pick jump ring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination