CN108398595A - A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function - Google Patents

A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function Download PDF

Info

Publication number
CN108398595A
CN108398595A CN201810202646.6A CN201810202646A CN108398595A CN 108398595 A CN108398595 A CN 108398595A CN 201810202646 A CN201810202646 A CN 201810202646A CN 108398595 A CN108398595 A CN 108398595A
Authority
CN
China
Prior art keywords
list file
pcb board
remote signalling
remote
point list
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810202646.6A
Other languages
Chinese (zh)
Inventor
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Li Tian Electric Power Industry Co Ltd
Original Assignee
Guangdong Li Tian Electric Power Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Li Tian Electric Power Industry Co Ltd filed Critical Guangdong Li Tian Electric Power Industry Co Ltd
Priority to CN201810202646.6A priority Critical patent/CN108398595A/en
Publication of CN108398595A publication Critical patent/CN108398595A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/10Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods using digital techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of electric energy meters carrying Intelligent remote signalling, telemetering, distant control function, including:Respectively independent is integrated for multiple functional units of electric energy meter;Main control unit realizes signal communication by inserting mode and the first pcb board, the second pcb board and third pcb board plug connection;First pcb board, the second pcb board and third pcb board generate remote controlled point list file, remote signalling point list file and telemetry station list file by dispatch automated system respectively;Main control unit reads remote controlled point list file, remote signalling point list file and telemetry station list file respectively;And by remote controlled point list file, remote signalling point list file and telemetry station list file import electrical power distribution automatization system, electrical power distribution automatization system issues the remote control command with check information, realizes that dispatch automated system verifies remote control command.With the application of the invention, provide with Intelligent remote signalling, telemetering, distant control function electric energy meter, and automatically update corresponding remote signalling, telemetering, distant control function list file.

Description

A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function
Technical field
The present invention relates to the intelligent management technical fields of electric energy meter, and in particular to one kind is with Intelligent remote signalling, telemetering, remote control The electric energy meter of function.
Background technology
Electrical power distribution automatization system carries out needing to be remotely controlled substation's 10kV gates out switch when fault insulation and resume, but It is that current substation 10kV gates out switch information and general be linked by electric substation automation system of remote control are dispatched automatically Change system, electrical power distribution automatization system can not be directly remotely controlled, and dispatch automated system model and electrical power distribution automatization system model are not Timing, remote control mistake, which easily occurs, to be caused the accident, therefore is needed through dispatch automated system to substation's 10kV gates out switch It is remotely controlled order.Currently, the method for being remotely controlled order to substation's 10kV gates out switch not yet.
Invention content
Technical problem to be solved by the invention is to provide it is a kind of with Intelligent remote signalling, telemetering, distant control function electric energy meter, There is provided has the electric energy meter of Intelligent remote signalling, telemetering, distant control function, and automatically updates corresponding remote signalling, telemetering, distant control function table File.
The technical solution that the present invention solves above-mentioned technical problem is as follows:It is a kind of with Intelligent remote signalling, telemetering, distant control function Electric energy meter, including:Respectively independent is integrated for multiple functional units of electric energy meter;The main control unit passes through inserting mode and first Signal communication is realized in pcb board, the second pcb board and third pcb board plug connection;
First pcb board, second pcb board and the third pcb board are generated by dispatch automated system respectively Remote controlled point list file, remote signalling point list file and telemetry station list file;
The main control unit reads the remote controlled point list file, remote signalling point list file and telemetry station list file respectively;And it will Remote controlled point list file, remote signalling point list file and the telemetry station list file imports electrical power distribution automatization system, power distribution automation system System issues the remote control command with check information, realizes that dispatch automated system verifies remote control command.
In the preferred embodiment of the present invention, first pcb board, the second pcb board and third pcb board pass through sky respectively The outwardly extending plug being arranged in heart slot and the groove realizes positioning.
In the preferred embodiment of the present invention, the main control unit is additionally operable to judge the remote controlled point list file, remote signalling Whether point list file and telemetry station list file change, and after judging to change, regenerate three distant list files, send out Delivery sets file update information and accordingly updates some list files to electrical power distribution automatization system.
In the preferred embodiment of the present invention, the system main website phase of the main control unit and the electrical power distribution automatization system Even, after the system main website of the electrical power distribution automatization system receives table group's file change information, after receiving variation Remote controlled point list file, remote signalling point list file and telemetry station list file and corresponding list file more new command.
In the preferred embodiment of the present invention, the third pcb board specifically includes:The mutual induction of voltage being connected with power transmission line Device;The current transformer being connected with power transmission line;The analog switch being connected respectively with voltage transformer and current transformer;With mould The connected A/D converter of quasi- switch.
Using the embodiment of the present invention, with Intelligent remote signalling, telemetering, distant control function electric energy meter, and automatically update remote signalling, Telemetering, corresponding list file of distant control function, and main control unit are additionally operable to judge remote controlled point list file, remote signalling point list file and distant Whether measuring point list file changes, and after judging to change, and regenerates three distant list files, sends configuration file more New information accordingly updates some list files to electrical power distribution automatization system.And inventive embodiments can automatically carry out more list file Newly, it realizes and remote signalling, telemetering, distant control function is readjusted, carry out new remote signalling, telemetering, the adjustment of remote control rule and strategy, High degree of automation and easy to operate.
Description of the drawings
Fig. 1 be the present invention with Intelligent remote signalling, telemetering, distant control function electric energy meter the first module map;
Fig. 2 is that the electric energy meter with Intelligent remote signalling, telemetering, distant control function of the present invention crosses second of module map.
Specific implementation mode
Present invention is further described in detail with reference to the accompanying drawings and examples.
Embodiment:
As depicted in figs. 1 and 2, a kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function, including:Electric energy meter it is more Respectively independent is integrated for a functional unit;Main control unit passes through inserting mode and the first pcb board, the second pcb board and third pcb board Signal communication is realized in plug connection;First pcb board, the second pcb board and third pcb board are given birth to by dispatch automated system respectively At remote controlled point list file, remote signalling point list file and telemetry station list file;Main control unit reads remote controlled point list file, remote signalling point respectively List file and telemetry station list file;And by remote controlled point list file, remote signalling point list file and telemetry station list file import distribution from Dynamicization system, electrical power distribution automatization system issue the remote control command with check information, realize dispatch automated system verification remote control Order.
It should be noted that intelligent electric meter is the intelligent terminal of intelligent grid, it has not been traditional electric energy Table, intelligent electric meter is other than having the function of measuring of traditional electric energy meter basic electricity, in order to adapt to intelligent grid and new energy Source using it also with two-way a variety of rate function of measuring, user terminal control function, plurality of data transmission modes two-way number According to the intelligentized function such as communication function, anti-stealing electricity function, intelligent electric meter represents the following energy-conserving intelligent power grid end user The developing direction of intelligent terminal.
In the prior art, the function module of intelligent point table is integrated, by being sent to difference after receiving point list file Function module, in this way in the case that receiving module breaks down, entire list file of putting cannot normally receive.This hair In bright embodiment, this problem is not solved, the function module of remote signalling, telemetering, remote control in electric energy meter is corresponded to first respectively The mode of pcb board, the second pcb board and third pcb board grafting is communicated with main control unit, and passes through dispatching automation respectively The mode correspondence with foreign country of system.Even if in the case that a function module goes wrong wherein, not influencing other two makes With, and the mode of grafting is readily replaceable, maintenance cost is low, maintenance efficiency is high.
It should be noted that in automation control, variable point is referred to as the variable a little, used in automatic control system Number becomes points.Automatic control system professional terms.Use feelings for characterizing each variable in automatic control system Condition.Point table mostly and device-dependent, the service condition for characterizing each variable in system.Point table is as equipment supplier, soft The construction of part provider, the important evidence of system integrator and consensus standard, entire automatic control system is all in table It is built based on the description of variable and regulation.In general, each variable can have corresponding unique variable name, implementor name, The related contents such as device address, register, register address.
In the embodiment of the present invention, list file is correspondingly arranged according to remote signalling, telemetering, remote control respectively, specifically, can Title file is arranged distinguishes, so that different point list files is sent to different PCB by automated system respectively It is distinguished in plate.
Main control unit in electric energy meter reads remote controlled point list file, remote signalling point list file and telemetry station list file respectively;And By remote controlled point list file, remote signalling point list file and telemetry station list file import electrical power distribution automatization system, electrical power distribution automatization system The remote control command with check information is issued, realizes that dispatch automated system verifies remote control command.To realize to electrical energy system Remote signalling, telemetering, remote control.It thus provides with Intelligent remote signalling, telemetering, distant control function electric energy meter, and automatically update remote signalling, Corresponding telemetering, distant control function list file.
The present invention a kind of realization method in, the first pcb board, the second pcb board and third pcb board respectively by groove with And the outwardly extending plug being arranged in groove realizes positioning.Positioning by groove and plug realization to pcb board, and Pcb board is taken out by mobile plug from groove when pcb board is replaced, realizes the replacement to pcb board.
In the preferred embodiment of the present invention, main control unit be additionally operable to judge remote controlled point list file, remote signalling point list file and Whether telemetry station list file changes, and after judging to change, and regenerates three distant list files, sends configuration file Fresh information accordingly updates some list files to electrical power distribution automatization system.And inventive embodiments can automatically carry out more list file Newly, it realizes and remote signalling, telemetering, distant control function is readjusted, carry out new remote signalling, telemetering, the adjustment of remote control rule and strategy, High degree of automation and easy to operate.
The present invention another realization method in, main control unit is connected with the system main website of electrical power distribution automatization system, with After the system main website of electric automation system receives table group's file change information, the remote controlled point list file, distant after variation is received Letter point list file and telemetry station list file and corresponding list file more new command.
In the preferred embodiment of the present invention, third pcb board specifically includes:The voltage transformer being connected with power transmission line;With The connected current transformer of power transmission line;The analog switch being connected respectively with voltage transformer and current transformer;It is opened with simulation Close connected A/D converter.This specific implementation of the present invention is the one of which realization method of pcb board, can also be adopted With other realization methods, the embodiment of the present invention is not specifically limited.Voltage transformer and current transformer pass through analog switch AD transformation is carried out to the signal received after being connected with AD converter, realizes bi-directional conversion and the transmission of data.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence " including one ... ", it is not excluded that There is also other identical elements in the process, method, article or apparatus that includes the element.
One of ordinary skill in the art will appreciate that all or part of step in realization above method embodiment is can It is completed with instructing relevant hardware by program, the program can be stored in computer read/write memory medium, The storage medium designated herein obtained, such as:ROM/RAM, magnetic disc, CD etc..
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.It is all Any modification, equivalent replacement, improvement and so within the spirit and principles in the present invention, are all contained in protection scope of the present invention It is interior.

Claims (5)

1. a kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function, which is characterized in that including:Multiple functions of electric energy meter Respectively independent is integrated for unit;Main control unit is connected by inserting mode and the first pcb board, the second pcb board and third pcb board grafting It connects, realizes signal communication;
First pcb board, second pcb board and the third pcb board are generated by dispatch automated system be remotely controlled respectively Point list file, remote signalling point list file and telemetry station list file;
The main control unit reads the remote controlled point list file, remote signalling point list file and telemetry station list file respectively;And it will be described Remote controlled point list file, remote signalling point list file and telemetry station list file import electrical power distribution automatization system, under electrical power distribution automatization system Hair band has the remote control command of check information, realizes that dispatch automated system verifies remote control command.
2. the electric energy meter according to claim 1 for carrying Intelligent remote signalling, telemetering, distant control function, which is characterized in that described First pcb board, the second pcb board and third pcb board are outwardly extending by being arranged in groove and the groove respectively Plug realizes positioning.
3. the electric energy meter according to claim 1 for carrying Intelligent remote signalling, telemetering, distant control function, which is characterized in that the master Control unit is additionally operable to judge whether the remote controlled point list file, remote signalling point list file and telemetry station list file change, and After judging to change, three distant list files are regenerated, send configuration file fresh information to electrical power distribution automatization system phase A list file should be updated.
4. the electric energy meter according to claim 3 for carrying Intelligent remote signalling, telemetering, distant control function, which is characterized in that the master Control unit is connected with the system main website of the electrical power distribution automatization system, is connect in the system main website of the electrical power distribution automatization system After receiving table group's file change information, remote controlled point list file, remote signalling point list file and the telemetry station list file after variation are received And corresponding list file more new command.
5. it is according to claim 1 with Intelligent remote signalling, telemetering, distant control function electric energy meter, which is characterized in that described the Three pcb boards specifically include:The voltage transformer being connected with power transmission line;The current transformer being connected with power transmission line;Respectively with voltage The analog switch that mutual inductor and current transformer are connected;The A/D converter being connected with analog switch.
CN201810202646.6A 2018-03-13 2018-03-13 A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function Pending CN108398595A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810202646.6A CN108398595A (en) 2018-03-13 2018-03-13 A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810202646.6A CN108398595A (en) 2018-03-13 2018-03-13 A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function

Publications (1)

Publication Number Publication Date
CN108398595A true CN108398595A (en) 2018-08-14

Family

ID=63092407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810202646.6A Pending CN108398595A (en) 2018-03-13 2018-03-13 A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function

Country Status (1)

Country Link
CN (1) CN108398595A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN202817907U (en) * 2012-10-10 2013-03-20 河南开启电力实业有限公司 Distribution system end intelligent power consumption monitoring device
CN103178613A (en) * 2011-12-24 2013-06-26 湖南省电力勘测设计院 Substation 10KV outlet switch remote control method
CN104635084A (en) * 2015-02-03 2015-05-20 国家电网公司 Distribution automation equipment transmission test method based on simulator station
CN205407418U (en) * 2016-03-03 2016-07-27 泰安华电智能科技有限公司 Intelligent power distribution measurement and control terminal
CN106300653A (en) * 2015-05-25 2017-01-04 国家电网公司 Power distribution automation main station system remote measure and communication introduction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN103178613A (en) * 2011-12-24 2013-06-26 湖南省电力勘测设计院 Substation 10KV outlet switch remote control method
CN202817907U (en) * 2012-10-10 2013-03-20 河南开启电力实业有限公司 Distribution system end intelligent power consumption monitoring device
CN104635084A (en) * 2015-02-03 2015-05-20 国家电网公司 Distribution automation equipment transmission test method based on simulator station
CN106300653A (en) * 2015-05-25 2017-01-04 国家电网公司 Power distribution automation main station system remote measure and communication introduction method
CN205407418U (en) * 2016-03-03 2016-07-27 泰安华电智能科技有限公司 Intelligent power distribution measurement and control terminal

Similar Documents

Publication Publication Date Title
Cavdar A solution to remote detection of illegal electricity usage via power line communications
CN105022874B (en) A kind of power distribution network Digital Simulation method for automatic modeling and system
CN110113220B (en) Plug and play method for electric power Internet of things end equipment
CN110490376B (en) Intelligent soft switch planning method for improving reliability and economy of power distribution network
CN103457354B (en) A kind of secondary equipment of intelligent converting station moves O&M method and device thereof
CN105868869A (en) Dynamic distribution automation terminal layout optimization planning method taking reliability and economic cost of power supply into account
CN104104151B (en) The cut-in method of distribution terminal facility information
CN110866735A (en) Method and system for positioning switch of distribution network line contact point by using GIS model and readable storage medium
CN103065269A (en) Marketing-distribution master data management system
CN111030303A (en) Low-voltage transformer area topology identification system based on characteristic current
CN107705017B (en) Weak configuration method for virtual secondary circuit of intelligent equipment of transformer substation
CN204348052U (en) Low voltage electric network power information acquisition system
CN102598629A (en) Method and system for publishing data from intelligent electronic devices
CN110535236A (en) A kind of simulation of intelligent substation wall is from Acceptance Test System and method
CN106910143A (en) Power distribution network artwork multi-edition control method and system
CN103927698A (en) Automatic identification method of intelligent substation virtual terminal correlated device
CN102945629A (en) Generating method and system of three-dimensional simulation training case of power grid substation
CN109038824A (en) A kind of distribution feeder automation method
CN105259860B (en) A kind of master-slave mode intelligent power device method of automatic configuration
CN108092267A (en) A kind of power distribution network access planning system and method based on intelligent body
CN209103120U (en) A kind of open port automatic recognition system
CN103676669A (en) Method and system for checking motion information
CN108398595A (en) A kind of electric energy meter carrying Intelligent remote signalling, telemetering, distant control function
CN106022952A (en) IEC61850 signal mapping method of intelligent transformer station apparatus
CN112865313A (en) Low-voltage distribution station topology identification system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814